AT70928B - Method for inserting a girder for bracing construction pits, in particular for building underground railways. - Google Patents

Method for inserting a girder for bracing construction pits, in particular for building underground railways.

Info

Publication number
AT70928B
AT70928B AT70928DA AT70928B AT 70928 B AT70928 B AT 70928B AT 70928D A AT70928D A AT 70928DA AT 70928 B AT70928 B AT 70928B
Authority
AT
Austria
Prior art keywords
pipe
girder
building underground
underground railways
bracing construction
Prior art date
Application number
Other languages
German (de)
Original Assignee
Siemens Ag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Ag filed Critical Siemens Ag
Application granted granted Critical
Publication of AT70928B publication Critical patent/AT70928B/en

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

  

   <Desc/Clms Page number 1> 
 



  Verfahren zum Einbringen eines Trägers zum Absteifen von Baugruben, insbesondere zum Bau von Untergrundbahnen. 
 EMI1.1 
 bringen derartiger Träger, welche sogar betoniert sein können. Das Wesentliche des neuen Verfahrens besteht darin, dass zunächst auf irgend eine bekannte Weise, z. B. durch Ein- 
 EMI1.2 
 wird daun in dieses   Rohr hineingelassen,   und dann werden die etwa erforderlichen Arbeiten des Betonierens innerhalb des Rohres ausgeführt, wobei gleichzeitig dieses allmählich aus dem Boden herausgezogen wird. 



   Das neue Verfahren bietet ausserdem den besonderen Vorteil, dass der zum Aufbau des Pfeilers verwendete Beton sich dicht an das Erdreich   anschliesst,   ohne dass Lücken zurückbleiben. 



   Fig. 1 bis 5 zeigen beispielsweise die Einbringung eines T-Trägers mit Holz-und Betonverkleidung nach dem   erssndungsgemässen   Verfahren. Fig. 1 zeigt einen Schnitt durch den mit Holz verkleideten Träger im   Rchr. Fig. 2   zeigt denselben Träger nach Entfernung der Holzbekleidung und nach Einsetzen der   Schalungsbohlen.   Fig. 3   lässt   die Form der verwendeten Stampfer erkennen. Fig. 4 zeigt eine Ansicht auf die   Bohlenwand   von der   Grube aus. Fig. n   stellt einen Schnitt durch die fertige Verschalung dar. 



   In diesen Figuren bezeichnet 1 das Rohr, innerhalb dessen der T-Träger in die 
 EMI1.3 
 bekleidet ist und weiche beim Einstampfen des Betons gewissermassen als Kern dient. 



  Dieser Holzkern wird nach der Fertigstellung des Trägers und nach   Entfernung des Rohn'M   von der Baugrube aus fortgenommen. In den dadurch entstandenen Zwischenraum werden die Schalungsbohlen in der üblichen Welse eingesetzt. Die Holzverkleidung 5 wird ebenfalls nach Entfernen des Rohres fortgenommen, so dass an dieser Stelle der Flansch des T-Trägers zum Vorschein kommt. 6 stellen die mit Stampfbeton ausgefüllten Räume dar. 



  Mit 7 ist eine Betonmasse bezeichnet, weiche dem Träger als Fundament dient. 
 EMI1.4 
 
Das Rohr wird zunächst auf irgend eine bekannte   erschütterungsfreie   Art in den Erdhoden eingeführt, z.   H.   durch Einspülen, Einbohren usw., dann wird der untere Teil des Rohres in einer angemessenen Höhe mit Beton 7 ausgefüllt, welcher im Rohr festgestampft wird. Bei dieser   Uetoniernngsarbelt   wird das Rohr allmählich aus dem Boden so weit herausgezogen, dass jederzeit der untere Rand des Rohres mit der oberen Beton- 
 EMI1.5 
 schon bemerkt, an der Stelle, an welcher später die Schalung 8 eingebracht werden soll, mit Holz verkleidet, ebenso an   der einen Seite,   an der der Flansch des Trägers nachher zu Tage treten soll.

   Dann werden die   Zwischenräume   6 allmählich unter weiterem stetigem Hochziehen des Rohres mit Beton   ausgefüllt   und mit besonders geformten   Stampfern ss   (Fig. 3) festgestampft. Das Hochziehen des Rohres bei diesen Arbeiten hat zur Folge, dass die Betonmasse dabei auch den Rand mit ausfüllt, welcher vorher von der Rohrwandung eingenommen wurde, und sich dadurch fest an das Erdreich anschliesst. Sollen die Schalllngsboblen an dem Träger angebracht   werden, ? c   wird von der Baugrube ans 
 EMI1.6 
 nach dem Verwendungszweck des Trägers auch eine andere sein. Das Verfahren wird dann sinngemäss angewendet. 
 EMI1.7 
 

**WARNUNG** Ende DESC Feld kannt Anfang CLMS uberlappen**.



   <Desc / Clms Page number 1>
 



  Method for inserting a girder for bracing construction pits, in particular for building underground railways.
 EMI1.1
 bring such carriers, which can even be concreted. The essence of the new method is that first in some known way, e.g. B. by
 EMI1.2
 is then let into this pipe, and then any work required of concreting is carried out inside the pipe, at the same time this is gradually being pulled out of the ground.



   The new process also offers the particular advantage that the concrete used to build the pillar adjoins the ground tightly without leaving any gaps.



   FIGS. 1 to 5 show, for example, the introduction of a T-beam with wood and concrete cladding according to the method according to the invention. Fig. 1 shows a section through the wood-clad carrier in the Rchr. Fig. 2 shows the same carrier after removing the wooden cladding and after inserting the formwork planks. 3 shows the shape of the tamper used. Fig. 4 shows a view of the plank wall from the pit. Fig. N shows a section through the finished casing.



   In these figures, 1 denotes the pipe within which the T-beam enters the
 EMI1.3
 is clothed and soft serves as a core when tamping the concrete.



  This wooden core is removed from the construction pit after the girder has been completed and the Rohn'M has been removed. In the space created as a result, the formwork planks are used in the usual catfish. The wooden cladding 5 is also removed after removing the pipe, so that the flange of the T-beam appears at this point. 6 show the rooms filled with stamped concrete.



  7 with a concrete mass is designated, which serves as a foundation for the carrier.
 EMI1.4
 
The tube is first inserted into the testicle in some known vibration-free manner, e.g. H. by flushing, boring, etc., then the lower part of the pipe is filled at an appropriate height with concrete 7, which is tamped into the pipe. In this Uetoniernngsarbelt the pipe is gradually pulled out of the ground so far that the lower edge of the pipe with the upper concrete
 EMI1.5
 already noticed, at the point where the formwork 8 is to be inserted later, clad with wood, as well as on the one side where the flange of the beam is to come to light afterwards.

   Then the spaces 6 are gradually filled with concrete while the pipe is continuously being pulled up and tamped down with specially shaped tampers ss (FIG. 3). The pulling up of the pipe during this work has the consequence that the concrete mass also fills the edge that was previously occupied by the pipe wall, and thus adheres firmly to the ground. Should the acoustic bobles be attached to the carrier? c is from the excavation ans
 EMI1.6
 may also be different depending on the intended use of the carrier. The procedure is then applied accordingly.
 EMI1.7
 

** WARNING ** End of DESC field may overlap beginning of CLMS **.

 

Claims (1)

in dieses Rohr ein Träger hineingestellt wird, dessen rreihleibender Flansch mit Holzleisten umkleidet ist, dann der freie Raum zwischen Träger und Erdreich unter gleichzeitigem Hochziehen des Rohres mit Betonmasse ausgefüllt und schliesslich beim Absteifen der Baugrube zwecks Einbringens der Schalungsbohlen die Ilolzverkleidnng entfernt wird. **WARNUNG** Ende CLMS Feld Kannt Anfang DESC uberlappen**. A beam is placed in this pipe, the rreihleibender flange of which is clad with wooden strips, then the free space between the beam and the ground is filled with concrete mass while the pipe is pulled up at the same time, and finally the wooden cladding is removed when the construction pit is braced for the purpose of inserting the formwork planks. ** WARNING ** End of CLMS field may overlap beginning of DESC **.
AT70928D 1914-01-22 1914-03-07 Method for inserting a girder for bracing construction pits, in particular for building underground railways. AT70928B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE70928X 1914-01-22

Publications (1)

Publication Number Publication Date
AT70928B true AT70928B (en) 1916-01-10

Family

ID=5635626

Family Applications (1)

Application Number Title Priority Date Filing Date
AT70928D AT70928B (en) 1914-01-22 1914-03-07 Method for inserting a girder for bracing construction pits, in particular for building underground railways.

Country Status (1)

Country Link
AT (1) AT70928B (en)

Similar Documents

Publication Publication Date Title
AT394592B (en) Method of producing a tubular foundation in the ground
AT70928B (en) Method for inserting a girder for bracing construction pits, in particular for building underground railways.
DE2354172A1 (en) Anchoring for preventing buoyancy lift of structures - uses temporary tensioning members operated above ground water level
DE2829712C2 (en) Process for the production of underground structures
DE3516576C2 (en)
DE340032C (en) Process for the construction of reinforced concrete tunnels using ridge tunnels
DE3644399A1 (en) METHOD FOR INTERCEPTING SUPPORT WALLS
DE3621611A1 (en) Arched bridge and method for the construction thereof
DE2616970C3 (en) Method and shuttering element for the production of a diaphragm wall in a prefabricated composite construction
DE3131725C2 (en) Noise barrier
DE19608940C2 (en) Process for the production of dams, pillars and the like in underground mining and expansion element for carrying out the process
EP0567659A1 (en) Bridge-strengthening and method for its manufacture
DE222633C (en)
DE3504161A1 (en) Method of producing wall-shaped structures in the ground and reinforcing slab for carrying out the method
DE2626762C2 (en) Method of making pile foundations using precast concrete piles
AT133375B (en) Procedure for reinforcing the foundations of existing buildings.
DE206878C (en)
DE231401C (en)
DE336452C (en) Process for the foundation of buildings in load-bearing ground
AT203705B (en) Process for the production of plastering on walls in cast concrete or brickwork
DE2532964A1 (en) Large framed wall block set in concrete - has tubes between glass blocks for rods and transport anchors
DE2013992A1 (en) Method for the construction of an excavation using a framework with piles
DE292511C (en)
DE2364925A1 (en) Sinking building foundation components - by division and supplementing with mounting walls with lining walls directed against impact
DE574446C (en) Method for connecting solidified subsoil with an overlying component made of concrete, reinforced concrete or masonry