DE4333011A1 - Spinning mill installation - utilises warning techniques applicable to block doffing system - Google Patents

Spinning mill installation - utilises warning techniques applicable to block doffing system

Info

Publication number
DE4333011A1
DE4333011A1 DE19934333011 DE4333011A DE4333011A1 DE 4333011 A1 DE4333011 A1 DE 4333011A1 DE 19934333011 DE19934333011 DE 19934333011 DE 4333011 A DE4333011 A DE 4333011A DE 4333011 A1 DE4333011 A1 DE 4333011A1
Authority
DE
Germany
Prior art keywords
machine
change
block
time
machines
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19934333011
Other languages
German (de)
Inventor
Urs Andreas Dr Meyer
Urs Prof Dr Meyer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maschinenfabrik Rieter AG
Original Assignee
Maschinenfabrik Rieter AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maschinenfabrik Rieter AG filed Critical Maschinenfabrik Rieter AG
Publication of DE4333011A1 publication Critical patent/DE4333011A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H9/00Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine
    • D01H9/005Arrangements for replacing or removing bobbins, cores, receptacles, or completed packages at paying-out or take-up stations ; Combination of spinning-winding machine for removing empty packages or cans and replacing by completed (full) packages or cans at paying-out stations; also combined with piecing of the roving

Abstract

A process to run a spinning mill, consists of a group of machines which require doffing on the block system. Each machine in the group has a predetermined block doffing time. The appts. used is also claimed. Typically, the machines may have a central control system with a counter and visual display, equipped with a programmed memory and arranged so that the doffing at each stage is staggered. This avoids personnel being called to more than one position at a time in their area. It also prevents overloading of inter-transport systems. The control has a programmed device to synchronise the times of block doffing. This is calculated to allow for measured length of material on the cops, bobbins, etc., and consideration has to be taken of the shift system of the personnel. This has also to allow for mechanism which results in some level of automation.

Description

Diese Erfindung bezieht sich auf eine Spinnereianlage, die zur Ausführung von Blockwechseln der Vorlagen geeignet ist. Die Erfindung ist besonders für Ringspinnanlagen konzipiert, ist aber im Prinzip nicht auf solche Anlagen eingeschränkt.This invention relates to a spinning plant which suitable for executing block changes of the templates. The invention is especially designed for ring spinning systems, but is not limited in principle to such investments.

Stand der TechnikState of the art

Die automatisierte bzw. teilautomatisierte Gatterbeschickung in Ringspinnanlagen beruht heute auf sogenannte wilde Wech­ sel, zum Beispiel gemäß EP 392 482 (Obj. 907) und EP 394 708 (Obj. 2083). Dabei ist es dem Fachmann wohl bekannt, daß der Blockwechsel eigentlich ein für die Automatisierung besser geeignetes Arbeitsprinzip darstellt - es verlangt aber eine komplexere Steuerung.The automated or semi-automated gate feed in ring spinning plants today is based on so-called wild Wech sel, for example according to EP 392 482 (object 907) and EP 394 708 (Obj. 2083). It is well known to those skilled in that the Block change actually better for automation suitable working principle - but it requires one more complex control.

Ein Vorschlag für eine Steuerung des Blockwechsels ist in EP-A-381934 aufgeführt. Dieser Vorschlag hat den Vorteil, daß sowohl die "Leerzeit" (Produktionsausfälle) wie auch die Abfallmenge (verbleibende Vorgarnreste auf den "Leer­ hülsen" beim Blockwechsel) auf einem optimierbaren Niveau gehalten werden können. Der Vorschlag geht aber vom "Be­ trachtungsstandpunkt" des einzelnen Blockes aus - es fehlt die Betrachtung der Anlage als ganzes, und insbesondere die Berücksichtigung der Belastung, die der Transportanlage und anderen Automatisierungsgeräten, zum Beispiel der Bedie­ nungsmannschaft, Ansetzroboter, auferlegt wird.A proposal for controlling the block change is in EP-A-381934. This proposal has the advantage that both the "idle time" (production losses) as well the amount of waste (remaining Vorgarnreste on the "Leer sleeves "at the block change) on an optimizable level can be kept. The proposal goes from "Be consideration of the individual block - it is missing the consideration of the plant as a whole, and especially the Consideration of the load, the transport system and other automation devices, for example the Bedie training crew, attachment robot.

Bedeutung für die BedienungMeaning for the operation

Das Zusammenfallen mehrerer Blockwechsel im Bedienbereich eines Ringspinnbedieners stellt einen äußerst ungünstigen Betriebsfall dar. Die hintereinander folgenden Blockwechsel führen zu einer starken temporären Belastung. In dieser Zeit werden die Maschinen schlechter überwacht und es besteht insbesondere die Gefahr, daß noch weitere Blöcke leerlau­ fen. Dabei ist zu berücksichtigen, daß eine einmal ungün­ stige Blockabstufung ohne gezielte Eingriffe ungünstig bleibt, das heißt das Risiko eines Absturzes erhöht sich. Wird ein Block erst bei leergelaufenen Vorgarnspulen ge­ wechselt, dann muß das Vorgarn neu ins Streckwerk einge­ führt werden. Bei einer Fadenbruchbehebung durch den ROBOfil Ansetzroboter der Anmelder-Firma resultiert für den Bediener ein zusätzlicher Arbeitsaufwand von 4-5 sec was 33% der Wechselzeit einer Spule entspricht. Muß der Bediener auch den Fadenbruch beheben, dann beträgt der zusätzliche Ar­ beitsaufwand 18 sec (Einführen der Lunte, warten bis aus dem Streckwerk ausgetreten, Fadenansetzen) und somit 73% der Spulenwechselzeit.The coincidence of several block changes in the operating area a ring spinning operator presents a very unfavorable Operating case dar. The successive block change  lead to a strong temporary burden. In these times the machines are less well monitored and there is in particular the risk that even more blocks leerlau fen. It should be noted that a once ungün stige Blockabstufung without targeted intervention unfavorable remains, ie the risk of a crash increases. If a block is only ge in idle roving changes, then the roving must be re-entered the drafting system be led. For a thread breakage repair by the ROBOfil Applicant Company startup robot results for the operator an additional workload of 4-5 sec which is 33% of the Change time corresponds to a coil. Must the operator too fix the thread break, then the additional Ar workload 18 sec (insertion of the fuse, wait until from the Drafting system leaked, threading) and thus 73% of Bobbin changing time.

Somit dauert ein Blockwechsel bei leergelaufenen Vorgarn­ spulen bei einem Wechsel aus dem Flyerspulenzufuhrzug und einer Fadenbruchbehebung durch den ROBOfil 33%, bei einer manuellen Bedienung mit Wechsel aus den Handwagen sogar 70% länger als ein rechtzeitiger Wechsel. Ein guter Ringspinn­ maschinenbediener versucht nun, durch ein vorzeitiges Wech­ seln eines Blockes eine Kumulation zu verhindern, wobei der vorzeitige Wechsel den Abgang auf den Hülsen erhöht. Beson­ ders bei der in automatisierten Betrieben notwendigen hohen Spindelzuteilungen (z. B. 8′000 Spindeln/Bediener) ist es für den Bediener zunehmend schwieriger, den Überblick über die 200 oder mehr Blöcke in seinem Bedienbereich zu behalten. Somit ist die Unterstützung des Blockwechsels durch die Ringspinnmaschine resp. durch ein Prozeßleitsystem von zu­ künftigem Interesse.Thus, a block change takes place with empty roving when changing from the flyer bobbin feed train and a yarn breakage repair by the ROBOfil 33%, at a manual operation with change from the trolley even 70% longer than a timely change. A good ring spinning machine operator now tries by a premature Wech a block to prevent accumulation, the early change increases the exit on the pods. Beson This is necessary for the high level of automated operations Spindle allocations (eg 8'000 spindles / operator) are there for the operator increasingly difficult to keep track of the Keep 200 or more blocks in its operating area. Thus, the support of the block change by the Ring spinning machine resp. through a process control system from to future interest.

Die Untersuchung des Störungsverhaltens der Ringspinnma­ schinen ergab eine eindeutig stabilisierende Wirkung einer günstig abgestuften Vorlage. Damit kann der Absturz verzö­ gert oder sogar verhindert werden. Dies ist insbesondere bei einer manuellen Bedienung wichtig, da in diesem Fall die Absturzschwelle deutlich tiefer liegt.The investigation of the disturbance behavior of the ring spinnma showed a clearly stabilizing effect  cheap graduated template. This can delay the crash gers or even prevented. This is especially true at Manual operation is important because in this case the Crash threshold is much lower.

Die ErfindungThe invention

Ein Verfahren nach dieser Erfindung ist dadurch gekennzeich­ net, daß für jede Maschine Wechselzeitpunkte vorgegeben sind und daß ein Wechsel an einem dieser vorgegebenen Wech­ selzeitpunkte ausgelöst wird. Die Wechselzeitpunkte sind vorzugsweise zeitlich regelmäßig verteilt (periodisch).A method according to this invention is characterized net that specified for each machine change times and that a change at one of these predetermined Wech time is triggered. The switching times are preferably distributed on a regular basis (periodically).

Die Maschine nach dieser Erfindung ist dadurch gekennzeich­ net, daß sie mit einer Steuerung versehen ist, worin für die Maschine vorgegebene Wechselzeitpunkte einprogrammiert sind, so daß an einem Wechselzeitpunkt ein Wechsel für einen Block der Maschine ausgelöst werden kann.The machine according to this invention is characterized net, that it is provided with a control, wherein for the machine has been programmed with predetermined switching times are so that at a change time a change for a Block the machine can be triggered.

Die Anlage nach dieser Erfindung ist dadurch gekennzeichnet, daß sie mit Steuerungsmitteln versehen ist, worin Wechsel­ zeitpunkte einprogrammiert sind, so daß an einem Wechsel­ zeitpunkt ein Wechsel ausgelöst werden kann, wobei die Wech­ selzeitpunkte zeitlich gestaffelt sind.The plant according to this invention is characterized that it is provided with control means, in which change times are programmed, so that at a change time a change can be triggered, the Wech time points are staggered.

Die Erfindung eignet sich offensichtlich zur Realisierung in einer Anlage, die mit einer maschinenübergeordneten Steue­ rung ausgerüstet ist. Diese Steuerung könnte in der Form eines Prozeßleitrechners vorgesehen werden, wobei dies nicht wesentlich ist. Im Gegensatz, zum Beispiel zum Prinzip nach EP-392 482 (Obj. 907) könnte zur Realisierung dieser Erfindung die Gatterbeschickung der Transportanlagensteue­ rung (und nicht mehr der Maschinensteuerung) unterstellt werden. The invention is obviously suitable for implementation in a plant with a machine-controlled Steue equipped. This control could be in the form a process control computer are provided, this is not essential. In contrast, for example, to the principle according to EP-392 482 (Obj. 907) could be to realize this Invention the gate loading of the transport system (and no longer the machine control) become.  

Ein Verfahren nach der Erfindung wäre demnach dadurch ge­ kennzeichnet, daß in einer Maschinengruppe (einer Mehrzahl von Spinnmaschinen) Blöcke von Vorlagestellen festgehalten werden, daß für die Wechsel der Vorlagen in jeder Maschine der Gruppe ein Zeitprogramm vorgegeben wird, und daß die Gatterbeschickungseinrichtung derart gesteuert wird, daß das Zeitprogramm eingehalten wird.A method according to the invention would thus be ge indicates that in a machine group (a plurality of spinning machines) blocks of presentation sites be that for changing the templates in each machine the group is given a time schedule, and that the Gate feed device is controlled such that the time program is adhered to.

Die Anlage nach dieser Ausführung der Erfindung umfaßt eine maschinenübergeordnete Steuerung, die mit einem Zeitprogramm für das Wechseln der Vorlagen in den einzelnen Blöcken pro­ grammiert und dazu ausgelegt ist, Steuerbefehle an eine Transportanlage zu leiten, um die Gatterbeschickung nach dem vorgegebenen Zeitprogramm auszuführen.The plant according to this embodiment of the invention comprises a superordinate control with a time program for changing the templates in each block per is programmed and configured to send control commands to a To conduct transport to the gate feed after the execute specified time program.

Eine maschinenübergeordnete Steuerung ist aber eigentlich zur Realisierung der Erfindung nicht wesentlich. Das Wech­ seln in jedem Block kann nach wie vor von der Maschine aus­ gelöst werden, wobei das Zeitprogramm für die Maschine in der Maschinensteuerung einprogrammiert werden muß. Die Ma­ schine sendet dementsprechend einen Wechselauftrag an das Bedienungspersonal bzw. die Bedienungseinrichtungen, um das Wechseln auszuführen. Die auszuwechselnden Spulen können vorzugsweise vorher am Gatter bereitgestellt werden. Die Zeitprogramme der einzelnen Maschinen können dann durch das Bedienungspersonal oder Leitsystem aneinander angepaßt werden.But a higher-level control is actually not essential to the realization of the invention. The change It is still possible to leave the machine in each block be solved, with the time program for the machine in the machine control must be programmed. The Ma Accordingly, the machine sends a bill of exchange order to the Operating personnel or the operating equipment to the To perform changes. The coils to be replaced can preferably previously provided at the gate. The Time programs of the individual machines can then by the Operating personnel or control system adapted to each other become.

Die Realisierung mittels einer maschinenübergeordneten Steuerung stellt eigentlich aus verschiedenen Gründen nicht die bevorzugte Lösung dar. Eine solche Anordnung erfordert erhebliche Rechen- und Datenspeicherkapazität an eine zen­ trale Stelle und dazu eine dieser Stelle zugeordnete dezentrale Sensorik. Dies ist im Prinzip möglich aber heutzutage wohl nicht praktisch durchführbar, ist wegen der Verkabelung aufwendig und birgt außerdem erhebliche Be­ triebsrisiken beim Ausfall in sich. Andererseits verstößt ein solches Konzept gegen die Prinzipien die in unserer PCT- Patentanmeldung WO 92/13121 (Obj. 2212) aufgestellt wurden, wonach keiner übergeordneten Steuerung der direkte Zugriff auf die Maschinenaktorik gewährt wird. Ein übergeordnetes System kann die Wechselzeitpunkte zuteilen. Dabei können die Wechselzeitpunkte z. B. von folgenden Kriterien abgeleitet werden, wie z. B. Spuleninhalt (Länge der Lunte), Periode der Taktgenerierung, Startzeitpunkt der Taktgenerierung oder Schichtplan in bezug auf bedienerlose Schichten. Das Ar­ beiten anhand dieser Zeitpunkte wird dann vorzugsweise von den Maschinen ausgeführt.The realization by means of a superordinate machine Control does not actually work for various reasons the preferred solution. Such an arrangement requires considerable computing and data storage capacity to one zen and a place assigned to this position decentralized sensor technology. This is possible in principle but  Probably not practicable these days is because of the Cabling elaborate and also holds considerable Be operating risks in the event of default. On the other hand, it breaks such a concept violates the principles of our PCT Patent Application WO 92/13121 (Obj. 2212), after which no parent control of direct access granted to the machine actuators. A parent System can allocate the change times. The can Changeover times z. B. derived from the following criteria be such. B. coil content (length of the fuse), period of Clock generation, start time of clock generation or Shift schedule with regard to unattended shifts. The Ar Based on these times is then preferably from running the machines.

Die Vorteile der Erfindung sind in der gleichmäßigen Aus­ lastung der Anlage zu sehen. Dies trifft nicht nur für die Transportanlage zu, sondern auch für die vorlagebildenden Maschinen, für das Bedienungspersonal und für Automatisie­ rungsgeräte, wie zum Beispiel Ansetzroboter. Außerdem wird die Produktion stabilisiert, und man erhält eine günstige Bedienungsstrategie sowie kein Leerlaufen der Blöcke in den bedienerlosen Schichten.The advantages of the invention are in the uniform off see load of the plant. This does not just apply to the Transport system too, but also for the template-forming Machines, for the operating personnel and for automation equipment, such as attachment robots. In addition, will The production stabilizes, and you get a cheap Operating strategy as well as no emptying of the blocks in the unmanned shifts.

Ausführungen der Erfindung werden nun als Beispiele anhand der Figuren der Zeichnungen näher erklärt werden.Embodiments of the invention will now be described by way of example the figures of the drawings will be explained in more detail.

Es zeigt:It shows:

Fig. 1 schematisch einen Plan einer Spinnereianlage, wie sie schon in unserer PCT-Patentanmeldung WO 92/00409 (Obj. 2136) gezeigt wurde, Fig. 1 shows schematically a diagram of a spinning plant, as has already been shown in our PCT patent application WO 92/00409 (Obj. 2136),

Fig. 2 einen Querschnitt durch eine teilautomatisierte Ringspinnmaschine, wie sie schon in unserer PCT-Pa­ tentanmeldung WO 92/13121 (Obj. 2212) gezeigt wurde, Fig. 2 shows a cross section through a partially automated ring spinning machine as tentanmeldung already in our PCT WO 92/13121 Pa (Obj. 2212) has been shown

Fig. 3 einen schematischen Plan einer automatisierten Transportanlage zum Fördern von Flyerspulen zwischen Flyern und Ringspinnmaschinen nach Fig. 2, Fig. 3 is a schematic diagram of an automated transport system for transporting roving bobbins between flyers and ring spinning machines according to Fig. 2,

Fig. 4A+B einen schematischen Plan eines Bereiches vom Ringspinngatter mit einem bereitgestellten Zug von Flyerspulen zur Gatterbeschickung mittels eines Blockwechsels, FIG. 4A + B is a schematic diagram of a portion of the ring spinning gate having a train of roving bobbins provided to the gate by means of a feed block substitution

Fig. 5A bis E Diagramme zur Erklärung des zeitlichen Ablaufes vom bekannten Blockwechselprinzip, Fig. 5A-E charts to explain the temporal sequence of known block change principle

Fig. 6 ein Diagramm zur Erklärung des Grundprinzipes der Erfindung, Fig. 6 is a diagram for explaining the basic principle of the invention,

Fig. 7 ein weiteres Diagramm zur Erklärung des gleichen Prinzipes, Fig. 7 is another diagram for explaining the same principle,

Fig. 8 eine schematische Darstellung einer Vorrichtung, die zur Realisierung des Prinzipes nach Fig. 6 verwendet werden kann, Fig. 8 is a schematic representation of an apparatus that can be used to realize the principle according to Fig. 6,

Fig. 9 weitere Diagramme zur Erklärung verschiedener Aspek­ te dieser Erfindung in ihrer Anwendung in Kombina­ tionen mit Anlagen nach einer oder mehreren der Fig. 1, 2 oder 3, Fig. 9 further diagrams for explaining various Aspek te of this invention in its application in combina tions with systems according to one or more of FIGS. 1, 2 or 3,

Fig. 10 eine schematische Darstellung einer Ergänzung der Maschinensteuerung zur Verwirklichung dieser Erfin­ dung, und Fig. 10 is a schematic representation of a supplement of the machine control for the realization of this inven tion, and

Fig. 11 ein weiteres Diagramm zur Erklärung von Einzelhei­ ten. Fig. 11 is a further diagram for the explanation of Einzelhei th.

Die in Fig. 1 dargestellte Spinnerei umfaßt einen Ballen­ öffner 120, eine Grobreinigungsmaschine 122, eine Mischma­ schine 124, zwei Feinreinigungsmaschinen 126, zwölf Karden 128, zwei Strecken 130 (erste Streckenpassage), zwei Kämme­ reivorbereitungs-Maschinen 132, zehn Kämmaschinen 136, vier Strecken 138 (zweite Streckenpassage), fünf Flyer 140, und vierzig Ringspinnmaschinen 142. Dies ist eine heute konven­ tionelle Anordnung zur Herstellung von einem sogenannten gekämmten Ringgarn. Das Ringspinnverfahren kann durch ein neueres Spinnverfahren (zum Beispiel das Rotorspinnen) er­ setzt werden, wobei die Flyer dann überflüssig werden. Da aber diese Erfindung insbesondere für das Ringspinnen kon­ zipiert ist, wird sie ausschließlich anhand dieses Verfah­ rens erklärt werden. Die Erklärung im Zusammenhang mit dem konventionellen Ringspinnen reicht auch für die Anwendung der Erfindung im Zusammenhang mit neuen Spinnverfahren.The spinning mill shown in Fig. 1 comprises a bale opener 120 , a roughing machine 122 , a Mischma machine 124 , two fine cleaning machines 126 , twelve cards 128 , two lines 130 (first route passage), two combs reivorbereitungs machines 132 , ten combing machines 136 , four Routes 138 (second route passage), five Flyer 140 , and forty ring spinning machines 142 . This is a conventional arrangement today for the production of a so-called combed ring yarn. The ring spinning process can be replaced by a newer spinning process (for example rotor spinning), whereby the flyers are then superfluous. However, since this invention is designed especially for ring spinning, it will be explained solely on the basis of this method. The explanation in connection with the conventional ring spinning is also sufficient for the application of the invention in connection with new spinning processes.

Eine solche Anlage bietet die Betriebsführung, eine äußerst komplexe Organisations, - bzw. Dispositionsaufgabe, was durch ständig steigende Anforderungen bezüglich Durchfluß, Qualität und Wirtschaftlichkeit (Optimierung) verkompliziert wird.Such a plant provides the operation management, an extremely complex organization, - or disposition task, what due to constantly increasing requirements regarding flow, Quality and efficiency (optimization) complicates becomes.

Die Ringspinnmaschine (und ihre Hilfsgeräte)The ring spinning machine (and its auxiliary equipment)

Die Ringspinnmaschine dient in dieser Anmeldung als Beispiel einer "Längsteilmaschine". Andere Längsteilmaschinen sind Flyer, die Spinnmaschinen für die neuen Spinnverfahren (Ro­ torspinnmaschinen, Düsenspinnmaschinen), Zwirnmaschinen (zum Beispiel Doppeldrahtzwirnmaschinen) und Falschdrahttextu­ riermaschinen zur Verarbeitung von Endlosfilamenten. Die allgemeinen Prinzipien einer modernen Ringspinnanlage sind im Artikel "Die automatisierte Ringspinnmaschine" von F. Dinkelmann enthalten, das am Reutlinger Spinnereikolloquium 2./3. Dezember 1986 vorgetragen wurde.The ring spinning machine is used in this application as an example a "slitting machine". Other slitting machines are Flyers, the spinning machines for the new spinning process (Ro torspinning machines, jet spinning machines), twisting machines (for Example, double twisting machines) and false-twist texturing processing machines for continuous filaments. The general principles of a modern ring spinning system  in the article "The Automated Ring Spinning Machine" by F. Dinkelmann, the Reutlinger Spinnereikolloquium 2./3. December 1986 was presented.

Die Maschine nach Fig. 2 umfaßt ein doppelseitiges Gestell 210 mit zwei Spinnstellenreihen 212 bzw. 214, die spiegel­ bildlich zu einer Mittelebene ME der Maschine angeordnet sind. In einer modernen Maschine enthält jede solche Spinn­ stellenreihe 212, 214 zwischen 500 und 600 dicht aneinander­ gereihte Spinnstellen. Jede Spinnstelle umfaßt ein Streck­ werk 216, Fadenführungselemente 218 und eine kopsbildende Einheit 220. Die Einheit 220 enthält einzelne Arbeitsele­ mente, wie zum Beispiel Spindel, Ring und Läufer, die aber für diese Erfindung keine Rolle spielen und nicht einzeln gezeigt sind. Diese Elemente sind dem Fachmann bekannt und sind zum Beispiel aus EP-A 382 943 ersichtlich. Für jede Spinnstellenreihe 212 bzw. 214 ist ein Doffautomat 222, 224 vorgesehen, welcher alle Spinnstellen der ihm zugeordneten Spinnstellenreihe gleichzeitig bedient. Dieser Automat wird hier auch nicht näher beschrieben, wobei Einzelheiten aus EP-A 303 877 gefunden werden können.The machine according to Fig. 2 comprises a double-sided frame 210 with two rows of spinning units 212 and 214 , which are arranged mirror-image to a center plane ME of the machine. In a modern machine, each such spin range 212 , 214 contains between 500 and 600 closely spaced spinning stations. Each spinning station comprises a drafting plant 216 , thread guide elements 218 and a kopsbildende unit 220th The unit 220 contains individual working elements, such as spindle, ring and rotor, but these are not relevant to this invention and are not shown individually. These elements are known to the person skilled in the art and can be seen for example from EP-A 382 943. For each spinning station row 212 or 214 , a doffing machine 222 , 224 is provided, which serves all spinning stations of its associated Spinnstellenreihe simultaneously. This machine will not be described here in detail, with details from EP-A 303 877 can be found.

Jede Spinnstellenreihe 212 bzw. 214 ist auch mindestens ei­ nem Bedienungsgerät 226 bzw. 228 zugeordnet, welches der jeweiligen Reihe entlang fahrbar ist und Bedienungsoperati­ onen an den einzelnen Spinnstellen ausführen kann. Einzel­ heiten eines solchen Bedienungsgerätes sind zum Beispiel aus EP-A 388 938 zu entnehmen.Each Spinnstellenreihe 212 and 214 is also associated with at least egg nem operating device 226 and 228 , which is movable along the respective row and operating operations on the individual spinning stations can perform. Individual units of such an operating device can be found for example in EP-A 388 938.

Das Gestell 210 trägt ein Gatter 230, das aus senkrechten Stangen 232 und Querträgern 234 gebildet ist. Schienen 236 sind an den äußeren Enden der Querträger 234 montiert und erstrecken sich in Längsrichtung der Maschine. Jede Schiene 236 dient als eine Führungsbahn für einen Trolleyzug 238, der neue Spulen 240 an das Gatter 230 heranführt. The frame 210 carries a gate 230 formed of vertical bars 232 and cross members 234 . Rails 236 are mounted at the outer ends of the cross members 234 and extend longitudinally of the machine. Each rail 236 serves as a guideway for a trolley train 238 , which brings new coils 240 to the gate 230 .

Einzelheiten eines solchen Trolleyzuges sind aus EP-431268 zu entnehmen.Details of such a trolley train are from EP-431268 refer to.

Das Gatter 230 umfaßt auch Träger 242 für Vorlagespulen 244, 246, welche die einzelnen Spinnstellen mit Vorgarn be­ liefern. Die Träger 242 sind als Querschienen gezeichnet, wobei aber diese Anordnung für diese Erfindung ohne Bedeu­ tung ist. Im Beispiel nach Fig. 2 sind die Vorlagespulen für jede Spinnstellenreihe 212 bzw. 214 in zwei Reihen angeord­ net, und zwar in einer inneren Reihe 244 in der Nähe der Mittelebene ME und einer äußeren Reihe 246, welche von der Mittelebene ME entfernt ist. Die Querträger 234 tragen auch auf jeder Maschinenseite eine Schienenanordnung 248 bzw. 250, welche als Führungsbahn für einen jeweiligen fahrbaren Roboter 252 bzw. 254 dient. Der Roboter 252 bzw. 254 läuft daher zwischen der äußeren Vorlagespulenreihe 246 und den vom Trolleyzug 238 getragenen neuen Spulen 240 und oberhalb des jeweiligen Bedienungsgerätes 226 bzw. 228. Der Roboter 252 ist zur Bedienung der beiden Vorlagespulenreihen des Gatters ausgelegt, wie in unserer PCT Patentanmeldung Nr. PCT/CH91/00225 erklärt wurde. Dieser Roboter ist für das Luntenhandling derart ausgelegt, daß nach einem Spulen­ wechsel im Gatter die Lunte der neuen Spule durch den Robo­ ter ins Streckwerk eingefädelt wird.The gate 230 also includes carriers 242 for feed bobbins 244 , 246 which provide the individual spinning stations with roving be. The carrier 242 are drawn as cross rails, but this arrangement is for this invention without importance tion. In the example of FIG. 2, the feed bobbins for each spinning station row 212 and 214 are in two rows angeord net, in an inner row 244 in the vicinity of the center plane ME and an outer row 246 , which is remote from the center plane ME. The cross members 234 also carry on each machine side a rail assembly 248 and 250 , which serves as a guide track for a respective mobile robot 252 and 254 , respectively. The robot 252 or 254 therefore runs between the outer supply coil row 246 and the new coils 240 carried by the trolley train 238 and above the respective operating device 226 or 228 . The robot 252 is designed to operate the two supply spool rows of the gate, as explained in our PCT Patent Application No. PCT / CH91 / 00225. This robot is designed for Luntenhandling such that after a coil change in the gate, the fuse of the new coil is threaded through the Robo ter into the drafting system.

Fig. 3 zeigt ein Beispiel für das Layout von einem Teil des Spinnsaales einer Ringspinnanlage, die durch einen Roboter nach PCT Patentanmeldung PCT/CH/91/00225 bedient wird. Das Diagramm der Fig. 3 soll insbesondere zur Erklärung der au­ tomatisierten Belieferung der Spinnmaschinen mit zu verar­ beitendem Vorlagematerial dienen. Ein Flyer 500 liefert über ein Schienennetz 502 (mit Puffer 505) für Trolleys (nicht gezeigt) Spulen an vier Ringspinnmaschinen 504, 506, 508 und 510. Mit AK bzw. EK ist für jede Maschine der Antriebskopf bzw. der Endkopf (vom Antriebskopf entfernt) angedeutet. Fig. 3 shows an example of the layout of a part of the spinning chamber of a ring spinning machine which is operated by a robot according to PCT patent application PCT / CH / 91/00225. The diagram of Fig. 3 is intended in particular to explain the au tomatisierten delivery of the spinning machines with to be processed processing material serve. A flyer 500 provides reels 502 (with buffer 505 ) for trolleys (not shown) to four ring spinning machines 504 , 506 , 508 and 510 via a rail network 502 . With AK or EK the drive head or the end head (away from the drive head) is indicated for each machine.

Über Weichenstellen 512 kann ein Trolley auf einer belie­ bigen Maschinenseite geführt werden. Jeder Maschine ist dementsprechend ein U-förmiger Abschnitt des Netzes zuge­ teilt. Die Transporteinrichtung ist von einem Zentralrechner 514 des Transportsystems gesteuert. Ein Beispiel für den Aufbau eines Transportnetzes zwischen Flyern und Ringspinn­ maschinen ist in der Europäischen Patentanmeldung Nr. 431 268 zu finden. Ein Beispiel für die Steuerung eines solchen Sy­ stems ist in unserer neuen schweizerischen Patentanmeldung Nr. CH-2988/92 vom 24.09.1992 (Titel: Transportanlage einer Spinnerei, Obj. 2352) gezeigt.About points 512 a trolley can be performed on a belie machine side. Each machine is accordingly a U-shaped section of the network shares. The transport device is controlled by a central computer 514 of the transport system. An example of the construction of a transport network between flyers and ring spinning machines is found in European Patent Application no. 431 268. An example of the control of such Sy stems is shown in our new Swiss Patent Application No. CH-2988/92 of 24.09.1992 (Title: Transport system of a spinning, Obj. 2352).

Es ist auch ein Schienennetz 516 für einen Spulenwechsel- bzw. Luntenhandling-Roboter 518 vorgesehen. Das Netz 516 umfaßt für jede Maschine einen jeweiligen U-förmigen Ab­ schnitt, der aber dem entsprechenden U-förmigen Abschnitt des Transportnetzes 502 entgegengerichtet ist. Über Ver­ bindungsstücke 520, kann der Roboter 518 von einer Maschine zu einer anderen geführt werden.A rail network 516 is also provided for a bobbin handling robot 518 . The network 516 comprises for each machine a respective U-shaped section from but opposite to the corresponding U-shaped section of the transport network 502 . Via connecting pieces 520 , the robot 518 can be guided from one machine to another.

Spulenwechseloperationen werden vorzugsweise nach einer vorbestimmten "Wechselstrategie" ausgeführt, wovon ein Bei­ spiel in Zusammenhang mit den Fig. 16 und 17 der vorer­ wähnten PCT-Patentanmeldung Nr. PCT/CH/91/00225 beschrieben ist. Nach dieser Strategie werden die Wechseloperationen abwechselnd auf der einen bzw. der anderen Seite der Ma­ schine durchgeführt, um die Arbeitsbelastung der Bedie­ nungsgeräte 26, 28 (Fig. 2) zu verringern. Es ist nämlich notwendig, beim Neueinfädeln des Streckwerkes jedesmal eine Spulenwechseloperation mit einer Fadenbruchbehebung zu ko­ ordinieren, so daß beim Spulenwechsel das Bedienungsgerät 26 bzw. 28 stets bei den betroffenen Spinnstellen vorhanden sein sollte. Dies bedeutet natürlich, daß das Bedienungs­ gerät zur Bedienung von anderen Spinnstellen nicht zur Ver­ fügung steht, obwohl allenfalls andere Störungen (die eine Fadenbruchbehebung erfordern) an diesen anderen Spinnstellen vorkommen. Die bevorzugte Maschinenanordnung umfaßt daher mindestens zwei Bedienungsgeräte (Fig. 2), die je einer Ma­ schinenseite zugeordnet sind. Während ein Bedienungsgerät daher zur Mitarbeit bei einer Spulenwechseloperation auf der einen Maschinenseite abgeordnet werden kann, ist das Bedie­ nungsgerät auf der anderen Maschinenseite freigestellt, die Spinnstellen zu bedienen, die keine Spulenwechseloperation erfordern.Bobbin change operations are preferably carried out according to a predetermined "change strategy", one of which is described in the context of FIGS . 16 and 17 of the aforementioned PCT Patent Application No. PCT / CH / 91/00225. According to this strategy, the replacement operations are alternately performed on one side and the other side of the machine to reduce the workload of the operation machines 26 , 28 ( FIG. 2). It is in fact necessary to ordinate the re-threading of the drafting system each time a bobbin changing operation with a yarn breakage to ko, so that the bobbin change the control unit 26 or 28 should always be present at the affected spinning stations. This means, of course, that the operating device is not available for the operation of other spinning stations for Ver addition, although possibly other disturbances (which require a thread breakage removal) occur at these other spinning stations. The preferred machine assembly therefore comprises at least two control devices ( Fig. 2), each associated with a machine side Ma. Therefore, while an operating device can be seconded to cooperate in a bobbin changing operation on one side of the machine, the operatability device on the other side of the machine is free to operate the spinning stations that do not require Spulenwechseleloperation.

Die Anforderung (in der Form eines Signals) zum Heranführen eines voll beladenen Trolleyzuges aus der Transporteinrich­ tung an eine bestimmte Ringspinnmaschine wird vorzugsweise von dieser Maschine selbst (z. B. gemäß EP-392482) erzeugt. Das Positionieren dieses Trolleyzuges gegenüber der Rings­ pinnmaschine hängt aber dann von der Gesamtanordnung ab. Es könnte zum Beispiel vorgesehen werden, daß eine gesamte Maschinenseite jedesmal mit Trolleyzügen besetzt wird, wo­ nach Spulenwechseloperationen durch den Roboter durchgeführt werden. Die Informationen bezüglich der Gatterstellen, welche aus diesen Trolleys zu besetzen sind, sollten in der Ringspinnmaschine bzw. Roboter (eher als in der Zentral­ steuerung 514 der Transporteinrichtung) vorhan­ den sein.The request (in the form of a signal) for bringing a fully loaded trolley train out of the transport device to a particular ring spinning machine is preferably generated by that machine itself (eg according to EP-392482). However, the positioning of this trolley train relative to the ring spinning machine then depends on the overall arrangement. For example, it could be provided that an entire machine side is occupied by trolley trains each time, where after bobbin changing operations are performed by the robot. The information regarding the gate locations to be occupied by these trolleys should be in the ring spinning machine or robot (rather than in the central controller 514 of the conveyor).

Im wahrscheinlicheren Fall, daß der Trolleyzug kürzer als die Gesamtlänge der Maschine ist, und, daß die Spulenwech­ seloperationen sektionsweise ("blockweise") erfolgen, muß jeder Trolleyzug in einer geeigneten Position gegenüber der Ringspinnmaschine gestellt und verriegelt werden. In diesem Fall ist vorzugsweise eine Schnittstelle zwischen der Steuerung 514 der Transporteinrichtung und der Steuerung der Ringspinnmaschine zu definieren, so daß die Bewegungen des Trolleyzuges ab dieser Schnittstelle von der Ringspinnma­ schinensteuerung übernommen werden (z. B. nach EP 392482). In the more likely case that the trolley train is shorter than the total length of the machine, and that the Spulenwech seloperationen done in sections ("block"), each trolley train must be placed and locked in a suitable position relative to the ring spinning machine. In this case, an interface between the controller 514 of the transport device and the control of the ring spinning machine is preferably to be defined so that the movements of the trolley train are taken over from this interface by the ring spinning machine control (eg according to EP 392482).

Die geeigneten Positionsinformationen können entweder vom Roboter an die Ringspinnmaschine abgegeben werden oder sie können in der Ringspinnmaschinensteuerung vorhanden sein und an den Roboter übertragen werden.The appropriate position information can be either from Robots are delivered to the ring spinning machine or they can be present in the ring spinning machine control and be transmitted to the robot.

Das Auslösen einer Spulenwechseloperation kann gemäß PCT/CH/91/00225 von der Ringspinnmaschine entweder nach Zeit oder der abgelieferten Luntenmenge (d. h. in Abhängigkeit von der Maschinengeschwindigkeit) gerechnet werden. Die Einzel­ heiten eines dazu geeigneten Systems sind aber in PCT/CH/91/00225 nicht erwähnt.The triggering of a bobbin exchange operation can according to PCT / CH / 91/00225 from the ring spinning machine either by time or the delivered amount of lunts (i.e. the machine speed). The singles However, systems of a suitable system are available in PCT / CH / 91/00225 not mentioned.

Fig. 4 umfaßt zwei schematische Pläne 4A und 4B in ver­ schiedenen Maßstäben. Die Maschine RSM hat ein Gatter, das in Blöcke B1 bis B30, je zu vierzig Spulen organisiert ist (Fig. 4A). Die Hängezapfen der Blöcke B8 und B23 sind voll­ ständig durch Punkte in Fig. 4B nochmals gezeigt und die Zapfen der Nachbarblöcke B7, B9, B24 und B25 sind zum Teil ebenfalls mit Punkten dargestellt worden. Fig. 4 comprises two schematic plans 4 A and 4 B in ver different scales. The machine RSM has a gate organized into blocks B1 to B30, each forty coils ( FIG. 4A). The suspension pins of the blocks B8 and B23 are fully shown again by dots in Fig. 4B, and the pins of the neighboring blocks B7, B9, B24 and B25 have also been partly shown with dots.

Die Hängezapfen eines Zuges Z sind neben dem Block B8 dar­ gestellt worden, wo demnächst ein Blockwechsel stattfinden sollte. Da die Zapfen des Gatters zweireihig, diejenigen des Zuges Z hingegen einreihig angeordnet sind, muß die Länge der Hängezapfenreihe des Zuges doppelt so hoch sein wie die Länge des Blockes in der Längsrichtung der Maschine.The suspension pins of a train Z are next to the block B8 where a block change will take place soon should. Since the tenons of the gate are double row, those of the Zuges Z, however, are arranged in a single row, the length must The hanging row of the train should be twice as high as the Length of the block in the longitudinal direction of the machine.

Gemäß dem Prinzip des Blockwechsels werden dann die leeren Hülsen auf den Gatterzapfen für volle Spulen des Zuges aus­ getauscht, entweder manuell oder automatisch.According to the principle of block change then the empty Pods on the gate spigots for train full spools exchanged, either manually or automatically.

Typische Beispiele für Anlagen, die nach dem Blockwechsel­ prinzip arbeiten, sind die folgenden:
Bei einer teil-automatisierten Anlage, wo ein Fadenansetz­ roboter für jede Maschinenseite vorhanden ist und die Spu­ lenzufuhr an die Maschine automatisch erfolgt:
Typical examples of plants that work according to the block change principle are the following:
In a partially automated system where a thread-setting robot is available for each machine side and the feed of the yarn to the machine is automatic:

Maschinenzuteilung = Maschinen pro Bediener:Machine allocation = machines per operator: 8 Maschinen 1000 Spindeln pro Maschine ("Bedienbereich")8 machines 1000 spindles per machine ("operating area") Anzahl Spulen pro Block:Number of coils per block: 40, ergibt 25 Blöcke pro Maschine, d. h. 200 Blöcke pro Bedienbereich40, gives 25 blocks per machine, d. H. 200 blocks per operating area Laufzeit einer Spule:Runtime of a coil: typisch 80 bis 90 Stundentypically 80 to 90 hours

Bei einer manuell bedienten Anlage (ohne Ansetzroboter und ohne Automatisierung der Spulenzufuhr):In a manually operated system (without startup robot and without automation of the coil feed):

Maschinenzuteilung:Machinery allocation: 3 Maschinen 50 Blöcken3 machines 50 blocks Anzahl Spulen pro Block:Number of coils per block: 2020

Fig. 5A zeigt schematisch den "idealen" Ablauf für die Be­ dienungsperson bzw. den Bedienungsautomaten. Jeder Block­ wechsel wird gerade dann eingeleitet, wenn die Spulen aus­ zulaufen beginnen, wobei jeder Wechsel Ba, Bb und Bc den gleichen Zeitaufwand erfordert und die Wechsel zeitlich gleichmäßig verteilt sind. Ein solch gutmütiges System kann einfach nach Zeit gesteuert werden. Normalerweise kommen die Maschinen eine nach der anderen an die Reihe für einen Blockwechsel, so daß Wechsel Ba an einer ersten Maschine, Wechsel Bb an einer zweiten Maschine, Wechsel Bc an einer dritten Maschine (und so fort) stattfindet. FIG. 5A schematically shows the "ideal" sequence for the operator or the automatic operator. Each block change is initiated just when the coils start to run, each change Ba, Bb and Bc requires the same amount of time and the bills are evenly distributed in time. Such a good-natured system can be easily controlled by time. Normally the machines come one after the other for a block change, so that change Ba takes place on a first machine, change Bb on a second machine, change Bc on a third machine (and so on).

Der Zeitaufwand für ein Blockwechsel in der obenerwähnten teil-automatisierten Anlage ist typischerweise 12 bis 14 Minuten und es wird ca. 25 Minuten zwischen einander nach­ folgenden Wechseln geplant. Nach einem Wechsel an einer ge­ gebenen Maschine kommt der Bediener dementsprechend nach ca. 3,3 Stunden an die gleiche Maschine zurück, um den nächst­ fälligen Block zu wechseln. Innerhalb der Laufdauer einer Spule, müssen alle anderen Blöcke der gleichen Maschine ge­ wechselt werden.The time required for a block change in the above-mentioned semi-automated plant is typically 12 to 14 Minutes and it will take about 25 minutes between each other following changes planned. After a change at a ge Accordingly, the operator will arrive after approx. 3.3 hours to the same machine back to the next to change due block. Within the term of a Coil, all other blocks must be the same machine be changed.

Fig. 5B zeigt nun die Wirkung einer Störung in der ersten Maschine, bevor der Wechsel Ba fällig wurde. Die Maschine stand wegen dieser Störung zum Beispiel ca. 20 Minuten still. Wenn nach dem Auslauf der Spulen gearbeitet wird, entsteht eine "Überlappung" der Blockwechsel Ba und Bb, was unmöglich ist, da der Bediener nur an einem Ort arbeiten kann. Fig. 5B now shows the effect of a fault in the first machine before the change Ba became due. For example, the machine was idle for about 20 minutes because of this malfunction. When working after the spools have been spooled, there is an "overlap" in the block changes Ba and Bb, which is impossible because the operator can only work in one place.

Normalerweise zieht der Bediener dann den Wechsel Ba etwas vor (was eine Erhöhung der Abfallmenge wegen Restlunten an den "leeren" Hülsen bedeutet) und eilt dann zum fälligen Wechsel Bb (Fig. 5c). Wenn die ersten und zweiten Maschinen jetzt ungestört weiterarbeiten, wiederholt sich dieses Mu­ ster ca. 80 bis 90 Stunden später, wenn die neu aufge­ steckten Spulen auslaufen (Fig. 5D). Bei wiederholten Stö­ rungen in verschiedenen Maschinen des gleichen Bedienbe­ reiches tritt allenfalls ein Zustand ähnlich dem in Fig. 5E gezeigten Muster ein, wo einige Blöcke "aneinander ge­ rutscht" sind und ein Block (Bc) völlig aus der Reihenfolge ausgetreten ist. Normally, the operator then makes the change Ba a little (which means an increase in the amount of waste due to leftover "empty" pods) and then goes to the due change Bb ( Figure 5c). If the first and second machines continue to work undisturbed, this pattern repeats approximately 80 to 90 hours later, when the newly inserted coils run out ( Figure 5D). At repeated disturbances in different machines of the same operating range, a state similar to the pattern shown in Fig. 5E occurs at most, where some blocks are "slipped together" and one block (Bc) has completely out of order.

Verwaltung der LeerlaufzeitpunkteManagement of idle time

Ein System nach Fig. 5 kann mittels eines Prozeßleitrechners gesteuert werden. Alle Blockleerlaufzeitpunkte eines Bedienbereiches werden zum Beispiel durch ein Prozeßleitsystem verwaltet, welches bei überlappenden Blockwechsel­ intervallen den Block resp. die Maschine bestimmt, der vor­ zeitig gewechselt werden muß. Zusätzlich kann nun von einer rundenorientierten Kontrollstrategie der Maschinen abgewi­ chen werden, indem mittels eines Kommunikationssystems (Pager, Maschinenbedienpanel) dem Bediener Zeitpunkt und Ort des nächsten Blockwechsels mitgeteilt wird. Der Idealzustand ist wieder durch konstante Blockwechselabstände gekenn­ zeichnet.A system according to FIG. 5 can be controlled by means of a process control computer. All block idle times of an operating area are managed, for example, by a process control system which, in the event of overlapping block changes, intervalls the block resp. determines the machine that needs to be changed ahead of time. In addition, it is now possible to derogate from a turn-oriented control strategy of the machines by informing the operator of the time and location of the next block change by means of a communication system (pager, machine operating panel). The ideal state is again marked by constant block change intervals.

Dieses Vorgehen ist bei gleichen Spulenlaufzeiten innerhalb eines Bedienbereiches jedoch nicht empfehlenswert, da eine Abweichung von Idealzustand nicht korrigiert wird und auf­ grund der Periodizität (gleiche Spulenlaufzeiten) sich repe­ titiv wiederholt. Die sonstigen Störungen der Ringspinnpro­ duktion die zu einer Verschiebung der Blockwechselzeitpunkte führen, wie zum Beispiel ein Maschinenstillstand während eines Läuferwechsels resp. eine Drehzahlreduktion während dem Läufereinlauf, müssen aufgrund der geforderten Maschi­ nenauslastung minimiert werden, so daß dadurch kein Aus­ brechen aus dem periodischen Verhalten erfolgt.This procedure is within the same coil running times an operating area, however, not recommended, as a Deviation from ideal state is not corrected and up Due to the periodicity (same coil running times), repe repeatedly titled. The other disorders of Ringspinnpro This leads to a shift of the block change times lead, such as machine downtime during a runner change resp. a speed reduction during the runner intake, due to the required Maschi nenauslastung be minimized, so that no off break off the periodic behavior takes place.

Dabei ist es möglich, zum Beispiel durch ein stärkeres Vor­ ziehen (Fig. 5c), den Zustand gemäß Fig. 5E zu vermeiden, oder auf die Kumulation von beispielsweise zwei Blöcken zu beschränken. Dies entspricht schlußendlich dem zweiten, weiter unten behandelten Vorgehen (nach dieser Erfindung), wobei dieses jedoch einen deutlich geringeren Aufwand er­ fordert. Insbesondere ist dazu kein Prozeßleitsystem und keine Vernetzung der Ringspinnmaschinen erforderlich. It is possible, for example, by a stronger pull before ( Fig. 5c), to avoid the state of FIG. 5E, or to limit the accumulation of, for example, two blocks. This corresponds ultimately to the second, further discussed below procedure (according to this invention), but this requires a much lower cost he asks. In particular, no process control system and no networking of the ring spinning machines is required.

Bei unterschiedlichen Spulenlaufzeiten und vielen Artikel­ wechseln (Standzeiten) kann dieses Verfahren vorteilhaft sein, sofern nicht eine wilde Aufsteckung günstiger ist. Diese führt jedoch bei einem Artikelwechsel mit Vorgarn­ wechsel zum Ausbrechen der Spulen, die entweder entsorgt oder gepuffert und wiederverwertet werden müssen.For different coil life and many items change (downtime), this procedure can be advantageous be, unless a wild Aufsteckung is cheaper. However, this leads to an article change with roving change to break out of the coils, which is either disposed of or buffered and recycled.

Taktfahrplaninterval timetable

Die Prinzipien dieser Erfindung können nach verschiedenen Kriterien angewendet werden. Beispiele verschiedener Anwen­ dungen werden nachfolgend gegeben werden. Das erste Beispiel nimmt einen niedrigen Automatisierungsgrad an, es zeigt die Anwendung der Erfindung, zum Beispiel zum Nachrüsten einer bestehenden Anlage nach Fig. 1, wo die Transport- und Wech­ selfunktionen grundsätzlich manuell ausgeführt werden.The principles of this invention can be applied according to various criteria. Examples of various applications will be given below. The first example assumes a low degree of automation, it shows the application of the invention, for example, for retrofitting an existing system of FIG. 1, where the transport and Wech selfunktionen are basically carried out manually.

In einer solchen Anlage können zum Beispiel "Ringspinnma­ schinengruppen" gebildet werden, wobei eine Gruppe einem bestimmten Bedienungsteam oder sogar einer bestimmten Person zugeordnet werden kann. Die Fig. 6 beruht auf der Annahme, daß acht Ringspinnmaschinen RSM1, RSM2, RSM3, RSM4, RSM5, RSM6, RSM7 und RSM8 einem Team bzw. einer Person zugeordnet sind.In such an installation, for example, "ring spinning machine groups" can be formed, whereby a group can be assigned to a specific operating team or even to a specific person. FIG. 6 is based on the assumption that eight ring spinning machines RSM1, RSM2, RSM3, RSM4, RSM5, RSM6, RSM7 and RSM8 are assigned to a team or to a person.

Fig. 6 zeigt einen "Zeitplan" für die Maschinen dieser Gruppe. Für jede Maschine der Gruppe enthält der Plan eine entsprechende Zeitachse. Die Zeitachsen müssen miteinander synchronisiert werden, was in dem einfachen Beispiel durch das Bedienungspersonal erfolgt. Die Querstriche W11, W12, W21, W22, W31, W32, W41, W42, usw. - stellen Wechselzeit­ punkte dar. Die Wechselzeitpunkte der Maschinen dieser Gruppe sind gegeneinander derart gestaffelt, daß Fig. 6 shows a "schedule" for the machines of this group. For each machine in the group, the plan contains a corresponding time axis. The time axes must be synchronized with each other, which is done in the simple example by the operator. The slashes W11, W12, W21, W22, W31, W32, W41, W42, etc. - represent change time points. The change times of the machines of this group are staggered against each other such that

  • - die Wechselzeitpunkte einer einzigen Maschine je durch ein vorbestimmtes Intervall getrennt sind (s. Fig. 7, welche den Zeitplan der Maschine RSM1 zu einem gegenüber Fig. 6 komprimierten Zeitmaßstab zeigt).the times of change of a single machine are each separated by a predetermined interval (see Fig. 7, which shows the schedule of the machine RSM1 at a time scale compressed with respect to Fig. 6).
  • - die Wechselzeitpunkte aller anderen Maschinen der Gruppe innerhalb des Intervalls einer einzigen Maschine gleichmäßig verteilt sind.- the switching times of all other machines in the group within the interval of a single machine evenly distributed.

Dementsprechend gilt n. KA = I, wo "I" der Intervall zwi­ schen zwei Wechselzeitpunkten einer Maschine, "n" die Anzahl Maschinen der Gruppe und "KA" der Kontrollabstand zwischen einander folgenden Wechselzeitpunkten der Gruppe vertreten.Accordingly, n. KA = I, where "I" is the interval between two change times of a machine, "n" the number Group machines and "KA" the control distance between represented by successive changeover points of the group.

An jedem Wechselzeitpunkt dieses Zeitplanes kann ein Block­ wechsel ausgelöst werden. Kein Blockwechsel darf normaler­ weise zu einem anderen Zeitpunkt ausgelöst werden. Mit an­ deren Worten, die Anlage wird anhand eines vorbestimmten "Fahrplanes" betrieben. Ausnahmen zum "Verbot" des Wechsels außerhalb des Fahrplanes können vorbestimmt werden, zum Beispiel im Fall eines Fehlers, so daß ein fälliger Wechsel nicht ausgeführt wurde, kann dies nach einem Alarm sofort gutgemacht werden. Unter speziellen Betriebszuständen, zum Beispiel während eines Artikelwechsels, mag es auch notwen­ dig sein, außerhalb des Fahrplanes "zu fahren".At each changeover time of this schedule, a block be triggered. No block change may be more normal be triggered at a different time. With whose words, the plant is based on a predetermined Operated "timetable". Exceptions to the "prohibition" of the bill of exchange outside the timetable can be predetermined to Example in case of an error, so that a due change not executed, this can happen immediately after an alarm be made good. Under special operating conditions, for Example during an article change, it may also be necessary be "driving" outside the timetable.

Die Überlegungen, die zum Festlegen des Fahrplanes verwen­ det werden können, sollen nachfolgend anhand komplizierterer Beispiele erklärt werden. Vorderhand wird das Prinzip wei­ terhin anhand des einfachen Beispieles erläutert werden.The considerations used to set the timetable can be described below on the basis of more complicated Examples are explained. For the time being the principle becomes white terhin be explained using the simple example.

Ein "Fahrplan" nach Fig. 6 ist ein Arbeitsorganisations- Prinzip und erfordert in der dargestellten Form keine Maßnahmen in den Maschinen bzw. in der Anlage. Der Plan könnte auf Papier im Arbeitsbüro des Bedienungspersonals aufgestellt und mittels eines "Weckers" im gleichen Büro verwirklicht werden. Das Personal holt dann die notwendigen Flyerspulen (z. B. aus einem Puffer), führt den Wechsel am zutreffenden Block durch und bringt die "leeren" Hülsen zu­ rück zum Puffer. Ein solches Organisationsprinzip fällt na­ türlich nicht innerhalb des Schutzbereiches dieser Anmel­ dung, dient aber trotzdem als Basis der Maßnahmen, die nach dieser Erfindung in den Maschinen realisiert werden sollten.A "timetable" according to FIG. 6 is a work organization principle and, in the illustrated form, does not require any measures in the machines or in the system. The plan could be set up on paper in the operator's work office and implemented by means of an "alarm clock" in the same office. The staff then fetches the necessary rollover bobbins (eg from a buffer), performs the change at the appropriate block and returns the "empty" pods back to the buffer. Naturally, such an organizational principle does not fall within the scope of this application, but nevertheless serves as the basis of the measures that should be implemented in the machines according to this invention.

In einer ersten Ausführung nach dieser Erfindung wird jede Maschine mit dem eigenen Zeitmeßsystem versehen, so daß an jedem Wechselzeitpunkt dieser Maschine ein Signal vom Zeitmeßsystem der Maschine erzeugt wird. Es liegt dann an dem Bedienungspersonal für dieses Zeitmeßsystem sowohl den Anfangspunkt (Synchronisierungs-Signal) wie auch die zu­ treffenden Intervalle zu bestimmen. Die Staffelung der Wechselpunkte wird dementsprechend durch geeignete Einstel­ lungen der Zeitmeßsysteme, resp. Synchronisationssignale der einzelnen Maschinen gewährleistet.In a first embodiment of this invention, each Machine equipped with its own timing system, so that every time this machine is changed, a signal from the Timing system of the machine is generated. It is then on the operator for this time measuring both the Start point (synchronization signal) as well as the determine the appropriate intervals. The staggering of Change points is accordingly set by appropriate lungs of the time measuring systems, resp. synchronization signals the individual machines guaranteed.

Fig. 8 zeigt eine einfache Vorrichtung, die in einer Steue­ rung vorgesehen werden kann, um einen Zeitplan nach Fig. 6 in der Praxis zu realisieren. Diese Vorrichtung umfaßt ei­ nen Taktgeber 60, die Impulse nach einem vorgegebenen Takt erzeugt (zum Beispiel eine "Quarzuhr"). Diese Impulse werden an einen Zähler 62 geliefert, welcher zum Messen von vorbe­ stimmten Intervallen nach Fig. 6 geeignet ist. Fig. 8 shows a simple device which can be provided in a Steue tion to realize a schedule of FIG. 6 in practice. This device comprises a timer 60 which generates pulses after a predetermined clock (for example, a "quartz watch"). These pulses are provided to a counter 62 , which is suitable for measuring predetermined intervals of FIG. 6.

Der Zähler 62 ist vorzugsweise eines einstellbaren Typs, um die Länge eines Intervalls einstellbar zu machen, zum Bei­ spiel vom Bedienungspersonal mittels einer Tastatur 64 oder von einer maschinenübergeordneten Steuerung (in Fig. 8 nicht gezeigt). Über das gleiche Einstellungsmittel kann der Anfangspunkt jeder Zeitmessung bestimmt werden, was die Synchronisierung des Zeitmeßsystems sowohl mit den Zeitmeßsystemen der anderen Maschinen wie auch mit dem Arbeitsab­ lauf der Maschine selbst ermöglicht. Die Ausgangssignale des Zählers können an einem Anzeigemittel (zum Beispiel an einem Bildschirm 66) und/oder an anderen Geräten (zum Beispiel über eine Leitung 68) gesendet werden. Ein Resetgerät 63 kann dazu verwendet werden, den Zählerinhalt am Schluß je­ des Intervalls wieder auf Null zurückzustellen und das Gerät 63 kann auch über die Tastatur 64 betätigt werden.The counter 62 is preferably of an adjustable type to make the length of an interval adjustable, for example by the operator by means of a keyboard 64 or by a superordinate controller (not shown in FIG. 8). By the same means of adjustment, the starting point of each time measurement can be determined, which enables synchronization of the time measuring system with both the time measuring systems of the other machines as well as with the working sequence of the machine itself. The output signals of the counter may be sent to a display means (for example on a display screen 66 ) and / or to other devices (for example via a line 68 ). A reset device 63 can be used to reset the counter contents at the end of each interval to zero again and the device 63 can also be operated via the keyboard 64 .

Höhere AutomatisierungHigher automation

Es wird zunächst die Anwendung der Erfindung in Anlagen mit verschiedenen Automatisierungsgraden kurz erklärt. Der Zweck dieses Abschnittes liegt aber darin, darzustellen, daß sich die Erfindung an allen diesen verschiedenen Automatisie­ rungsstufen anpassen läßt und nicht darin, die höchstmög­ liche Automatisierung als vorteilhaft vorzuschlagen.It is first the application of the invention in systems with various degrees of automation explained briefly. The purpose But this section lies in showing that the invention of all these different Automatisie level and not in it, the highest possible Liche automation to propose advantageous.

In diesem Abschnitt werden Kombinationen dieser Erfindung mit anderen, in unseren Patentanmeldungen festgehaltenen Erfindungen dargelegt. Der Inhalt der einzelnen Patentan­ meldungen ist durch den Hinweis auch in dieser Anmeldung eingeschlossen. Um die Länge dieser Beschreibung zu begren­ zen, werden aber nur Auszüge aus einzelnen Anmeldungen hier wiederholt.In this section are combinations of this invention with others, recorded in our patent applications Set forth inventions. The content of each patent Messages are by the note in this application locked in. To limit the length of this description But only excerpts from individual registrations are here repeated.

In einer ersten Variante wird ein Prozeßleitrechner zur Bedienungsunterstützung nach unserer PCT Patentanmeldung Nr. WO-91/16481 (Obj. 2093) der Anlage nach Fig. 6 überlagert. Die von den Maschinen erzeugten Signale können dann an den Prozeßleitrechner gesandt werden, wo sie in Hinweise an das Bedienungspersonal umgewandelt werden können, zum Beispiel in Rufsignale bzw. Instruktionen bezüglich der nächsten Ma­ schine, die einen Blockwechsel braucht, und des Zeitpunktes des Wechsels. Dabei kann das Rufsignal durch Aufruf durch eine Lampe oder ein Horn direkt durch Maschine erfolgen.In a first variant, a process control computer for operating support according to our PCT Patent Application No. WO-91/16481 (Obj. 2093) is superimposed on the system according to FIG . The signals generated by the machines can then be sent to the process control computer, where they can be converted into notes to the operator, for example, in calls or instructions for the next Ma chine that needs a block change, and the time of the change. In this case, the call signal can be made by calling by a lamp or a horn directly by machine.

In einer zweiten Variante kann die Erstellung bzw. die Auf­ rechterhaltung des Zeitplanes auf den Prozeßleitrechner selbst verlegt werden, so daß die Vorrichtung nach Fig. 8 nur einmal in diesem Rechner (statt in den Maschinensteue­ rungen) realisiert werden muß. Die Maschinen selber brau­ chen dann keine steuerungsmäßigen Anpassungen - der Prozeßleitrechner erzeugt zu den gegebenen Zeitpunkten In­ struktionen an das Bedienungspersonal.In a second variant, the creation or the maintenance of the schedule can be relocated to the process control computer itself, so that the device of Fig. 8 only once in this computer (instead of in the Maschinensteue ments) must be realized. The machines themselves then do not require any control adjustments - the process control computer generates instructions to the operating personnel at the given times.

In einer weiteren Automatisierungsstufe kann eine automa­ tische Transportanlage zum Fördern der Flyerspulen zwischen den Flyern und den Ringspinnmaschinen, zum Beispiel nach Fig. 3, vorgesehen werden. Eine dazu geeignete Anordnung ist auch in unserer Europäischen Patentanmeldung Nr. 431268 (Obj. 2012) gezeigt worden. Gemäß unserer Europäischen Pa­ tentanmeldung Nr. 392 482 (Obj. 907) kann dann ein Rufsignal an die Transportanlage von der Ringspinnmaschine gesendet werden.In a further automation stage, an automatic transport system for conveying the flyer bobbins between the flyers and the ring spinning machines, for example according to FIG. 3, can be provided. A suitable arrangement has also been shown in our European Patent Application No. 431268 (Obj. 2012). According to our European patent application no. 392 482 (ref. 907), a call signal can then be sent to the transport system from the ring spinning machine.

Das Rufsignal (welches das Heranführen eines neuen Zuges auslösen sollte), könnte selbst am Wechselzeitpunkt ausge­ löst werden. Dies würde aber eine fast unplanbare Verzöge­ rung gegenüber dem Wechselsignal bedeuten, was die Bedie­ nungsunterstützung erschweren würde. Statt dessen kann, wie bis anhin (z. B. in einem System nach EP-392 482) ein Rufsi­ gnal nach einem neuen Zug an die Transportanlage gleichzei­ tig mit bzw. anschließend an der Rücksendung eines Zuges mit Leerhülsen gesendet werden. Der neue Zug sollte dann schon beim nächsten Wechselzeitpunkt an der zutreffenden Maschine zur Verfügung bereit stehen.The call signal (which is the approach of a new train should trigger), could even out at the time of change be solved. But this would be an almost unscheduled delay tion to the alternating signal mean what the Bedie support would be difficult. Instead, how can until now (eg in a system according to EP-392 482) a Rufsi gnal after a new train to the transport system simultane- ously with or after the return of a train be sent with empty tubes. The new train should then  already at the next change time at the appropriate Machine available.

Das Fördern der Flyerspulen an die Ringspinnmaschine läßt an und für sich das Umtauschen der vollen und leeren Spulen noch offen. Dies kann zum Beispiel noch vom Personal ausge­ führt werden. In diesem Fall ist eine Kombination dieser Erfindung mit einem System nach unserer PCT Patentanmeldung Nr. PCT/CH92/00139 (Obj. 2247) vorteilhaft, wonach die Ringspinnmaschine einen Zug aus der Transportanlage ruft und diesen Zug dann gegenüber dem Gatter positioniert, so daß das Personal nur das Umtauschen aus dem vorpositionierten Zug auszuführen hat.The conveying of the flyer bobbins to the ring spinning machine leaves in and of itself the exchange of full and empty bobbins still open. This can, for example, still from the staff be led. In this case, a combination of these Invention with a system according to our PCT patent application No. PCT / CH92 / 00139 (Obj. 2247), according to which the Ring spinning machine calls a train from the transport system and then positioned this train opposite the gate, so that the staff only the exchange from the prepositioned Train has to perform.

Die Gatterbeschickung kann aber automatisch nach unserer Europäischen Patentanmeldung Nr. 394708 (Obj. 2083) oder Nr. 419968 (Obj. 2054) ausgeführt werden. In diesem Fall kann die Maschinensteuerung den Gatterbedienungsroboters an den zu­ treffenden Block führen, wo der Zug schon positioniert ist, oder den Roboter mit dem eintreffenden Zug verbinden, so daß der Roboter selbst den Zug gegenüber dem Gatter positio­ niert.The gate can be loaded automatically after our European Patent Application No. 394708 (Obj. 2083) or no. 419968 (Obj. 2054). In this case, the Machine control to the gate operator robot to leading block, where the train is already positioned, or connect the robot to the incoming train so that the robot itself positio the train opposite the gate ned.

Ein solches System kann weiterhin mit einem Prozeßleitrechner zur Bedienungsunterstützung kombiniert werden, so daß das Bedienungspersonal an einen Block geführt wird, wo ein Spulenwechsel stattfindet, um Zusatzfunktionen zu übernehmen, zum Beispiel Lunten bzw. Faden wieder anzuset­ zen.Such a system can continue with a process control computer be combined to provide operator assistance, so that the operator is guided to a block, where a bobbin change takes place to additional functions take over, for example, Lunten or thread again anzuset Zen.

In einer vollautomatisierten Anlage ist aber der Eingriff des Bedienungspersonals unnötig, da die zutreffenden Bedie­ nungsroboter, zum Beispiel nach unserer PCT-Patentanmeldung Nr. WO-92/01098 (Obj. 2097) oder unserer Europäischen Patent­ anmeldungen Nr. 382 943 (Obj. 2151) und Nr. 377 888 (Obj. 2152) an die zutreffenden Stellen geleitet werden können. All diese Varianten beruhen auf dem in unserer PCT-Patent­ anmeldung Nr. WO-92/13l21 (Obj. 2212) dargelegten Prinzip, wonach eine maschinenübergeordnete Steuerung keinen direkten Zugriff in die Maschinenaktorik gewährt wird. Dieses Prinzip erlaubt nur insofern einen Eingriff der maschinenübergeord­ neten Steuerung, zum Beispiel zum Anpassen der Synchronisie­ rung bzw. des Wechseltaktes der einzelnen Maschinen. Die Erfindung ist aber auch dort anwendbar, wo diesem Prinzip nicht gefolgt wird, sondern statt dessen eine übergeordnete Steuerung vorgesehen ist, die bestimmt, wo und zu welchem Zeitpunkt ein Blockwechsel stattfinden sollte und die ent­ sprechenden Signale an die betroffenen Bedienungsein­ richtungen bzw. das Personal sendet.In a fully automated system but is the intervention of the operators unnecessary, since the applicable Bedie robot, for example according to our PCT patent application No. WO-92/01098 (Obj. 2097) or our European Patent  applications No. 382,943 (Obj. 2151) and No. 377,888 (Obj. 2152) can be directed to the relevant authorities. All of these variants are based on that in our PCT patent registration no. WO-92 / 13l21 (obj. 2212), according to which a superordinate control no direct Access is granted in the Maschinenaktorik. This principle only allows an intervention of machine superiority Neten control, for example, to adjust the Synchronisie tion or the changeover cycle of the individual machines. The But invention is also applicable where this principle is not followed, but instead a parent Control is provided, which determines where and to which Time a block change should take place and the ent speaking signals to the affected Bediensein directions or personnel.

Ausarbeitung des KonzeptesPreparation of the concept

Es ist bislang nicht zur Diskussion gestellt worden, ob bei einem "Wechselzeitpunkt" des Planes nach Fig. 6/Fig. 7 die Maschine eigentlich einen Block wechseln muß. Das System könnte so angeordnet werden, um einen zwangshaften Wechsel durchzuführen. In der bevorzugten Ausführung ist dies aber nicht so, weil ein solcher "Automatismus" gegen das Prinzip verstößt, das in Obj. 2212 aufgestellt wurde, nämlich daß die Maschine selbst "Entscheide" fällen muß, welche einen Eingriff in die eigene Aktorik bedeuten. Die Gründe dafür (in diesem Zusammenhang) sollen nachfolgend anhand der Fig. 9 näher erläutert werden. Ein Grund ist aber sofort erkenn­ bar, wenn kein neuer Zug eingetroffen ist, was von der Sensorik der Maschine feststellbar sein solle, kann kein Wechsel durchgeführt werden. Die Maschine sollte dann aber ein Alarm auslösen. It has not yet been put up for discussion, whether at a "change time" of the plan of Fig. 6 / Fig. 7, the machine actually has to change a block. The system could be arranged to perform a forced change. However, in the preferred embodiment, this is not so, because such "automatism" is contrary to the principle set forth in Obj. 2212, namely, that the machine itself must make "decisions" which imply interference with its own actuators. The reasons for this (in this context) will be explained in more detail below with reference to FIG. 9. A reason is immediately recognizable bar, if no new train has arrived, which should be detectable by the sensors of the machine, no change can be performed. The machine should then trigger an alarm.

Die Überlegungen, die zur Bestimmung der Länge eines In­ tervalls (Fig. 7) herangezogen werden können, sind noch nicht in Einzelheiten vorgelegt worden. Es kann aber zuerst davon ausgegangen werden, daß der nächste Block der Maschine (d. h. jede Spule dieses Blockes) innerhalb dieses Intervalls ungefähr aufgebraucht wird, das heißt während jedes Inter­ valls laufen die Spulen eines Blockes aus. Dies kann aber nur unter Erfüllung gewisser Annahmen stimmen, nämlich daß die Maschine mit einer vorgegebenen Liefergeschwindigkeit betrieben wird, daß die Doffunterbrüche sich stochastisch aufteilen, und daß der Betrieb ungestört bleibt, so daß keine unvorhersehbare Unterbrüche vorkommen. Dies kann aber nicht in der Praxis gewährleistet werden - insbesondere müssen mit gelegentlichen "unvorhersehbaren" Unterbrüchen gerechnet werden. Die Auswirkungen sind aus Fig. 9 zu ent­ nehmen.The considerations that may be used to determine the length of an interval ( Figure 7) have not yet been presented in detail. However, it can first be assumed that the next block of the machine (ie each coil of this block) will be approximately used up within this interval, that is, during each interval, the coils of one block will expire. However, this can only be true by meeting certain assumptions, namely that the machine is operated at a predetermined delivery speed, that the Doffunterbrüche divide stochastically, and that the operation remains undisturbed, so that no unpredictable interruptions occur. However, this can not be guaranteed in practice - in particular must be expected with occasional "unpredictable" interruptions. The effects are taken from Fig. 9 ent.

Fig. 9A zeigt den normalen Zustand, wonach innerhalb eines Intervalls ein Block der über mehrere Intervalle im Betrieb gestanden ist, gerade aufgebraucht wird. Dabei ist mit einer gewissen Abfallmenge auf einzelnen Spulen zu rechnen, da die Flyerspulen wohl nicht alle die genau gleiche Länge aufwei­ sen. Wenn nun gemäß Fig. 9B innerhalb dieses Intervalls (oder vorher) ein Betriebsunterbruch der Dauer T für diese Maschine vorkommt, sind keine Spulen am Wechselzeitpunkt aufgebraucht worden. Wenn aber dann trotzdem gewechselt wird, ist mit einer deutlichen Erhöhung der Abfallmenge zu rechnen, was die Entsorgungskosten erhöhen wird. Fig. 9A shows the normal state that within one interval a block that has been in operation for several intervals is being consumed. It is to be expected with a certain amount of waste on individual coils, since the flyer spools probably not all the exact same length aufwei sen. If, as shown in FIG. 9B, within this interval (or before) there is an interruption in operation of the duration T for this machine, no coils have been used up at the time of change. However, if it is changed anyway, a significant increase in the amount of waste is to be expected, which will increase disposal costs.

Die Maschine kann trotzdem "gezwungen" werden, den "fäl­ ligen" Block auszuwechseln, (vorausgesetzt, daß ein Zug vorhanden ist), was zumindest den Vorteil des ruhigen (ge­ steuerten) Laufs der Gesamtanlage mit sich bringt. Es ist aber möglich, diesen Vorteil beizubehalten und gleichzeitig die Nachteile des "Automatismus" zu vermeiden. Dazu aber ist es notwendig, die Maschinensteuerung mit einer Entschei­ dungsregel zu versehen, womit bei jedem Wechselzeitpunkt entschieden werden kann, ob ein Wechsel auszuführen ist oder nicht.The machine can nevertheless be "forced", the "Fäl "change block, (assuming that a train is present), which at least the advantage of the quiet (ge controlled) run of the entire system entails. It is but possible to maintain this advantage and at the same time to avoid the disadvantages of "automatism". But this is  it is necessary, the machine control with a decision tion rule, which at each change time It can be decided whether a change is to be carried out or Not.

Eine geeignete Regel lautet:A suitable rule is:

  • - an jedem Wechselzeitpunkt prüfen, ob in dem Block mit dem geringsten Spuleninhalt noch genügend Material vor­ handen ist, um die entsprechenden Spinnstellen bis zum nächsten Wechselzeitpunkt zu versorgen.- Check at each changeover time whether in the block with the least spool content still sufficient material before hand is to the appropriate spinning stations until the supply the next changeover point.

Wenn ja, wird kein Wechsel ausgeführt, d. h. es wird kein Signal erzeugt, welches einen Wechsel auslöst.If so, no change is carried out, i. H. it will not be Signal generated, which triggers a change.

Wenn nein, wird wie schon beschrieben, gewechselt.If not, change as already described.

Dies bedeutet, daß beim Wechselzeitpunkt sowohl der Inhalt des dem Leerlaufen annähernden Blockes (normalerweise des am längsten im Einsatz stehenden Blockes), wie auch der Bedarf bis zum nächsten Wechselzeitpunkt bekannt bzw. abschätzbar sein muß. Dies kann durch eine Blockverwaltung nach Fig. 10 oder nach EP-381 934 erfolgen. Für jeden Block B1 bis Bn ist ein diesem Block zugeordneter Speicher vorgesehen, welcher Daten zur noch verbleibenden Vorgarnmenge des Blockes ent­ hält. Mittels eines Meßgerätes 80 (z. B. eines mit dem Lie­ ferzylinder drehbaren Encoders) werden Signale erzeugt, welche dem Verbrauch entsprechen. Beim Verbrauch einer Men­ geneinheit wird der Inhalt jeder Speicherzelle entsprechend abgebaut, zum Beispiel über den Datenbus 82, der mit jeder Speicherzelle verbunden ist.This means that at the time of change, both the content of the block approaching idling (usually the longest-standing block) and the need for the next change-over point must be known or can be estimated. This can be done by block management according to FIG. 10 or according to EP-381 934. For each block B1 to B n, a block associated with this memory is provided, which holds data about remaining roving amount of the block ent. By means of a measuring device 80 (eg., An encoder with the Lie¬ rotatable encoder) signals are generated, which correspond to the consumption. Consuming a Men geneinheit the content of each memory cell is reduced accordingly, for example via the data bus 82 , which is connected to each memory cell.

Der Anfangsinhalt beim Wechsel des Blockes muß über ein geeignetes Gerät 84 in die zutreffenden Speicherzellen ein­ gelesen werden. Dieses Gerät kann zum Beispiel ein Datenübermittlungsgerät sein, welches Angaben direkt von Flyern weiterleitet. Als Alternative könnte die Information auf den Spulen angegeben werden, durch das Gerät 84 beim Laden der neuen Spulen ins Gatter abgegeben und an die Ma­ schinensteuerung weitergeleitet werden, wobei die Block­ adresse auch feststellbar sein muß.The initial content when changing the block must be read via a suitable device 84 in the appropriate memory cells. This device can be, for example, a data transmission device that forwards information directly from flyers. Alternatively, the information could be given on the coils, delivered by the device 84 when loading the new coils in the gate and forwarded to the Ma machine control, the block address must also be detectable.

An einem Wechselzeitpunkt können die Inhalte aller Spei­ cherzellen ausgelesen und miteinander verglichen werden, um die Zellenadresse (Blockadresse) mit dem geringsten Inhalt festzustellen. Falls dieser Inhalt andeutet, daß die Spinnstellen bis zum nächsten Wechselzeitpunkt der gleichen Maschinen nicht sicher versorgt werden können, wird ein Si­ gnal erzeugt, das die Blockadresse angibt und das Bedie­ nungspersonal an diesen Block leitet. Eine ähnliche Spei­ cheranordnung ist in EP-381 934 gezeigt worden.At a point of change, the contents of all Spei be read and compared with each other to the cell address (block address) with the least content determine. If this content indicates that the Spinning positions until the next changeover time of the same Machines can not be safely supplied, a Si gnal which specifies the block address and the operation personnel to this block. A similar Spei arrangement has been shown in EP-381 934.

Wie im System nach EP-381 934, wird angenommen, daß jede Spule eines Blockes ungefähr die gleiche Menge Vorgarn trägt.As in the system according to EP-381 934, it is assumed that each Spool of a block about the same amount of roving wearing.

Vorteilhaft wäre auch die Berücksichtigung allfälliger planbarer Zwischenstopps wie zum Beispiel ein Doff oder Änderungen in Betriebsbedingungen, zum Beispiel Änderungen der Spindeldrehzahl während des Kopsaufbaus, Ring- bzw. Läufereinlaufperioden, Wartungsperioden usw. Solche Infor­ mationen könnten zum Beispiel gemäß einem System nach un­ serer europäischen Patentanmeldung Nr. 92 107 474.6 (Obj. 2219) bzw. unserer deutschen Patentanmeldung Nr. 41 31 247.3 (Obj. 2260) ermittelt werden. The consideration of any would be advantageous Plannable stopovers such as a Doff or Changes in operating conditions, for example changes the spindle speed during the Kopsaufbaus, ring or Runner-in periods, maintenance periods, etc. Such information For example, according to a system according to un European Patent Application No. 92 107 474.6 (Obj. 2219) or our German patent application No. 41 31 247.3 (ref. 2260).  

Wahl der ZeitpunkteChoice of dates

Die Laufdauer (LD) einer Spule (unter den gegebenen Be­ triebsbedingungen) und die Anzahl (A) der Blöcke, die in einer Maschine bedient werden müssen, ergeben den
"Blockabstand" oder "Periode" (P)
The running time (LD) of a spool (under the given operating conditions) and the number (A) of blocks that must be operated in one machine give the
"Block spacing" or "period" (P)

Die Periode P wird nun zwischen den "n" Maschinen des Be­ dienbereiches gleichmäßig verteilt, was einen "Kontrollab­ stand" KA zwischen zwei Wechselzeitpunkten im Bedienbereich von KA = P/n ergibt.The period P is now between the "n" machines of Be evenly distributed, which creates a "Kontrollab "KA between two change times in the operating area of KA = P / n.

Allerdings sollte eine Sicherheitsmarge (S) einkalkuliert werden, zum Beispiel um den Laufweg des Bedienungspersonals zwischen zwei Blöcken zu berücksichtigen, so daß die effek­ tiv zwischen zwei Wechselzeitpunkten für die Arbeiten zur Verfügung stehende Zeit durch KA - S bzw.However, a safety margin (S) should be included be, for example, the walk of the operators between two blocks, so that the effek tively between two changeover times for the work on the Available time by KA - S or

gegeben ist.given is.

Das Resultat ist schematisch in Fig. 11 gezeigt worden. Es wird angenommen, die Maschine RSM2 erzeuge am Wechselzeit­ punkt W21 ein "Wechselsignal", welches zum Beispiel zum Aufleuchten einer Lampe an der Maschine RSM führt. Ein Zug ist schon vorher gerufen worden und ist gemäß dem Verfahren nach PCT/CH92/00139 gegenüber dem auszutauschenden Block positioniert worden, so daß der Bediener sofort weiß, welcher Block gewechselt werden muß.The result has been shown schematically in FIG . It is assumed that the machine RSM2 generate at the change time point W21 a "change signal", which leads, for example, to a lamp lighting on the machine RSM. A train has already been called and has been positioned according to the procedure of PCT / CH92 / 00139 with respect to the block to be exchanged, so that the operator knows immediately which block has to be changed.

Der Bediener trifft innerhalb der "Sicherheitsmarge" S am zutreffenden Block ein, und führt eine Operation aus, welche ihre Anwesenheit an die Maschinensteuerung über ein maschi­ neninternes Kommunikationssystem meldet (sie betätigt z. B. die in PCT/CH92/00139 erwähnte "Reissleine", um den Zug in Langsamfahrt in Bewegung zu setzen). Wenn die Anwesenheit der Bedienerin beim Ablauf der Sicherheitsmarge nicht an die Maschinensteuerung gemeldet worden ist, kann ein Alarm aus­ gelöst werden.The operator meets within the "safety margin" S on block, and perform an operation which their presence at the machine control via a maschi internal communication system reports (for example, it actuates in PCT / CH92 / 00139 mentioned "rip cord" to the train in To set slow motion in motion). If the presence the operator during the expiry of the safety margin to the Machine control has been reported, may be an alarm be solved.

Die eigentliche Arbeitszeit für den Blockwechsel beträgt zum Beispiel BWI (Blockwechselintervall) und die vorerwähnte Zeitdauer (KA-S) ist vorzugsweise länger als BWI. Die Be­ dienerin kann sich daher mit weiteren Operationen beschäf­ tigen, bevor der nächste Wechsel fällig wird.The actual working time for the block change amounts to Example BWI (block change interval) and the aforementioned Duration (KA-S) is preferably longer than BWI. The Be Servant can therefore deal with further operations before the next change is due.

Solange keine Störung vorkommt und die gespeicherten Angaben zur Menge des Vorgarnes stets genau sind, soll jeder Block beginnen auszulaufen, als sich die "Sicherheitsmarge" S zu Ende kommt. Dies ergibt die minimale Abgangsmenge. Die ide­ alen Anforderungen sind allerdings praktisch unerfüllbar. Ein Stop führt gezwungenermaßen zur Erhöhung der Abfall­ menge. Diese Wirkung kann dadurch begrenzt werden, daß der Kontrollabstand KA zwischen den Wechselzeitpunkten kürzer gewählt wird. Ein Kontrollabstand "gleich Null" bedeutet die kontinuierliche Überwachung der Maschinen eines Bedienbe­ reiches mit dem Ausführen von Blockwechseln zu "beliebigen" Zeitpunkten. Dies ist nicht wünschenswert, aus Gründen die im Zusammenhang mit Fig. 5 erklärt wurden.As long as no disturbance occurs and the stored information on the amount of roving is always accurate, each block should begin to leak as the "safety margin" S comes to an end. This gives the minimum amount of waste. The ideal requirements, however, are practically unattainable. A stop leads forced to increase the amount of waste. This effect can be limited by the fact that the control distance KA between the change times is shorter. A control distance "equal to zero" means the continuous monitoring of the machines of a Bedienbe rich with the execution of block changes to "any" time points. This is not desirable, for reasons explained in connection with FIG .

Vorzugsweise ist der Kontrollabstand durch die folgende Formel gegeben:Preferably, the control distance is by the following Formula given:

wo i eine ganzzahlige Zahl <0 ist. Keine Überlappung der Blockwechsel muß sichergestellt sein.where i is an integer number <0. No overlap of Block change must be ensured.

Zuteilung fester Leerlaufzeitpunkte an jede Ringspinnma­ schineAllocation of fixed idle times to each ring spinnma machine

Nach einer Ausführung dieser Erfindung wird jeder Rings­ pinnmaschine eines Bedienbereiches ein kurzes Zeitintervall zugeteilt, in dem ein Bediener zum Wechseln eines Blockes dieser Maschine angefordert werden kann. Die Maschinen­ steuerung berechnet aus diesem Zeitpunkt und der bekannten Periode (Spulenlaufzeit/Anzahl Blöcke pro RSM) die für alle Maschinen eines Bedienbereiches gleich sein muß, die fol­ genden Zeitintervalle während denen sie einen Bediener an­ fordern kann. Dabei wird durch die Wahl der Anzahl einem Bediener zugeteilten Maschinen und der Periodendauer si­ chergestellt, daß die Blockwechsel zweier Maschinen nie überlappen.According to one embodiment of this invention, each ring becomes spinning machine of an operating area a short time interval assigned in which an operator to change a block This machine can be requested. The machines Control calculated from this date and the known Period (Coil running time / number of blocks per RSM) for all Machines of an operating area must be the same, the fol Time intervals during which they are an operator can demand. It is by choosing the number one Operator assigned machines and the period si made sure that the block change of two machines never overlap.

Die Abstimmung der Blockwechselzeitpunkte der Maschinen ei­ nes Bedienbereiches kann durch die Vorgabe des ersten Blockwechselzeitpunktes jeder Maschine erreicht werden, wo­ bei das Blockwechsel-Unterstützungssystem diese Synchroni­ sation mit der Echtzeit (bzw. Betriebszeit) durch die Ver­ wendung einer fixen Periode aufrecht erhält.The coordination of the block change times of the machines ei The operating range can be changed by specifying the first Block change time of each machine to be achieved, where in the block change support system this Synchroni sation with the real time (or operating time) through the Ver a fixed period.

Jede Ringspinnmaschine überprüft beim Beginn des ihr zuge­ teilten Intervalls während dem sie einen Bediener anfordern darf, ob die Vorgarnlänge des Blockes mit dem geringsten Inhalt bei der vorgesehenen Produktion bis zum nächsten Intervall ausreicht. Dazu verwendet sie den Spuleninhalt und die vorgesehene Drehzahlkurve - wobei eine allfällige Dreh­ zahlreduktion (Läufereinlauf) und die Doffzeiten mitberück­ sichtigt werden - sowie die Dauer bis zum nächsten Inter­ vall. Reicht der Inhalt dieses Blockes nicht aus, dann for­ dert sie einen Bediener an (Lampe) oder signalisiert den vorzunehmenden Blockwechsel dem patrouillierenden Bediener. Dabei kann zum Beispiel auf dem Bedienpanel der Ort des zu wechselnden Blockes ausgegeben, am besten graphisch darge­ stellt, (Obj.2093) oder der Spulenzug direkt vor dem zu wechselnden Block positioniert werden.Each ring spinning machine checks at the beginning of it shared intervals while requesting an operator allowed, whether the roving length of the block with the least Content at the scheduled production until the next  Interval sufficient. For this purpose it uses the coil contents and the intended speed curve - with a possible rotation number reduction (rotor inlet) and the Doffzeiten mitberück - and the duration until the next Inter Vall. If the content of this block is insufficient, then for she turns on an operator (lamp) or signals the operator to be made block change the patrolling operator. It can, for example, on the control panel, the place of changing block issued, preferably graphically darge (Obj.2093) or the coil train directly in front of it changing block to be positioned.

Alle Maschinen eines einem Bediener zugeteilten Bereiches (Bedienbereich) müssen die gleichen Intervalle zwischen zwei möglichen Anforderungszeitpunkten des Bedieners aufweisen. Weisen alle Maschinen die gleichen Spulenlaufzeiten auf, dann ist diese Bedingung erfüllt. Bei unterschiedlichen Spulenlaufzeiten kann durch die Wahl der Blockgrößen und der Spulenlaufzeiten jeder Maschine versucht werden, für alle Maschinen ein gemeinsames Intervall zwischen dem Leer­ laufen zweier Blöcke zu erreichen. Die Spulenlaufzeit kann durch das Spulengewicht beeinflußt werden und hängt von der durchschnittlichen Drehzahl und dem Abgang der Maschine ab. Hierzu ein Beispiel: Im betrachteten Fall beträgt die Blockgröße 40 Spulen und die Spulenlaufzeit 86 h. Wird bei einer Maschine eine Blockgröße von 48 Spulen gewählt (21 Blöcke bei 1008 Spinnstellen), dann resultiert bei gleicher Drehzahl und gleichem Spulengewicht eine Spulenlaufzeit von 72 h. Damit ein Transportzug eine ganze Anzahl Blöcke umfaßt, werden zwei Züge zu 120 Spulen gekoppelt und ge­ meinsam der Maschine zugeführt. Bei einer Blockgröße von 20 Spulen resultiert eine Spulenlaufzeit von 172 h.All machines of an area assigned to an operator (Operating area) must have the same intervals between two have possible request times of the operator. If all machines have the same coil running times, then this condition is fulfilled. At different Coil running times can be determined by the choice of block sizes and The coil run times of each machine are tried for all machines have a common interval between the empty to reach two blocks. The coil running time can be influenced by the coil weight and depends on the average speed and the departure of the machine. Here is an example: In the considered case is the Block size 40 coils and the coil running time 86 h. Is at a machine selected a block size of 48 bobbins (21 Blocks at 1008 spinning positions), then results in the same Speed and same coil weight a coil running time of 72 h. So that a transport train a whole number of blocks includes two trains are coupled to 120 coils and ge together fed to the machine. With a block size of 20 Coils results in a coil running time of 172 h.

Dabei sind auch Spulenlaufzeiten erlaubt, die ein ganzzah­ liges Vielfaches der oben berechneten sind. Diese Maschinen benötigen dann nicht jeden Taktzeitpunkt. So kann mit einer Blockgröße von 48 Spulen auch eine Spulenlaufzeit von 144 h erreicht werden und die entsprechende Maschine benötigt im Durchschnitt nur jeden 2. Taktzeitpunkt.It also coil times are allowed, which is a ganzzah are many times that calculated above. These machines  then do not need every clock time. So can with one Block size of 48 coils also has a coil running time of 144 h be achieved and the appropriate machine needed in the Average only every 2nd clock time.

Durch den vorgezogenen Blockwechsel wird die Vorgarnmenge auf den Hülsen vergrößert. Diese kann entweder entsorgt werden oder besser auf einer wild aufgesteckten Ringspinn­ maschine, die das gleiche Sortiment benötigt, ausgesponnen werden. Der ungünstigste Fall ist ein Stillstand der gesam­ ten Maschine, wobei die Leerlaufzeitpunkte aller Blöcke verschoben werden. Die dabei anfallenden Vorgarnreste be­ tragen:Due to the early block change, the Vorgarnmenge enlarged on the sleeves. This can either be disposed of or better on a wild pinned ring spinning machine that needs the same assortment, spun out become. The worst case is a stoppage of the total machine, where are the idle times of all blocks be moved. The resulting Vorgarnreste be carry:

Als Periodendauer kann die Dauer zwischen dem Leerlaufen zweier Blöcke auf der gleichen Ringspinnmaschine oder ein ganzzahliger Bruchteil davon verwendet werden. Diese Zeit muß noch um ein fixes Sicherheitsintervall verringert wer­ den, das für das Eintreffen des Bedieners benötigt wird. Eine Reduktion der Periodendauer reduziert die maximalen Vorgarnspulenreste, wobei die Periodendauer immer noch so groß gewählt werden muß, daß keine Blockwechsel überlap­ pen.The period between the emptying can be the period duration two blocks on the same ring spinning machine or one integer fraction of it can be used. This time still has to be reduced by a fixed security interval who the one needed for the arrival of the operator. A reduction of the period reduces the maximum Vorgarnspulenreste, the period is still so must be chosen large that no block changes overlap pen.

Dieses Vorgehen weist den Vorteil auf, daß die Anforde­ rungszeitpunkte nach Vorgarnspulen gleichmäßig verteilt sind, zu deutlich geringeren Schwankungen der Transportan­ lageauslastung und der Flyerproduktion führt. Somit kann ein Transportsystem mit geringerer Kapazität gewählt und die Auslastung der Flyerarbeiter erhöht werden. Zudem ist kein Prozeßleitsystem notwendig, da die Startzeitpunkte, die Periodendauer und die Vorgarnlänge einer Spule über das Bedienpanel manuell eingegeben resp. korrigiert werden kön­ nen.This approach has the advantage that the requirement evenly distributed after roving bobbins are, at significantly lower fluctuations in the transportan capacity utilization and the production of flyers. Thus, a  Transport system chosen with lower capacity and the Utilization of the flyer workers can be increased. Moreover, no Process control system necessary because the start times, the Period duration and the roving length of a coil over the Control panel manually entered resp. can be corrected NEN.

Ein durchgeführter Blockwechsel kann entweder durch den Be­ diener betätigt werden, zum Beispiel durch Quittieren eines entsprechenden Alarmes, oder der Bediener wird angewiesen, bei jeder gewechselten Spule einen Fadenbruch zu erzeugen. Dies verhindert, das der Vorgarnansetzer zu einem, vom Rei­ niger der Spulmaschine nicht erkannten, Garnfehler führt (abhängig von der Reinigereinstellung). Durch die Auswertung der ROBOfildaten kann die Bedienung aller Spulstellen des Blockes erkannt werden. Werden die Spulen aus einem Spulen­ zufuhrzug gewechselt, dann löst der Bediener bei Beginn des Blockwechsels das Signal zum Verschieben des Zuges aus (Reißleine), so daß er die Spulen bequem aus dem fahrenden Zug entnehmen kann (Obj. 2247). Somit bereitet das Erkennen des Blockwechselbeginns in diesem Fall keine Schwierigkeiten und erfordert auch keine zusätzlichen Bedienereingriffe.A completed block change can either by Be be operated, for example, by acknowledging a corresponding alarm, or the operator is instructed to produce a yarn break at each changed bobbin. This prevents the roving piecing from becoming a tear niger the winder unrecognized, thread error leads (depending on the cleaner setting). By the evaluation The ROBOfile data can be used to operate all winding units of the Blockes are detected. Are the coils of a coil changed feeder, then the operator triggers at the beginning of Block change the signal to move the train (Ripcord) so that he can comfortably pull the spools out of the way Can take train (Obj. 2247). Thus, the cognition prepares the block change start in this case, no difficulties and does not require any additional operator intervention.

Durch eine Kontrolle der leergelaufenen Spulen (ROBOfil setzt Luntenstopps für den gesamten Block) sowie der ent­ sorgten Vorgarnspulenmenge (Hülsenreinigungsstation) können Fehler wie ein nicht ausgeführten Wechsel oder eine ungenaue Vorgarnlänge erkannt werden.By checking the empty bobbins (ROBOfil sets Luntenstopps for the entire block) and the ent provided roving bobbin amount (tube cleaning station) Errors like an unexecuted change or an inaccurate one Roving length are detected.

Dieses Vorgehen weist den Vorteil auf, daß die Blockwech­ selabstände konstant sind. Daraus resultiert ein deutlich stabileres Verhalten im Störbetrieb. Der Bedieneraufruf vor dem bevorstehenden Blockwechsel kann ohne Mehraufwand ein­ geführt werden und erlaubt eine günstigere Bedienungsstra­ tegie. This approach has the advantage that the Blockwech Actual distances are constant. This results in a clear more stable behavior in fault mode. The operator call before the upcoming block change can be done without extra effort be guided and allows a more favorable Bedienstrastra strategy.  

Zudem ist kein Prozeßleitsystem notwendig, da die Start­ zeitpunkte, die Periodendauer und die Vorgarnlänge einer Spule über das Bedienpanel manuell eingegeben resp. korri­ giert werden können. Dadurch läßt sich mit diesem Block­ wechselunterstützungssystem auch ein günstiges Verhalten bei bedienerlosen Ringspinnmaschinenschichten erreichen. Insbe­ sondere kann das Leerlaufen von Spulen während den bedien­ erlosen Schichten verhindert werden.In addition, no process control system is necessary because the start times, the period and the roving length of a Coil manually entered via the control panel resp. Corridor can be gassed. This can be done with this block change support system also a favorable behavior reach unmanned ring spinning machine layers. in particular special may be the emptying of coils during the operations to prevent salvaged layers.

Die gleichmäßige Verteilung der Anforderungszeitpunkte nach Vorgarnspulen führt zu deutlich geringeren Schwankungen der Transportsystemauslastung und der Flyerproduktion. Somit kann ein Transportsystem mit geringerer Kapazität gewählt und die Auslastung der Flyerarbeiter erhöht werden.The even distribution of request times after Roving leads to significantly lower fluctuations in the Transport system utilization and flyer production. Thus can choose a transport system with lower capacity and the workload of the flyer workers will be increased.

Anstelle des vorzeitigen Wechsels der Spulen ist auch eine Regelung der Ringspinnmaschinendrehzahl denkbar, mit der erreicht wird, daß der nächste Block innerhalb des er­ laubten Intervalls leerläuft. Diese Variante weist jedoch den großen Nachteil auf, daß sie die Produktionsleistung der Ringspinnmaschine reduziert. Zudem existiert für jeden Artikel eine optimale Drehzahl und durch die Variation der­ selben können die Garneigenschaften ungewollt beeinflußt werden.Instead of the premature change of the coils is also a Control of the ring spinning machine speed conceivable with the is achieved that the next block within the he allowed intervals running idle. However, this variant points the big disadvantage that they affect the production the ring spinning machine reduced. There is also something for everyone Article an optimal speed and by the variation of same, the yarn properties can be affected unintentionally become.

Claims (12)

1. Ein Verfahren zum Betreiben einer Spinnereianlage bzw. eine Gruppe von Spinnmaschinen, wo Vorlagen gemäß dem Blockwechselprinzip gewechselt werden, dadurch gekenn­ zeichnet, daß für jede Maschine der Anlage bzw. der Gruppe Wechselzeitpunkte vorgegeben sind und daß ein Wechsel an einem dieser vorgegebenen Wechselzeitpunkte ausgelöst wird.1. A method for operating a spinning plant or a group of spinning machines, where templates are changed according to the block change principle, characterized in that for each machine of the system or group change times are given and that triggered a change at one of these predetermined change times becomes. 2. Eine Spinnmaschine mit Vorlagestellen, die blockweise angeordnet sind, dadurch gekennzeichnet, daß die Ma­ schine mit einer Steuerung versehen ist, worin für die Maschine vorgegebene Wechselzeitpunkte einprogrammiert sind, so daß an einem Wechselzeitpunkt ein Wechsel für einen Block der Maschine ausgelöst werden kann.2. A spinning machine with presentation points, block by block are arranged, characterized in that the Ma is provided with a control, wherein for the Machine programmed preset switching times are so that at a change time a change for a block of the machine can be triggered. 3. Eine Anlage mit zumindest einer Gruppe von Spinnmaschi­ nen, dadurch gekennzeichnet, daß die Anlage mit Steue­ rungsmitteln versehen ist, worin Wechselzeitpunkte ein­ programmiert sind, so daß an einem Wechselzeitpunkt ein Wechsel ausgelöst werden kann, wobei die Wechselzeit­ punkte zeitlich gestaffelt sind.3. An installation with at least one group of spinning maschi NEN, characterized in that the system with Steue is provided, in which switching points a are programmed so that at a change time Change can be triggered, with the change time points are staggered over time. 4. Eine Anlage nach Anspruch 3, dadurch gekennzeichnet, daß die Maschinen nach Anspruch 2 gebildet sind und die Staffelung durch Einstellung der Maschinensteuerungen erfolgt.4. An installation according to claim 3, characterized that the machines are formed according to claim 2 and the Graduation by setting the machine controls he follows. 5. Eine Anlage nach Anspruch 3, dadurch gekennzeichnet, daß die Wechselzeitpunkte in einer maschinenübergeord­ neten Steuerung einprogrammiert sind.5. A plant according to claim 3, characterized that the switching times in a machine superior Neten control are programmed. 6. Eine Anlage nach Anspruch 5, dadurch gekennzeichnet, daß der Wechsel anhand der vorgegebenen Wechselzeitpunkte in Verbindung mit dem ermittelten Spuleninhalt zum jeweiligen Zeitpunkt gesteuert wird.6. An installation according to claim 5, characterized that the change based on the given  Change times in connection with the determined Coil content is controlled at the time. 7. Eine Anlage nach Anspruch 6, dadurch gekennzeichnet, daß der durch die Steuerung ermittelte Wechselzeitpunkt einen Wechselauftrag an das Bedienungspersonal bzw. die Bedienungseinrichtungen gibt, um das Wechseln auszufüh­ ren.7. A plant according to claim 6, characterized that determined by the control change time a replacement order to the operator or the Operating facilities are to perform the change ren. 8. Eine Anlage nach Anspruch 3 oder 6, dadurch gekenn­ zeichnet, daß der Wechselzeitpunkt anhand der Steuerung vorgegebenen Prioritäten (z. B. kein Leerlaufen in einer bedienerlosen Schicht, Spulenverfügbarkeit usw.) durch­ geführt wird.8. An installation according to claim 3 or 6, characterized gekenn records that the change time based on the controller given priorities (eg no emptying in one unattended layer, coil availability, etc.) to be led. 9. Ein Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß das Wechseln in jedem Block von der Maschine aus­ gelöst werden kann, wobei ein Zeitprogramm für die Ma­ schine in der Maschinensteuerung einprogrammiert ist.9. A method according to claim 1, characterized that switching in each block from the machine can be solved, with a time program for the Ma machine is programmed in the machine control. 10. Ein Verfahren nach Anspruch 9, dadurch gekennzeichnet, daß die Maschinensteuerung einen Wechselauftrag an das Bedienungspersonal bzw. die Bedienungseinrichtungen gibt, um das Wechseln auszuführen.10. A method according to claim 9, characterized that the machine control an exchange order to the Operating personnel or operating devices to perform the switch. 11. Ein Verfahren nach Anspruch 10, dadurch gekennzeichnet, daß die auszuwechselnden vollen Spulen vor dem Wechsel­ zeitpunkt am Gatter bereitgestellt werden.11. A method according to claim 10, characterized that the full bobbins to be replaced before changing time be provided at the gate. 12. Ein Verfahren nach Anspruch 9, 10 oder 11, dadurch ge­ kennzeichnet, daß die Zeitprogramme der Maschinen an­ einander angepaßt sind.12. A method according to claim 9, 10 or 11, characterized ge indicates that the time programs of the machines adapted to each other.
DE19934333011 1992-09-28 1993-09-28 Spinning mill installation - utilises warning techniques applicable to block doffing system Withdrawn DE4333011A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH302292 1992-09-28

Publications (1)

Publication Number Publication Date
DE4333011A1 true DE4333011A1 (en) 1994-03-31

Family

ID=4246878

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19934333011 Withdrawn DE4333011A1 (en) 1992-09-28 1993-09-28 Spinning mill installation - utilises warning techniques applicable to block doffing system

Country Status (1)

Country Link
DE (1) DE4333011A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007007150A1 (en) * 2007-02-09 2008-08-14 Oerlikon Textile Gmbh & Co. Kg Spinning plant with at least one master / slave arrangement
DE102019111775A1 (en) * 2019-05-07 2020-11-12 Saurer Spinning Solutions Gmbh & Co. Kg Method for controlling a service unit

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3135333A1 (en) * 1981-09-07 1983-03-24 Zinser Textilmaschinen Gmbh, 7333 Ebersbach Method and device for controlling the use of an attendance or a mobile maintenance appliance in a spinning plant
DE3635576A1 (en) * 1986-10-20 1988-04-21 Zinser Textilmaschinen Gmbh METHOD AND SYSTEM FOR REPLACING THE REWARNING REEL
EP0381934A1 (en) * 1989-01-10 1990-08-16 Maschinenfabrik Rieter Ag Method and device for effecting the replacement of a set of bobbins in a ring-spinning machine
DE3939789A1 (en) * 1989-12-01 1991-06-06 Schlafhorst & Co W METHOD AND DEVICE FOR OPERATING AN AUTOMATIC WORKING TEXTILE MACHINE
EP0451477A2 (en) * 1990-04-10 1991-10-16 Zinser Textilmaschinen GmbH Device for automatically exchanging empty roving bobbins for new roving bobbins in the creel of a ring spinning machine
WO1992007980A1 (en) * 1990-11-02 1992-05-14 Maschinenfabrik Rieter Ag Automation of the creel feed of a spinning or twisting machine
DE4106542A1 (en) * 1991-03-01 1992-09-03 Zinser Textilmaschinen Gmbh Spinning frame - has computer control to link process timing to doffing mechanism

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3135333A1 (en) * 1981-09-07 1983-03-24 Zinser Textilmaschinen Gmbh, 7333 Ebersbach Method and device for controlling the use of an attendance or a mobile maintenance appliance in a spinning plant
DE3635576A1 (en) * 1986-10-20 1988-04-21 Zinser Textilmaschinen Gmbh METHOD AND SYSTEM FOR REPLACING THE REWARNING REEL
EP0381934A1 (en) * 1989-01-10 1990-08-16 Maschinenfabrik Rieter Ag Method and device for effecting the replacement of a set of bobbins in a ring-spinning machine
DE3939789A1 (en) * 1989-12-01 1991-06-06 Schlafhorst & Co W METHOD AND DEVICE FOR OPERATING AN AUTOMATIC WORKING TEXTILE MACHINE
EP0451477A2 (en) * 1990-04-10 1991-10-16 Zinser Textilmaschinen GmbH Device for automatically exchanging empty roving bobbins for new roving bobbins in the creel of a ring spinning machine
WO1992007980A1 (en) * 1990-11-02 1992-05-14 Maschinenfabrik Rieter Ag Automation of the creel feed of a spinning or twisting machine
DE4106542A1 (en) * 1991-03-01 1992-09-03 Zinser Textilmaschinen Gmbh Spinning frame - has computer control to link process timing to doffing mechanism

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007007150A1 (en) * 2007-02-09 2008-08-14 Oerlikon Textile Gmbh & Co. Kg Spinning plant with at least one master / slave arrangement
DE102019111775A1 (en) * 2019-05-07 2020-11-12 Saurer Spinning Solutions Gmbh & Co. Kg Method for controlling a service unit

Similar Documents

Publication Publication Date Title
EP0513339B1 (en) Plant with a process control computer
EP0712949B1 (en) Process control in the textile field
EP3802927B1 (en) Ring-spinning line and process thereof
EP0090911A2 (en) Method and apparatus to optimize a work occurrence at each working station of a textile machine
DE102017129700A1 (en) Method for operating a service aggregate
DE4209203B4 (en) Spinning / winding machine combination with a device for monitoring the proper working of the individual spinning stations
DE3635576C2 (en) Process and system for changing roving bobbins
DE4306095A1 (en) Spinning and winding installation - has electronic data processing to enable first quality spun yarn to be wound with priority
DE4212629A1 (en) Ring spinner and robot communication system for yarn break servicing - uses existing current and other supply lines with interfaces to connect robot microprocessor with the machine control
DE4333011A1 (en) Spinning mill installation - utilises warning techniques applicable to block doffing system
DE4017303C2 (en) Process for the production of packages with different yarn lengths
DE3210329C2 (en)
DE3429153A1 (en) Textile machine
EP0431268A1 (en) Installation or control for such an installation for transporting flyer bobbins to a ring spinning machine
EP3802389B1 (en) Automatic ring spinning system and method for automatically operating same
EP0916753B1 (en) Spinning system with roving frames and with ring spinning machines
DE102020123977A1 (en) Textile machine and method for operating such a textile machine
EP0501913B1 (en) Procedure for the operation of a winding machine consisting of a cops preparing station, a circulation buffer and several winding station
WO1992015737A1 (en) Process and device for controlling a reticulated installation
DE19648215A1 (en) Open end spinning batch change
EP0512442A1 (en) Planning and control of the production for a spinning installation
EP3957783B1 (en) Textile machine with a large number of identical work positions
CH686190A5 (en) Product exchange process.
DE4400601A1 (en) Systemic efficiency control
EP0290004A2 (en) System for making cross-wound packages with different lengths in meters

Legal Events

Date Code Title Description
OR8 Request for search as to paragraph 43 lit. 1 sentence 1 patent law
8105 Search report available
8139 Disposal/non-payment of the annual fee