DE4227789A1 - Railway train axle spacing measuring system - using equation specified in terms of front and rear axle detection time points of axle pairs provided by spaced track switches - Google Patents

Railway train axle spacing measuring system - using equation specified in terms of front and rear axle detection time points of axle pairs provided by spaced track switches

Info

Publication number
DE4227789A1
DE4227789A1 DE4227789A DE4227789A DE4227789A1 DE 4227789 A1 DE4227789 A1 DE 4227789A1 DE 4227789 A DE4227789 A DE 4227789A DE 4227789 A DE4227789 A DE 4227789A DE 4227789 A1 DE4227789 A1 DE 4227789A1
Authority
DE
Germany
Prior art keywords
axle
track
distance
switching means
track switching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE4227789A
Other languages
German (de)
Other versions
DE4227789B4 (en
Inventor
Achim Dr Ing Gottschalk
Wilfried Dipl Ing Jobst
Dietrich Dipl Ing Ennulat
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Priority to DE4227789A priority Critical patent/DE4227789B4/en
Priority to CH182693A priority patent/CH687419A5/en
Publication of DE4227789A1 publication Critical patent/DE4227789A1/en
Application granted granted Critical
Publication of DE4227789B4 publication Critical patent/DE4227789B4/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L17/00Switching systems for classification yards

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Measurement Of Resistance Or Impedance (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The axle spacing measuring system calculates the spacing between the successive axles of a multiple-carriage train. An equation is defined in terms of the axle detection time points provided by a railway track switches and the known spacing between the latter. Pref. the spacing between the track switches is greater than the min. possible spacing between the vehicle axles, with the axle detection time points provided by a further preceding or following track switch used to replace the axle detection time points of a failed track switch. ADVANTAGE - In procedure for determining running resistance and path following measurement. Simple detection of axle spacing without additional track side device.

Description

Die Erfindung bezieht sich auf ein Verfahren nach dem Oberbegriff des Patentanspruches 1.The invention relates to a method according to the Preamble of claim 1.

In dem Hauptpatent ist ein Verfahren zum Bestimmen des Rollwiderstandes von Eisenbahnfahrzeugen offenbart, das dadurch gekennzeichnet ist, daß bestimmte bei der Roll­ widerstandsbestimmung zunächst geschätzte Parameterwerte in einem iterativen Verfahren nach und nach verbessert werden, bis sie schließlich den tatsächlichen Gegebenhei­ ten des jeweils betrachteten Ablaufes entsprechen. Das vorliegende Verfahren bezeichnet eine Möglichkeit für die Bestimmung eines die Achsabstände der Abteilungen beschrei­ benden Anfangsschätzwertes, der den tatsächlichen Gegeben­ heiten der Abteilungen bereits sehr nahe kommt.In the main patent is a method for determining the Rolling resistance of railway vehicles discloses that is characterized in that certain in the roll resistance determination first estimated parameter values gradually improved in an iterative process until they finally become the actual fact correspond to the process under consideration. The The present procedure denotes a possibility for the Determination of a description of the center distances of the departments initial estimate, which is the actual given departments is already very close.

Das im Hauptpatent offenbarte Verfahren benötigt die Kennt­ nis über die einzelnen Achsabstände der ablaufenden Abtei­ lungen, um eine Laufwegverfolgung der Abteilungen inner­ halb einer Meßstrecke vornehmen zu können. Die Kenntnis über den aktuellen Laufweg der einzelnen Achsen ist erforderlich, um den Einfluß der Streckenneigung an jedem Ort innerhalb der Meßstrecke auf die Abteilungen rechne­ risch bestimmen zu können. Bislang werden für die Laufweg­ verfolgung von Fahrzeugen, wenn auch jeweils für andere Zwecke, entweder Radargeräte (DE-PS 30 25 828) oder gleis­ gebundene Einrichtungen zur Gleisfreilängenmessung vor den vorrückenden Abteilungen verwendet (DE-PS 31 27 672). Der Aufwand für die Laufwegverfolgung nach dem Stand der Technik ist durch das Vorhalten von Radargeräten bzw. die Ausrüstung der Gleise mit Gleisstromkreisen groß. Mindestens mit der letztgenannten Einrichtung ist auch nur der Fahrort der ersten Achse einer Abteilung feststellbar, nicht der Fahrort der übrigen Achsen der Abteilung.The method disclosed in the main patent requires knowledge nis about the individual center distances of the running abbey in order to keep track of the internal departments to be able to make half of a measuring section. The knowledge about the current travel of the individual axes required to understand the influence of the slope on each Calculate the location within the measuring section on the departments to be able to determine. So far for the runway tracking vehicles, albeit for others Purposes, either radars (DE-PS 30 25 828) or track tied facilities for free track length measurement before advancing departments used (DE-PS 31 27 672). Of the Expenses for route tracking according to the status of  Technology is by keeping radar equipment available Equipping the tracks with track circuits large. At least with the latter facility is only the location of the first axis of a department can be determined, not the location of the other axes of the department.

Aufgabe der Erfindung ist es, ein Verfahren nach dem Oberbegriff des Patentanspruches 1 anzugeben, das zur Bestimmung der Achsabstände ablaufender Abteilungen ohne zusätzliche Mittel am Gleis auskommt und lediglich auf das Vorhandensein von aus anderen Gründen ohnehin vorhandenen Gleisschaltmitteln im Bereich einer Meßstrecke abstellt.The object of the invention is a method according to the The preamble of claim 1 specify that for Determination of the center distances of running departments without additional funds on the track and only on that Presence of already existing for other reasons Track switching means in the area of a measuring section.

Die Erfindung löst diese Aufgabe durch die kennzeichnenden Merkmale des Patentanspruches 1. Der danach zahlenmäßig bestimmbare Wert für den Abstand zweier aufeinander folgen­ der Achsen einer Abteilung beruht ausschließlich auf der Kenntnis des Abstandes zweier Gleisschaltmittel, die die Befahrungsereignisse detektieren und den Zeitmessungen, dieser Gleisschaltmittel. Alle diese Größen sind hochgenau feststellbar, so daß der bei der Anwendung des im Haupt­ patent beschriebenen Verfahrens ablaufende Optimierungs­ vorgang bezüglich der in die Betrachtung eingebrachten Achsabstände kaum mehr größere Änderungen erfordert. Der formelmäßige Zusammenhang zwischen den Achsabständen und den zugehörigen Ereignismeldungen der Gleisschaltmittel beruht auf der Annahme einer gleichmäßig beschleunigten Bewegung innerhalb des von der Abteilung während des Meßvorganges zurückgelegten Laufweges. Etwaige Fehler für die berechneten Achsabstände, die dadurch bedingt sind, daß die tatsächliche Bewegung innerhalb des beobachteten Laufweges keine gleichmäßig beschleunigte Bewegung sondern eine ungleichmäßig beschleunigte Bewegung darstellt, werden durch das im Hauptpatent geschilderte Iterations­ verfahren zur Meßwertoptimierung eliminiert. Die detek­ tierten Achsabstände beziehen sich sowohl auf die Achsen ein und desselben Fahrzeugs als auch auf die letzte Achse eines Fahrzeugs und die erste Achse eines Folgefahrzeugs der betreffenden Abteilung.The invention solves this problem by the characterizing Features of claim 1. The number thereafter determinable value for the distance between two successive The axes of a department are based exclusively on the Knowledge of the distance between two track switching means that the Detect traffic events and the time measurements, this track switching means. All of these sizes are highly accurate noticeable so that when applying the in the main ongoing optimization process described in patent process related to the considered Axis spacing hardly requires any major changes. Of the formulaic relationship between the center distances and the associated event messages of the track switching means is based on the assumption of an evenly accelerated Movement within that of the department during the Measuring process covered route. Any errors for the calculated center distances, which are due to this, that the actual movement is observed within the Path, not an evenly accelerated movement, but represents an unevenly accelerated movement, through the iteration described in the main patent  process for measured value optimization eliminated. The detec Centered distances relate both to the axes one and the same vehicle as well as on the last axle of a vehicle and the first axle of a following vehicle the department concerned.

Für jeden Radsatz gibt es beim Passieren zweier beabstan­ deter Gleisschaltmittel insgesamt vier Zeitmeßwerte, von denen die der jeweils hinteren Achse des betrachteten Achspaares zugeordneten Zeitwerte gleichzeitig auch die für die vordere Achse des folgenden Achspaares geltenden Zeitwerte sind.For each wheel set there are two beabstan when passing The track switch means a total of four time measurements, from those of the respective rear axle of the considered The time values assigned to the axis pair also the apply to the front axle of the following pair of axles Are current values.

Fehlerbetrachtungen bezüglich der Zeitmessungen, die sich aus der Abtastfrequenz für die Zeitmessungen ergeben, zeigen, daß es von Vorteil ist, die Meßbasis also den Abstand der Gleisschaltmittel für die Ausgabe der Über­ rollzeiten größer zu machen als den kleinsten möglichen Achsabstand innerhalb einer Abteilung. Dieser kleinst­ mögliche Achsabstand ist durch den Achsabstand bei Drehge­ stellen gegeben. Zweckmäßig liegt der Abstand der die Meßwerte liefernden Gleisschaltmittel in der Größenordnung des mittleren Achsabstandes der ablaufenden Abteilungen.Error considerations regarding the time measurements that occur result from the sampling frequency for the time measurements, show that it is advantageous to use the measuring base Distance of the track switching means for the output of the over to make roll times greater than the smallest possible Center distance within a department. This smallest possible center distance is due to the center distance at Drehge put given. The distance between them is expedient Track switching means delivering measured values in the order of magnitude the center-to-center distance of the running departments.

Fällt aufgrund eines Defektes eines der Gleisschaltmittel aus, deren Meßwerte in die Ermittlung der Achsabstände ablaufender Abteilungen einfließt, so kann an deren Stelle ohne weiteres auf eine oder auch auf zwei andere Gleis­ schaltmittel zurückgegriffen werden. Fallen beispielsweise die in Ablaufrichtung gesehen zweiten Schaltmittel aus, so erfolgt die Bestimmung der Achsabstände durch Bewertung der Ereignismeldungen des ersten und eines dritten Gleis­ schaltmittels; im Bestimmungsausdruck für die Achsabstände der Abteilungen sind dann die geänderten Abstandswerte zwischen den an der Messung beteiligten Gleisschaltmitteln zu berücksichtigen. Fällt das in Ablaufrichtung gesehen erste Gleisschaltmittel aus, so kann entweder auf die Ereignismeldungen eines noch weiter entgegen der Ablauf­ richtung liegenden Gleisschaltmittels zurückgegriffen werden oder aber in die Achsabstandsermittlung werden die Ereignismeldungen des noch intakten, in Fahrrichtung hin­ ter dem ausgefallenen Gleisschaltmittel liegenden Gleis­ schaltmittels und die des folgenden Gleisschaltmittels herangezogen.Falls due to a defect in one of the track switching devices from, the measured values in the determination of the center distances running departments, so in their place easily on one or two other tracks switching means can be used. Fall, for example the second switching means seen in the downward direction, see above the center distances are determined by evaluation the event messages of the first and a third track switching means; in the determination printout for the center distances of the departments are the changed distance values  between the track switching devices involved in the measurement to consider. If this is seen in the drain direction first track switching means, so either on the Event messages one more contrary to the process in the direction of the track switch be or in the axis distance determination Event messages of the still intact, in the direction of travel ter the failed track switch means switching means and that of the following track switching means used.

Für den Fall, daß über die Gleisschaltmittel normierte Achsabstände, vorzugsweise die Abstände von Drehgestellen, detektiert werden, ist es von Vorteil, für die Bestimmung des Rollwiderstandes einer Abteilung anstelle des durch die Anwendung des erfindungsgemäßen Verfahrens gewonnenen Achsabstandswertes den tatsächlichen Achsabstandswert heranzuziehen. Dieser liegt z. B. in Tabellenform vor, so daß auf ihn zurückgegriffen werden kann, sobald ein Meßwert bestimmt wird, der außerordentlich nahe an einem normierten Achsabstandswert liegt.In the event that standardized over the track switching means Center distances, preferably the distances between bogies, be detected, it is advantageous for the determination the rolling resistance of a department instead of through obtained the application of the method according to the invention Center distance value the actual center distance value to use. This is z. B. in tabular form, so that it can be accessed as soon as a Measurement value is determined that is extremely close to a normalized center distance value.

Die bei Anwendung des erfindungsgemäßen Verfahrens gefun­ denen, gegebenenfalls durch das im Hauptpatent geschilder­ te Verfahren zur Rollwiderstandsmessung verbesserten Ab­ standswerte können auch zur Laufwegverfolgung der Abteilun­ gen außerhalb der Meßstrecken herangezogen werden, bei­ spielsweise um den Füllzustand der Zugbildungsgleise zu bestimmen.Found when using the method according to the invention those, if necessary, by the one described in the main patent Improved methods for rolling resistance measurement Status values can also be used to track the route of the department conditions outside the measuring sections are used for example to fill up the train formation tracks determine.

Claims (4)

1. Verfahren zum Bestimmen der Achsabstände von eine Strecke im freien Lauf passierenden Eisenbahnfahrzeugen durch Bewertung von Befahrungsereignissen als Anfangs­ werte einer der Modellparameter für die Laufzeit/Laufwegbe­ schreibung in einem Verfahren zum Bestimmen des Rollwider­ standes von Eisenbahnfahrzeugen nach Patent (P 42 14 541.4), dadurch gekennzeichnet, daß die Achsabstände aufeinanderfolgender Achsen einer aus gegebenenfalls mehreren gekuppelten Fahrzeugen bestehenden Abteilung ausschließlich aus den Überrollzeitpunkten zweier Gleisschaltmittel nach folgendem Bestimmungsaus­ druck ermittelt werden mit li = zu bestimmender Achsabstand
t = Überrollzeitpunkt eines Gleisschaltmittels mit dem Index i für die jeweils vordere Achse und dem Index i+1 für die hintere Achse eines Achspaares und
mit dem Index K für das zunächst überlaufene Gleis­ schaltmittel und
dem Index K+1 für ein danach überlaufenes Gleisschaltmittel und
a = Abstand der betrachteten Gleisschaltmittel.
1.Procedure for determining the center distances of railway vehicles passing a line in free running by evaluating driving events as initial values of one of the model parameters for the runtime / route description in a method for determining the rolling resistance of railway vehicles according to patent (P 42 14 541.4), characterized in that the center distances of successive axes of a department consisting of possibly several coupled vehicles are determined exclusively from the rollover times of two track switching means according to the following determination expression with l i = axis distance to be determined
t = rollover time of a track switching device with index i for the respective front axle and index i + 1 for the rear axle of a pair of axles and
with the index K for the initially overrun track and
the index K + 1 for a track switching device that subsequently overflows and
a = distance of the track switching means under consideration.
2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Zeitmessungen an zwei im Gleis aufeinanderfolgenden Gleis- Schaltmittel vorgenommen werden, deren Abstand größer ist als der kleinste mögliche Achsabstand der Abteilungen.2. The method according to claim 1, characterized in that the Time measurements on two consecutive tracks in the track  Switching means are made whose distance is greater as the smallest possible center distance of the departments. 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß bei Ausfall eines Gleisschaltmittels die Zeitmessungen an mindestens einem anderen im Gleis weiter vor- oder zurück­ liegenden Gleisschaltmittel vorgenommen werden.3. The method according to claim 1 or 2, characterized in that at Failure of a track switch means the time measurements at least one other forward or backward in the track lying track switching means are made. 4. Verfahren nach einem der Ansprüche 1 bis 2, dadurch gekennzeichnet, daß die ermittelten Achsabstandswerte beim Erkennen eines normierten Achsabstandes verworfen und durch die entspre­ chenden tatsächlichen Abstandswerte ersetzt werden.4. The method according to any one of claims 1 to 2, characterized, that the determined center distance values when recognizing a normalized center distance discarded and by the corresponding actual distance values are replaced.
DE4227789A 1992-04-29 1992-08-19 Method for determining the center distances of railway vehicles Expired - Fee Related DE4227789B4 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE4227789A DE4227789B4 (en) 1992-04-29 1992-08-19 Method for determining the center distances of railway vehicles
CH182693A CH687419A5 (en) 1992-08-19 1993-06-21 Railway train axle spacing measuring system

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE4214541A DE4214541A1 (en) 1992-04-29 1992-04-29 METHOD FOR DETERMINING THE ROLLING RESISTANCE OF RAILWAY VEHICLES
DE4227789A DE4227789B4 (en) 1992-04-29 1992-08-19 Method for determining the center distances of railway vehicles

Publications (2)

Publication Number Publication Date
DE4227789A1 true DE4227789A1 (en) 1994-02-24
DE4227789B4 DE4227789B4 (en) 2006-06-01

Family

ID=6458016

Family Applications (4)

Application Number Title Priority Date Filing Date
DE4214541A Withdrawn DE4214541A1 (en) 1992-04-29 1992-04-29 METHOD FOR DETERMINING THE ROLLING RESISTANCE OF RAILWAY VEHICLES
DE4227789A Expired - Fee Related DE4227789B4 (en) 1992-04-29 1992-08-19 Method for determining the center distances of railway vehicles
DE4227787A Expired - Fee Related DE4227787C2 (en) 1992-04-29 1992-08-19 Method for determining the speed of entry of railway vehicles into a measuring section
DE59300081T Expired - Fee Related DE59300081D1 (en) 1992-04-29 1993-04-14 Method for determining the rolling resistance of railway vehicles.

Family Applications Before (1)

Application Number Title Priority Date Filing Date
DE4214541A Withdrawn DE4214541A1 (en) 1992-04-29 1992-04-29 METHOD FOR DETERMINING THE ROLLING RESISTANCE OF RAILWAY VEHICLES

Family Applications After (2)

Application Number Title Priority Date Filing Date
DE4227787A Expired - Fee Related DE4227787C2 (en) 1992-04-29 1992-08-19 Method for determining the speed of entry of railway vehicles into a measuring section
DE59300081T Expired - Fee Related DE59300081D1 (en) 1992-04-29 1993-04-14 Method for determining the rolling resistance of railway vehicles.

Country Status (6)

Country Link
EP (1) EP0568167B1 (en)
AT (1) ATE118416T1 (en)
DE (4) DE4214541A1 (en)
DK (1) DK0568167T3 (en)
ES (1) ES2069445T3 (en)
GR (1) GR3015743T3 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19736711C1 (en) * 1997-08-18 1998-11-12 Siemens Ag Measurement method for axle speed vehicle axle
DE4227787C2 (en) * 1992-04-29 2001-06-28 Siemens Ag Method for determining the speed of entry of railway vehicles into a measuring section
DE102008026572A1 (en) 2008-05-30 2009-12-10 Siemens Aktiengesellschaft Method for monitoring occupation status of track section, involves detecting axle of railcar and determining driving direction of railcar, and position of former or latter axle of railcar is determined from position of each axle

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2725520B1 (en) * 1994-10-06 1996-12-20 Univ Franche Comte METHOD AND DEVICE FOR MEASURING THE COEFFICIENTS OF AERODYNAMIC RESISTANCE AND BEARING OF A LAND VEHICLE
DE19507931C1 (en) * 1995-02-24 1996-09-12 Siemens Ag Method for updating replacement values for a running characteristic of wagons on a shunting system
DE19507932C1 (en) * 1995-02-24 1996-07-25 Siemens Ag Train waggon characteristics updating method for marshalling yard
DE19526816C2 (en) * 1995-07-12 1998-04-09 Siemens Ag Method for recognizing an incorrect message in a section-by-section axle counting
DE102010041183A1 (en) 2010-09-22 2012-03-22 Siemens Aktiengesellschaft Method for operating a drainage system of the rail-bound traffic and control device for such a drainage system
DE102011079419A1 (en) * 2011-07-19 2013-01-24 Siemens Aktiengesellschaft Method and control device for determining the length of at least one track section
DE102011079416A1 (en) * 2011-07-19 2013-01-24 Siemens Aktiengesellschaft Method and control device for determining the length of at least one track section
DE102017207646A1 (en) * 2017-05-05 2018-11-08 Siemens Aktiengesellschaft Method for operating a technical draining system and control device for such a system
DE102018202081A1 (en) * 2018-02-09 2019-08-14 Knorr-Bremse Systeme für Schienenfahrzeuge GmbH Method for adapting a rail vehicle model

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1095016B (en) * 1956-02-01 1960-12-15 Siemens Ag Device for triggering control or signal processes
DE1015037B (en) * 1956-03-23 1957-09-05 Funke Huster Elektrizitaets Car sorting device for mine railways
DE1236256B (en) * 1965-06-05 1967-03-09 Siemens Ag Arrangement for determining the rolling resistance of railroad cars
US4256278A (en) * 1979-07-23 1981-03-17 Servo Corporation Of America Railway freight car identification system
GB2093593A (en) * 1981-02-20 1982-09-02 Coal Industry Patents Ltd Method of and equipment for sensing speed of travel
DD229657B5 (en) * 1984-12-14 1994-08-04 Deutsche Reichsbahn Method for determining the number and length of moving railway vehicles
DD233347A1 (en) * 1984-12-28 1986-02-26 Verkehrswesen Forsch Inst CIRCUIT ARRANGEMENT FOR DETECTING AND IDENTIFYING ROLLING RAIL VEHICLES
DE4214541A1 (en) * 1992-04-29 1993-11-04 Siemens Ag METHOD FOR DETERMINING THE ROLLING RESISTANCE OF RAILWAY VEHICLES

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4227787C2 (en) * 1992-04-29 2001-06-28 Siemens Ag Method for determining the speed of entry of railway vehicles into a measuring section
DE19736711C1 (en) * 1997-08-18 1998-11-12 Siemens Ag Measurement method for axle speed vehicle axle
DE102008026572A1 (en) 2008-05-30 2009-12-10 Siemens Aktiengesellschaft Method for monitoring occupation status of track section, involves detecting axle of railcar and determining driving direction of railcar, and position of former or latter axle of railcar is determined from position of each axle

Also Published As

Publication number Publication date
DE4214541A1 (en) 1993-11-04
GR3015743T3 (en) 1995-07-31
EP0568167A1 (en) 1993-11-03
EP0568167B1 (en) 1995-02-15
ES2069445T3 (en) 1995-05-01
DE4227789B4 (en) 2006-06-01
ATE118416T1 (en) 1995-03-15
DE4227787A1 (en) 1994-02-24
DE4227787C2 (en) 2001-06-28
DK0568167T3 (en) 1995-07-10
DE59300081D1 (en) 1995-03-23

Similar Documents

Publication Publication Date Title
EP1940668B1 (en) Method for the detection and consideration of crosswind loads in a traveling railway vehicle, and the accordingly configured last car thereof
DE4227789A1 (en) Railway train axle spacing measuring system - using equation specified in terms of front and rear axle detection time points of axle pairs provided by spaced track switches
DE102008002484A1 (en) Method for testing a vibration damper of a motor vehicle when installed and vibration damper test system for a motor vehicle
DE19852220C2 (en) Process for the detection of damage in rail traffic
WO2018041569A1 (en) Device and method for determining the state of railways
EP3089895B1 (en) Method and control unit for the control of a vehicle, in particular of a rail vehicle
CH674180A5 (en)
AT521877A1 (en) Method and device for detecting a derailment condition of a rail vehicle
EP0123774B1 (en) Method of identification of waggons in a fast running train and device for carrying out the method
WO2000023787A1 (en) Evaluation method for a particle counter and device for carrying out said method
DE102014108685A1 (en) Method and device for derailment detection
DE3124428C2 (en)
EP0681702B1 (en) Process for determining the speed of railway vehicles, in particular those with bogies
CH687419A5 (en) Railway train axle spacing measuring system
DE3300429A1 (en) Device for measuring the length of a train
DE1170445B (en) Method and device for determining the arrow height of flat spots on rolling railway wheels
EP1123498A1 (en) Evaluation method for a particle counter and device for carrying out said method
EP1279581A1 (en) External train length measuring device
DE4401484C2 (en) Non-destructive testing of composite busbars
DE19736711C1 (en) Measurement method for axle speed vehicle axle
DE19925962C1 (en) Speed measuring system calibration
CH453419A (en) Control device for a rail brake device of a marshalling yard
EP0624776A1 (en) Procedure for detecting rough road sections using a fuel tank pressure sensor
DE102010038463A1 (en) Method for recognizing dynamic mechanical loads of given rating classes during driving of vehicle, involves recognizing dynamic loading of rating class for waveforms, if determined similarity meets predetermined conditions
DD229657B5 (en) Method for determining the number and length of moving railway vehicles

Legal Events

Date Code Title Description
AF Is addition to no.

Ref country code: DE

Ref document number: 4214541

Format of ref document f/p: P

8162 Independent application
8110 Request for examination paragraph 44
8125 Change of the main classification

Ipc: G01B 21/16

8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee