DE3343926A1 - Anchor block for guide post - Google Patents

Anchor block for guide post

Info

Publication number
DE3343926A1
DE3343926A1 DE19833343926 DE3343926A DE3343926A1 DE 3343926 A1 DE3343926 A1 DE 3343926A1 DE 19833343926 DE19833343926 DE 19833343926 DE 3343926 A DE3343926 A DE 3343926A DE 3343926 A1 DE3343926 A1 DE 3343926A1
Authority
DE
Germany
Prior art keywords
stone
anchor
delineator
road
guide post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19833343926
Other languages
German (de)
Other versions
DE3343926C2 (en
Inventor
Arthur 3138 Dannenberg Dreher
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE3343926A priority Critical patent/DE3343926C2/en
Publication of DE3343926A1 publication Critical patent/DE3343926A1/en
Application granted granted Critical
Publication of DE3343926C2 publication Critical patent/DE3343926C2/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F15/00Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
    • E01F15/02Continuous barriers extending along roads or between traffic lanes
    • E01F15/04Continuous barriers extending along roads or between traffic lanes essentially made of longitudinal beams or rigid strips supported above ground at spaced points
    • E01F15/0461Supports, e.g. posts
    • E01F15/0469Covers, e.g. of ground surface around the foot
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F9/00Arrangement of road signs or traffic signals; Arrangements for enforcing caution
    • E01F9/60Upright bodies, e.g. marker posts or bollards; Supports for road signs
    • E01F9/604Upright bodies, e.g. marker posts or bollards; Supports for road signs specially adapted for particular signalling purposes, e.g. for indicating curves, road works or pedestrian crossings
    • E01F9/608Upright bodies, e.g. marker posts or bollards; Supports for road signs specially adapted for particular signalling purposes, e.g. for indicating curves, road works or pedestrian crossings for guiding, warning or controlling traffic, e.g. delineator posts or milestones
    • E01F9/61Special features of delineator posts, e.g. with parts cantilevered toward the roadway or fixed vertically on a tilted surface

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Signs Or Road Markings (AREA)
  • Retaining Walls (AREA)

Abstract

Published without abstract.

Description

Ankerstein für Leitpfosten Die Erfindung betrifft einen Ankerstein für Leitpfosten zur seitlichen Begrenzung des Verkehrsraumes von Straßen mit einer Öffnung zur Aufnahme des Leitpfostens Leitpfosten sind eine aus den Leitsteinen und Leitpflöcken entwickelte Leiteinrichtung, die die seitliche Grenze des Verkehrsraumes und den Verlauf einer Straße anzeigt. Sie sind etwa 12 cm bre=+ep weiße Pfosten mit einem Tageskennzeichen und einem Nachtkennzeichen für Kraftfahrer. Ihre Höhe beträgt 100 cm über dem Fahrbahnrand. Sie werden aus Beton oder Stahlblech hergestellt. Um besonders deutlich erkennbar zu sein werden die Sichtflächen der Leitpfosten der Fahrbahn zugewendet. Die Leitpfosten haben deshalb einen winkelförmigen Grundriß mit einer der Fahrbahnseite zugewandten Abrundung des Winkelscheitels. Das Tageskennzeichen ist ein 25 cm hoher7 schwarzer Streifens der mit einer Neigung von 30 0 von der Außenseite der Straße nach der Fahrbahnseite fallend unter einem 20 cm hohen weißen Kopf angebracht ist Durch diese Neigung des Streifens unterscheiden sich die Leitpfosten auf der linken und auf der rechten Seite der Straße. Dies erleichtert in Krümmungen das Zurechtw finden vor allem bei Neuschnee und Nebel. Die volle Wirksamkeit der Kennzeichen setzt voraus, daß die Leitpfosten korrekt in das Erdreich eingesetzt und dauerhaft in der vorschriftsmäßigen Lage fixiert werden. Zu diesem Zweck sind Ankersteine entwickelt worden Sie sorgen dafür daß die vertikale Position der Leitpfosten eingehalten wird Zu diesem Zweck sind sie mit einer dem Pfostenquerschnitt entsprechenden Öffnung versehen. Durch diese greift der Leitpfosten hindurch in das Erdreich. Der Ankerstein muß dabei zwangsläufig eine waagerechte Lage einnehmen. Da das Erdreich neben der Fahrbahn nicht horizontal ist sonden einen Böschungswinkel aufweist, ist es notwendig den Stein etwa 5 cm vollstandig unter der Erdoberfläche anzuordnen. Erst dadurch ist sichergestellt, daß infolge des Böschungswinkels keine Kante des Ankersteines aus der Erdoberfläche heraussteht. Während der Vegetationsperiode wird der Ankerstein vor allem von Gras überwucherLb Von Zeit zu Zelt ist es noGwendigs das Gras zu schneidens um die Kennzeichen der Leitpfosten freizuhalten. Zum Schneiden des Grases werden Maschinen eingesetzt , die jedoch nicht in der Lage sind, den Schnitt bis an die Lcitpfosten heanzuführen. Es besteht auch nicht die Möglichkeit, die Leitpfosten aus ihnen Ankersteinen herauszuziehen, um dadurch eine freie Schnittfläche zu erhalten. Es ist nicht möglich die Aufnahmeöffnungen von hereinfallendem Erdreich freizu halten Wegen dieser Nachteile konnte sich der Ankerstein nicht wie gewünscht als Stütze für die Leitpfosten durch setzen. Anchor stone for delineator posts The invention relates to an anchor stone for delineator posts for the lateral delimitation of the traffic area of roads with a Opening for receiving the delineator post Delineator posts are one of the delineator stones and guide pegs developed guidance device, which the lateral boundary of the traffic area and shows the course of a road. They are about 12 cm wide = + ep white posts with a day license plate and a night license plate for drivers. Your height is 100 cm above the edge of the road. They are made from concrete or sheet steel. In order to be particularly clearly recognizable, the visible surfaces of the delineator posts facing the road. The delineator posts therefore have an angular plan with a rounding of the angle apex facing the road side. The day indicator is a 25 cm high7 black stripe that slopes 30 degrees from the Outside of the street after the side of the carriageway falling under a 20 cm high white Head is attached It is this inclination of the strip that distinguishes the delineator posts on the left and on the right side of the street. This makes it easier in curvatures Find your way especially in fresh snow and fog. The full effectiveness of the Marking assumes that the delineator posts are correctly inserted into the ground and permanently fixed in the correct position. To this end are Anchor stones They ensure that the vertical position of the delineator posts is maintained For this purpose, they are equipped with an opening corresponding to the cross-section of the post Mistake. The delineator reaches through this into the ground. The anchor stone must necessarily assume a horizontal position. Since the soil next to the The roadway is not horizontal but has an angle of repose, it is necessary to place the stone about 5 cm completely below the surface of the earth. Only then it is ensured that no edge of the anchor stone due to the slope angle protrudes from the surface of the earth. During the growing season the anchor stone becomes especially overgrown with grass From time to time it is necessary to cut the grass to keep the marks of the delineators clear. Be used to cut the grass Machines are used, but are not able to cut up to the Lcitpost to lead. There is also no possibility of the delineator post pulling anchor stones out of them in order to obtain a free cut surface. It is not possible to keep the receiving openings free from falling soil Because of these disadvantages, the anchor stone could not act as a support as desired for the delineator post.

Der Erfindung liegt die Aufgabe zugrunde einen Ankerstein so auszubilden9 daß das Heranwachsen von Gras bis an den Leitpfosten verhindert wird Die erfindungsgemäße Lösung zeichnet sich dadurch aus daß die Aufnahmeöffnung des Antiero steines von der Steinoberseite in Richtung zur Unterseite einseitig konisch erweitert ist. Der Stein kann dadurch bündig mit der Erdoberfläche abschließena ohne daß die vervirale Ausrichtung des Leitpfostens beeinträchtigt wird.The invention is based on the object of designing an anchor block in this way9 that the growth of grass up to the delineator post is prevented Solution is characterized in that the receiving opening of the Antiero stone from the stone top is flared on one side in the direction of the bottom. Of the Stone can thus be flush with the surface of the eartha without the vervirale Alignment of the delineator post is affected.

Da die Steinoberfläche durch diese Maßnahme vollkommen frei liegt, ist es dem Pflanzenwuchs nicht möglich7 bis an den Pfosten vorzudringen. Das Abmähen zu gegebener Zeit mit Hilfe üblicher Maschinen wird nicht behindert. Außerdem besteht die Möglichkeit, die Pfosten aus den Ankersteinen herauszuziehen, um mit einer Maschine über den Stein hinweg fahren zu können. Umständliches Rangieren durch notwendige Richtungsänderungen erweist sich als unnötig. Besonders vorteilhaft ist die Anpassung des Winkels der konischen Erweiterung der Steinöffnung an den Straßenböschungswinkel. Hierdurch ist sichergestellt, daß der Leitpfosten an seiner der Straßen seite abgekehrten Fläche genau geführt wird. Diese Maßnahme ist jedoch nicht unbedingt Voraussetzung für die Erfüllung der erfindungsgemäßen Aufgabe, da die Leitpfosten bereits zwei seitliche Führungen haben und durch ihr Hineinreichen in das unter dem Stein befindliche Erdreich auch eine hinreichende Sicherung gegeh eine Neigung zur Straßenseite oder von dieser weg erhalten. Besonders günstig ist die Teilung des erfindungsgemäßen Steines in zwei Halbsteine mit einer Trennfläche senkrecht zur Fahrbahnrichtung. Da der Stein an der Oberfläche angeordnet ist, können sich die beiden Steinhälften bei Druck auf den Leitpfosten auseinanderschieben, so daß der Leitpfosten im Falle eines Gegenfahrens durch ein Kraftfahrzeug erhalten bleibt.As the stone surface is completely free by this measure lies, it is not possible for the vegetation to penetrate to the post. The mowing in due course with the help of common machines is not hindered. In addition, there is the possibility of pulling the posts out of the anchor stones to do with a machine to be able to drive over the stone. Cumbersome maneuvering through necessary Changes in direction turn out to be unnecessary. Adaptation is particularly advantageous the angle of the conical enlargement of the stone opening to the road slope angle. This ensures that the delineator post faces away from the street Surface is guided precisely. However, this measure is not an essential requirement for the fulfillment of the task according to the invention, since the delineator posts already have two have lateral guides and by reaching into the one under the stone Soil also a sufficient security against a slope to the street side or get away from this. The division of the invention is particularly favorable Stone into two half-stones with a dividing surface perpendicular to the direction of the road. Since the stone is arranged on the surface, the two stone halves can join push apart when pressure is applied to the delineator post so that the delineator post in the event a counter-drive by a motor vehicle is retained.

In der Zeichnung ist ein Ausführungsbeispiel der Erfindung schematisch dargestellt und nachstehend erläutert.An exemplary embodiment of the invention is shown schematically in the drawing shown and explained below.

Es zeigen: Fig. 1 einen Vertikalschnitt durch einen Ankerstein, Fig. 2 die Draufsicht auf den Ankerstein gemäß Figur 1 mit einer Trennlinie zur Unterteilung in zwei Halbsteine und Fig. 3 einen in das Erdreich eingelassenen Ankerstein.They show: FIG. 1 a vertical section through an anchor stone, FIG. 2 shows the top view of the anchor block according to FIG. 1 with a dividing line for subdivision in two half-stones and FIG. 3 an anchor stone embedded in the ground.

Der Ankerstein 1 von üblicher Quaderförmiger Ausbildung weist in etwa seiner Mitte Mitte eine durchgehende Aufnahmeöffnung 2 &u" Sie ist dem winkelförmigen Querschnitt eines Leitpfostens 3 angepaßt. Die Wande 5 der Aufnahmeöffnung 2 erstrecken sich senkrecht von der Steinoberseite 6 zur Steinunterseite 7 mit Ausnahme der der Straßenseite abgekehrten Wandfläche 6. Diese ist mit einer Neigung α gegen die Vertikale versehen Die Öffnung 2 erweitert sich in diesem Bereich konisch von der Steinoberseite in Richtung auf die Steinunterseite Der Nei« gungswinkel α entspricht vorzugsweise dem Neigungswinkel ß der sich neben der Fahrbahn 4 erstreckenden Böschung 9. Um eine Umklammerung der oberen Steinkanten mit Erdreich zu zur möglichen, sind diese mit einer Schräge 10 versehen.The anchor stone 1 has the usual parallelepiped design in about its middle middle a continuous receiving opening 2 & u "It is the angled cross-section of a delineator post 3 adapted. The walls 5 of the receiving opening 2 extend perpendicularly from the stone top 6 to the stone bottom 7 with the exception the wall surface facing away from the street side 6. This is with an inclination α provided against the vertical. The opening 2 widens conically in this area from the top of the stone in the direction of the underside of the stone The angle of inclination α preferably corresponds to the angle of inclination β which is next to the roadway 4 extending embankment 9. To encircle the upper stone edges with soil to be possible, these are provided with a bevel 10.

Wie Figur 3 zeigte kann der Ankerstein bündig mit der Erd oberfläche in die Straßenböschung 9 eingesetzt werden. Der in unterbrochener Strichführung dargestellte Leitpfosten 3 kann trotz der Neigung des Steines vertikal gehalten werden Dadurch wird um den Leitpfosten ein völlig vegetationsfreier Raum geschaffen, so daß bei der Böschungepflege die Schneidgeräte an den Leitpfosten vorbeigefahren werden können. Es besteht auch die Möglichkeit, den Pfosten vor dem Mähen aus dem Ankerstein 1 herauszuziehen, da beim Überfahren des Stei- S; nes Erdreich von oben nicht in die Öffnung fallen kann, wodurch mit der Zeit eine Verstopfung hervorgerufen werden könnte. Besonders günstig hat sich die Aufteilung des Ankersteines in zwei Halbsteine 1a und 1b erwiesen, wobei die Trennlinien senkrecht zur Fahrbahnrichtung bzw quer zur Fahrtrichtung der Verkehrsteilnehmer verlauft Da der erCindungsgemaß ausgebildete Stein sehr hoch im Erdreich einrebetet ist, sind die beiden Hälften durch Druck auf den Leitpfosten und die dadurch ausgelöste Hebslkraft leicht auseinander zu schieben. Sobald also ein Verkehrsteilnehmer mit einem Fahrzeug einen Leitpfosten berührt, ann dieser nachgeben und unversehrt bleiben. Diese Möglichkeit bestand bei den bisher bekannten Ankersteinen, die tief im Erdreich eingebettet waren.As Figure 3 showed, the anchor stone can be flush with the earth's surface be used in the road embankment 9. The one with broken lines illustrated delineator post 3 can be held vertically despite the inclination of the stone This creates a completely vegetation-free space around the delineator post, so that the cutters passed the delineator posts when maintaining the embankment can be. There is also the option to remove the post from the before mowing Pull out anchor stone 1 because when driving over the stone S; nes soil from above cannot fall into the opening, which will cause clogging over time could be. The division of the anchor stone into two has proven particularly favorable Half-stones 1a and 1b proved, with the dividing lines perpendicular to the direction of the road or transversely to the direction of travel of the road users formed stone is embedded very high in the ground, are the two halves slightly apart due to pressure on the delineator post and the resulting lifting force to push. As soon as a road user with a vehicle hits a delineator post touched, can give way and remain intact. This possibility existed with the previously known anchor stones that were embedded deep in the ground.

nicht.not.

- Leerseite -- blank page -

Claims (1)

P A T E N T A N S P R Ü C H E 1. Ankerstein für Leitpfosten zur seitlichen Begrenzung des Verkehrsraumes von S-traßen, mit einer Öffnung zur Auf nahme des Leitpfostens, dadurch gekennzeichnet, daß die Aufnahmeöffnung (2)p von der Steinoberseite (6) in Richtung zur Unterseite (7) einseitig konisch erweitert ist 2 Ankerstein nach Anspruch 1 D dadurch gekennzeichnet, daß der Winkel (α) der konischen Erweiterung dem Strassenböschungswinkel (ß) entspricht 3 Ankerstein nach den Anspruches 1 oder 2, dadurch gekennzeichnet , daß der Stein aus zwei Hälften (la, ib) besteht deren Trennlinie (l1) sich senkrecht zur Fahrbahnrichtung erstreckt 4 Ankerstein nach einem oder mehreren der Ansprüche 1 3 dadurch gekennzeichnet daß die oberen Steinkant n mit einer vom Erdreich zu überdeckenden Schräge versehen sind P A T E N T A N S P R Ü C H E 1. Anchor stone for delineator posts to the side Limitation of the traffic area of suburban streets, with an opening to accommodate the Guide post, characterized in that the receiving opening (2) p from the stone top (6) in the direction of the underside (7) is flared on one side conically 2 anchor stone according to claim 1 D, characterized in that the angle (α) of the conical Extension of the road slope angle (ß) corresponds to 3 anchor stones according to the claim 1 or 2, characterized in that the stone consists of two halves (la, ib) whose dividing line (l1) extends perpendicular to the direction of the road 4 anchor stones according to one or more of claims 1 3, characterized in that the upper Stone edge n are provided with a slope to be covered by the soil
DE3343926A 1983-12-05 1983-12-05 Anchor stone for a delineator post Expired DE3343926C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE3343926A DE3343926C2 (en) 1983-12-05 1983-12-05 Anchor stone for a delineator post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE3343926A DE3343926C2 (en) 1983-12-05 1983-12-05 Anchor stone for a delineator post

Publications (2)

Publication Number Publication Date
DE3343926A1 true DE3343926A1 (en) 1985-06-13
DE3343926C2 DE3343926C2 (en) 1985-10-31

Family

ID=6216083

Family Applications (1)

Application Number Title Priority Date Filing Date
DE3343926A Expired DE3343926C2 (en) 1983-12-05 1983-12-05 Anchor stone for a delineator post

Country Status (1)

Country Link
DE (1) DE3343926C2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4427109A1 (en) * 1994-07-30 1996-02-01 Bayerische Motoren Werke Ag Road boundary post with two=part base
GB2295835A (en) * 1994-12-07 1996-06-12 David Frederick Green Growth-inhibiting device for use e.g. around lamp-posts

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2148007A3 (en) 2008-07-21 2012-03-14 Peter Rausch Foundation stone for delineators

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1912951U (en) * 1964-12-08 1965-04-01 Gerda Rudolph FOOT PLATE FOR GUIDANCE POST.

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1912951U (en) * 1964-12-08 1965-04-01 Gerda Rudolph FOOT PLATE FOR GUIDANCE POST.

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4427109A1 (en) * 1994-07-30 1996-02-01 Bayerische Motoren Werke Ag Road boundary post with two=part base
GB2295835A (en) * 1994-12-07 1996-06-12 David Frederick Green Growth-inhibiting device for use e.g. around lamp-posts

Also Published As

Publication number Publication date
DE3343926C2 (en) 1985-10-31

Similar Documents

Publication Publication Date Title
DE2720271A1 (en) CONCRETE BLOCK, PREFERABLY ROAD BARRIER
DE3012680C2 (en) Guard rail that can be assembled from prefabricated parts
DE3343926A1 (en) Anchor block for guide post
DE3133420A1 (en) LIMITING ELEMENT
CH683355A5 (en) Lightweight acoustic structure.
DE3423566A1 (en) Noise protection screen
EP0846204B1 (en) Safety device for a culvert
DE19850251C2 (en) traffic island
DE2939979A1 (en) ROAD LIMIT POST
EP1094158A2 (en) Process and apparatus for fixing marker posts, guardrails or similar
DE3921553A1 (en) Safety measure for exit road - includes sleepers set in carriageway which have projecting square shoulder along trailing edge
DE3240584C2 (en)
DE3643810C2 (en) Control system for amphibians and other animals
DE2238864A1 (en) CROSS-DRIVING, SELF-ALIGNING DIRECTIONAL AND LIMITING POST
DE8124673U1 (en) LIMITING ELEMENT FOR LIMITING OR SEPARATING DIFFERENT AREAS, IN PARTICULAR OUTDOORS
DE3406663A1 (en) Noise protection wall
AT213284B (en) Two-part delineator post for marking traffic routes
CH367091A (en) Two-part delineator post for marking traffic routes
AT401536B (en) Device for preventing driving onto a road surface
AT214965B (en) Training of from concrete or similar. edge marking strips for motor vehicle expressways manufactured from a hardenable mass and processes for their production
DE1194890B (en) Two-part delineator post for marking traffic routes
DE8109198U1 (en) "Support structure for noise barriers"
DE1094282B (en) Two-part delineator post for marking traffic routes
DE1247221B (en) Covering device for the cantilever spanning of structures of greater length to be created under the earth's surface, in particular tunnels
DE1459841A1 (en) Road curb to demarcate the street from the sidewalk or a parking lane

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee