DE3009923A1 - Verfahren und einrichtung zum abbau der pfeiler beim kammer-pfeilerbau - Google Patents

Verfahren und einrichtung zum abbau der pfeiler beim kammer-pfeilerbau

Info

Publication number
DE3009923A1
DE3009923A1 DE19803009923 DE3009923A DE3009923A1 DE 3009923 A1 DE3009923 A1 DE 3009923A1 DE 19803009923 DE19803009923 DE 19803009923 DE 3009923 A DE3009923 A DE 3009923A DE 3009923 A1 DE3009923 A1 DE 3009923A1
Authority
DE
Germany
Prior art keywords
mining
long
pillars
front operation
dismantling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19803009923
Other languages
German (de)
English (en)
Inventor
Hans-Th. 4750 Unna Grisebach
Helmut Dr. 4670 Lünen Langenberg
Heinz 4650 Gelsenkirchen Weinhold
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gewerkschaft Eisenhutte Westfalia GmbH
Original Assignee
Gewerkschaft Eisenhutte Westfalia GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gewerkschaft Eisenhutte Westfalia GmbH filed Critical Gewerkschaft Eisenhutte Westfalia GmbH
Priority to DE19803009923 priority Critical patent/DE3009923A1/de
Priority to AU67379/81A priority patent/AU539673B2/en
Priority to US06/241,483 priority patent/US4391470A/en
Priority to IN256/CAL/81A priority patent/IN155347B/en
Priority to ZA00811601A priority patent/ZA811601B/xx
Publication of DE3009923A1 publication Critical patent/DE3009923A1/de
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C35/00Details of, or accessories for, machines for slitting or completely freeing the mineral from the seam, not provided for in groups E21C25/00 - E21C33/00, E21C37/00 or E21C39/00
    • E21C35/20General features of equipment for removal of chippings, e.g. for loading on conveyor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/08Filling-up hydraulically or pneumatically

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Mechanical Engineering (AREA)
  • Working Measures On Existing Buildindgs (AREA)
DE19803009923 1980-03-14 1980-03-14 Verfahren und einrichtung zum abbau der pfeiler beim kammer-pfeilerbau Withdrawn DE3009923A1 (de)

Priority Applications (5)

Application Number Priority Date Filing Date Title
DE19803009923 DE3009923A1 (de) 1980-03-14 1980-03-14 Verfahren und einrichtung zum abbau der pfeiler beim kammer-pfeilerbau
AU67379/81A AU539673B2 (en) 1980-03-14 1981-02-17 Mining coal
US06/241,483 US4391470A (en) 1980-03-14 1981-03-09 Method of, and apparatus for, winning mineral material
IN256/CAL/81A IN155347B (enExample) 1980-03-14 1981-03-10
ZA00811601A ZA811601B (en) 1980-03-14 1981-03-11 Method of,and apparatus for,winning mineral material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19803009923 DE3009923A1 (de) 1980-03-14 1980-03-14 Verfahren und einrichtung zum abbau der pfeiler beim kammer-pfeilerbau

Publications (1)

Publication Number Publication Date
DE3009923A1 true DE3009923A1 (de) 1981-10-01

Family

ID=6097270

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19803009923 Withdrawn DE3009923A1 (de) 1980-03-14 1980-03-14 Verfahren und einrichtung zum abbau der pfeiler beim kammer-pfeilerbau

Country Status (5)

Country Link
US (1) US4391470A (enExample)
AU (1) AU539673B2 (enExample)
DE (1) DE3009923A1 (enExample)
IN (1) IN155347B (enExample)
ZA (1) ZA811601B (enExample)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7540693B2 (en) 2005-08-24 2009-06-02 Dbt Gmbh Method for pillar recovery in chamber-and-pillar working and tubbing unit for pillar recovery

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4445723A (en) * 1982-07-26 1984-05-01 Mcquade Paul D Method of circle mining of ore
CN102121386B (zh) * 2011-03-15 2013-03-27 三一重型装备有限公司 一种星轮装置及掘进机
CN103742147A (zh) * 2014-01-17 2014-04-23 淄博王煤矿业有限公司 连续梁桥式充填法采煤工艺
WO2018009970A1 (en) * 2016-07-14 2018-01-18 Strata Linings Pty Ltd Seal, seal forming system, method of forming a seal and associated formwork support
CN114198104B (zh) * 2021-12-15 2024-09-06 中天合创能源有限责任公司 一种长距离煤柱堵漏与加固方法
CN115992704B (zh) * 2023-02-13 2025-08-22 中煤科工开采研究院有限公司 双采煤机开采方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2891778A (en) * 1956-12-17 1959-06-23 Milik Rudolf Long wall mining apparatus having a seam embracing channel
US3945680A (en) * 1973-11-17 1976-03-23 Gebr. Eickhoff, Maschinenfabrik Und Eisengiesserei M.B.H. Drum coal cutting machine having a roller crusher
DE2533518C3 (de) * 1975-07-26 1980-11-20 Friedrich Wilhelm 4223 Voerde Paurat Verfahren und Vorrichtung zum Hereingewinnen von Kohlen mit Hilfe einer Schneckenschräm- und Fördervorrichtung
US3999804A (en) * 1976-03-08 1976-12-28 Atlantic Richfield Company Longwall mining with chain pillar recovery

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7540693B2 (en) 2005-08-24 2009-06-02 Dbt Gmbh Method for pillar recovery in chamber-and-pillar working and tubbing unit for pillar recovery
RU2391512C2 (ru) * 2005-08-24 2010-06-10 Дбт Гмбх Секция крепи для камерно-столбовой системы разработки с выемкой целиков в обратном порядке

Also Published As

Publication number Publication date
AU6737981A (en) 1981-09-17
US4391470A (en) 1983-07-05
ZA811601B (en) 1982-08-25
IN155347B (enExample) 1985-01-19
AU539673B2 (en) 1984-10-11

Similar Documents

Publication Publication Date Title
DE2307413C2 (de) Vorrichtung fur die Hereingewinnung einer flozartigen Lagerstatte im Strebbau
DE3009923A1 (de) Verfahren und einrichtung zum abbau der pfeiler beim kammer-pfeilerbau
EP0257652B1 (de) Verfahren und Vorrichtung zum Vortrieb einer in das Liegende eines Flözes gelegten Abbau- bzw. Flözstrecke
EP2758633B1 (de) Schildvortriebsvorrichtung
DE3017046A1 (de) Gewinnungsanlage fuer untertaegige gewinnungsbetriebe
DE19737936B4 (de) Abbaueinrichtung für den Untertagebergbau, insbesondere für die Kohlegewinnung in Strebbetrieben
DE2401832C2 (de) An schreitendem Ausbau nachgeführte Versatzwand, insbesondere für mächtige Flöze und Spülversatz
EP0230667B1 (de) Verfahren zum streifenweisen Abbau unterirdischer, insbesondere nicht standfester Schichten
DE3739680A1 (de) Maschine und verfahren zum kontinuierlichen loesen von gestein od. dgl. und abfoerdern des geloesten, zerkleinerten haufwerks im berg-, erd- und tunnelbau
DE3237969A1 (de) Wandernder strecken- oder stallausbau
DE2041582A1 (de) Verfahren und Vorrichtung zum Errichten von Streckendaemmen
DE2161291A1 (de) Bewegliche Deckenstütze, insbesondere für den Bergbau
DE3335098A1 (de) Abbauverfahren fuer floezartige lagerstaetten
DE3409002C2 (enExample)
DE2530127C3 (de) Verbauschild für den Vortrieb von Tunneln, Stollen u.dgl
EP0233979B1 (de) Abdichtung von Deponien
DE2549941C3 (de) Spann-, Rück- und Haltevorrichtung für ein Förder-, FUhrungs- oder Gewinnungsgerät
DE3031113A1 (de) Verfahren und einrichtung zum auffahren eines aufhauens und einrichten des gewinnungsstrebs in bergbaubetrieben
DE3024464C2 (enExample)
DE3023282A1 (de) Schildbock, insbesondere fuer den einsatz beim abbau maechtiger lagerstaetten im scheibenbau
DE3240843C2 (enExample)
DE2406751C2 (de) Hydraulischer Grubenausbau
DE3339611C1 (de) Ausbauanordnung zum stoßartigen Gewinnen mit einer Kurzfrontmaschine im Streb
DE2350401A1 (de) Wandernder grubenausbau
DE19732946B4 (de) Gewinnungseinrichtung für den Untertagebergbau, insbesondere für die Kohlegewinnung in Strebbetrieben

Legal Events

Date Code Title Description
8127 New person/name/address of the applicant

Owner name: GEWERKSCHAFT EISENHUETTE WESTFALIA GMBH, 4670 LUEN

8110 Request for examination paragraph 44
8139 Disposal/non-payment of the annual fee