DE29700893U1 - Joint between two longitudinal sleepers made of concrete - Google Patents

Joint between two longitudinal sleepers made of concrete

Info

Publication number
DE29700893U1
DE29700893U1 DE29700893U DE29700893U DE29700893U1 DE 29700893 U1 DE29700893 U1 DE 29700893U1 DE 29700893 U DE29700893 U DE 29700893U DE 29700893 U DE29700893 U DE 29700893U DE 29700893 U1 DE29700893 U1 DE 29700893U1
Authority
DE
Germany
Prior art keywords
loops
longitudinal
concrete
bracket
joint according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE29700893U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dw Schwellen De GmbH
Original Assignee
Walter Spannbeton Guesen GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Walter Spannbeton Guesen GmbH filed Critical Walter Spannbeton Guesen GmbH
Priority to DE29700893U priority Critical patent/DE29700893U1/en
Publication of DE29700893U1 publication Critical patent/DE29700893U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/12Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B3/00Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails
    • E01B3/28Transverse or longitudinal sleepers; Other means resting directly on the ballastway for supporting rails made from concrete or from natural or artificial stone
    • E01B3/38Longitudinal sleepers; Longitudinal sleepers integral or combined with tie-rods; Combined longitudinal and transverse sleepers; Layers of concrete supporting both rails

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

Stoßstelle zwischen zwei aus Beton bestehendenJoint between two concrete

LängsschwellenLongitudinal sleepers

Die Erfindung betrifft eine Stoßstelle zwischen zwei aus Beton bestehenden Längsschwellen eines Gleisrostes.The invention relates to a joint between two concrete longitudinal sleepers of a track grid.

Straßenbahngleise bestehen im allgemeinen aus lückenlos verschweißten Rillenschienen, die auf einer Packlage oder Schotter, meist ohne Schwellen auf einer Unterstopfüng aufliegen. Die Spur wird durch Spurstangen oder bei Betonunterlage durch Verankerungen gesichert. Straßenbahngleise auf einem besonderen Bahnkörper weisen oftmals einen Querschwellenob erbau wie bei Eisenbahnen auf.Tram tracks generally consist of seamlessly welded grooved rails, which rest on a layer of packing or ballast, usually without sleepers on a tamping base. The track is secured by tie rods or, in the case of a concrete base, by anchors. Tram tracks on a special track bed often have a cross-sleeper superstructure like on railways.

Eine Längsschwelle ist der Gegenstand der DE 44 15 363 C 1. Diese Längsschwelle ist für Brücken von Hochgeschwindigkeitsstrecken bei Eisenbahnen vorgesehen. Sie weist an ihrer Oberseite mehrere Schienenauflager auf. An ihren Enden ist sie mit rechteckigen Ausnehmungen versehen, denen rechteckige Ausnehmungen am Brückenüberbau gegenüberstehen. Nach dem Justieren der Schwelle werden die Ausnehmungen mit einer Vergußmasse verfüllt, weil es sich bevorzugt um sehr dünnflüssigen Mörtel handelt. Nach dem Abbinden des Mörtels sind die Verlegearbeiten beendet. Der in den Ausnehmungen befindliche Mörtel stellt die Ableitung der Längs- und Querkräfte zum Unterbau her. Am einen Ende weist die Längsschwelle ein Auflager und am anderen Ende eine Nase auf, die das Auflager der in Längsrichtung benachbarten Schwelle übergreift. Eine starre Verbindung zwischen diesen Längsschwellen ist nicht vorgesehen, vielmehr soll ein Spalt zwischen den Schwellen bestehen, der einen Wasserabfluß ermöglicht.A longitudinal sleeper is the subject of DE 44 15 363 C 1. This longitudinal sleeper is intended for bridges on high-speed railway lines. It has several rail supports on its top. At its ends it is provided with rectangular recesses, which are opposite rectangular recesses on the bridge superstructure. After adjusting the sleeper, the recesses are filled with a casting compound, because it is preferably very thin mortar. After the mortar has set, the laying work is finished. The mortar in the recesses transfers the longitudinal and transverse forces to the substructure. At one end the longitudinal sleeper has a support and at the other end a nose that overlaps the support of the sleeper adjacent in the longitudinal direction. A rigid connection between these longitudinal sleepers is not intended, rather there should be a gap between the sleepers that allows water to drain away.

Es besteht die Aufgabe, einen über eine längere Strecke hinweg starren Gleisrost Straßenbahnen zu schaffen, der aus einzelnen Längsschwellen zusammengesetzt ist.The task is to create a rigid track grid for trams over a longer distance, which is composed of individual longitudinal sleepers.

Gelöst wird diese Aufgabe mit den Merkmalen des Anspruches 1. Vorteilhafte Ausgestaltungen sind den Unteransprüchen entnehmbar.This problem is solved with the features of claim 1. Advantageous embodiments can be found in the subclaims.

Die Länge der einzelnen Längsschwellen beträgt beispielsweise 6 m, mit denen ein starrer Schwellenstrang von beispielsweise 30 m hergestellt werden soll. Parallel zueinander verlaufende Längsschwellen können an ihren Enden und dazwischen in entsprechenden Abständen über Querstege miteinandner verbunden sein.The length of the individual longitudinal sleepers is, for example, 6 m, with which a rigid sleeper line of, for example, 30 m is to be produced. Longitudinal sleepers running parallel to one another can be connected to one another at their ends and at appropriate distances between them via crossbars.

Ein Ausfuhrungsbeispiel wird nachfolgend anhand der Zeichnung näher erläutert. Es zeigen:An example of implementation is explained in more detail below using the drawing. It shows:

Fig. 1 eine Draufsicht auf eine Stoßstelle undFig. 1 is a plan view of a joint and

Fig. 2 einen Vertikalschnitt längs der Linie II-II in Fig. 1.Fig. 2 is a vertical section along the line II-II in Fig. 1.

An den Schwellenenden ist jeweils stirnseitig eine vertikale U-fÖrmige Aussparung 1, la vorgesehen. In jede dieser Aussparungen 1,1a ragen zwei U-förmige Schlaufen 2, 2a, die jeweils einen vertikal verlaufenden Mittenschenkel 3,3a aufweisen, welcher bündig mit der jeweiligen Stirnseite 4, 4a der Schwelle verläuft. Die U-fÖrmigen Schlaufen 2, 2a sind vertikal angeordnet und in die Schwellen einbetoniert.A vertical U-shaped recess 1, 1a is provided on the front side of each sleeper end. Two U-shaped loops 2, 2a protrude into each of these recesses 1, 1a, each of which has a vertically running center leg 3, 3a that runs flush with the respective front side 4, 4a of the sleeper. The U-shaped loops 2, 2a are arranged vertically and concreted into the sleepers.

Zur Montage werden die Längsschwellen auf einen Abstand der Stirnseiten 4, 4a von 2 cm ausgerichtet. Sodann werden zwei rechteckförmige Bügel 5 eingesetzt, deren Querschenkel 6, 6a im Abstand zu den Mittenschenkeln 3, 3a verlaufen. Sie werden mit Bindedraht an den Außenschenkeln der Schlaufen 2, 2a befestigt. An jedem Eckpunkt der Schlaufen 2, 2a und der Bügel 5 werden Quereisen 7 eingesetzt und mit Bindedraht befestigt. Nach dem Ausrichten der Längsschwellen werden die Aussparungen 1, la mitFor assembly, the longitudinal sleepers are aligned so that the front sides 4, 4a are 2 cm apart. Two rectangular brackets 5 are then inserted, the cross legs 6, 6a of which are spaced apart from the central legs 3, 3a. They are attached to the outer legs of the loops 2, 2a with binding wire. Cross irons 7 are inserted at each corner point of the loops 2, 2a and the brackets 5 and attached with binding wire. After aligning the longitudinal sleepers, the recesses 1, la are filled with

fließfähigem Beton ausgefüllt. Die Quereisen 7, 7a verlaufen von Schlaufe 2 bzw. 2a zu Schlaufe 2, 2a. Nach dem Aushärten des Betons ist ein stabiler Verbund zwischen benachbarten Längsschwellen vorhanden.filled with flowable concrete. The cross bars 7, 7a run from loop 2 or 2a to loop 2, 2a. After the concrete has hardened, a stable bond is formed between adjacent longitudinal sleepers.

Claims (6)

AnsprücheExpectations 1. Stoßstelle zwischen zwei aus Beton bestehenden Längsschwellen eines Gleisrostes, dadurch gekennzeichnet, daß jede Längsschwelle stirnseitig eine vertikale U-fÖrmige Aussparung (1,1a) aufweist, in jede Aussparung zwei in die jeweilige Längsschwelle einbetonierte U-fÖrmige Schlaufen (2,2a) ragen, zwischen den Schlaufen (2,2a) benachbarter Längsschwellen mindestens ein rechteckförmiger Bügel (5) verläuft und die Schlaufen (2,2a) mit dem Bügel (5) über Quereisen (7,7a) miteinander verbunden sind.1. Joint between two longitudinal sleepers of a track grid made of concrete, characterized in that each longitudinal sleeper has a vertical U-shaped recess (1,1a) on the front side, two U-shaped loops (2,2a) embedded in concrete in the respective longitudinal sleeper protrude into each recess, at least one rectangular bracket (5) runs between the loops (2,2a) of adjacent longitudinal sleepers and the loops (2,2a) are connected to the bracket (5) via cross bars (7,7a). 2. Stoßstelle nach Anspruch 1, dadurch gekennzeichnet, daß zwei rechteckförmige Bügel (5) vorgesehen sind, die jeweils zwei Schlaufen (2,2a) benachbarter Längsschellen zugeordnet sind.2. Joint according to claim 1, characterized in that two rectangular brackets (5) are provided, each of which is assigned to two loops (2, 2a) of adjacent longitudinal clamps. 3. Stoßstelle nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Querschenkel (6,6a) des bzw. der Bügel (5) im Abstand zu den Mittenschenkeln (3,3a) der Schlaufen (2,2a) verlaufen und an jedem Eckpunkt des bzw. der Bügel (5) und der Schlaufen (2,2a) ein Quereisen (7) angeordnet ist.3. Joint according to claim 1 or 2, characterized in that the transverse legs (6, 6a) of the bracket(s) (5) extend at a distance from the central legs (3, 3a) of the loops (2, 2a) and a transverse iron (7) is arranged at each corner point of the bracket(s) (5) and the loops (2, 2a). 4. Stoßstelle nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß die Querschenkel (6,6a) des bzw. der Bügel (5) und die Mittenschenkel (3,3a) der Schlaufen (2,2a) vertikal verlaufen.4. Joint according to one of claims 1 to 3, characterized in that the transverse legs (6,6a) of the bracket(s) (5) and the central legs (3,3a) of the loops (2,2a) run vertically. 5. Stoßstelle nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß die Aussparungen (1,1a) mit Beton ausgefüllt sind.5. Joint according to one of claims 1 to 4, characterized in that the recesses (1,1a) are filled with concrete. 6. Stoßstelle nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß die Stoßstellen zweier parallel verlaufender Längsschwellen über Querstege miteinander zur Bildung eines Gleisrosteiä verbunden sind.6. Joint according to one of claims 1 to 5, characterized in that the joints of two parallel longitudinal sleepers are connected to one another via crosspieces to form a track grid.
DE29700893U 1997-01-20 1997-01-20 Joint between two longitudinal sleepers made of concrete Expired - Lifetime DE29700893U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE29700893U DE29700893U1 (en) 1997-01-20 1997-01-20 Joint between two longitudinal sleepers made of concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE29700893U DE29700893U1 (en) 1997-01-20 1997-01-20 Joint between two longitudinal sleepers made of concrete

Publications (1)

Publication Number Publication Date
DE29700893U1 true DE29700893U1 (en) 1997-02-27

Family

ID=8034781

Family Applications (1)

Application Number Title Priority Date Filing Date
DE29700893U Expired - Lifetime DE29700893U1 (en) 1997-01-20 1997-01-20 Joint between two longitudinal sleepers made of concrete

Country Status (1)

Country Link
DE (1) DE29700893U1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1048783A1 (en) * 1999-04-29 2000-11-02 Bahnbau Wels GmbH Railway track and its construction method
DE102006023312A1 (en) * 2006-05-18 2007-11-22 Thyssenkrupp Gft Gleistechnik Gmbh Method for producing roadway superstructures for transhipment installations
DE202006017671U1 (en) * 2006-11-17 2008-03-27 Dw Schwellen Gmbh Joint between two longitudinal sleepers made of concrete
CN107881911A (en) * 2017-10-27 2018-04-06 中铁大桥勘测设计院集团有限公司 Spacing timber regulation system and its erection method at rail traffic bridge girder steel beam seam

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1048783A1 (en) * 1999-04-29 2000-11-02 Bahnbau Wels GmbH Railway track and its construction method
DE102006023312A1 (en) * 2006-05-18 2007-11-22 Thyssenkrupp Gft Gleistechnik Gmbh Method for producing roadway superstructures for transhipment installations
DE202006017671U1 (en) * 2006-11-17 2008-03-27 Dw Schwellen Gmbh Joint between two longitudinal sleepers made of concrete
CN107881911A (en) * 2017-10-27 2018-04-06 中铁大桥勘测设计院集团有限公司 Spacing timber regulation system and its erection method at rail traffic bridge girder steel beam seam

Similar Documents

Publication Publication Date Title
EP2623670B1 (en) Ballastless railway track structure for rail vehicles
DE4415363C1 (en) A permanent way superstructure for railways, especially for bridges and processes for its manufacture
EP2329079B1 (en) Track supporting layer
DE10212090B4 (en) Track for an electromagnetic high-speed train
DE2017116A1 (en) Railway sleeper
DE29700893U1 (en) Joint between two longitudinal sleepers made of concrete
DE19708896C2 (en) Slab track, mainly for the switch area
CH715209B1 (en) Track transition unit between a ballast track section and a ballastless track section.
DE29703508U1 (en) Slab track, mainly for the switch area
EP1736599B1 (en) Method for construction of tracks for railways or the like
DE4004452C2 (en)
EP2800833B1 (en) Slab track
DE2365505A1 (en) METHOD OF MANUFACTURING A BALLLESS SUPERSTRUCTURE OF A TRACK
DE10301231B3 (en) Superstructure guided over viaducts for rail-bound vehicles
DE3144558C2 (en)
DE10220096A1 (en) Concrete-block and steel tie-bar for permanent ways has one individual block lengthened and with second rail support with clamp profiles, two different gauges
DE3640004C1 (en) Track for a conveying railway
DE3608344C2 (en)
DE3329788C2 (en) Lane for lane buses
DE4416437C1 (en) Attachment of rails to sleepers
AT375699B (en) RAIL ARRANGEMENT, IN PARTICULAR FOR TRAMWAY TRACKS
DE19538712A1 (en) Prestressed concrete rail track sleeper
AT275579B (en) Track superstructure, especially for level crossings, industrial tracks and the like. using reinforced concrete slabs
DE1020665B (en) Long sleeper made of reinforced concrete for railway tracks on ballast bedding
DE4325869A1 (en) Solid trackway (railway track foundation) for rail-bound traffic

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 19970410

R150 Utility model maintained after payment of first maintenance fee after three years

Effective date: 20000321

R081 Change of applicant/patentee

Owner name: DW SCHWELLEN GMBH, DE

Free format text: FORMER OWNER: WALTER SPANNBETON-GMBH GUESEN, 39317 GUESEN, DE

Effective date: 20021210

R151 Utility model maintained after payment of second maintenance fee after six years

Effective date: 20030327

R152 Utility model maintained after payment of third maintenance fee after eight years

Effective date: 20050315

R071 Expiry of right