DE2915498A1 - Electricity substation with superimposed concrete sections - has lowest cell embedded in concrete mounting and supporting remainder and containing steel reinforcing rods - Google Patents
Electricity substation with superimposed concrete sections - has lowest cell embedded in concrete mounting and supporting remainder and containing steel reinforcing rodsInfo
- Publication number
- DE2915498A1 DE2915498A1 DE19792915498 DE2915498A DE2915498A1 DE 2915498 A1 DE2915498 A1 DE 2915498A1 DE 19792915498 DE19792915498 DE 19792915498 DE 2915498 A DE2915498 A DE 2915498A DE 2915498 A1 DE2915498 A1 DE 2915498A1
- Authority
- DE
- Germany
- Prior art keywords
- room
- concrete
- tower station
- station according
- cells
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/02—Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
- E04H5/04—Transformer houses; Substations or switchgear houses
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/12—Structures made of specified materials of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B7/00—Enclosed substations, e.g. compact substations
- H02B7/06—Distribution substations, e.g. for urban network
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Power Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
"Turmstation't"Tower station't
Die Erfindung betrifft eine als Turmstation ausgeführte elektrische Netzstation aus vorgefertigten aufeinandersetzbaren Rahmenbauteilen aus Beton, an deren oberstem Rahmenteil Mittel- und Niederspannungsfreileitungen mit der vollen Seilzugspannung abspannbar sind.The invention relates to an electrical one designed as a tower station Network station made of prefabricated, stackable frame components made of concrete whose uppermost frame part medium and low voltage overhead lines with the full Cable tension can be tensioned.
Es ist bekannt, derartige Turmstationen aus einer vor Ort gegossenen Fundamentplatte, auf diese Platte und übereinander gesetzten vorgefertigten rahmenförmigen Betonbauteilen und einem aufgesetzten Dach errichten (DE-GM 6 603 667). Die Verwendung vorgefertigter Bauteile ermöglicht es, die Turmstati'on in kürzester Zeit aufzubauen und damit erhebliche Montagekosten einzusparen.It is known such tower stations from a cast on site Foundation plate, on this plate and placed on top of each other prefabricated frame-shaped Erect concrete components and an attached roof (DE-GM 6 603 667). The usage Prefabricated components make it possible to set up the tower station in the shortest possible time and thus save considerable assembly costs.
Es hat sich aber gezeigt, daß diese bekannten Turmstationen vor allem in statischer Hinsicht den stets steigenden orderungen nicht mehr gewachsen sind, die sich aus den ständig zunehmenden Seilzugspannungen ergeben, mit denen die ankommenden Mittelspannungs-Freileitungen und die abgehenden Niederspannungs-Freileitungen an der Turmstation nach allen Seiten hin.abgespannt werden sollen.It has been shown, however, that these known tower stations above all from a static point of view are no longer able to cope with the ever increasing demands, which result from the constantly increasing cable tension with which the incoming Medium-voltage overhead lines and the outgoing low-voltage overhead lines of the tower station on all sides.
Der vorliegenden Erfindung liegt deshalb die Aufgabe zugrunde, die bekannten Turmstationen der eingangs beschriebenen Art so weiterzuentwickeln, daß die Vorteile der Verwendung vorgefzrtigter Bauteile erhalten bleiben, die aufgebaute Turmstation aber insbesondere in statischer Hinsicht alle Forderungen erfüllt, die heute an eine moderne Turmstation gestellt werden.The present invention is therefore based on the object known tower stations of the type described above so that the advantages of using prefabricated components are retained, the built-up Tower station, but especially in static terms, meets all the requirements that today to be placed at a modern tower station.
Die Aufgabe wird erfindungsgemäß dadurch gelöst, daß die Rahmenbauteile monolithische, quaderförmige Raumzellen mit vier senkrechten und einer waagerechten Wandfläche sind, von denen die unterste Raumzelle zumindest teilweise als verlorene Schalung für ein Ortsfundament dient.The object is achieved according to the invention in that the frame components monolithic, cuboid room cells with four vertical and one horizontal Wall areas are, of which the lowest room cell is at least partially as lost Formwork for a site foundation is used.
Die monolithisch angeformten waagerechten Wandflächen der einzelnen Raumzellen üben eine aussteifende Funktion aus und setzen den bei ungleichmäßig angreifenden Seilzugspannungen auftretenden Verdrillungskräften einen erheblichen Widerstand entgegen. Sie dienen aber auch als belastungsfähige Zwischendecken für die einzelnen Etagen und in der untersten Raumzelle zusammen mit den senkrechten Wandflächen als Schalung für das Ortsfundament. Beispielhaft sei erwähnt, daß bei einer erfindungsgemäß aufgebauten Turmstation mit einem Grundriß von 3 m x 3,6 m auf jeder ihrer vier Seiten in 9 m Höhe über dem Erdreich Seilkräfte von insgesamt 75 kN abgespannt werden können.The monolithically molded horizontal wall surfaces of the individual Space cells exercise a stiffening function and place the unevenly attacking cable tension occurring twisting forces a considerable Opposition. But they also serve as resilient false ceilings for the individual floors and in the lowest room cell together with the vertical ones Wall surfaces as formwork for the site foundation. As an example, it should be mentioned that with one according to the invention built tower station with a floor plan 3 m x 3.6 m on each of its four sides at a height of 9 m above the ground of a total of 75 kN can be guyed.
In zweckmäßiger Weiterbildung der Erfindung wird vorgeschlagen, daß die unterste Raumzelle an zwei gegenüberliegenden Seitenflächen Durchbrüche aufweist, durch die Moniereisen des sich nach außen fortsetzenden Ortsfundamentes ragen. Daneben wird vorgeschlagen, daß die waagerecht liegenden Wandflächen der Raumzellen Durchbrüche zur Durchführung einer Treppe und/oder eines Schaltgestänges aufweisen. Die einzelnen Raumzellen haben selbstverständlich gleiche Breite und Länge. Vorteilhafterweise besitzen sie auch die gleiche Höhe. Bei den modernen Betonierverfahren, beispielsweise dem Glockengußverfahren, bereitet es jedoch keine Schwierigkeiten, Raumzellen unterschiedlicher Höhe unter Verwendung der gleichen Kern- und Außenschalung zu gießen, da die Höhe der Raumzelle durch zwischen die Schalungen eingelegte Bretter in einfacher Weise verkürzt werden kann. Auf diese Weise können auch Durchbrüche und Tür-und Fensteröffnungen bei den einzelnen Raumzelle an den unterschiedlichsten Stellen nach völlig freier Wahl berücksichtigt werden. Obwohl die aufeinanderzusetzenden Raumzellen also durchaus unterschiedlich gestaltet sein können, werden sie doch nach einem einheitlichen Verfahren in ein und derselben Betonierform hergestellt, so daß man von untereinander gleichartigen Raumzellen sprechen kann, aus denen die erfindungsgemäße Turmstation durch Aufeinandersetzen aufgebaut ist. Die Tatsache, daß für sämtliche Raumzellen die gleiche Schalung benutzt werden kann, ist insofern von besonderer Bedeutung, weil die Schalung den größten Kostenfaktor bei der Herstellung derartiger Turmstationen darstellt.In an expedient development of the invention it is proposed that the lowest room cell has openings on two opposite side surfaces, protrude through the reinforcement bars of the local foundation that continues to the outside. Besides it is proposed that the horizontally lying wall surfaces of the room cells breakthroughs to carry out a staircase and / or a shift linkage. The single ones Of course, room cells have the same width and length. Advantageously they also have the same height. With modern concreting methods, for example the bell casting process, however, it does not cause any difficulties, room cells of different Pour height using the same core and outer formwork as the height the room cell by means of boards inserted between the formwork in a simple manner can be shortened. In this way, openings and door and window openings can also be made with the individual room cells in the most varied of places for completely free Choice to be considered. Although the space cells to be stacked on top of each other are definitely Can be designed differently, but they are based on a uniform Process in one and the same concreting form, so that one of each other similar room cells can speak from which the tower station according to the invention is built up by stacking. The fact that for all room cells the same formwork can be used is of particular importance, because the formwork is the largest cost factor in the manufacture of such tower stations represents.
Zweckmäßige Weiterbildungen der Erfindung sind in den Unteransprüchen 4 bis 7 angegeben. Die Erfindung wird nachfolgend anhand einer in der Zeichnung perspektivisch dargestellten Turmstation näher beschrieben und-erläutert, wobei der Ubersichtlichkeit halber die vorderen Wandflächen der einzelnen Raumzellen weggelassen sind und die Raumzellen jeweils etwas abgehoben voneinander dargestellt sind.Appropriate further developments of the invention are set out in the subclaims 4 to 7 indicated. The invention is illustrated below with reference to one in the drawing tower station shown in perspective described and explained in more detail, wherein For the sake of clarity, the front wall surfaces of the individual room cells have been omitted and the room cells are each shown slightly raised from one another.
Die Turmstation nach dem Ausführungsbeispiel besteht aus vier aufeinandergesetzten Raumzellen 1 bis 4, die je aus einem Quader von vier senkrechten Seitenwänden und einer monolithisch angeformten waagerechten Wand- oder Deckenfläche 5 bzw. 6 bzw. 7 bzw. 8 bestehen. Die vordere Seitenfläche jeder Raumzelle 1 bis 4 ist in der Zeichnung der Ubersichtlichkeit halber weggelassen. Bei der untersten Raumzelle 1 weist die Deckenfläche 5 nach unten, bei den anderen Raumzellen 2 bis 4 nach oben.The tower station according to the embodiment consists of four stacked one on top of the other Room cells 1 to 4, each consisting of a cuboid with four vertical side walls and a monolithically molded, horizontal wall or ceiling surface 5 or 6 or 7 or 8 exist. The front side surface of each room cell 1 to 4 is in the drawing omitted for the sake of clarity. In the lowest room cell 1, the Ceiling area 5 downwards, in the other room cells 2 to 4 upwards.
Die unterste Raumzelle 1 dient als verlorene Schalung für das Ortsfundament. Zu diesem Zweck weist sie an zwei gegenüberliegenden Seitenflächen 9 und 10 Durchbrüche 11 und 1? auf, durch die Moniereisen 13 als Armierung für das Betonfundament 14, das sich über die Seitenflächen 9 und 10 erstreckt, hindurchgesteckt sind.The lowest room cell 1 serves as permanent formwork for the site foundation. For this purpose, it has openings on two opposite side surfaces 9 and 10 11 and 1? on, through the reinforcement bar 13 as reinforcement for the concrete foundation 14, which extends over the side surfaces 9 and 10, are pushed through.
Ähnliche Durchbrüche weisen auch die anderen Raumzellen 2 bis 4 auf der in der Zeichnung nicht dargestellten vorderen Seitenfläche als Tür- bzw. Fensteröffnungen auf. Weitere Durchbrüche 15 und 16 sind als Mannlöcher in den Decken 6 bzw. 7 vorgesehen. Die Decke 8 weist einen Durchbruch für ein Oberlicht 17 auf.The other room cells 2 to 4 also have similar openings the front side surface, not shown in the drawing, as door or window openings on. Further openings 15 and 16 are provided as manholes in the ceilings 6 and 7, respectively. The ceiling 8 has an opening for a skylight 17.
Die Raumzellen 1 bis 4 sind im Glockengußverfahren hergestellt, wobei jeweils die Deckenfläche als waagerechte Fläche betoniert ist.The room cells 1 to 4 are made in the bell casting process, with the ceiling surface is concreted as a horizontal surface.
Die Raumzellen 1 bis 4 sind miteinander durch in den Ecken anliegende, in der Zeichnung nicht dargestellte Winkeleisen kraft- und formschlüssig verbunden. Sie können aber auch durch Rundstäbe verspannt werden, die durch in den vier Ecken liegende Durchgangslöcher geführt sind. Eine besonders zweckmäßige Verankerung der Raumzellen untereinander ergibt sich, wenn die Rundstäbe vom Fundament bis zur obersten Raumzelle verlaufen.The room cells 1 to 4 are interconnected by lying in the corners, Angle iron not shown in the drawing non-positively and positively connected. But they can also be braced by round bars that go through in the four corners lying through holes are performed. A particularly useful anchorage of the Room cells among each other result when the round bars from the foundation to the top Room cell run.
Da der auf den Seitenwänden der Turmstation lastende Flächendruck durch die fünfseitigen monolithischen Raumzellen besonders günstig aufgenommen wird, können die einzelnen Raumzellen 1 bis 4 aus Leichtbeton gefertigt werden.Because the surface pressure on the side walls of the tower station is particularly favorably received by the five-sided monolithic room cells, the individual room cells 1 to 4 can be made of lightweight concrete.
Die erfindungsgemäße Turmstation ist in kürzester Zeit aufbaubar, da vor Ort nur das Fundament gegossen und die Raumzellen aufeinandergesetzt und miteinander verspannt zu werden brauchen. Auch die Installation erfordert geringen Zeitaufwand, da alle Befestigungsvorrichtungen wie Dübel und Halteeisen in die vorgefertigten Betonbaueinheiten eingelassen sind. Besondere Erdleitungen zu den Geräten der Station sind nicht erforderlich, weil sämtliche Halteeisen und Dübel mit den Moniereisen und diese wiederum untereinander verschweißt sind. Es bedarf lediglich einer die Raumzellen miteinander verbindenden Erdsammelleitung. Abspannungen können in jeder Höhe der Turmstation und an allen Seiten vorgenommen werden.The tower station according to the invention can be set up in a very short time, because on site only the foundation was poured and the room cells placed on top of each other and need to be braced together. Installation also requires little Time required, since all fastening devices such as dowels and holding iron in the prefabricated Concrete building units are embedded. Special earth lines to the Devices of the station are not required because all holding irons and dowels with the reinforcement bars and these in turn are welded to one another. It requires only one earth collecting line connecting the room cells with one another. Guyings can be carried out at any height of the tower station and on all sides.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19792915498 DE2915498A1 (en) | 1979-04-17 | 1979-04-17 | Electricity substation with superimposed concrete sections - has lowest cell embedded in concrete mounting and supporting remainder and containing steel reinforcing rods |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19792915498 DE2915498A1 (en) | 1979-04-17 | 1979-04-17 | Electricity substation with superimposed concrete sections - has lowest cell embedded in concrete mounting and supporting remainder and containing steel reinforcing rods |
Publications (1)
Publication Number | Publication Date |
---|---|
DE2915498A1 true DE2915498A1 (en) | 1980-10-30 |
Family
ID=6068529
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19792915498 Withdrawn DE2915498A1 (en) | 1979-04-17 | 1979-04-17 | Electricity substation with superimposed concrete sections - has lowest cell embedded in concrete mounting and supporting remainder and containing steel reinforcing rods |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE2915498A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT381751B (en) * | 1984-12-14 | 1986-11-25 | Mayreder Kraus & Co Ing | Tower-like station building for electrical power installations |
CN110905271A (en) * | 2019-11-29 | 2020-03-24 | 中铁大桥局第七工程有限公司 | Assembled measuring tower and installation method thereof |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE6603667U (en) * | 1964-06-03 | 1969-10-30 | Gervin Mueller | ELECTRICAL DISTRIBUTION STATION, ESPECIALLY. UNFORMER STATION |
DE2607871A1 (en) * | 1976-02-26 | 1977-09-01 | Weinzierl Geb | Earthed transformer station reinforced concrete box section - has interconnecting holed top and bottom inside corner brackets and tie rods |
-
1979
- 1979-04-17 DE DE19792915498 patent/DE2915498A1/en not_active Withdrawn
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE6603667U (en) * | 1964-06-03 | 1969-10-30 | Gervin Mueller | ELECTRICAL DISTRIBUTION STATION, ESPECIALLY. UNFORMER STATION |
DE2607871A1 (en) * | 1976-02-26 | 1977-09-01 | Weinzierl Geb | Earthed transformer station reinforced concrete box section - has interconnecting holed top and bottom inside corner brackets and tie rods |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT381751B (en) * | 1984-12-14 | 1986-11-25 | Mayreder Kraus & Co Ing | Tower-like station building for electrical power installations |
CN110905271A (en) * | 2019-11-29 | 2020-03-24 | 中铁大桥局第七工程有限公司 | Assembled measuring tower and installation method thereof |
CN110905271B (en) * | 2019-11-29 | 2021-08-10 | 中铁大桥局第七工程有限公司 | Assembled measuring tower and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2354316C2 (en) | Prefabricated building | |
DE1941281A1 (en) | Buildings made from standard parts | |
DE3535829A1 (en) | BUILDING ELEMENTS AND BUILDING MADE FROM SUCH | |
DE2756337A1 (en) | THREE-DIMENSIONAL COMPOSITIONABLE MODULE IN THE SHAPE OF A T - MODIFIED FOR THE INDUSTRIAL DEFORMING OF BUILDINGS | |
DE1284076B (en) | Method of erecting a building | |
DE371180C (en) | Process for the manufacture of reinforced concrete structures | |
RU2691232C1 (en) | Method for manufacturing volumetric housing module for transformer distribution substations | |
DE2915498A1 (en) | Electricity substation with superimposed concrete sections - has lowest cell embedded in concrete mounting and supporting remainder and containing steel reinforcing rods | |
DE2210342A1 (en) | REINFORCED CONCRETE ROOM FOR FINISH | |
DE2242131A1 (en) | TRANSFORMER STATION, SUBSTATION OR DGL | |
EP0515724B1 (en) | Method and prefabricated module for the fabrication of structures and buildings | |
DE2943786C2 (en) | Prefabricated, assembly-resistant panel element for the production of ceilings and method for its production | |
DE2632176C2 (en) | Support frames of a high-voltage outdoor switchgear combined into three-phase modules | |
EP0106297A2 (en) | Structural element for manufacturing concrete walls, and building wall produced with the same | |
DE2941382A1 (en) | Precast concrete switch box - is formed from squared U-shaped smooth cellular modules without needing reinforcing ribs | |
EP0631022A2 (en) | Tridimensional element for building purposes and its manufacturing process | |
DE3103390A1 (en) | Electrical control station | |
DE3203980C2 (en) | Underpass structure and process for its construction | |
DE1784054A1 (en) | Room cells made of reinforced concrete for building construction | |
DE1684769A1 (en) | Prefabricated house for transformer stations, switching stations, etc. like | |
DE2617504A1 (en) | Concrete component set for power station switchgear housing - comprising prefabricated ribbed slabs with projecting corner sidewalls or support columns | |
EP0196624B1 (en) | Small station | |
EP0064572A2 (en) | Silo, in particular of prefabricated reinforced concrete elements | |
DE3116567A1 (en) | Modular structural part | |
DE102021210135A1 (en) | Building module, building consisting thereof and method and molding device for the production of a building module |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
8110 | Request for examination paragraph 44 | ||
8139 | Disposal/non-payment of the annual fee |