DE2653462A1 - Concrete wall climbing shuttering bracket framework - has work platform at top of movable form element rigidly joined to lower platform - Google Patents

Concrete wall climbing shuttering bracket framework - has work platform at top of movable form element rigidly joined to lower platform

Info

Publication number
DE2653462A1
DE2653462A1 DE19762653462 DE2653462A DE2653462A1 DE 2653462 A1 DE2653462 A1 DE 2653462A1 DE 19762653462 DE19762653462 DE 19762653462 DE 2653462 A DE2653462 A DE 2653462A DE 2653462 A1 DE2653462 A1 DE 2653462A1
Authority
DE
Germany
Prior art keywords
working platform
platform
formwork
console
formwork element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19762653462
Other languages
German (de)
Inventor
Heinz Schwechheimer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Acrow Wolff GmbH
Original Assignee
Acrow Wolff GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Acrow Wolff GmbH filed Critical Acrow Wolff GmbH
Priority to DE19762653462 priority Critical patent/DE2653462A1/en
Publication of DE2653462A1 publication Critical patent/DE2653462A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/28Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The bracket framework for cimbing formwork, used in concrete wall erection, has a bracket supported on the existent walling, bearing a working platform. there is a form element bearing a form membrane. standing vertically to the platform, with drive for moving it to and fro parallel to the platform top, and with a further platform at its top end. This upper working platform (11) is rigidly connected to the lower one (7), to form a single entity. The form element (14) is movably mounted between the two platforms. The upper platform may be supported by a carrier frame (8, 9, 10) on the bracket (1) bearing the lower platform. The form element can be displaceably suspended on its underside.

Description

Konsolgerüst für KletterschalungenBracket scaffolding for climbing formwork

Die Erfindung betrifft ein Konsolgerüst für die Herstellung von Betonwandungen als Kletterschalung mit einer an der bereits hergestellten Betonwandung sich abstützenden Konsole, welche eine Arbeitsbühne trägt, mit einem eine Schalungshaut tragenden Schalungselement, das etwa senkrecht zur ArbeitsbUhne steht und parallel zur Oberseite der Arbeitsbühne mittels eines Antriebes hin- und herbewegt werden kann, und mit einer am oberen Ende-des Schalungselementes befindlichen weiteren Arbeitsbühne.The invention relates to a bracket frame for the production of concrete walls as climbing formwork with a support on the concrete wall that has already been made Console, which carries a working platform, with one that carries a formwork skin Formwork element that is approximately perpendicular to the working platform and parallel to the top the working platform can be moved back and forth by means of a drive, and with a further working platform located at the upper end of the formwork element.

Zum Herstellen von hohen GebSuden mit Betonwandungen wie beispielsweise auch Betontürmen verwendet man sogenannte Kletterschalungen , die aus einzelnen Elementen, sogenannten Knnsolgerusten und gegebenenfalls Ausgleichselementen, zusammengesetzt sind, welche zusammen als Schalung das obere Ende des herzustellenden Gebäudes ringartig umschließt bzw.For the production of tall buildings with concrete walls such as Also concrete towers are used so-called climbing formwork, which consists of individual Elements, so-called Knnsolgerusten and, if necessary, compensation elements are, which together as formwork, the upper end of the building to be produced ring-like encloses or

an seiner Innenseite als innerer Schalungsring anliegen, wobei im verschalten Zwischenraum Armierungen ~angebracht werden und dieser schließlich mit Beton dem -ausgegossen wird. Nach/Festwerden des Betons werden die die Schalungshaut tragenden Schalungselemente aus der-Schalungsebene zurückgefahren, woraufhin die Außenseite der Schalungshaut gereinigt und mit einem Schutzmittel versehen wird, um das Schalungselement für den nächsten Schalungsvorgang vorzubereiten.rest on its inside as an inner formwork ring, with im interconnected space reinforcements ~ are attached and this finally with Concrete to be poured. After the concrete has set, these become the formwork skin load-bearing formwork elements moved back from the formwork level, whereupon the The outside of the formwork skin is cleaned and provided with a protective agent, to prepare the formwork element for the next formwork process.

D klettert die Brüstung mit der Schalung an dem fertigFestellten Wandabschnitt in die nächste Schalungsposition hoch, wo die die Schalungshaut tragenden Schalungselement wieder in die Schalungsebene eingerUckt werden.D climbs the parapet with the formwork on the completed Wall section up to the next formwork position, where the formwork element carrying the formwork skin be indented again into the formwork level.

Bei bekannten Kletterschalungen dieser Art (vergl. With known climbing formwork of this type (cf.

DT-AS 2 217 584 und DT-OS 24 4--383) sind die mit der Schalung-shaut versehenen Schalungselemente jeweils auf der am unteren Ende des Konsolgerüstes befindlichen Konsole verfahrbar abgestutzt, wodurch sich beim Verschieben des Schalungselementes ungünstige Kippmomente ergeben können, weil das Schalungselement - -labil auf der Konsole ruht. Ein besonderer Nachteil der aus der DT-OS 24 45 383 bekannten Kletterschalung besteht darin, daß die obere Arbeitsbühne fest mit dem verfahrbaren Schalungselement verbunden ist und somit zusammen mit diesem gegenüber der Schalungsebene verfahren wird. Daher steht diese zweite Arbeitsbühne nur dann filr Arbeiten am herzustellenden Gebäude zur Verfügung, wenn sich die ßchalungshaut in. der Schalungsebene befindet. Ist die-Schalungshaut aus der Schalungsebene zurückgefahren, so darf von der zweiten Arbeitsbühne nicht gearbeitet werden. Die zweite Arbeitsbühne ist deshalb nur beschränkt benutzbar und erhöht andererseits die instabile Abstützung der die Schalungshaut tragenden Schalungselemente.DT-AS 2 217 584 and DT-OS 24 4--383) are the ones with the formwork provided formwork elements on the one at the lower end of the bracket frame The console located movably supported, whereby when moving the formwork element unfavorable tilting moments can arise because the formwork element - unstable on the Console rests. A particular disadvantage of the climbing formwork known from DT-OS 24 45 383 consists in the fact that the upper working platform is firmly attached to the movable formwork element is connected and thus move together with this opposite the formwork level will. Therefore, this second working platform is only available for work on the to-be-built Building available when the formwork skin is in the formwork level. If the formwork skin has moved back out of the formwork level, the second Working platform cannot be worked. The second working platform is therefore only limited usable and on the other hand increases the unstable support of the formwork skin load-bearing formwork elements.

cOie -Aufgabe der Erfindung besteht darin, ein Konsolgerüst für Kletterschalungen zu schaffen, das viaseitige als die bekannten Konsolgerüste für Kletterschalungen verwendet werden kann.Coie task of the invention is to create a bracket frame for climbing formwork to create the vias side as the well-known bracket scaffolding for climbing formwork can be used.

Zur Lösung dieser Aufgabe wird bei einem Konsolgerüst der eingangs genannten Art erfindungsgemäß vorgeschlagen, daß die obere Arbeitsbühne mit der unteren Arbeitsbühne starr zu einer Einheit verbunden und das die Schalungshaut tragende Schalungselement zwischen beiden Arbeitsbühnen verschiebbar gelagert ist. Im Gegensatz zu den bekannten-Konsolgerüsten für Kletterschalungen sind gemäß der Erfindung die beiden am oberen und unteren Ende derselben befindlichen BrbeitsaUhnen also nicht gegeneinander bewegbar, sondern zu einer starren Einheit miteinander verbunden und bleiben somit auch dann in der Arbeitsebene, selbst wenn die Schalungshaut aus der Schalungsebene zurAckgefahren ist. Daher stehen die obere und die untere- - -Arbeitsbühne immer fUr Arbeiten zur Verfügung. Die Reinigung und Vorbereitung der Schalungsseite der Schalungshaut für den nächsten Schalungsvorgang wird von der unteren Arbeitsbühne vorgenommen, Die obere Arbeitsbuhne steht standig für Arbeiten am nächsten - -- Sdialungsabschnitt zur Vergügung, selbst- wenn- das- Scha lungselement zurückgefahren ist. To solve this problem, the at the beginning of a console frame proposed type according to the invention, that the upper platform with the lower working platform rigidly connected to form a unit and that is the formwork skin load-bearing formwork element is slidably mounted between the two working platforms. In contrast to the known bracket scaffolding for climbing formwork, according to the Invention of the two BrbeitsaUhnen located at the top and bottom of the same so they cannot be moved against each other, but as a rigid unit with each other connected and thus remain in the working level, even if the formwork skin has moved back out of the formwork level. Therefore, the upper and lower - Working platform always available for work. The cleaning and preparation the formwork side of the formwork skin for the next formwork process is taken from made of the lower working platform, the upper working platform is always available for work on the next - - Sdialungsabschnitt available, even if the formwork element has moved back.

Vorzugsweise ist die obere Arbeitsbiihne mittels eines Tragrahmens auf der die untere Arbeitsbühne tragenden Konsole abgestützt, so daß das Konsolgerüst einen beide Arbeitsbiihnen abstützenden, mehr oder weniger starren Tragrahmen aufweist. Dabei ist die obere Arbeitsbühne vorzugsweise auf fhnenträgern des Tragrahmens angeordnet, wobei sie wenigstens teilweise frei auskragend über der unteren Arbeitsbiihne liegt. Dies erreicht man zweckmäßig dadurch, daß jeder Bühnenträger mittels wenigstens einer in seinem mittleren Bereich an ihm angreifenden Stütze und wenigstens einer an seinem hinteren Ende angreifenden Zugstange mit der Konsole verbunden ist.The upper working platform is preferably by means of a support frame supported on the console carrying the lower work platform, so that the console frame has a more or less rigid support frame supporting both working platforms. The upper working platform is preferably arranged on flag carriers of the support frame, wherein it is at least partially freely cantilevered over the lower working platform. This is expediently achieved in that each stage support means at least a support engaging it in its central area and at least one at its rear end engaging tie rod is connected to the console.

Das mit der Schalungshaut versehene Schalungselement kann an der Unterseite der oberen Arbeitsbühne verfahrbar aufgehängt sein , beispielsweise an den die obere Arbeitsbühne tragenden Kragarmen. Dadurch erhält man eine stabile Lagerung des schweren-Schalungselementes weil dasselbe nicht auf der Konsole bzw. der unteren Arbeitsbühne abgestützt ist, sondern an einem oberen Teil hängt und sich daher keine eine Instabilität hervorrufenden Kippmomente ergeben. Deshalb kann man die Schalungshaut auch einfacher und sicherer in die Schalungsebene einfahren und in dieser festlegen. The formwork element provided with the formwork skin can be attached to the Underside of the upper working platform can be suspended, for example on the cantilever arms supporting the upper working platform. This gives a stable one Storage of the heavy formwork element because it is not on the console or the lower working platform is supported, but hangs from an upper part and therefore, there are no tilting moments causing instability. Therefore can it is also easier and safer to move the formwork skin into the formwork level and set in this.

Zusätzlich kann eine Verriegelung zum Verriegeln des Schalungaelements in der Sctialungsposition vorgesehen sein,- falls dies zum Halten der Schalungshaut in der Schalungsebene notwendig sein sollte. In addition, a lock can be used to lock the formwork element be provided in the Sctialungsposition, - if this is to hold the formwork skin should be necessary in the formwork level.

In der Zeichnung ist ein Ausführungsbeispiel des erfindungsgemäßen Konsolgerüstes in Seitenansicht schematisch dargestellt. In the drawing is an embodiment of the invention Bracket frame shown schematically in side view.

Das in der Zeichnung dargestellte Konsolgerüst für Kletterschalungen weist eine Konsole 1 auf, die auf senkrechten Stützen 2 und schräg verlaufenden Verstrebungen 3 angeordnet ist. Diese Konsole 1 ist mittels Gerüstschuhen 4 und 5 an dem bereits fertiggestellten Teil einer Betonwand 6 abgestützt. The bracket frame for climbing formwork shown in the drawing has a bracket 1 on vertical supports 2 and sloping Struts 3 is arranged. This console 1 is by means of scaffolding shoes 4 and 5 supported on the already completed part of a concrete wall 6.

Auf der Konsole 1 ist eine Arbeitsbühne 7 angeordnet, welche die Hauptarbeitsbühne des Konsolgerüstes bildet. On the console 1, a working platform 7 is arranged, which the Forms the main work platform of the console frame.

Im mittleren Bereich der Konsole 1. sind auf derselben Stützen 8 befestigt, die sich wenigstens anbeiden Enden der Konsole befinden. Außerdem greifen an das auskragende äußere Ende der Konsole 1 nach oben führende Zugstangen 9 an, wobei jeder Stütze 8 eine Zugstange 9 zugeordnet ist. Die oberen Enden der einander Zugeordneten Stützen 8 und Zugstangen 9 sind jeweils durch einen horizontalen Träger 10 untereinander verbunden, dessen vorderes Ende 10a frei nach vorne auskragt. Diese auskragenden vorderen Enden 10a der$ Träger 10 dienen als Stütze für eine obere ArbeitsbUhne 11, welche an der Rückseite mit einem als Fallsicherung dienenden Geländer 12 versehen ist. Im Bereich der Zugstangen kann eine weitere Fallsicherung vorgesehen sein. In the middle area of the console 1. are on the same supports 8 attached, which are located at least at both ends of the console. Also grab it to the protruding outer end of the console 1 upwardly leading tie rods 9 on, each support 8 being assigned a pull rod 9. The top ends of each other Associated supports 8 and tie rods 9 are each supported by a horizontal beam 10 connected to one another, the front end 10a of which protrudes freely forward. These Cantilevered front ends 10a of the beam 10 serve as a support for an upper one Working platform 11, which at the rear with a guardrail serving as a fall protection 12 is provided. A further fall protection can be provided in the area of the tie rods be.

Die Träger 10 sind beispielsweise als I-Träger oder Doppel-T-Träger ausgebildet und dienen beim dargestellten Ausführungsbeispiel auch zum Aufhängen der Schalungshaut 15. Diese ist auf einem Schalungselement 14 befestigt, welches eine Trägerkonstruktion aus einer Mehrzahl von im Abstand voneinander angeordneten Stäben 15 und 16 und diese verbindenden Gurten 17 besteht. Am oberen Ende des Schalungselementes 14 sind Gleit- oder Rollschuhe 18 angeordnet, deren Gleitlager oder Rollen 19 jeweils an einen der Profilträger 10 angehängt sind.The girders 10 are, for example, I-girders or double-T-girders formed and are also used for hanging in the illustrated embodiment the formwork skin 15. This is attached to a formwork element 14, which a support structure composed of a plurality of spaced apart Rods 15 and 16 and these connecting belts 17 is made. At the upper end of the formwork element 14 sliding or roller skates 18 are arranged, their sliding bearings or rollers 19 each are attached to one of the profile supports 10.

Als eine Möglichkeit zum Verschieben des Schalungselementes 14 ist beim dargestellten Ausfahrungsbeispiel des Konsolgerüstes wenigstens eine als Antrieb dienende windel 20 vorgesehen, die mit ihrem einen Ende in einem.der Querträger 21 des Schalungselementes drehbar g d agert ist.DieseSpindel 20 greift mit-ihrem anderen Ende in eine an einer der Stütze 8 befestigte Spindelmutter ein und wird zum Verstellen des Schalungselementes 14 um ihre Längsachse gedreht.Zu diesemZweck ist am auBeren hinteren Ende der Spindel 20 ein Kettenrad 23 befesugt,über das eine nach unten hängende und von Hand zu betätigende endlose Kette 24 geführt ist. Je nachdem in welche Drehrichtung die Spindel 20 gedreht wird,uird das an den Profilträgern 10 hängende Schalungselement 14 entlang dieser Träger aus der Schalungsebene heraus oder in die Schalungsebene hinein verfahren.As a way to move the formwork element 14 is In the illustrated embodiment of the console frame, at least one is used as a drive Serving diaper 20 is provided, which has one end in ein.der cross member 21 of the formwork element is rotatable. This spindle 20 engages with its the other end into a spindle nut attached to one of the supports 8 and becomes to adjust the formwork element 14 rotated about its longitudinal axis. For this purpose a chain wheel 23 is attached to the outer rear end of the spindle 20, over which one downwardly hanging and manually operated endless chain 24 is guided. Ever after which direction of rotation the spindle 20 is rotated, that uird at the profile girders 10 hanging formwork element 14 along these girders from the Move the formwork level out or into the formwork level.

Hierbei kann im unteren Bereich des Schalungselementes 14 eine nicht dargestellte Verriegelung vorgesehen sein, welche das Schalungselement 14 in der in der Zeichnung dargestellten Schalungsebene arretiert und für die Verstellbewegungen von Hand gelöst werden kann.Here, in the lower area of the formwork element 14, one cannot Lock shown be provided, which the formwork element 14 in the Shuttering level shown in the drawing locked and for the adjustment movements can be solved by hand.

Aus der Zeichnung ist erkennbar, daß die untere Ar-Arbeitsbühne 7 des Konsolgerüstes eine größere Tiefe als die obere Arbdtsbühne 11 aufweist, sodaß das aus der Schalungs ebene zurückgefahrene Schalungselement 14 das Begehen der Hauptarbeitsbühne der unteren ArbeitsbLUme 7 nicht behindert. Die untere Arbeitsbünne 7 wird im wesentlichen für Bedienungsiwecke und zum Reinigen der Schalungshaut und zum Vorbereiten derselben für den nächsten Schalungsvorgang benutzt, während die obere ArbeitsbUhne 11 für Bewehrungsarbeiten am nächst häheren Abschnitt der herzustellenden Betonwand benutzt wird. Die Arbeitsbühne 7 kann gleichzeitig als Schutz- und Fanggerüst für die obere Ar-Arbeitsbühne 11 ausgebildet werden und entspricht dann den Vorschriften der DIN 4420. Zu diesem Zweck kann ein Maschendraht angebracht werden.It can be seen from the drawing that the lower Ar working platform 7 of the console frame has a greater depth than the upper Arbdtsbühne 11, so that the retracted from the formwork level formwork element 14 walking on the Main work platform of the lower work flow 7 not obstructed. The lower working level 7 is essentially used for operating purposes and for cleaning the formwork skin and used to prepare the same for the next formwork process, while the upper work platform 11 for reinforcement work on the next higher section of the to be produced Concrete wall is used. The working platform 7 can be used as a protective and safety scaffold at the same time for the upper Ar-working platform 11 and then complies with the regulations DIN 4420. A wire mesh can be attached for this purpose.

An der Konsole 1 können auch noch Naciiaufbdbneii 25 -hängen, welche zum Ziehen der vorletzten Anker aus der bereits fertiggestellten Betonwand-6 benutzt wird.Naciiaufbdbneii 25 can also hang on the console 1, which used to pull the penultimate anchor from the already completed concrete wall-6 will.

Da alle ArbeitsbUhnen , ~ die eine Lauffläche beispielsweise aus Holzplanken 26 aufweisen, stets bis an die fertiggestellte Betonwand 6 bzw. an die Schalungs ebene heranreichen, können diese Arbeitsbühnen zu jeder Zeit uneingeschränkt benutzt werden.Fallsicherungen können an jeder Arbeitsbühne vorgesehen sein.Since all work platforms have a running surface made of wood planks, for example 26 have, always up to the finished concrete wall 6 or the formwork level, these working platforms can be used without restriction at any time Fall protection devices can be provided on every working platform.

Claims (7)

Patentansprüche: Konsolgerüst für Kletterschalungen zum Herstellen von Betonwandungen, mit einer an der bereits hergestellten Betonwandung sich abstützenden Konsole, welche eine Arbeitsbühne trägt, mit einem eine Schalungshaut tragenden Schalungselement, das senkrecht zur Arbeitsbühne steht und Parallel zur Oberseite der Arbeitsbühne mitten eines Antriebes hin- und herbewegt werden kann, und mit einer im Bereich des oberen Endes des Schalungselementes befindlichen weiteren-Arbeitsbühne, d a -d u r c h g e k e n n z e i c h n e t , daß die obere Arbeitsbühne (11) mit der unteren Arbeitsbühne (7) starr zu einer Einheit verbunden und das beweg- -t bare Schalungselement (14) zwischen den beiden Arbeitsbühnen verschiebbar gelagert ist.Claims: Bracket scaffolding for climbing formwork to be produced of concrete walls, with one supported on the concrete wall that has already been produced Console, which carries a working platform, with one that carries a formwork skin Formwork element that is perpendicular to the working platform and parallel to the top the work platform can be moved back and forth in the middle of a drive, and with another working platform located in the area of the upper end of the formwork element, d a d u r c h e k e n n n z e i c h n e t that the upper working platform (11) with the lower working platform (7) rigidly connected to form a unit and the moves face formwork element (14) slidably mounted between the two working platforms is. 2.) Konsolgerüst nach Anspruch 1,dadurch gekennzeichnet, daß die obere Arbeitsbühne (11) mittels eines Tragrahmens (8,9,10) auf der die untere Arbeitsbühne (7) tragenden Konsole (1) abgestützt ist.2.) console frame according to claim 1, characterized in that the upper Working platform (11) by means of a support frame (8,9,10) on which the lower working platform (7) supporting console (1) is supported. 3.) Konsolgerüst nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die obere Arbeitsbühne (11) auf Bühnen- auf Bühnenträgern (10a) des Tragrahmens (8,9,10) angeordnet ist.3.) console frame according to claim 1 or 2, characterized in that the upper working platform (11) on stage on stage supports (10a) of the support frame (8,9,10) is arranged. 4. Konsolgerüst nach Anspruch 3, dadurch gekennzeichnet, daß jeder Kragarm (iO,lOa) mittels wenigstens einer in seinem mittleren Bereich an ihm angreifenden Stütze (8) und wenigstens einer an seinem hinteren Ende angreifenden Zugstange (9) mit der Konsole (1) verbunden ist.4. console frame according to claim 3, characterized in that each Cantilever arm (iO, lOa) by means of at least one in its middle area at it engaging support (8) and at least one engaging at its rear end Drawbar (9) is connected to the console (1). 5.) Konsolgerüst nach Anspruch 1 bis 4, dadurch gekennzeichnet, daß das Schalungselement (14) an der Unterseite der'oberen Arbeitsbühne (11) verschiebbar aufgehängt ist.5.) console frame according to claim 1 to 4, characterized in that the formwork element (14) can be displaced on the underside of the upper working platform (11) is hung. 6.) Konsolgerüst nach Anspruch 5, dadurch gekennzeichnet, daß das Schalungselement (14) an den die obere Arbeitsbühne (11) tragenden Bühnenträgern (10,10a)verschiebbaraufgehãngt~ist.6.) console frame according to claim 5, characterized in that the Formwork element (14) on the platform girders supporting the upper working platform (11) (10,10a) is slidably suspended ~. 7.) Schalungselement nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß unter der unteren Arbeitsbühne (7y eine Nachlaufbühne (25) als weitere Arbeitsbühne yorgesehen ist, die an der Konsole (1) hängt.7.) Formwork element according to one of claims 1 to 5, characterized in that that under the lower working platform (7y a trailing platform (25) as a further working platform that is attached to the console (1).
DE19762653462 1976-11-25 1976-11-25 Concrete wall climbing shuttering bracket framework - has work platform at top of movable form element rigidly joined to lower platform Pending DE2653462A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19762653462 DE2653462A1 (en) 1976-11-25 1976-11-25 Concrete wall climbing shuttering bracket framework - has work platform at top of movable form element rigidly joined to lower platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19762653462 DE2653462A1 (en) 1976-11-25 1976-11-25 Concrete wall climbing shuttering bracket framework - has work platform at top of movable form element rigidly joined to lower platform

Publications (1)

Publication Number Publication Date
DE2653462A1 true DE2653462A1 (en) 1978-06-01

Family

ID=5993900

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19762653462 Pending DE2653462A1 (en) 1976-11-25 1976-11-25 Concrete wall climbing shuttering bracket framework - has work platform at top of movable form element rigidly joined to lower platform

Country Status (1)

Country Link
DE (1) DE2653462A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0018014A2 (en) * 1979-04-24 1980-10-29 SGB public limited company Formwork assembly
DE3117409A1 (en) * 1981-05-02 1982-11-25 Josef 7611 Steinach Maier "CLIMBING FORMWORK"

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0018014A2 (en) * 1979-04-24 1980-10-29 SGB public limited company Formwork assembly
EP0018014A3 (en) * 1979-04-24 1980-11-26 Sgb Group Public Limited Company Improvements in or relating to formwork
DE3117409A1 (en) * 1981-05-02 1982-11-25 Josef 7611 Steinach Maier "CLIMBING FORMWORK"
US4478385A (en) * 1981-05-02 1984-10-23 Josef Maier Climbing forms

Similar Documents

Publication Publication Date Title
AT503924B1 (en) CLIMBING FOR CONCRETING A WALL OF A BUILDING
DE2622840A1 (en) CLIMBING SCAFFOLDING WITH APPROPRIATE FORMWORK
DE1255695B (en) Method and device for the construction of multi-span bridges or similar structures in sections
DE2947210A1 (en) DEVICE FOR LIFTING SLIDING SHAPES ON STEEL RODS FOR THE PRODUCTION OF CONCRETE CONSTRUCTIONS AND THE LIKE
DE2452182C2 (en) Device for the production of structures made of reinforced concrete with a curved outline and elevation by means of a climbing process
EP2679744A1 (en) Concreting ceiling board
DE1283484B (en) Procedure for building high-rise buildings and formwork to carry out the procedure
DE2217584C3 (en) Climbing formwork for a concrete wall formwork
DE902188C (en) Sliding circuit for concrete structures
DE3505174C2 (en)
DE2759088C2 (en) Climbing scaffold with climbing formwork for the production of a reinforced concrete wall
WO2008000654A1 (en) Lifting platform and method for setting up a lifting platform
DE2521622A1 (en) CLIMBING FORMWORK
DE2653462A1 (en) Concrete wall climbing shuttering bracket framework - has work platform at top of movable form element rigidly joined to lower platform
DE3115239A1 (en) Device as a scaffold for driving, in sections, under concrete bridges
DE1135511B (en) Device for the production of long concrete structures for bridges provided with structural supports for bridges or the like.
DE3509832C1 (en) Bricklayer's table
EP0159467B1 (en) Platform for lifting persons
CH638861A5 (en) Apparatus for producing vertical wall panels from masonry blocks
DE1759873C3 (en) Formwork for the serial production of at least one-sided open space cells made of reinforced concrete, such as prefabricated garages or the like
DE1280534B (en) Protective hood for a work scaffold for industrial chimney construction
DE811292C (en) Formwork scaffolding for beamless ceilings
DE1658587C (en) Device for the production of multi-span structures, in particular bridge structures, made of steel or prestressed concrete
DE2125383C3 (en) Method and device for producing a reinforcement body from wire mesh