DE2531957C3 DE19752531957 DE2531957A DE2531957C3 DE 2531957 C3 DE2531957 C3 DE 2531957C3 DE 19752531957 DE19752531957 DE 19752531957 DE 2531957 A DE2531957 A DE 2531957A DE 2531957 C3 DE2531957 C3 DE 2531957C3
Authority
DE
Germany
Prior art keywords
wall
layer
belt conveyor
wall part
bricks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19752531957
Other languages
German (de)
Other versions
DE2531957B2 (en
DE2531957A1 (en
Inventor
Hans 7910 Neu-Ulm Lingl
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hans Lingl Anlagenbau und Verfahrenstechnik & Co Kg 7910 Neu-Ulm De GmbH
Original Assignee
Hans Lingl Anlagenbau und Verfahrenstechnik & Co Kg 7910 Neu-Ulm De GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hans Lingl Anlagenbau und Verfahrenstechnik & Co Kg 7910 Neu-Ulm De GmbH filed Critical Hans Lingl Anlagenbau und Verfahrenstechnik & Co Kg 7910 Neu-Ulm De GmbH
Priority to DE19752531957 priority Critical patent/DE2531957C3/en
Priority to BE163900A priority patent/BE838035A/en
Priority to IT4831476A priority patent/IT1073744B/en
Priority to GB1620976A priority patent/GB1547190A/en
Priority to AT377276A priority patent/AT348912B/en
Priority to AU14454/76A priority patent/AU490792B2/en
Priority to FR7622011A priority patent/FR2318014A1/en
Priority to CH913176A priority patent/CH599843A5/xx
Publication of DE2531957A1 publication Critical patent/DE2531957A1/en
Publication of DE2531957B2 publication Critical patent/DE2531957B2/en
Application granted granted Critical
Publication of DE2531957C3 publication Critical patent/DE2531957C3/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/04Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
    • E04C2/041Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres composed of a number of smaller elements, e.g. bricks, also combined with a slab of hardenable material
    • E04C2/042Apparatus for handling the smaller elements or the hardenable material; bricklaying machines for prefabricated panels

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

4040

Die Erfindung betrifft ein Verfahren zur automatischen Vorfertigung von Wandteilen aus Blockziegeln mit den im Oberbegriff des Patentanspruches 1 aufgeführten Merkmalen.The invention relates to a method for the automatic prefabrication of wall parts from block bricks with the features listed in the preamble of claim 1.

Ein Verfahren dieser Art ist durch die US-PS 85 092 bekanntgeworden. Hierbei werden die Ziegel Stein für Stein auf eine Bereitstellungsunterlage gelegt auf der Lagerfuge vermörtelt und in den Wandteilfertiger geschoben. Nach dem Aufmauern wird das Wandteil durch ein Hebezeug mittels in den Ziegeln eingelassener Stangen abtransportiert Hierbei ist jedoch sowohl das Einbringen der Ziegel als auch der Abtransport des Wandteils zeitaufwendig und störungsanfällig.A method of this type has become known from US Pat. No. 85,092. Here are the bricks Brick by brick laid on a preparation pad, mortared on the bed joint and in the wall part paver pushed. After the walling up, the wall part is let into the bricks by means of a hoist Poles transported away Here, however, is both the introduction of the bricks and the removal of the Part of the wall is time-consuming and prone to failure.

Der Erfindung liegt demgegenüber die Aufgabe zugrunde, das gesamte Verfahren so zu verbessern, daß sowohl das Einbringen der Ziegel in den Wandteilfertiger als auch der Abtransport des fertigen Wandteils beschleunigt und vereinfacht und die Genauigkeit des Wandteils erhöht wird. Dbse Aufgabe wird erfindungsgemäß durch die im kennzeichnenden Teil des Patentanspruchs 1 aufgeführten Merkmale gelöstThe invention is based on the object of improving the entire process so that both the introduction of the bricks into the wall part maker and the removal of the finished wall part accelerated and simplified and the accuracy of the wall part is increased. This object is achieved according to the invention solved by the features listed in the characterizing part of claim 1

Durch das Einfahren der Ziegelreihen auf Bandförderern in den Wandteilfertiger läßt sich bei hö herer Genauigkeit eine wesentlich höhere Leistung erzielen. Dasselbe gilt für das Ausfahren des Wandteils, da es nunmehr keiner Stangen oder Anker und keines aufwendigen Hebezeuges mehr bedarf.By moving the rows of bricks on belt conveyors into the wall component paver, a significantly higher level of performance can be achieved with higher accuracy. The same applies to the extension of the wall part, since there is no longer any need for rods or anchors and expensive lifting equipment.

Von Vorteil ist es, wenn die Mauerschichten an einer lotrechten Führung für die Ziegelreihen hochgemauert werden, wobei Zwischenwände, die eine geringere Wanddicke aufweisen, während des Aufbaus geführt werden können.It is advantageous if the wall layers are built up on a vertical guide for the rows of bricks be, with partitions, which have a smaller wall thickness, guided during the construction can be.

In der Zeichnung ist ein Ausführungsbeispiel der Erfindung dargestellt Es zeigtIn the drawing, an embodiment of the invention is shown

F i g. 1 eine Ansicht der Vorrichtung beim Einfahren einer Ziegelreihe auf einem Bandförderer und die teilgefertigte Wand in Anpreßstellung,F i g. 1 shows a view of the device when moving in a row of bricks on a belt conveyor and FIG partially finished wall in contact position,

F i g. 2 eine Ansicht der Vorrichtung mit angehobener Ziegelreihe in Anpreßstellung durch den Preßbalken gegen das WiderlagerundF i g. 2 is a view of the device with the row of bricks raised in the pressing position by the press beam against the abutment and

F i g. 3 eine Ansicht der Vorrichtung bei der Übernahme des Wandteils durch die Palette vor Absenken durch die Hebeeinrichtung.F i g. 3 shows a view of the device when the wall part is taken over by the pallet Lowering by the lifting device.

Bei dem Verfahren nach der Erfindung erfolgt der Aufbau des Wandteils durch Nachschieben der Mauerschichten zur Vermauerung von unten her in der Weise, daß zunächst eine erste Mauerschicht ohne Mörtel in die Wandbauvorrichtung auf einem Bandförderer 2 (F 1 g. 1) bis zu einem Anschlag eingefördert wird. Anschließend wird der Bandförderer 2 mit der Mauerschicht auf eine größere Höhe wie die der Mauerschicht Hochgehoben und mittel - eines Preßbalkens 3 gegen ein Widerlager 4 gepreßt und dort gehalten. Daraufhin wird der Bandförderer 2 wieder abgesenkt und die nächstfolgende Mauerschicht auf dem Bandförderer 2 bereitgestellt, die mit einer Lagerfugenmörtelschicht versehen ist, welche abgeglichen und entsprechend tragfähig in ihrer Konsistenz gehalten ist.In the method according to the invention, the construction of the wall part takes place by pushing the wall layers for bricking up from below in such a way that first a first wall layer without mortar is conveyed into the wall construction device on a belt conveyor 2 (F 1 g. 1) up to a stop will. Then the belt conveyor 2 with the wall layer is raised to a greater height than that of the wall layer and, by means of a press beam 3, is pressed against an abutment 4 and held there. The belt conveyor 2 is then lowered again and the next following wall layer is provided on the belt conveyor 2, which is provided with a layer of floor joint mortar, which is leveled and kept in its consistency in a correspondingly load-bearing manner.

Diese Mauerschicht wird wiederum angehoben und gegen die in seitlicher Anpressung gehaltene erste Mauerschicht von unten her angepreßt und die Mörtelschicht zwischen den beiden Flächen verpreßt, wobei der Mörtel in die perforierten Blockziegelflächen eindringt, bis die vorgesehene Fugendicke erreicht ist.This wall layer is in turn raised and held against the first one, which is pressed against the side Wall layer pressed from below and the mortar layer pressed between the two surfaces, with the mortar penetrates into the perforated block brick surfaces until the intended joint thickness is reached.

Anschließend löst sich der seitliche Preßbalken 3, und die beiden Mauerschichten werden angehoben, bis sich die untere Mauerschicht wieder in Höhe des Preßbalkens 3 befindet Die untere Mauerschicht wird dann seitlich an das Widerlager 4 angepreßt Danach folgt der Einlauf der nächsten Mauerschicht Auf diese Weise werden die einzelnen Mauerschichten bis m Wandhöhe aufgebautThen the lateral press beam 3 is released and the two wall layers are raised until the lower wall layer is again at the level of the press beam 3. The lower wall layer is then pressed against the side of the abutment 4 individual wall layers built up to a wall height of m

Zweckmäßig wird das Wandteil beim Aufbau an einer Führung 5 in Wandhöhe gehalten. Dies ist insbesondere bei der Herstellung von Zwischenwänden geringer Dicke notwendig.The wall part is expediently held on a guide 5 at wall height during assembly. This is particular necessary for the production of partitions of small thickness.

Nach Fertigstellung der auf diese Weise aufgebauten Wand wird, entgegengesetzt zur Einlaufrichtung der Mauerschichten, unter der durch Anpressung gehaltenen unteren Mauerschicht eine fahrbare Palette 7 (Fig.3) auf einer Gleisbahn auf dem Rahmen 6 des Bandförderers 2 eingefahren und durch Anhebung unter die Wand geführt Anschließend wird die Seitenpressung der unteren Schicht an dem Widerlager 4 gelöst und das Wandteil von der Palette 7 übernommen, auf Gleisbahnhöhe abgesenkt und in Förderrichtung des Bandförderers 2 aus der Vorrichtung bewegt und der weiteren Nachbearbeitung zugeführtAfter completion of the wall constructed in this way, opposite to the inlet direction of the Wall layers, under the lower wall layer held by pressure a mobile pallet 7 (Fig.3) on a track on the frame 6 of the Belt conveyor 2 retracted and by raising it under the wall is guided Then the side pressure of the lower layer on the abutment 4 is released and the wall part taken over from the pallet 7, lowered to track height and in the conveying direction of the Belt conveyor 2 moved out of the device and fed to further post-processing

Hierzu 1 Blatt Zeichnungen1 sheet of drawings

Claims (2)

Patentansprüche:Patent claims: 1. Verfahren zur automatischen Vorfertigung von Wandteilen aus Blockziegeln od. dgl. im lotrechten Aufbau, wonach zunächst die Ziegel auf einer waagerechten Unterlage ausgerichtet, auf der Lagerfläche mit einer Mörtelschicht versehen und in einen Wandteilfertiger auf eine heb- und senkbare Unterlage eingefördert werden, wonach die Unterlage mit der Mauerschicht mit Stoß- und abgeglichener Lagerfuge bis zu einer Klemmvorrichtung angehoben und die Mauerschicht seitlich festgeklemmt wird, danach die Unterlage abgesenkt und auf ihr jeweils die folgende Mauerschicht bereitgestellt, gegen die Unterfläche der in Klemmstellung befindlichen Mauerschicht angehoben und nach Öffnung der Klemmvorrichtung zusammen mit der oberen Miaierschicht bis in die Anpreßposition weitei-gehoben wird und wonach schließlich nach Aufbau des Wandteils bis zur gewünschten Höhe dieses entnommen wird, dadurch gekennzeichnet, daß die jeweilige Mauerschicht in Mauerlänge auf einem Bandförderer hergestellt und unter den Wandteilfertiger auf ein heb- und senkbares Bandfördererglied gegen einen Anschlag eingefördert wird und daß nach dem Aufbau des Wandteils ein Palettenwagen auf einer Gleisbahn am Rahmen des im abgesenkten Zustand befindlichen Bandförderergliedes entgegen dessen Förderrichtung eingefahren, mit dem Bandfördererglied unter das Wandteil angehoben und nach Lösung der Klemmvorrichtung zusammen mit dem Wandteil abgesenkt sowie in Förderrichtung des Bandförderergliedes auf einer Gleisbahn ausgefördert wird.1. Method for the automatic prefabrication of wall parts from block bricks or the like in the vertical Construction, after which the bricks are initially aligned on a horizontal surface, on the storage area provided with a layer of mortar and placed in a partial wall finisher on a liftable and lowerable one Underlay are conveyed, after which the underlay with the wall layer with butt and leveled Horizontal joint raised up to a clamping device and the wall layer clamped to the side is then lowered and the following layer of wall is placed on top of it, raised against the lower surface of the wall layer in the clamped position and after Opening of the clamping device together with the upper meering layer raised further into the pressing position is and after which finally after building the wall part up to the desired height of this is removed, characterized in that that the respective wall layer produced in wall length on a belt conveyor and under the Wall part finisher conveyed on a liftable and lowerable belt conveyor link against a stop and that after the construction of the wall part, a pallet truck on a track on the frame of the The belt conveyor link in the lowered state is retracted against its conveying direction, lifted with the belt conveyor link under the wall part and after releasing the clamping device lowered together with the wall part and in the conveying direction of the belt conveyor link on one Track is conveyed out. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß das Wandteil während der Fertigung an einer lotrechten Führung geführt wird.2. The method according to claim 1, characterized in that the wall part during manufacture is guided on a vertical guide.
DE19752531957 1975-07-17 1975-07-17 Method for the automatic prefabrication of wall parts from block bricks or the like. Expired DE2531957C3 (en)

Priority Applications (8)

Application Number Priority Date Filing Date Title
DE19752531957 DE2531957C3 (en) 1975-07-17 1975-07-17 Method for the automatic prefabrication of wall parts from block bricks or the like.
BE163900A BE838035A (en) 1975-07-17 1976-01-29 PROCEDURE AND DEVICE FOR PREFABRICATING PARTS CONSTITUTED BY BLOCK ASSISES
IT4831476A IT1073744B (en) 1975-07-17 1976-02-27 PROCEDURE AND DEVICE FOR THE MANUFACTURE OF PARTS OF WALLS FROM BLOCK BRICK WALLS
GB1620976A GB1547190A (en) 1975-07-17 1976-04-21 Prefabrication of wall panels
AT377276A AT348912B (en) 1975-07-17 1976-05-24 EQUIPMENT FOR THE AUTOMATIC PREFABRICATION OF WALL PARTS FROM BLOCK BRICKS OR DGL.
AU14454/76A AU490792B2 (en) 1976-05-31 Pre-fabricating wall panels
FR7622011A FR2318014A1 (en) 1975-07-17 1976-07-09 METHOD AND DEVICE FOR THE MANUFACTURING OF PREFABRICATED WALL ELEMENTS, COMPOSED OF MASONNE LAYERS OF BLOCK BRICK
CH913176A CH599843A5 (en) 1975-07-17 1976-07-16

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19752531957 DE2531957C3 (en) 1975-07-17 1975-07-17 Method for the automatic prefabrication of wall parts from block bricks or the like.

Publications (3)

Publication Number Publication Date
DE2531957A1 DE2531957A1 (en) 1977-01-27
DE2531957B2 DE2531957B2 (en) 1977-08-25
DE2531957C3 true DE2531957C3 (en) 1982-04-08

Family

ID=5951760

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19752531957 Expired DE2531957C3 (en) 1975-07-17 1975-07-17 Method for the automatic prefabrication of wall parts from block bricks or the like.

Country Status (7)

Country Link
AT (1) AT348912B (en)
BE (1) BE838035A (en)
CH (1) CH599843A5 (en)
DE (1) DE2531957C3 (en)
FR (1) FR2318014A1 (en)
GB (1) GB1547190A (en)
IT (1) IT1073744B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3226529C1 (en) * 1982-07-15 1983-11-03 Hans Lingl Anlagenbau Und Verfahrenstechnik Gmbh & Co Kg, 7910 Neu-Ulm Method for automatically prefabricating wall parts from block bricks or the like.
DE4014615A1 (en) * 1990-05-07 1991-11-14 Anliker Hedwig MACHINE MACHINE PRODUCTION PLANT

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3038534C2 (en) * 1980-10-11 1983-01-13 Hans Lingl Anlagenbau Und Verfahrenstechnik Gmbh & Co Kg, 7910 Neu-Ulm Process for the prefabrication of wall parts from block bricks
DE3150126C1 (en) * 1981-12-18 1983-06-09 Hans Lingl Anlagenbau Und Verfahrenstechnik Gmbh & Co Kg, 7910 Neu-Ulm Apparatus for the automatic prefabrication of wall parts from block bricks or the like in a vertical arrangement
DE4028884C2 (en) * 1990-09-12 1994-04-07 Konrad Dipl Ing Hofmann Device and method for producing vertical wall elements from masonry

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1195214B (en) * 1963-12-23 1965-06-16 Alfred Schach Dipl Kfm Dr Process for the production of prefabricated masonry stone panels and system for carrying out the process
CH461752A (en) * 1967-05-01 1968-08-31 Antonietti Raoul Method of manufacturing a wall element
US3585092A (en) * 1969-09-29 1971-06-15 Storer & Sons Co Sa Apparatus and method for fabricating wall sections
DE2215661C3 (en) * 1972-03-27 1979-01-04 Alfred Dr. 6951 Obrigheim Schach Device for the production of preferably story-high brick slabs

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3226529C1 (en) * 1982-07-15 1983-11-03 Hans Lingl Anlagenbau Und Verfahrenstechnik Gmbh & Co Kg, 7910 Neu-Ulm Method for automatically prefabricating wall parts from block bricks or the like.
DE4014615A1 (en) * 1990-05-07 1991-11-14 Anliker Hedwig MACHINE MACHINE PRODUCTION PLANT

Also Published As

Publication number Publication date
BE838035A (en) 1976-05-14
GB1547190A (en) 1979-06-06
CH599843A5 (en) 1978-05-31
DE2531957B2 (en) 1977-08-25
DE2531957A1 (en) 1977-01-27
AU1445476A (en) 1977-12-08
AT348912B (en) 1979-03-12
FR2318014B1 (en) 1982-07-16
FR2318014A1 (en) 1977-02-11
IT1073744B (en) 1985-04-17
ATA377276A (en) 1978-07-15

Similar Documents

Publication Publication Date Title
DE2531957C3 (en) Method for the automatic prefabrication of wall parts from block bricks or the like.
DE1284076B (en) Method of erecting a building
DE2257768A1 (en) PLANT FOR PRODUCING PRE-FABRICATED CONCRETE PARTS
DE3931201C1 (en) Concrete railway sleepers mfr. - uses moving frame mechanism which releases each sleeper immediately
AT404046B (en) METHOD FOR CREATING A WALL FROM PRE-PREPARED WALL PANELS
DE1584637C3 (en) Device for producing a large-format building board and use of the device
DE3332981C2 (en)
DE3226529C1 (en) Method for automatically prefabricating wall parts from block bricks or the like.
DE2820039A1 (en) Plant for making prestressed concrete beam sections - fills moulds and removes as strings on pallet supports before dividing into required lengths
DE2917998C2 (en) Device for the prefabrication of large brick walls
DE3605373A1 (en) METHOD AND DEVICE FOR PRODUCING BRICK WALL ELEMENTS
DE1683943C3 (en)
DE2053519C2 (en) Method for building up walls from individual shaped stones and for the simultaneous application of a single or double-sided plaster layer by means of sliding formwork
DE7037889U (en) DEVICE FOR THE AUTOMATIC PRODUCTION OF BRICK WALL PARTS FOR THE FINISHING CONSTRUCTION
DE2216950C3 (en) Method for producing the superstructure of a bridge or the like. Structure made of reinforced or prestressed concrete and scaffolding for carrying out the process
DE864375C (en) Device for the production of moldings from ceramic masses
DE7536113U (en) Device for the prefabrication of wall parts from block brick wall layers
DE2333709C2 (en) Method and device for the production of wall parts from bricks or the like. with window and door openings
DE3344034A1 (en) Installation for assembly-line production of precast concrete parts, in particular of large panels
DE2161301B2 (en)
CH615616A5 (en) Shuttering for producing concrete floor beams
DE2408484C2 (en) Method and device for the production of cladding on prefabricated wall parts
DE2636598A1 (en) Stacking raw concrete blocks - moving block layers from machine form onto movable support plate and transferring by stripping equipment on stack
DE3150126C1 (en) Apparatus for the automatic prefabrication of wall parts from block bricks or the like in a vertical arrangement
DE2756596C2 (en) Method for producing a prefabricated part from reinforced concrete, in particular a room cell, and device for carrying out the method

Legal Events

Date Code Title Description
BGA New person/name/address of the applicant
C3 Grant after two publication steps (3rd publication)
8339 Ceased/non-payment of the annual fee