DE2346212A1 - MOBILE BITUMEN CONCRETE MIXING DEVICE - Google Patents

MOBILE BITUMEN CONCRETE MIXING DEVICE

Info

Publication number
DE2346212A1
DE2346212A1 DE19732346212 DE2346212A DE2346212A1 DE 2346212 A1 DE2346212 A1 DE 2346212A1 DE 19732346212 DE19732346212 DE 19732346212 DE 2346212 A DE2346212 A DE 2346212A DE 2346212 A1 DE2346212 A1 DE 2346212A1
Authority
DE
Germany
Prior art keywords
fillers
heating
storage
conveyor
bitumen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19732346212
Other languages
German (de)
Inventor
Harold Martin Zimmerman
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of DE2346212A1 publication Critical patent/DE2346212A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/02Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
    • E01C19/10Apparatus or plants for premixing or precoating aggregate or fillers with non-hydraulic binders, e.g. with bitumen, with resins, i.e. producing mixtures or coating aggregates otherwise than by penetrating or surface dressing; Apparatus for premixing non-hydraulic mixtures prior to placing or for reconditioning salvaged non-hydraulic compositions
    • E01C19/1059Controlling the operations; Devices solely for supplying or proportioning the ingredients
    • E01C19/1068Supplying or proportioning the ingredients
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/002Apparatus for preparing and placing the materials and for consolidating or finishing the paving
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/02Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
    • E01C19/10Apparatus or plants for premixing or precoating aggregate or fillers with non-hydraulic binders, e.g. with bitumen, with resins, i.e. producing mixtures or coating aggregates otherwise than by penetrating or surface dressing; Apparatus for premixing non-hydraulic mixtures prior to placing or for reconditioning salvaged non-hydraulic compositions
    • E01C19/1013Plant characterised by the mode of operation or the construction of the mixing apparatus; Mixing apparatus
    • E01C19/1027Mixing in a rotary receptacle
    • E01C19/1031Mixing in a rotary receptacle the mixture being discharged continuously
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/02Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
    • E01C19/10Apparatus or plants for premixing or precoating aggregate or fillers with non-hydraulic binders, e.g. with bitumen, with resins, i.e. producing mixtures or coating aggregates otherwise than by penetrating or surface dressing; Apparatus for premixing non-hydraulic mixtures prior to placing or for reconditioning salvaged non-hydraulic compositions
    • E01C19/1013Plant characterised by the mode of operation or the construction of the mixing apparatus; Mixing apparatus
    • E01C19/104Mixing by means of movable members in a non-rotating mixing enclosure, e.g. stirrers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/48Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ
    • E01C19/488Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ with rollers for consolidating or finishing combined with tamping, vibrating, pressing or smoothing consolidation or finishing means
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/02Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing the materials
    • E01C19/10Apparatus or plants for premixing or precoating aggregate or fillers with non-hydraulic binders, e.g. with bitumen, with resins, i.e. producing mixtures or coating aggregates otherwise than by penetrating or surface dressing; Apparatus for premixing non-hydraulic mixtures prior to placing or for reconditioning salvaged non-hydraulic compositions
    • E01C2019/1081Details not otherwise provided for
    • E01C2019/109Mixing containers having a counter flow drum, i.e. the flow of material is opposite to the gas flow

Description

PATENTANWÄLTE HENKEL— KERN — FEILER — HÄNZEL — MÜLLERPATENTANWÄLTE HENKEL - KERN - FEILER - HÄNZEL - MÜLLER

DR. PHIL. D1PL.-ING. DR. RER. NAT. D1PL.-ING. D1PI..-ING. DR. PHIL. D1PL.-ING. DR. RER. NAT. D1PL.-ING. D1PI ..- ING.

TBLBX: »s it ιοί HNKL D E D UAR D-SC H MID-STRAS SE 2 bayerische Hypotheken und TBLBX: »s it ιοί HNKL DED UAR D-SC H MID-STRAS SE 2 Bavarian mortgages and

THLlPON: (Olli) 1*11 t7. *»3tll-t2 mnil lllturUDU Dn WECHSELBANK MCNCHhN NR. 31S-«5 IU THLlPON: (Olli) 1 * 11 t7. * »3tll-t2 mnil lllturUDU Dn EXCHANGE BANK MCNCHhN NO. 31S- «5 IU

TBLBOEAMMB: ELLIPSOID MÖNCHEN D-BOOO MÜNCHEN 90 POSTSCHECK MCHN 1*2147-10» TBLBOEAMMB: ELLIPSOID MÖNCHEN D-BOOO MUNICH 90 POSTSCHECK MCHN 1 * 2147-10 »

Harold Martin Zimmerman 2346212 Harold Martin Zimmerman 2346212

Ephrata, Pa., V.St. A.Ephrata, Pa., V.St. A.

1 a SEP. 19731 a SEP. 1973

Fahrbare Bitumenbeton-MischvorrichtungMobile bitumen concrete mixing device

Die Erfindung bezieht sich allgemein auf Straßenbaumaschinen und betrifft insbesondere eine in sich abgeschlossene, fahrbare Bitumenbeton-Misch- und -Auftragvorrichtung, die unmittelbar an der Baustelle einsetzbar ist. Der in der Beschreibung benutzte Ausdruck "Bitumenbeton" bezieht sich auf ein elastisches Straßenbelagsmaterial, das üblicherweise als Makadam, Schwarzbelag oder Asphalt bezeichnet wird, und zwar im Gegensatz zu starrem Portlandzement und Betonstraßenflächen mit einem Portlandzement-Bindemittel.The invention relates generally to road construction machinery and, more particularly, relates to a self-contained, Mobile bitumen concrete mixing and application device that can be used directly on the construction site is. The term "bituminous concrete" used in the description refers to an elastic road surface material, commonly referred to as macadam, black pavement, or asphalt, in contrast to rigid portland cement and concrete pavement surfaces with a portland cement binder.

Derzeit-gibt es viele Straßen und Fahrbahnen, die gelegentlich üblicher Wartung und Instandsetzung bzw. Ausbesserung bedürfen. Für größere Hartungs- oder Ausbesserungsarbeiten, die eine Neubelegung ganzer Fahrbahnabschnitte erfordern, können wirtschaftlich und zweckmäßig große Straßenbaumaschinen eingesetzt werden. Bei kleineren, vergleichsweise unbedeutenden Ausbesserungsarbeiten, bei denen nur ein stellenweises Ausbessern o.dgl. nötig ist, ist es dagegen nicht zweckmäßig, schv/ere Straßenbaugeräte vorzusehen und zur Baustelle zu transportieren, um diese Arbeiten durchzuführen.Currently- there are many streets and carriageways that are occasional Require normal maintenance and repair or repair. For larger hardening or repair work, which require re-paving of entire sections of the carriageway can be economical and practical large road construction machines are used. For smaller, comparatively insignificant repair work, where only a patchy patch is needed or the like. is necessary, on the other hand, it is not expedient to sever Provide road construction equipment and transport it to the construction site in order to carry out this work.

Die meisten Instandsetzungsarbeiten als solche werden von Hand durchgeführt. Ein typisches Verfahren bestehtAs such, most of the repair work is done by hand. A typical procedure exists

409813/0426409813/0426

~2~ 2345212~ 2 ~ 2345212

z.B. darin, Bitumenbeton auf die Ladefläche eines Lastkraftwagens oder eines ähnlichen Fahrzeugs aufzuladen
und dann eine Mannschaft aus mehreren Arbeitern zum
Fahrbahnort zu senden, an dem die Instandsetzung vorgenommen werden soll. Der Bitumenbeton wird dann zur
For example, in loading bituminous concrete onto the loading area of a truck or similar vehicle
and then a team of several workers to the
To send the lane where the repair is to be carried out. The bitumen concrete is then used to

Instandsetzung von Hand in die Fahrbahnlöcher oder
-risse geschaufelt und anschließend zum Abschluß der
Reparatur von Hand eingestampft.
Repair by hand in the pavement holes or
-cracks shoveled and then at the end of the
Repairs pulped by hand.

Dieses manuelle Verfahren ist mit offensichtlichen Nachteilen behaftet. Beispielsweise nuß nicht nur eine
mehrere Arbeiter umfassende Mannschaft aufgestellt werden, sondern diese Mannschaft muß auch im voraus die für die betreffende Arbeit benötigte Materialmenge kennen, da
der Bitumenbeton, sobald er einmal gemischt und auf das Fahrzeug verladen worden ist, nicht über längere Zeit
hinweg in einem verarbeitbaren Zustand gehalten werden kann. Die Kürze der Zeit, während welcher vorgemischter Bitumenbeton weich bleibt, macht es auch schwierig, eine Ausbesserung an einer von der Mischanlage weit entfernten Stelle vorzunehmen, die erst nach vergleichsweise langer Fahrzeit erreichbar ist. Weitere Schwierigkeiten ergeben sich speziell bei der Durchführung von Ausbesserungsarbeiten im Winter. Diesbezüglich wird selbstverständlich eine Keißbitumenbeton-Instandsetzung wegen ihrer besseren !{aftungseigenschaften einer Kaltinstandsetzung vorgezogen. Dennoch kann diese Heißausbesserung nicht ohne weiteres in den Wintermonaten angewandt
werden, da der heißgemischte Bitumenbeton, sofern er geliefert werden kann, nicht längere Zeit auf deti Lastkraftwagen auf erhöhter Temperatur gehalten werden kann. Hauptsächlich aus diesem Grund werden die meisten Fahrbahnausbesserungsarbeiten im Winter nach dem Kaltverfahren durchgeführt, das aber unwirtschaftlich ist und unweigerlich später weitere Instandsetzungen erforderlich macht, da eine kalt ausgebesserte Stelle gegenüber Ab-
There are obvious disadvantages to this manual method. For example, not just one nut
several workers comprehensive team are set up, but this team must also know in advance the amount of material required for the work in question, since
the bitumen concrete, once it has been mixed and loaded onto the vehicle, not for a long period of time
can be kept in a workable state away. The short time during which the pre-mixed bituminous concrete remains soft also makes it difficult to carry out a repair at a point that is far away from the mixing plant and that can only be reached after a comparatively long journey time. Further difficulties arise especially when carrying out repair work in winter. In this regard, a repairs to the concrete bitumen concrete is of course preferred to cold repairs because of its better retention properties. However, this hot touch-up cannot be easily applied in the winter months
because the hot-mixed bituminous concrete, if it can be delivered, cannot be kept at an elevated temperature on the truck for a longer period of time. Mainly for this reason, most road repair work is carried out in winter using the cold method, which is, however, uneconomical and inevitably requires further repairs later, as a cold repaired area is

409813/0425409813/0425

nützung und Temperaturschwankungen nicht so widerstandsfähig ist wie eine heiß ausgebesserte Stelle.use and temperature fluctuations are not as resistant is like a hot-patched place.

Darüber hinaus besitzt möglicherweise eine vorgemischte Eitumenbetoncharge, die zur Arbeitsstelle befördert wird, nicht die gleiche hohe Qualität und/oder Konsistenz wie der tatsächlich an der Baustelle gemischte Bitumenbeton.In addition, there may be a premixed cement concrete batch that goes to the job site conveyed is not of the same high quality and / or consistency as that actually conveyed at the job site mixed bituminous concrete.

Ersichtlicherweise besteht mithin auf den Gebiet der Fahrbahninstandsetzung und -neubelegung ein Bedarf für Geräte, mit deren Hilfe die Instandsetzung der Fahrbahnen modernisiert und anderweitig vereinfacht werden kann, so daß die derzeit gebräuchlichen, nachteiligen manuellen Verfahren vermieden werden können. Der Erfindung liegt daher in erster Linie d 2 Aufgabe zugrunde, eine Vorrichtung zu schaffen, mit welcher diesem Bedarf entsprochen werden kann.Obviously, there is therefore a need in the field of roadway repair and re-paving for devices with the help of which the repair of the roadway is modernized and otherwise simplified can be, so that the disadvantageous manual procedures currently in use are avoided can. The invention is therefore primarily based on the task of creating a device with which this need can be met.

Genauer gesagt, bezweckt die Erfindung die Schaffung einer neuartigen Vorrichtung, welche die Bestandteile von Bitumenbeton in getrennten Kammern zur Baustelle befördern kann, wo die Vorrichtung sodann die Bestandteile αtomatisch zumißt oder dosiert und den Bitumenbeton mischt und aufträgt, wodurch der Auftrag einer gleichbleibend hochqualitativen Ausbesserungsdecke an jeder Ausbesserungsstelle ohne Materialvergeudung gewährleistet wird.More precisely, the invention aims to provide a novel device which comprises the components of bituminous concrete in separate chambers to the construction site, where the device then the components αtomatisch measures or doses and the bitumen concrete mixes and applies, resulting in the application of a consistently high-quality touch-up blanket every repair point is guaranteed without wasting material.

bi-t dieser Vorrichtung soll außerdem der gemischte Eitumenbeton automatisch auf die Oberfläche der auszubessernden Fahrbahn auftragbar sein. bi-t of this apparatus is also intended the mixed Eitumenbeton automatically be coatable on the surface of the road to be repaired.

Zuden soll diese Vorrichtung vollständig in sich abgeschlossen und fahrbar sein, wobei die gesamten Ausbesserungsarbeiten mit einer kleineren Arbeitsmannschaft, z.B. nur einotn einzigen Mann, durchführbarIn addition, this device should be completely self-contained and mobile, with the entire repair work feasible with a smaller work team, e.g. only one man

409813/0426409813/0426

sein sollen.meant to be.

Mit dLeser Vorrichtung können Heißbitumenbeton-Ausbesserungsarbeiten zu jeder Jahreszeit, d.h. auch während der Wintermonate, durchgeführt v/erden.Hot bitumen concrete repair work can be carried out with the reader in every season, i.e. also during the winter months.

Weiterhin kann mit dieser Vorrichtung eine hochqualitative Ausbesserung von Fahrbahnen bei niedrigen Kosten erzielt werden.Furthermore, with this device, a high quality repair of roads at low Costs can be achieved.

Diese Aufgabe wird bei einer in sich abgeschlossenen, auf einem fahrbaren Rahmen oder Chassis montierten Bitumenbeton-Mischvorrichtung erfindungsgemäß gelöst durch eine Speichereinrichtung für die Füllstoffe, eine zweite Speichereinrichtung für flüssiges Bitumen, eine Zumeßeinrichtung zum Zumessen und Austragen der Füllstoffe aus der ersten Speichereinrichtung in vorbestimmten Mengenanteilen und Mengenverhältnissen, eine Einrichtung zum Erwärmen der entnommenen Füllstoffe, eine zweite Zumeßeinrichtung, um unter Dosierung eine vorbestinmte Menge dee flüssigen Bitumens aus der zweiten Speichereinrichtung zu entnehmen, und eine Einrichtung zum Vermischen der zugemessenen Bestandteile unter Bildung von Bitumenbeton.This task is performed with a self-contained, mounted on a mobile frame or chassis Bitumen concrete mixing device solved according to the invention by a storage device for the fillers, a second storage device for liquid bitumen, a metering device for metering and discharging the fillers from the first storage device in predetermined Quantities and proportions, a device for heating the removed fillers, a second metering device to dispense a predetermined amount of the liquid bitumen from the to be taken from the second storage device, and a device for mixing the metered components with the formation of bitumen concrete.

Die erfindungsgemMße Vorrichtung bildet somit eine in sich abgeschlossene, fahrbare, d.h. selbstfahrende Bitumenbeton-Misch- und -Auftragvorrichtung. In bevorzugter Ausführungsform ist diese Vorrichtung auf einem Fahrgestell z.3. eines Lastkraftv/agens angeordnet, und sie weist eine Anzahl getrennter Farmern zur getrennten Speicherung der Aggregate bzw. Füllstoffe und der flüssigen Bestandteile eines Eitumenbetongenisches auf. Beispielsweise sind getrennte .\'ap.r.ern zur Aufnahme von fein- und grobkörnigen Füllstoffen sowie zur Speicherung von flüssigem bitumen, etwa Asphalt, vorgesehen. The device according to the invention thus forms an in self-contained, mobile, i.e. self-propelled bitumen concrete mixing and application device. In preferred Embodiment is this device on a chassis z.3. a truck arranged, and it has a number of separate farmers for separate storage of the aggregates or fillers and of the liquid components of a concrete mix on. For example, there are separate. \ 'Ap.r.ern for recording of fine and coarse-grained fillers and for the storage of liquid bitumen, such as asphalt.

409813/0425409813/0425

BADBATH

Die Füllstoffe werden an der Baustelle über Zumeßschieber ο.dgl. aus ihren betreffenden Kammern entnommen, so daß eine vorbestiramte Menge und ein vorbestlmmtes Verhältnis der Füllstoffe gewährleistet werden kann. E'odann werden die Füllstoffe zu einer ebenfalls auf den Fahrgestell angeordneten Heiz- und Trocknungsvorrichtung gefördert, die bei der bevorzugten Ausführungsform der Erfindung aus einer drehbaren Heiz- und Trocknungstrommel besteht. Die Füllstoffe v/erden in der drehbaren Trommel getrocknet und auf eine Temperatur von etwa 2o4°C erwärmt und sodann in einen Fülltrichter mit einer weiteren Zumeßeinrichtung eingeschüttet, aus den die Füllstoffe in einen Kollermühlen-Mischförderer ausgetragen werden. Dem Mischförderer wird flüssiges Bitumen aus einer getrennten, ggf. beheizten Vorratskammer zugeführt. Die Menge der Trockenstoffe im Verhältnis zum flüssigen Bitumen wird mit Hilfe der dem Fülltrichter zugeordneten Zumeßeinrichtung sowie mittels einer Bitumen-Zumeßeinrichtung sorgfältig gesteuert. Auf diese Weise wird ein Bitumenbeton mit kontrollierter Konsistenz und Qualität gewährleistet.The fillers are applied at the construction site via metering slides ο the like. taken from their respective chambers so that a predetermined amount and a predetermined ratio the fillers can be guaranteed. Then the fillers are also put on the chassis arranged heating and drying device promoted in the preferred embodiment of the Invention consists of a rotating heating and drying drum. The fillers are grounded in the rotatable Drum dried and heated to a temperature of about 2o4 ° C and then in a hopper with a poured further metering device from which the Fillers are discharged into a pan grinder mixer conveyor. Liquid bitumen is fed to the mixing conveyor supplied from a separate, possibly heated storage chamber. The amount of dry matter in relation to the liquid bitumen is supplied with the aid of the metering device assigned to the filling funnel and by means of a bitumen metering device carefully controlled. In this way, a bituminous concrete is created with a controlled consistency and quality guaranteed.

Der Bitumenbeton, d.h. das Gemisch aus Füllstoffen und dem Bitumen, wird dann zu einer vorzugsweise an der Rückseite des Fahrgestells angeordneten Auftragvorrichtung überführt, mit deren Hilfe der Bitumenbeton auf die Oberfläche einer unter dieser Vorrichtung befindlichen Fahrbahn aufgetragen wird. In bevorzugter Ausführungsforra der Erfindung weist die Auftragvorrichtung eine vorderseitige Heizkammer auf, durch welche die unter ihr befindliche Fahrbahnfläche erwärmt wird, um eine gute Haftung des Bitumenbetons zu gewährleisten. Außerdem sind mehrere Schneckenförderer zur gleichmäßigen Verteilung des 3itumenbetons über die erwärmte Fahrbahnfläche vorgesehen. Der ausgestreute Bitumenbeton wird mittels einer Rüttelvorrichtung eingestampft undThe bituminous concrete, i.e. the mixture of fillers and the bitumen, then becomes an application device, preferably arranged on the rear of the chassis transferred, with the help of which the bituminous concrete on the surface of a device located under this device Road surface is applied. In a preferred embodiment of the invention, the application device has a front-side heating chamber, through which the road surface below it is heated to a to ensure good adhesion of the bitumen concrete. In addition, there are several screw conveyors for uniform The 3itumen concrete is to be distributed over the heated road surface. The bituminous concrete spread over is pulped by means of a vibrator and

409813/C425409813 / C425

schließlich mittels einer an der Rückseite der Streuoder Auftragvorrichtung angeordneten Walze verdichtet.finally compacted by means of a roller arranged on the back of the spreading or application device.

Die vorstehend allgemein beschriebene, kombinierte Bitumenbeton-Misch- und -Auftragvorrichtung speichert alle Bestandteile des Bitumenbetons jeweils getrennt, so daß die Schwierigkeiten, die mit einem vorzeitigen Aushärten einer vorgemischten Charge verbunden sind, vollständig ausgeschaltet werden. Außerdem wird durch die erfindungagemäße Vorrichtung eine vorbestimmte Bitumenbetonmenge mit kontrollierter Konsistenz und Qualität an der Baustelle gemischt, ^.o daß die bisherigen Schwierigkeiten bezüglich der Bestimmung der Menge an Bitumenbeton, die für eine vorgegebene Ausbesserungsarbeit benötigt wird, fortfallen. Bei den mit Hilfe der erfindungsgemäßen Vorrichtung durchgeführten Ausbesserungsarbeiten kann auch während der Wintermonate das Heißverfahren angewandt werden und, was noch wichtiger iet, die erfindungsgemMße Vorrichtung kann gewünschtenfalls durch einen einzigen Mann bedient werden.The combined bituminous concrete mixing and spreading device generally described above stores all components of the bituminous concrete are separated, so that the difficulties associated with a premature Curing of a premixed batch associated with it can be completely turned off. In addition, the According to the invention a predetermined amount of bituminous concrete mixed with controlled consistency and quality at the construction site, ^ .o that the previous ones Difficulties in determining the amount of bituminous concrete that is required for a given repair job are eliminated. With the help the device according to the invention carried out repair work the hot process can also be used during the winter months, and what else more importantly, the device according to the invention can if desired, can be operated by a single man.

Im folgenden ist eine bevorzugte Ausführungsform der Erfindung anhand der beigefügten Zeichnung näher erläutert. Es zeigen:In the following, a preferred embodiment of the invention is explained in more detail with reference to the accompanying drawing. Show it:

Fig. 1 eine Seitenansicht eines Lastkraftwagens, welcher zur Aufnahme der in sich abgeschlossenen Bitumenbeton-Mischvorrichtung mit Merkmalen nach der Erfindung ausgebildet ist,Fig. 1 is a side view of a truck, which for receiving the self-contained Bituminous concrete mixing device is designed with features according to the invention,

Fig. 2 eine Aufsicht auf die Vorrichtung gemäß Fig. 1,FIG. 2 is a plan view of the device according to FIG. 1,

Fig. 3 eine der besseren Veranschaulichung halber teilweise weggebrochene und im Schnitt dargestellte Seitenansicht der Vorrichtung gemäß Fig. 1,3 shows a partially broken away and shown in section for the sake of better illustration Side view of the device according to FIG. 1,

409813/0425409813/0425

Fig. 4 einen Schnitt längs der Linie 4-4 in Fig . 3, Fig. 5 einen Schnitt längs der Linie 5-5 in Fig. 3, Fig. 6 einen Schnitt längs der Linie 6-6 in Fig, 3,Fig. 4 is a section along the line 4-4 in Fig. 3, 5 shows a section along the line 5-5 in FIG. 3, FIG. 6 shows a section along the line 6-6 in FIG. 3,

Fig. 7 eine Rückseitenansicht der Vorrichtung Fig. 1,7 shows a rear view of the device in FIG. 1,

Fig. 8 eine Aufsicht auf die hinter der Vorrichtung gemäß Fig. 1 und 3 nachgeschleppte Bituirenbeton-Auftragvorrichtung und8 shows a plan view of the bituminous concrete application device dragged behind the device according to FIGS. 1 and 3 and

Fig. 9 einen Schnitt längs der Linie 9-9 in Fig. 8 durch den Schnecken- oder Streuförderer der Bitumenbeton-Auftragvorrichtung.FIG. 9 shows a section along the line 9-9 in FIG. 8 through the screw conveyor or scatter conveyor Bituminous concrete application device.

Gemäß Fig. 1 ist die erfindungsgemäße Bitumenbeton-Mischvorrichtung auf dem Chassis bzw. Fahrgestell 2o eines allgemein mit 22 bezeichneten Lastkraftwagens angeordnet. Die erfindungagemäße Vorrichtung weist eine erste Speichereinrichtung 24 zur Aufnahme von grob- und feinkörnige» Füllstoffen, wie Sand und Kies, sowie eine zweite Speichereinrichtung 2 6 zur Aufnalir.e von flüssigem Bitumen, wie flüssigem Asphalt oder Teer, auf. Die in der ersten Speichereinrichtung 24 enthaltenen Füllstoffe bzw. Zuschlagstoffe werden aus dieser Speichereinrichtung über eine Zume3sinrichtung 28 (Fig. 3) entnommen und ausgetragen und mittels einer Fördereinrichtung, die einen praktisch waagerechten ersten Abschnitt 3o und einen praktisch lotrechten zweiten Abschnitt 32 aufweist in eine allgemein bei 34 angedeutete Heiz- und Trocknungseinrichtung überführt, in welcher die Füllstoffe getrocknet und auf erhöhte Temperatur erwärmt und zur Rückseite bzw. zu der gemäß den Fig. 1 und 3 linken Seite der Vorrichtung transportiert werden. Sodann werden die Füllstoffe inAccording to Fig. 1, the bitumen concrete mixing device according to the invention is on the chassis or chassis 2o of a truck generally designated 22 arranged. The inventive device has a first storage device 24 for receiving coarse and fine-grained fillers such as sand and gravel, as well as a second storage device 26 for receiving liquid bitumen, such as liquid asphalt or tar. The ones contained in the first storage device 24 Fillers or aggregates are made from this storage device Taken via a metering device 28 (Fig. 3) and discharged and by means of a conveyor which has a practically horizontal first section 3o and has a practically perpendicular second section 32 in a heating and drying device indicated generally at 34 transferred, in which the fillers are dried and heated to an elevated temperature and transferred to the back or be transported to the left side of the device according to FIGS. 1 and 3. Then the fillers are in

409813/0425409813/0425

einen Fülltrichter 35 ausgetragen, der eine weitere Zumaßeinrichtung aufreist, von welcher '.lic Füllstoffe in eins Kollerraühlen—iccheinrichtung 116-113 überfahrt werden, welcher euch das """itumen zugenessen viril, so daß in ihr ein IDitumenbeton kontrollierter Qualität und IConsistenz gebildet wird. Der auf diese ""eise hergestellte ivituvnenbeton wird sodann zu einer an der Rückseite des Fahrgestells angeordneten, allgemein iait 38 bezeichneten Auftrageinrichtxmg ausgetragen, welche den Ditumenbeton zur Ausbesserung der Fahrbahn auf die Oberfläche des tinter ihr befindlichen Fahlbahnabschnitts aufträgt.discharged a hopper 35, which is a further Metering device rises from which '.lic fillers Passing through in one Kollerraühlen-iccheinrichtung 116-113 become who you eat the "" "itumen viril, so that in it a bituminous concrete of controlled quality and IConsistency is formed. The one made on this "" ice ivituvnenbeton then becomes one at the rear of the chassis, generally referred to as 38, carried out the application device, which the Ditumen concrete for repairing the road surface on the surface of the pale track section located tinter it.

Dei der bevorzugten Ausführungsform der Erfindung v/eist die erste Speichereinrichtung 24 .mehrere getrennte Kairmern, wie die Karninern 4o und 42 auf, die am besten aus der Aufsicht auf die Vorrichtung gemäß Fig. 2 ersichtlich sind. Jede der Karanern 4o und 42 bildet einen praktisch rechteckigen Raun, dessen Außenwände 44 und 46 (Fig. 5) i)n wesentlichen in Form, eines Fülltrichters abwärts und einwärts geneigt sind. Die getrennten, grob- und feinkörnigen Füllstoffe, wie Sand und Kies o.dgl., werden jeweils getrennt in den einzelnen Speicherkainmern 4o und 42 aufbewahrt.The preferred embodiment of the invention is v / e the first storage device 24, several separate Kairmern, like the carninals 4o and 42 on, the best from supervision on the device according to FIG. 2 can be seen. Each of the carans 4o and 42 forms a practically rectangular one Raun, whose outer walls 44 and 46 (Fig. 5) i) n essentially in the form of a hopper downwards and inwards are inclined. The separate, coarse and fine-grained fillers, such as sand and gravel or the like. Will each separately in the individual storage rooms 4o and 42 kept.

Die Unterseiten der getrennten Speicherkammerη 4o und 42 sind offen und befinden sich unmittelbar über dem langgestreckten, praktisch waagerecht verlaufenden Förderertrum 3o, das beispielsweise aus einem Förderband bestehen kann, welches durch einen aus Gründen der Übersichtlichkeit nicht näher dargestellten Antriebsmechanismus gemäß Fig. 3 im Uhrzeigersinn angetrieben wird. Dieser Thtriebsiaechanisirvus könnte über eine Zahnradanordnung bzv7. ein Getriebe mit dem noch zu beschreibenden-, praktisch lotrechten Fördererabschnitt 32 gekoppelt sein.The undersides of the separate storage chamber η 4o and 42 are open and are located directly above the elongated, practically horizontal conveyor strand 3o, which can for example consist of a conveyor belt, which by a for the sake of clarity drive mechanism not shown in detail according to FIG. 3 is driven clockwise. This thtriebsiaechanisirvus could be a gear arrangement bzv7. a transmission with the still to be described, be practically vertical conveyor section 32 coupled.

409813/0426409813/0426

BAD ORIGINALBATH ORIGINAL

Infolge dieser TConstruktion liegen die Füllstoffe, wie Sand und Kies, unmittelbar auf der Oberfläche des waagerechten Förderertrums 3o auf, so daß sie im Betrieb des Förderers in Vorwärtsrichtung zur vorderen bzw. gemäß den Figuren 1 und 3 rechten Seite der Vorrichtung befördert v/erden. Die tatsächlichen "engenanteile und -ierigenverhältnisse der verschiedenen Füllstoffe, die aus den Speicherkaru:iern 4o und 42 ausgetragen werden, werden durch die erste Zuraßeinrichtung 28 gesteuert. Diese erste Zumeßeinrichtung 28 ist in Fig. 5 in allen Zinzelheiten dargestellt. In bevorzugter Ausführungsform der Erfindung v/eist diese erste Zumeßeinrichtung 28 lotrechte verschiebbare Schieber und 5o auf, Vielehe den Kammern 4o bzw. 42 zugeordnet sind. Die Schieber 4B und 5o sind in Prof ."ilen bzw. Führungen 52 lotrecht verschiebbar geführt, so daß ihre lotrechte Position und soriit ihr -''>f fnungsgrad leicht regelbar sind.As a result of this construction, the fillers like sand and gravel, directly on the surface of the horizontal conveyor strand 3o, so that they are in operation of the conveyor in the forward direction to the front or right side of the device according to FIGS. 1 and 3 promoted v / earth. The actual "narrow proportions and ratios of the various fillers, those from the storage carousels 4o and 42 carried out are made by the first fitting device 28 controlled. This first metering device 28 is shown in FIG Fig. 5 is shown in full detail. In preferred Embodiment of the invention is this first Metering device 28 vertically displaceable slide and 5o, plural marriage assigned to chambers 4o and 42, respectively are. The slides 4B and 5o are in profiles or guides 52 vertically displaceable, so that its vertical position and its degree of opening can be easily regulated.

In bevorzugter Ausfuhrungsform ist beispielsweise jedem Schieber 48 und 5o eine an seiner Rückseite angeordnete Zahnstange 54 zugeordnet, die jeweils■nit einem Ritzel 56 auf einer welle 58 in Eingriff steht, die mit Hilfe eines äußeren Handrads So drehbar ist. In diesem Zusammenhang ist zu beachten, daß es sich bei der Felle 53 der Regeleinrichtung' für den Schieber 48 uia eine biegsame Teile handelt, obgleich de^i Fachmann auf diesen Gebiet auch andere Regeleinrichtungen geläufig sind, die ohne weiteres an Stelle der Einrichtung gem"?Π Fig. 5 verwendet werden können.In a preferred embodiment, for example, everyone Slider 48 and 5o arranged on its rear side Associated rack 54, each with a pinion 56 is engaged on a shaft 58 which is rotatable by means of an external handwheel So. In this context It should be noted that the skins 53 of the control device for the slide 48 are, among other things, a flexible one Parts, although the ^ i expert in this field other control devices are also known which are readily used in place of the device according to FIG. 5 can be.

Durch Drehung der einzelnen Handräder 6o können somit die Mengenanteile und -Verhältnisse der Füllstoffe, wie Sand und Kies,, die aus den einzelnen Kammern 4o und 42 ausgetragen werden, volumetrisch gesteuert werden.By turning the individual handwheels 6o, the proportions and proportions of the fillers, such as Sand and gravel, from the individual chambers 4o and 42 be discharged, be controlled volumetrically.

Die auf diese Weise durch das waagerechte FörderertrunThat way through the horizontal conveyor run

I09813/0425 I 09813/0425

BAD ORIGINALBATH ORIGINAL

-Ιο --Ιο -

3ο ausgetragenen Füllstoffe gelangen von diesen in eine I'ulde bzw. einen Schacht 62 an eier Vorderseite der Vorrichtung. Aus diesen Schacht 62 werden die ausgetragenen Füllstoffe durch den praktisch lotrechten Fördererabschnitt 32 nach oben befördert. In bevorzugter Ausföhrungsforn besteht der Fördererabschnitt 32 aus einem Becherwerk mit einer Anzahl von Schaufeln bzw. Bachern 64 an einer Kette 66, wobei die Kette 66 und mithin . der Fördererabschnitt 32 über eine Getriebeanordnung 68 angetrieben wird, die einen Kraftabtrieb von den Fahrzeug aufweisen kann, auf welchen die Mischvorrichtung montiert ist. Der Fördererabschnitt 32 dient somit dazu, die aus den einzelnen Speicherkammern 4o und 42 in den Schacht 62 ausgetragenen Füllstoffe aufwärts zu fördern. An der Oberseite des Förderers 32 werden die hochgeförderten Füllstoffe in eine darunter befindliche Schnecke 7o ausgetragen. Die Schnecke 7o dient dazu, die ausgetragenen Bestandteile in Rückwärtsrichtung, d.h. gemäß den Fig. 1 und 3 von rechts nach links zum Beispiel in eine Ileiz- und Trocknungseinrichtung 34 zu fördern, in welcher die Füllstoffe auf noch zu erläuternde Weise getrocknet und auf erhöhte Temperatur erwärmt werden. Die Schnecke 7o kann gemäß Fig. 4 mittels eines Ketten- oder Riemenantriebs 72 unmittelbar vom Förderer 32 angetrieben werden, wobei die Kette bzw. der Riemen 72 um ein leerlaufendes Kettenrad bzw. eine leerlaufende Riemenscheibe 74 herumgeführt ist. Bei der bevorzugten Ausführungsform der Erfindung ist der praktisch lotrechte Fördererabschnitt 32 von einem Mantel 76 umschlossen und außerdem unter einem kleinen spitzen Winkel gegenüber der Lotrechten angeordnet, d.h. er ist zur Rückseite der Vorrichtung hin geneigt, wodurch der Austrag der Füllstoffe in die^Heiz- und Trocknungseinrichtung 34 erleichtert wird und außerdem die mechanischen Getriebe- und anderen Kupplungsanordnungen zwischen der Heiz- und Trocknungseinrichtung 34 vereinfacht werden, wie dies noch näher erläutert werden wird. 409813/04253ο discharged fillers get into a trough or a shaft 62 on egg front the device. From this shaft 62, the discharged fillers are through the practically perpendicular Conveyor section 32 conveyed upwards. In a preferred embodiment, there is the conveyor section 32 from a bucket elevator with a number of shovels or brookers 64 on a chain 66, wherein the chain 66 and hence. the conveyor section 32 is driven via a gear arrangement 68 which may have a power take-off from the vehicle on which the mixing device is mounted. Of the Conveyor section 32 is thus used to make the individual storage chambers 4o and 42 in the shaft 62 discharged fillers to promote upwards. At the At the top of the conveyor 32, the fillers conveyed up are discharged into a screw 7o located below. The screw 7o serves to feed the discharged components in the reverse direction, i.e. according to FIGS. 1 and 3 from right to left, for example in an ileiz and to promote drying device 34, in which the fillers are dried and be heated to an elevated temperature. The worm 7o can according to FIG. 4 by means of a chain or belt drive 72 are driven directly by the conveyor 32, the chain or belt 72 around an idle sprocket or an idling pulley 74 passed around is. In the preferred embodiment of the invention is the practically perpendicular conveyor section 32 of FIG enclosed by a jacket 76 and also arranged at a small acute angle with respect to the vertical, i.e. it is inclined towards the rear of the device, whereby the discharge of the fillers into the ^ heating and drying assembly 34 is facilitated, as well as the mechanical transmission and other clutch assemblies be simplified between the heating and drying device 34, as will be explained in more detail will be. 409813/0425

BAD ORIGINALBATH ORIGINAL

Die Aufgabe der Heiz- und Trocknungseinrichtung 34 besteht darin, die in sie eingebrachten Füllstoffe zu trocknen und ihre Temperatur auf etwa 2o4°C zu erhöhen,und sodann die Füllstoffe für den anschließenden Austrag zur Rückseite der Vorrichtung zu fördern. Zu diesem Zweck ist die Heiz- und Trocknungseinrichtung 34 gemäß der Erfindung in Form einer länglichen, hohlen Trommel 78 ausgebildet, die vorzugsweise aus Stahl besteht und mit einer Anzahl von Rippen 8o, die in das Innere der hohlen Trommel hineinreichen, sowie durch eine an der Vorderseite angeordnete Querstrebe 82 versteift ist. Die hohle Trommel 78 ist drehbar und zur Ermöglichung dieser Drehbewegung an ihrem hinteren Ende in einem Lager 84 gelagert. Am vorderen Ende der länglichen, hohlen Trommel 78 ist eine T^eIIe 86 an der Ouerstrebe 82 befestigt, wobei diese Welle bei 88 gelagert und über eine. Kette bzw. einen Riementrieb 9o antriebsmäßig mit der leerlaufenden Riemenscheibe bzw. dem Kettenrad 74 des praktisch lotrechten Fördererabschnitts 32 verbunden ist. Im Betrieb des praktisch lotrechten Fördererabschnitts 32 V7ird somit auch eine Drehung der länglichen, hohlen · Trommel 78 hervorgebracht.The task of the heating and drying device 34 is to remove the fillers introduced into it to dry and raise its temperature to about 204 ° C, and then the fillers for the subsequent To promote discharge to the rear of the device. The heating and drying equipment is used for this purpose 34 according to the invention in the form of an elongated, hollow drum 78, which is preferably made of steel and with a number of ribs 8o, which extend into the interior of the hollow drum, as well as through one transverse strut 82 arranged at the front is stiffened is. The hollow drum 78 is rotatable and in one at its rear end to enable this rotational movement Bearing 84 stored. At the front end of the elongated, hollow drum 78, a part 86 is attached to the cross brace 82, this shaft being journalled at 88 and via a. Chain or a belt drive 9o drivingly with the idling pulley or the sprocket 74 of the practically vertical conveyor section 32 is connected. During the operation of the practically vertical conveyor section 32 V7, a rotation of the elongated, hollow Drum 78 spawned.

Am Hinterende der umlaufenden, hohlen Trommel 78 ist eine Heizeinrichtung 92 z.B. in Form eines Zwangsluftölbrenners angeordnet. Gemäß Fig. 7 ist eine Luftzufuhrquelle über eine Leitung 94 mit dem Brenner 92 verbunden, wobei diese Leitung zu einen gemäß Fig. 1 an der Seite der Vorrichtung angeordneten Gebläse 96 verläuft. Eine nicht dargestellte Ölleitung zur Speisung des Brenners 92 ist mit einem Ölbehälter 98 verbunden, der ebenfalls 'auf des* Fahrgestell 2o des Lastkraftwagens angeordnet ist. Selbstverständlich kann für den Betrieb des Brenners auch ein anderer Brennstoff als öl verwendet v/erden. Die von der Heizeinrichtung bzw. vom Brenner 92 gelieferte Heizluft strömt durch die umlaufende Trommel 78 von derenAt the rear end of the rotating, hollow drum 78 is a heater 92, for example in the form of a forced air oil burner arranged. According to FIG. 7, an air supply source is connected to the burner 92 via a line 94, this line running to a fan 96 arranged according to FIG. 1 on the side of the device. One Oil line, not shown, for feeding the burner 92 is connected to an oil tank 98, which is also 'Is arranged on the * chassis 2o of the truck. Of course, a fuel other than oil can also be used to operate the burner. the Heating air supplied by the heating device or by the burner 92 flows through the rotating drum 78 from the latter

4 0 9 8 13/04254 0 9 8 13/0425

hinterem 3ncle zu ihrem vorderen Ende, wobei die Drehbewegung der Trommel, speziell in Verbindung mit den einwärts abstehenden Schaufeln bzw. Rippen 80, ein Umwälzen der Füllstoffe bewirkt, so daß sie gleichmäßiger erwärmt und dabei gleichzeitig vom Vorderende der Trommel zu ihrem hinteren Ende transportiert v/erden. Ersichtlicherweise ist die Trommel 78 zur Erleichterung dieser Förderung bei der bevorzugten Ausführungsform der Erfindung nicht genau waagerecht angeordnet, sondern vom Vorderende zum hinteren Ende leicht geneigt, so daß sie mit dem praktisch lotrechten Fördererabschnitt 32 effektiv einen rechten ΐ-Tinkel bildet.rear 3ncle to their front end, being the rotational movement the drum, especially in connection with the inward protruding Paddles or ribs 80, causes a circulation of the fillers, so that they are heated more evenly and thereby simultaneously from the front end of the drum to its rear End transported v / earth. It can be seen that the drum 78 is the preferred one to facilitate this conveyance Embodiment of the invention is not arranged exactly horizontally, but from the front end to the rear end slightly inclined so that it effectively forms a right ΐ angle with the practically vertical conveyor section 32.

Die in die drehbare Trommel 78 eingeblasene Heißluft wird über einen Luftkanal I00 abgeführt, der eine Verbindung zwischen der Trommel 78 und den Speicherkammern 4o und 42 herstellt. Der Luftkanal I00 wird zum Teil durch innere Kanäle, die zu den einzelnen Speicherkammern 4o und 42 führen, und weiterhin durch einen Mantel bzvr. eine Abdeckung 1o2 gebildet, die sich unmittelbar über der hohlen Trommel 78 über deren Gesamtlänge hinweg erstreckt. Wie am besten aus Fig. 3 ersichtlich ist, strömt die Luft somit axis der Trommel 78 in Richtung des Pfeils 1o4 in die beiden Speicherkammern 4o und 42, so daß sie eine Vortrocknung der in diesen Kammern befindlichen Bestandteile bewirkt und den im Betrieb der umlaufenden Trommel 78 entstehenden Staub abführt. Dieser Luftstrom kann weiterhin durch Anordnung von Gebläsen I06 in Kanälen unterstützt werden, welche eine Verbindung zwischen den Kammern 4o und 42 und der hohlen, umlaufenden Trommel 78 herstellen. Der Antrieb für diese Gebläse I06 kann von den verschiedenen, für den praktisch lotrechten Fördererabschnitt vorgesehenen Zahnrädern abgenommen werden, wobei der Fördererabschnitt 32 selbst, wie erwähnt, vom Kraftabnahmepunkt 68 des Fahrzeugs angetrieben wird.The hot air blown into the rotatable drum 78 is discharged through an air duct I00 which is a connection between the drum 78 and the storage chambers 4o and 42 produces. The air duct I00 is partly through internal Channels that lead to the individual storage chambers 4o and 42, and continue through a jacket bzvr. a cover 1o2 is formed, which extends immediately above the hollow drum 78 over the entire length thereof. How best As can be seen from FIG. 3, the air thus flows into the two storage chambers axis of the drum 78 in the direction of the arrow 1o4 4o and 42, so that it causes a pre-drying of the components located in these chambers and during operation the rotating drum 78 removes dust generated. This Air flow can continue through the arrangement of fans I06 be supported in channels, which a connection between the chambers 4o and 42 and the hollow, circumferential Manufacture drum 78. The drive for this fan I06 can be removed from the various gears provided for the practically vertical conveyor section, the conveyor section 32 itself, as mentioned, being driven from the power take-off point 68 of the vehicle.

Die nunmehr erwärmten, sich in Rückwärtsrichtung durch die hohle, umlaufende Trommel 78 bewegenden Füllstoffe v/erden aus dieser Trommel über einen an ihrem hinteren Binde vorge-The fillers, which are now heated and move backwards through the hollow, rotating drum 78, are grounded from this drum via a

4 09813/04264 09813/0426

BAD ORIGINALBATH ORIGINAL

sehenen Auslaß 1o8 in eine Fülltrichteranordnung 3 6See outlet 1o8 in a hopper assembly 3 6

dies
ausgetragen, wie/am besten aus Fig. 1, 3 und 7 ersichtrlich ist. Die in die Fülltrichteranordnung 36 eingefüllten Füllstoffe werden aus dieser über einen weiteren Schieber 11o in Verbindung mit einer drehbaren Trommel bzw. einem Förderer 112 zugemessen, welcher sich gemäß Fig. 7 im Uhrzeigersinn dreht. Auf diese T-?eise werden die erwärmten Füllstoffe, die in die Fülltrichteranordnung auf den sich drehenden Förderer 112 ausgetragen werden, über den verschiebbaren Schieber 11o aus der Fülltrichteranordnung abgeführt, vrobei sie längs einer Rutsche 114-in eine Kollerinühlen-'-Iischeinrichtung hineinfallen, die durch eine Trichtereinrichtung 116 und einen darunter befindlichen Quer- bzw. Schneckenförderer 118, der nachstehend noch näher erläutert v/erden wird, gebildet wird. Außerdem wird in die Trichtereinrichtung 116 und anschließend in den Ouerför.ierer 118 das flüssige Bitumen eingebracht, das in der Speieherkammer 26 aufbewahrt worden ist und ger.ä.R Fig. 7 über ein Rohr 12o und ein Zumeßventil 122 ausgetragen wird. Das in der Speicherkamraer bzw. im Behälter 26 enthaltene flüssige Bitumen kann durch einen weiteren ölbrenner 124', der von allgemeinen, ölbehälter 98 aus gespeist wird, ebenfalls vorgewärmt worden sein.
this
carried out, as / best from Fig. 1, 3 and 7 can be seen. The fillers filled into the filling funnel arrangement 36 are metered from this via a further slide 11o in connection with a rotatable drum or a conveyor 112, which rotates clockwise according to FIG. 7. In this T - else are the heated fillers which are discharged into the hopper arrangement on the rotating conveyor 112, removed via the sliding vane 11o from the hopper arrangement, it vrobei along a chute 114 into a Kollerinühlen -'- Iischeinrichtung fall into it, which is formed by a funnel device 116 and a transverse or screw conveyor 118 located below it, which will be explained in more detail below. In addition, the liquid bitumen, which has been stored in the storage chamber 26 and is discharged via a pipe 12o and a metering valve 122, is introduced into the funnel device 116 and then into the Ouerför.ierer 118. The liquid bitumen contained in the storage chamber or in the container 26 can also have been preheated by a further oil burner 124 'which is fed from the general oil container 98.

Das Mengenverhältnis der in den Quer- bzw. Schneckenförderer 118 eingebrachten Trockenbestandteile zu den flüssigen Bestandteilen läßt sich somit genau steuern, so daß die Konsistenz und die Qualität des gebildeten Asphalts genau vorherbestimmt werden kann. In diesem Zusammenhang ist darauf hinzuweisen, daß die Fülltrichteranordnung und die darunter befindliche, umlaufende Trommel 112 auf einem schwenkbar angeordneten und federbelasteten Hebel bzw. Tragarm 124 montiert sind. Genauer gesagt, ist der Tragarm 124 mittels eines Lagers 126 am Fahrzeugrahmen angelenkt, während sein anderes Ende mittels einer Federeinrichtung 128 am Fahrzeug-The quantity ratio in the cross or screw conveyor 118 introduced dry components to the liquid components can thus be precisely controlled so that the consistency and quality of the asphalt formed is precisely predetermined can be. In this context, it should be noted that the hopper assembly and the below located, rotating drum 112 on a pivotable arranged and spring-loaded lever or support arm 124 are mounted. More precisely, the support arm 124 is means a bearing 126 hinged to the vehicle frame while being the other end by means of a spring device 128 on the vehicle

"4 09813/0425"4 09813/0425

BAD ORIGINALBATH ORIGINAL

aufbau angebracht ist. Auf diese "eisa vernag sich die gesagte Fülltrichteranordnung bein Eefüllen r.iit den Füllstoffen nach unten zu bewegen, während sie sich im leeren Zustand praktisch in die Stellung gemäß Fig. 7 aufwärts verlagert. Diese Bewegung dor Fülltrichter anordnung und speziell des Hebels -b:r/*· Tragarrcs 124 kann als Anzeige für die Füllstoffnencje benützt v/erden, die aus der Heiz- und Trocknungseinrichtung 34 ausgetragen wird. Hierbei earfolgt die Betätigung des umlaufenden Förderers bzw. der Tronnel 112 durch einen Slektromotor 13o, der seinerseits über ein mit dem Hebelarra 124 gekoppeltes mechanisches Gestänge 132 gesteuert wird. Wenn sich der Hebelarm 124 nach unten verschwenkt, d.h. gemäß Fig. 7 und gegen dem Uhrzeigersinn um seinen Scbwenkpunkt 126 herum|3cbwingt, wird sonit der Elektromotor 13o durch das Gestänge 132 eingeschaltet. Bei entleerter Fülltrichteranordnung wird dagegen der Elektromotor 13o abgeschaltet, so daß eine selektive Steuerung der Drehung des Förderers bzw. der Trommel 112 nöglich ist.structure is attached. On this "eisa nag the Said hopper arrangement when filling with the To move fillers downwards, while they are practically in the empty state in the position according to FIG. 7 shifted upwards. This movement of the hopper arrangement and especially the lever -b: r / * · Tragarrcs 124 can used as an indicator for the filler levels, the discharged from the heating and drying device 34 will. Here, the actuation of the circulating Conveyor or the Tronnel 112 by a slectromotor 13o, which in turn is coupled to the lever arm 124 via a mechanical linkage 132 is controlled. if the lever arm 124 pivots downward, i.e. according to FIG 7 and swings counterclockwise around its pivot point 126, the electric motor 13o is thus turned on the linkage 132 switched on. With empty hopper arrangement on the other hand, the electric motor 13o is switched off, so that a selective control of the rotation of the conveyor or the drum 112 is possible.

Das in der Leitung 12o, über welche das flüssige Bitumen zugeführt wird, angeordnete Zumeßventil 122 wird ebenfalls über das mechanische Gestänge 132 durch die Stellung des Trag- oder Hebelarris 124 gesteuert. - I'Jenn der Förderer bzw. die Trommel 112 in Betrieb steht und die Füllstoffe über die Rutsche 114 in den Trichter 116 austrägt, wird somit eine kontrollierte Ilenge flüssigen Bitumens unter Dosierung in den Trichter 116 eincrefüllt. Wie erwähnt, läßt sich eine weitere Steuerung der Qualität und Konsistenz des gebildeten Bitumenbetons durch Betätigung des Schiebers erreichen, welcher die Volumemienge der ausgetragenen Füllstoffe steuert. Dem Fachmann auf diesem Gebiet sind selbstverständlich verschiedene andere Synchronisiereinrichtungen an Stelle des mechanischen Gestänges 132 bekannt, welche zur Steuerung der Füllstoffe uncl/Flüssigbitumenzufuhr in den Trichter 116 herangezogen v/erden können.That in line 12o, through which the liquid bitumen is supplied, arranged metering valve 122 is also via the mechanical linkage 132 by the position of the Carrying or lever arm 124 controlled. - If the sponsor or the drum 112 is in operation and the fillers over the chute 114 discharges into the hopper 116 is thus a controlled olege of liquid bitumen under dosing creped into the funnel 116. As mentioned, can a further control of the quality and consistency of the bituminous concrete formed by operating the slide achieve which is the volume of the discharged fillers controls. Various other synchronizers will of course be apparent to those skilled in the art instead of the mechanical linkage 132, which is used to control the fillers / liquid bitumen feed in the funnel 116 can be used v / ground.

-A 0 9-813/0425-A 0 9-813 / 0425

BAD ORIGINALBATH ORIGINAL

_ 1 r „_ 1 r "

Die in den Trichter 116 eingebrachten Bestandteile, d.h. sowohl die Maß- als auch die Trockenbestandteile, werden im Quer- bzw. Schneckenförderer·11 8 miteinander vermischt, so daß eine im allgemeinen als Eitunenbeton bezeichnete Masse gebildet wird. Selbstverständlich kann die vorstehend beschriebene Vorrichtung auch, im wesentlichen korxtinuierlich arbeiten, bis die für die betreffenden Arbeiten erforderliche Menge an Bitumenbeton gebildet worden ist. aus dem Schneckenförderer 118 wird der Biturienbeton in eine an der Päickseite des Fahrgestells 2o angeordnete und mit ihm mitgeführte Auftrag- bzw. Streueinrichtung 38 abgegeben .The constituents introduced into the hopper 116 , ie both the bulk and the dry constituents, are mixed with one another in the transverse or screw conveyor 11 8, so that a mass generally referred to as egg concrete is formed. Of course, the device described above can also work essentially continuously until the amount of bitumen concrete required for the work in question has been formed. The bituria concrete is discharged from the screw conveyor 118 into an application or spreading device 38 arranged on the pick side of the chassis 2o and carried along with it.

Die Aiftrageinrichtung 38 weist eine Wärmekammereinrichtung 134 auf, die am vorderen ^nde dieser Vorrichtung angeordnet ist und welche mit einem weiteren ölbrenner o.dgl. Heizeinrichtung 136 in Verbindung steht, der ebenfalls vom ölbehälter 98 aus gespeist wird. Auf diese weise kann die unter der Auftrageinrichtung 30 befindliche^ Oberfläche einer Fahrbahn beheizt, d.h. vorgewärmt werden. Bei der bevorzugten Ausführungsform der Erfindung sind zwei derartige Brenner bzw. Heizeinrichtungen 136 zu beiden Seiten der Vorrichtung angeordnet, wie dies an besten aus Fig. ersichtlich ist.The Aiftrageinrichtung 38 has a heat chamber device 134 which is arranged at the front ^ end of this device and which with a further oil burner or the like. Heating device 136 is connected, which is also fed from the oil container 98. In this w else can located under the applicator 30 ^ surface of a roadway heated, ie preheated. In the preferred embodiment of the invention, two such burners or heating devices 136 are arranged on both sides of the device, as can best be seen in FIG.

Hinter der Heizkammereinrichtung 134 ist eine allgemein mit 138 bezeichnete Querfördereinrichtung zur 7uif nähme des Bitumenbetons vom Schneckenförderer 118 und zur gleichmäßigen Verteilung des Bitunenbetons über die darunter befindliche, vorgewärmte Fahrbahnfläche angeordnet. Wie am besten aus Fig. 9 hervorgeht, weist diese Querfördereinrichtung 138 in bevorzugter Ausführungsform zwei übereinander liegende längliche Schnecken 142 und 144 auf, von denen" die Schnecke 144 den Bitumenbeton in Auswärtsrichtung zu beiden Seiten der Vorrichtung und die Schnecke 142 den Bituir.enbeton von beiden Reiten der Vorrichtung einwärts in Richtung auf ihre Mitte fördert.Behind the heating chamber device 134 is a transverse conveyor, generally designated 138 , for 7uif taking the bitumen concrete from the screw conveyor 118 and for evenly distributing the bitumen concrete over the preheated road surface below. As can best be seen from FIG. 9, this transverse conveyor device 138 in a preferred embodiment has two elongated screws 142 and 144 lying one above the other, of which "the screw 144 the bitumen concrete in the outward direction on both sides of the device and the screw 142 the bitumen concrete from both riding the device inward towards their center.

■ ■ . M 0 9 8 1 3 / 0 A 2 5 ^ ORIGINAL ■ ■. M 0 9 8 1 3 / A 2 0 5 ^ ORIGINAL

Auf diese Weise wird eine gleichmäßige Verteilung des Bitumenbetons über die darunter liegende Fahrbahnfläche gewährleistet.In this way an even distribution of the Bituminous concrete over the underlying road surface guaranteed.

Hinter der Querfördereinrichtung 138 ist eine allgemein mit 146 bezeichnete Rütteleinrichtung zur Verfestigung des aufgetragenen Eitunenbetons vorgesehen. Genauer gasagt, weist die Rütteleinrichtung 146 bei der bevorzugten Ausführungsform der Erfindung eine dreieckig geformte Platte auf, die eine Innenkammer festlegt, und mit welcher ein Rüttler 15o verbunden ist. Weiterhin stellt ein hohles Rohr bzw. ein Schacht 152 eine Verbindung zwischen dem Inneren der Heizkammereinrichtung 134 und der Rüttelkammer 146 her, so daß der abgesetzte Bitumenbeton weiter erwSrrat wird, wodurch gute Hafteigenschaften des 3itumenbetons gewährleistet werden und sein Festkleben an der Kammer verhindert wird. Die Platte 148 der Rütteleinrichtung 146 ist vorzugsweise an einem Schvrenkpunkt 153 angelenkt.Behind the transverse conveying device 138 is a vibrating device, generally designated 146, for solidification of the applied egg-concrete. More precisely gas says the vibrator 146 in the preferred embodiment of the invention has a triangular shape Plate that defines an inner chamber, and with which a vibrator 15o is connected. Continues to provide a hollow tube or a shaft 152 a connection between the interior of the heating chamber device 134 and the vibrating chamber 146, so that the separated bitumen concrete is further increased, which means that it has good adhesive properties of the 3itumen concrete are guaranteed and its sticking to the chamber is prevented. Plate 148 of Vibrator 146 is preferably at a pivot point 153 hinged.

An der Rückseite der Auftrageinrichtung 38 ist eine allgemein mit 154 bezeichnete Verdichtungseinrichtung zur Verdichtung des auf vorher beschriebene V'eise aufgetragenen Bitumenbetons vorgesehen. Bei der dargestellten Ausführungsform der Erfindung besteht die Verdichtungseinrichtung 154 aus einer gewichtsbelasteten l^alze.At the rear of the applicator 38 is one general Compaction device designated 154 for compacting the bitumen concrete applied in the previously described manner intended. In the illustrated embodiment of the According to the invention, the compression device 154 consists of a weight-loaded roller.

Die Auftrageinrichtung 38 oder, genauer gesagt, die Einrichtung, welche den Bitunenbeton auf die Fahrbahnflache auftragt, ist an der Rickseite des Fahrzeugs 22 mit Hilfe einer allgemein mit 156 bezeichneten Anbaueinrichtung angebracht. In bevorzugter Ausführungsform besteht diese Anbaueinrichtung aus einer dreieckigen Lagerung, die durch drei Hydraulikzylinder gebildet wird. Dabei ist je ein Zylinder, beispielsweise der Zylinder 158, zu beiden Seiten der Auftrageinrichtung 30 angeordnet. Zusätzlich ist z.B. ein Zylinder 16o in der MitteThe application device 38 or, more precisely, the device which applies the bitumen concrete to the road surface attached to the rick side of the vehicle 22 with the aid of an attachment device generally designated 156. In preferred Embodiment, this attachment consists of a triangular bearing, which is formed by three hydraulic cylinders will. A cylinder, for example the cylinder 158, is arranged on both sides of the application device 30. In addition, there is e.g. a cylinder 16o in the middle

*09813/(U2S βαοοβ,ο,να..* 09813 / (U2S βαοοβ, ο, να ..

der Auftrageinrichtung 38 angeordnet, wobei die Hydraulikzylinder die Auftrageinrichtung in der Weise mit dem Fahrgestell 2o des Fahrzeugs 22 koppeln, daß sowohl die Höhe der Aa£trageinrichtung 38 über der Eodenflache als auch ihr Winkel relativ zur darunter befindlichen Bodenflache ohne weiteres einstellbar sind. Selbstverständlich wird das hintere Ende der Auftrageinrichtung durch die Verdichtungseinrichtung in Form der Walze 154 getragen. of the application device 38, wherein the hydraulic cylinder connects the application device in the manner with the chassis 2o of the vehicle 22 couple that both the height of the Aa £ support device 38 above the Eodenflache and you Angle relative to the floor area below without further adjustable. Of course, the rear end of the application device is carried by the compacting device in the form of the roller 154.

Aus Gründen der besseren Übersichtlichkeit sind zahlreiche Konstruktionseinzelheiten der vorliegenden Erfindung in der Zeichnung nicht näher dargestellt, weil ihre Verwirklichung dem Fachmann auf diesem Gebiet keinerlei Schwierigkeiten bereitet. Beispielsweise sollen den verschiedenen Brennern, bzw. Keizeinrichtungen elektrische Temperaturfühler zugeordnet sein, so daß sich ihre Temperaturen genauestens einstellen lassen. Zudem kann auch die Einstellung der verschiedenen, vorstehend beschriebenen Zumeßschieber mittels verschiedener bekannter hydraulischer Einrichtungen erfolgen, und zu diesem Zweck sieht die Erfindung gewünschtenfalls die Anordnung von Hydraulikpumpen und zweckmäßigen automatischen Steuerungen für diese vor, die an die Kraftabnahmestelle des Fahrzeugs angeschlossen sind. Ähnliche automatische Steuerungen und Getriebe bzw. Zahnradverbindungen können zur Steuerung der Relativgeschwindigkeiten bzw. -Drehzahlen der verschiedenen Förderer und dergleichen vorgesehen sein, so daß die gesamte Arbeitsweise der Bitupenbeton-Herstellungsvorrichtung automatisiert werden kann.For the sake of clarity, numerous construction details of the present invention are shown in FIG the drawing is not shown in detail because their implementation is not the expert in this field Causes difficulties. For example, the various burners or heating devices should be electrical Be associated with temperature sensors so that their temperatures can be precisely adjusted. In addition, the Adjustment of the various metering slides described above by means of various known hydraulic ones Facilities take place, and for this purpose the invention provides, if desired, the arrangement of hydraulic pumps and appropriate automatic controls for this, which are connected to the power take-off point of the vehicle are. Similar automatic controls and gears or gearwheel connections can be used to control the relative speeds or -speeds of the various conveyors and the like be provided, so that the entire Automated operation of the bitupen concrete manufacturing device can be.

Nach der genauen Beschreibung der bevorzugten Konstruktionsmerkmale der Erfindung seien im folgenden die bedeutsamsten Erfindungsnerkrcale zur Erleichterung des Verständnisses der Erfindung kurz zusammengefaßt. Vie ervrähnt, bezieht sich die Erfindung auf eine in sich abgeschlossene Mischvorrichtung, die auf einen langgestreckten Fahrgestell, beispielsweise einer.! Lastvracienaufbau, angeordnet ist. ,auf den After detailed description of the preferred design features of the invention are the most significant in the following Invention keys to facilitate understanding the invention briefly summarized. Vie mentions relates the invention on a self-contained mixing device that is mounted on an elongated chassis, for example one. Loadvracienaufbau, is arranged. , on the

409813/0425 BAD ORIGINAL409813/0425 BATH ORIGINAL

23452122345212

Fahrgestell bzw. Rahmen sind getrennte Speicherkammern zur getrennten Aufbewahrung der Füllstoffe und des flüssigen Bitumens angeordnet. Ein Förderer dient zur Beförderung der Füllstoffe aus den verschiedenen, zugeordneten Speicherkairjnern in Vorwärtsrichtung zum Vorderende des Fahrgestells sowie von hier in Aufwärtsrichtung in eine Heiz- und Trocknungseinrichtung zur Erwärmung und Trocknung der Füllstoffe, die sich über den Speicherkammern befindet und sich praktisch über die Gesamtlänge desJfehmens hinweg erstreckt. Diese Heiz- und Trocknungseinrichtung v/eist eine Rühr- bzw. Umwälzeinrichtung in Form von Schaufeln bzw. Rippen auf, welche die in ihr erwärmten Füllstoffe von der Vorderseite des Rahmens zu seinem hinteren Ende befördern, wo die erwärmten Füllstoffe in eine am hinteren Ende des Rahmens vorgesehene Austrageinrichtung ausgetragen werden. Die erwärmten Füllstoffe fallen anschließend in eine Mischeinrichtung herab, in welche auch das flüssige Bitumen zugeführt wird, wobei die Mengenanteile der in die Mischeinrichtung eingebrachten Bestandteile zur Herstellung von Bitumenbeton sorgfältig gesteuert und zugemessen werden. Bei der bevorzugten Ausführungsform der Erfindung wird dieser Bitumenbeton sodann mittels einer getrennten, aber zugeordneten Vorrichtung auf der darunter liegenden Fahrbahnfläche verteilt und auf sie aufgetragen, wobei diese Vorrichtung zunächst die unter ihr befindliche Fahrbahnfläche vorwärmt, sodann den Bitumenbeton verteilt, um ihn anschließend anzudrücken bzw. glattzustreichen und sodann zu verdichten. Die gesamte, vorstehend beschriebene Vorrichtung ist selbstfahrend und kann ohne weiteres zu der Stelle verfahren werden, an welcher Ausbesserungsarbeiten vorgenommen werden sollen, und die Vorrichtung kann ohne weiteres mit einem Mindestmaß an Personal betrieben werden, wodurch viele der den bisher angewandten Verfahren anhaftenden Schwierigkeiten ausgeschaltet werden.The chassis and frame are separate storage chambers for the separate storage of the fillers and the liquid bitumen arranged. A sponsor is used to Conveying the fillers from the various assigned storage boxes in a forward direction to the front end of the chassis and from here in the upward direction into a heating and drying device for heating and drying of the fillers, which is located above the storage chambers and practically over the entire length of the company. This heating and drying device v / eis an agitating or circulating device in the form of blades or ribs, which are heated in it Convey fillers from the front of the frame to its rear end where the heated fillers into a discharge device provided at the rear end of the frame be carried out. The heated fillers then fall down into a mixing device which the liquid bitumen is also fed in, the proportions of which are introduced into the mixing device Components for the production of bitumen concrete are carefully controlled and measured. In the preferred embodiment According to the invention, this bitumen concrete is then made by means of a separate but associated device distributed on the underlying road surface and applied to it, this device initially the under preheats your existing road surface, then the bitumen concrete distributed in order to then press it down or smooth it out and then compress it. The whole, prominent The device described is self-propelled and can easily be moved to the point at which repair work are to be made and the device can be easily operated with a minimum of personnel can be operated, thereby eliminating many of the difficulties inherent in the methods previously used.

Zusammenfassend wird mit der Erfindung somit eine Bitumen--In summary, the invention thus provides a bitumen--

RAD OBlQlNAL 409813/042$ WHEEL OBlQlNAL 409813/042 $

234621?234621?

beton-Misch- und-Auftragvorrichtung geschaffen, die vollständig in sich abgeschlossen und selbstfahrend ist, so daß der Bitumenbeton an der Arbeitsstelle gemischt und aufgetragen werden kann. Die Vorrichtung weist einen länglichen Rahmen bzw..ein Fahrgestell, beispielsweise ein Lastkraftwagenfahrgestell auf, auf dem getrennte Speicherkammern zur Aufnahme von Füllstoffen, wie Sand, Stein, Kies u.dgl. sowie von flüssigen Bitumen, wie Asphalt, Teer o.dgl., vorgesehen sind.· Unterhalb der Speicherkammer für die Füllstoffe ist eine Fördereinrichtung vorgesehen, welche diese Füllstoffe aus den Speicherkammern über eine Zumeßvorrichtung in eine Heiz- und Trocknungseinrichtung fördert, in welcher die Füllstoffe erwärmt, getrocknet und umgewälzt v/erden. Die trockenen Füllstoffe sowie das flüssige Bitumen, das auf ähnliche Weise vorgewärmt wurde, werden in eine am Fahrgestell angeordnete Austragvorrichtung bzw. Fülltrichteranordnung ausgetragen, an welcher der Bitumenbeton gebildet wird. Dieser Bituirenbeton wird unter Bildung eines üblicherweise als Makadam , SchwarzbeiagConcrete mixing and application device created that is completely self-contained and self-propelled, so that the bitumen concrete on the job can be mixed and applied. The device has an elongated frame or chassis, For example, a truck chassis on which separate storage chambers to hold fillers, such as sand, stone, gravel and the like, as well as liquid bitumen such as asphalt, tar or the like., Provided A conveying device is provided below the storage chamber for the fillers. which these fillers from the storage chambers via a metering device into a heating and drying device promotes, in which the fillers are heated, dried and circulated. The dry ones Fillers as well as the liquid bitumen, which has been preheated in a similar way, are placed in one on the chassis arranged discharge device or hopper arrangement discharged on which the bitumen concrete is formed will. This bitumen concrete is usually called macadam, black with the formation of a

oder Asphalt bezeichneten Straßenbelags mittels einer Auftragvorrichtung auf eine darunter liegende Fahrbahnfläche aufgebracht, und diese Auftragvorrichtung weist bei der bevorzugten Ausführungsform der Erfindung eine Heizkamner, mehrere Auftrag- Schneckenförderer, einen Rüttler und eine Verdichtungswalze auf. Die erfindungsgemäße Vorrichtung stellt im wesentlichen eine fahrbare ?itunenbeton-HerStellungsanlage dar, die aim ''ipchen und Auftragen des Bituir.enbetons unnittelbar zu einer Baustelle verfahren werden kann.or asphalt designated road surface by means of an application device on an underlying road surface applied, and this applicator has in the preferred embodiment of the invention a heating chamber, several order screw conveyors, a vibrator and a compaction roller. The device according to the invention is essentially a mobile? itune concrete production plant, the aim '' ipchen and application of the bituminous concrete directly can be moved to a construction site.

409813/0425409813/0425

BAD OBIQINAtBAD OBIQINAt

Claims (25)

PatentansprücheClaims 1. In sich abgeschlossene, auf einem Fahrgestell montierte Bitumenbeton-Mischvorrichtung, gekennzeichnet durch eine Speichereinrichtung für die Füllstoffe, eine zveite Speichereinrichtung für flüssiges Bitumen, eine Zumeßeinrichtung zum Zumessen und Austragen der Füllstoffe aus der ersten Speichereinrichtung in vorbestimmten Mengenanteilen und Mengenverhältnissen, eine Einrichtung zum Erwärmen der entnommenen Füllstoffe, eine zweite Zumeßeinrichtung, um unter Dosierung eine vorbestinutite Menge des flüssigen Bitumens aus der zweiten Speichereinrichtung zu entnehmen, und eine Einrichtung zum Vermischen der zugemessenen Pestandteile unter Bildung von Bitumenbeton.1. Self-contained bituminous concrete mixing device mounted on a chassis, characterized by a storage device for the fillers, a second storage device for liquid bitumen, a metering device for metering and discharging the fillers from the first storage device in predetermined proportions and proportions, a device for Heating the removed fillers, a second metering device in order to meter a predetermined amount of the liquid bitumen from the second storage device, and a device for mixing the metered P constituents to form bitumen concrete. 2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß eine Auftrageinrichtung zum Auftragen und Verdichten des Bitumenbetons auf einer Fahrbahnfläche vorgesehen ist.2. Apparatus according to claim 1, characterized in that an application device for applying and compressing the bitumen concrete is provided on a road surface. 3. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die erste Speichereinrichtung in mehrere Kammern zur getrennten Aufbewahrung einer Anzahl verschiedener Füllstoffe unterteilt ist.3. Apparatus according to claim 1, characterized in that the first storage device is divided into several chambers is divided for separate storage of a number of different fillers. 4. Vorrichtung nach Anspruch 3, wobei die Füllstoffe in grob- und feinteiliger Form vorliegen, dadurch gekennzeichnet, daß eine Heizeinrichtung vorgesehen ist, um das Bitumen in der zweiten Speichereinrichtung auf erhöhter Temperatur zu halten.4. Apparatus according to claim 3, wherein the fillers are present in coarse and fine-particle form, characterized in that that a heating device is provided to the bitumen in the second storage device to keep elevated temperature. 4Q9S13/Q4254Q9S13 / Q425 BAD ORIGINALBATH ORIGINAL 5. Vorrichtung nach Anspruch 3, dadurch gekennzeichnet, daß die Einrichtung zur Erwärmung der entnommenen Füllstoffe eine Heiz- und Trocknungskammer aufweist, in Vielehe die Füllstoffe durch die erste Zumeßeinrichtung eingeführt werden.5. Apparatus according to claim 3, characterized in that the device for heating the removed fillers has a heating and drying chamber, in many ways the fillers are introduced through the first metering device. 6. Vorrichtung nach Anspruch 5, dadurch gekennzeichnet, daß die Heizkammer eLne Zwangsluft-Heizeinrlchtung aufweist, "eiche Heißluft über die in der Heizkammer befindlichen Füllstoffe bläst.6. Apparatus according to claim 5, characterized in that the heating chamber eLne forced air heating device "blows oak hot air over the fillers in the heating chamber. 7. Vorrichtung nach Anspruch 6, dadurch gekennzeichnet, daß in der Heiz- und Trocknungskammer eine Einrichtung zum umwälzen und Fördern der Füllstoffe vorgesehen ist.7. Apparatus according to claim 6, characterized in that a device in the heating and drying chamber for circulating and conveying the fillers is provided. 8. Vorrichtung nach Anspruch 7, dadurch gekennzeichnet, daß die Heiz- und Trocknungskammer über den die erste Speichereinrichtung bildenden Kammern angeordnet8. Apparatus according to claim 7, characterized in that the heating and drying chamber over the first Storage device forming chambers arranged ■ ist, daß die erste Zumeßeinrichtung eine unter dan verschiedenen Kammern angeordnete erste Fördereinrichtung zur Förderung der Füllstoffe aus den Kammern über Zumeß-Schiefoer zu einen Austragpunkt am einen Ende der Vorrichtung und eine zweite, im wesentlichen lotrecht angeordnete Fördereinrichtung zur Förderung der zugemessenen Füllstoffe vor^ Austragpunkt aufwärts in die Heiz- und Trocknungskammer aufweist, daß die in der Heiz- und Trocknungskammer vorgesehene Uiavälzeinrichtung die Füllstoffe entgegengesetzt zur Förderrichtung der ersten Fördereinrichtung zu einer Austragstelle am anderen Ende der \brrichtung fördert und daß die Mischeinrichtung an diesem anderen Vorrichtungsende angeordnet ist.■ is that the first metering device is a below dan First conveying device arranged in various chambers for conveying the fillers from the Chambers via Zumeß-Schiefoer to a discharge point at one end of the device and a second, in essential vertically arranged conveying device for conveying the metered fillers in front of ^ discharge point up into the heating and drying chamber has that the Uiavälzeinrichtung provided in the heating and drying chamber opposite the fillers to the conveying direction of the first conveying device to a discharge point at the other end conveying direction and that the mixing device is arranged at this other end of the device. 9. In sich abgeschlossene Bitumenbeton-Mischvorrichtun^9. Self-contained bituminous concrete mixing device 409813/0425409813/0425 BAD ORIGINALBATH ORIGINAL insbesondere nach einem der vorangehenden Ansprüche, gekennzeichnet durch einen länglichen Fahrzeug-Rahmen bzw. ein Fahrgestell, auf diesen angeordnete Speicherkammern zur getrennten Speicherung von Füllstoffen und flüssigen Bitumen, eine Heizeinrichtung zum Erwärmen und Trocknen der Füllstoffe, die über den Speicherkammern praktisch über die Gesamtlänge des Rahmens hinweg angeordnet ist, eine am hinteren Rahmenende vorgesehene Einrichtung zum Mischen der Füllstoffe und des flüssigen Bitumens, eine Fördereinrichtung zur Förderung der Füllstoffe aus den Speicherkammern in Vorwärtsrichtung zum Vorderende des Rahmens und in Aufwärtsrichtung vom Vorderende des Rahmens in die Heizeinrichtung, wobei letztere mit Umwälzeinrichtungen versehen ist, um die in ihr erwärmten Füllstoffe vom Vorderende zum hinteren Ende des Rahmens zu transportieren, und eine am hinteren Rahmenende über der Mischeinrichtung angeordnete Austrageinrichtung zum Austragen der erwärmten Füllstoffe in Abwärtsrichtung in die Mischeinrichtung, in welcher der Bitumenbeton gebildet wird.in particular according to one of the preceding claims, characterized by an elongated vehicle frame or a chassis, on these arranged storage chambers for separate storage of fillers and liquid bitumen, a heating device for heating and drying the fillers, which is arranged over the storage chambers practically over the entire length of the frame, means provided at the rear end of the frame for mixing the fillers and the liquid Bitumen, a conveyor for conveying the fillers from the storage chambers in a forward direction towards the front end of the frame and upwards from the front end of the frame into the heater, the latter being provided with circulation devices for the fillers heated in it from the front end to the rear end of the frame, and one at the rear end of the frame Discharge device arranged above the mixing device for discharging the heated fillers in the downward direction into the mixing device in which the bitumen concrete is formed. 10. Vorrichtung nach Anspruch 9, dadurch gekennzeichnet, daß die Heizeinrichtung eine langgestreckte, hohle Trommel mit einem an ihrem hinteren Ende angeordneten Brenner sowie eine Einrichtung zum Drehen der Trommel zwecks Hervorbringung einer Umwälzung der in ihr enthaltenen Füllstoffe aufweist und daß die Trommel von vorn nach hinten geneigt ist, so daß die in der Trommel enthaltenen Füllstoffe von ihrem Vorderende zu ihre.T hinteren Fnäe bewegbar sind.10. The device according to claim 9, characterized in that that the heating device is an elongated, hollow drum with one arranged at its rear end Burner and means for rotating the drum to produce a circulation has the fillers contained in it and that the drum is inclined from the front to the rear, so that the fillers contained in the drum can be moved from its front end to its rear end. 11. Vorrichtung nach Anspruch 1o, dadurch gekennzeichnet, daß die Speicherkamnern nehrere getrennte Kammern zur getrennten Aufnahme von Füllstoffen sind, die praktisch über die Geeamtlänoe des Rahmens hinweg11. The device according to claim 1o, characterized in that the storage chambers have several separate chambers for the separate inclusion of fillers, which are practically across the Geeamtlänoe of the frame 409813/0425409813/0425 BAD ORiQSNALBAD ORiQSNAL 23452122345212 zu beiden Seiten un;l praktisch unmittelbar unter der die Heizeinrichtung bildenden hohlen Trcnrnal angeordnet sind, daß die Fördereinrichtung ein langgestrecktes, unmittelbar unter, den getrennten Kammern angeordnetes waagerechtes Trum zur Förderung der in den Kammern enthaltenen Füllstoffe in Richtung auf das Vorderende des Fahrgestells bzw. Rahmens aufweist und daß der. waagerechten Förderertrum eine steuerbare ^chiehereinrichtum zur Bemessung der aus den getrennten "erlern entnommenen Füllstoffmengen zugeordnet ist.on both sides un; l practically immediately below the hollow doorway forming the heating device are arranged that the conveyor is an elongated, immediately below, the separate Horizontal strand arranged in chambers for conveying the fillers contained in the chambers towards the front end of the chassis or frame and that the. horizontal conveyor strand a controllable ^ chiehereinrichtum for dimensioning the extracted from the separate "learners Is assigned filler quantities. 12. Vorrichtung nach Anspruch 1o, dadurch gekennzeichnet, daß der Brenner, welcher der lie heizeinrichtung bildenden hohlen Trommel zugeordnet ist, ein Zvrangsluftbrenner ist, welcher einen Heizluftstron durch die Trommel von ihrem, hinteren au ihre?" vorderen Ende über die in der Trommel befindlichen Füllstoffe strömen läßt.12. The device according to claim 1o, characterized in that that the burner, which the lie heating device forming hollow drum is assigned, a forced air burner is, which a hot air stream through the drum from hers, back to hers? "front Let the end flow over the fillers in the drum. 13. Vorrichteng nach Anspruch 12. dadurch gekennzeichnet,13. Vorrichteng according to claim 12, characterized in that daß Luftkanäle vor^.-ivr-.jn sind, -Zi<± eir.e Verbindung zwischen den Vorder·.1;-Je c'e: λζ...'.-- ~~:':":*-!. und -*<?:; einzelnen ?peicherka:".\nern zur Λ ufr::;.-,.-» dar Füllstoffe herstellen, u- einer ^Λί t~tr_r- -ui l^r ~T\ror--el in die Speicherkannern zu erzeuger, --/oiurc'i üio in den Fpeicherkammern enthaltenen Füllstoffe veitor getrocknet v/erden und der Staub in den Speicherkammern abgesetzt wirJ. that air ducts are in front of ^ .- ivr-.jn, -Zi <± eir.e connection between the fore ·. 1 ; - J e c'e: λζ ...'.-- ~~: ': ": * - !. and - * <?:; Individual? Peicherka:". \ Nern zur Λ ufr ::;. -, .- »to produce fillers, u- a ^ Λί t ~ tr_r- -ui l ^ r ~ T \ ror - el in the storage cans to produce, - / oiurc'i üio in the storage chambers contained fillers veitor dried v / ground and the dust is deposited in the storage chambers. 14. Vorrichtung nach Anspruch■ 1o, -.ladurch r-?l--c:in?eichr.et, daß die "ischvorrichturg 2irv?r '"illtrichtc-r z'cr 'ufnahr^e c.er aus der T us trageinrichtur.g ausgetragenen, erv.'är!uten Füllstoffe, eine unter der Fülltrichter angeordnete "ischeinrichtung, ein::14. Apparatus according to claim ■ 1o, -.l Perform r-? L - c: in? Eichr.et that the "ischvorrichturg 2irv? R '" illtrichtc-r z'cr ' ufnahr ^ e c.er from the T erv.'är! uten fillers discharged from the carrying facility, an "icing facility" located under the filling funnel, a: A098 1 3/0;2δA098 1 3/0; 2δ zur Steuerung der .".enge der aus de^ Fülltrichter in die Mischeinrichtung aufgetragenen Füllstoffe, eine zv:eite Abgabeeinrichtung zur Steuerung der Menge cfes Flüösigbitumenaustrags aus der zugeordneten Speicherkammer in die Mischeinrichtung und eine Einrichtung zum Synchronisieren der beiden Abgabeeinrichtungen aufweist.to control the. ". close the from de ^ filling funnel in the mixing device applied fillers, a second dispensing device for controlling the Amount of liquid bitumen discharge from the assigned Storage chamber in the mixing device and a device for synchronizing the two Having dispensing devices. 15. Vorrichtung nach Anspruch 14, dadurch gekennzeichnet, daß die Mischeinrichtung einen Schneckenförderer aufweist.15. Apparatus according to claim 14, characterized in that the M ischeinrichtung comprises a screw conveyor. 16. Vorrichtung nach Anspruch 14, dadurch gekennzeichnet, daß die erste Abgabeeinrichtung einen an der Unterseite des Fülltrichters angeordneten, umlaufenden Förderer aufweist, welcher die in ihm enthaltenen Füllstoffe zu einer Austragstelle befördert, an welcher Zumeß-Schieber vorgesehen sind, wobei die Drehzahl des Drehförderers, die Schließgeschwindigkeit der Schieber und die von der zv/elten Abgabeeinrichtung abgegebene Flüssigbituraenmenge aufeinander abgestimmt sind.16. The device according to claim 14, characterized in that that the first dispensing device is arranged on the underside of the hopper, revolving Has conveyor which conveys the fillers contained in it to a discharge point at which Metering slide are provided, the speed of the rotary conveyor, the closing speed of the Slider and the amount of liquid bitura delivered by the second / fourth delivery device are coordinated with one another are. 17. Verrichtung nach Anspruch 16, dadurch gekennzeichnet, daß die Synchronisiereinrichtung Mttel zum "lessen des Gewichts der im Fülltrichter enthaltenen Füllstoffe zur Steuerung der Arbeitsweise des Drehförderers und der zweiten Abgabeeinrichtung aufweist. 17. Performing according to claim 16, characterized in that that the synchronizer means to "read" the weight of the fillers contained in the hopper to control the operation of the rotary conveyor and the second dispenser. 18. Vorrichtung nach Anspruch 11, dadurch gekennzeichnet, daß die Fördereinrichtung weiterhin einen durch ein Becherwerk gebildeten lotrechten Abschnitt aufweist, welcher die vom waagerechten Trum abgegebenen Füllstoffe in Aufvä'rtsrichtung und in die hohle Troimel hinein fördert.18. The apparatus according to claim 11, characterized in that the conveyor device furthermore one through a Bucket elevator has formed vertical section, which the discharged from the horizontal strand Fillers in the upward direction and in the promotes hollow troimel into it. 409813/042S409813 / 042S BAD ORIGINALBATH ORIGINAL 19. Vorrichtung nach Anspruch 13, dadurch gekennzeichnet,daß ein in den Luftkanälen angeordnetes, zusätzliches Gebläse vorgesehen ist, welches die Luftströmung in die die Füllstoffe speichernden Speicherkammern unterstützt.19. The device according to claim 13, characterized in that an additional fan arranged in the air ducts is provided, which the air flow in the storage chambers that store the fillers. 20. Fahrbare Vorrichtung zum Auftragen von Ditunenbeton auf eine darunter liegende Fahrbahnfläche, insbesondere nach einen der vorangehenden Ansprüche, gekennzeichnet durch eine an ihrer Vorderseite angeordnete Ileizkammereinrichtung zun Erwärnen der darunter liegenden Fahrbahnfläche, eine hinter der Heizkainmereinrichtung angeordnete Querfördereinrichtung zur Aufnahme des Bitumenbetons und zur gleichmäßigen Verteilung desselben über die erwärmte Fahrbahnfläche, eine hinter der Fördereinrichtung angeordnete Rütteleinrichtung zum Ausbreiten und Stampfen des aufgetragenen Bitumenbetons u' ' eine am hinteren Ende der Vorrichtung angeordnt^e Verdichtungseinrichtung zum Verdichten bzw. Einwalzen des ausgebreiteten Bituir.enbetons.20. Mobile device for the application of ditunenbeton on an underlying road surface, in particular according to one of the preceding claims, characterized by an Ileizkammeinrichtung arranged on its front side for heating the underlying road surface, a transverse conveyor arranged behind the heating chamber for taking up the bitumen concrete and distributing it evenly over the heated one Road surface, a vibrating device arranged behind the conveyor device for spreading and tamping the applied bitumen concrete u "one arranged at the rear end of the device ^ e Compaction device for compacting or rolling in the expanded bituminous concrete. 21. Vorrichtung nach Anspruch 2o, dadurch gekennzeichnet, daß eine Einrichtung zum Beheizen der Rütteleinrichtung vorgesehen ist.21. The device according to claim 2o, characterized in that a device for heating the vibrating device is provided. 22. Vorrichtung nach Anspruch 21, dadurch gekennzeichnet, daß ein Heizkanal von der ileizkamrereinrichtung zur Sütteleinrichtung vorgesehen ist.22. The device according to claim 21, characterized in that a heating channel from the ileizkamreinrichtung is provided for the shaking device. 23. Vorrichtung nach Anspruch 2o, dadurch gekennzeichnet, daß die Querfördereinrichtung zvei langgestreckte, übereinander angeordnete Schnecken aufweist, von denen die eine den Bitunenbston in TVusw'irtsrichtung zu beiden Saiten der Vorrichtuno und die andere den Bitumenbeton einwärts zur Mitte der Vorrichtung fördert. 23. The device according to claim 2o, characterized in that the transverse conveyor means two elongated, Has snails arranged one above the other, one of which has the Bitunenbston in TVusw'irtsrichtung to both strings of the device and the other conveys the bitumen concrete inwards to the center of the device. 409813/0425409813/0425 BAD ORIGINALBATH ORIGINAL 24. Vorrichtung nach Anspruch 23, dadurch gekennzeichnet, daß an ihrer Vorderseite eine Anbaueinrichtung für den AnschluP der Vorrichtung an ein Motorfahrzeug vorgesehen ist. 24. The device according to claim 23, characterized in that an attachment device for connecting the device to a motor vehicle is provided on its front side. 25. Vorrichtung nach Anspruch 24, dadurch gekennzeichnet, dafl die Verdientun-jsoiririchtung eino V7alze aufv.'eist, "/eiche dis Vorrichtung auf der Fahrbahnfläche tr"at.25. The device according to claim 24, characterized in that that the direction of merit is one V7alze aufv.'eist, "/ eiche dis device on the Road surface tr "at. 409813/0A2S409813 / 0A2S BAD OFlIQiNALBATHROOM OFlIQiNAL e ee e rs ers e
DE19732346212 1972-09-14 1973-09-13 MOBILE BITUMEN CONCRETE MIXING DEVICE Pending DE2346212A1 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US00288987A US3820914A (en) 1972-09-14 1972-09-14 Self contained mobile asphalt mixing and applying apparatus
AU69189/74A AU478692B2 (en) 1972-09-14 1974-05-21 Self-contained mobile bituminous concrete mixing and applying apparatus
CH734474A CH593391A5 (en) 1972-09-14 1974-05-29

Publications (1)

Publication Number Publication Date
DE2346212A1 true DE2346212A1 (en) 1974-03-28

Family

ID=27155797

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19732346212 Pending DE2346212A1 (en) 1972-09-14 1973-09-13 MOBILE BITUMEN CONCRETE MIXING DEVICE

Country Status (12)

Country Link
US (1) US3820914A (en)
JP (1) JPS4965628A (en)
AU (1) AU478692B2 (en)
BE (1) BE815770A (en)
BR (1) BR7307090D0 (en)
CA (1) CA987665A (en)
CH (1) CH593391A5 (en)
DE (1) DE2346212A1 (en)
FR (1) FR2200409A1 (en)
GB (1) GB1442829A (en)
HK (1) HK43777A (en)
KE (1) KE2778A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5006012A (en) * 1989-03-09 1991-04-09 Sterner Carl L Combination road repair machine with improved crack-filling capabilities
CN114319016A (en) * 2021-11-24 2022-04-12 怀宁县四通混凝土制品有限公司 Modified epoxy asphalt concrete processing device and processing technology thereof

Families Citing this family (47)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4072435A (en) * 1976-11-11 1978-02-07 Irl Daffin Associates, Inc. Method and apparatus for maintaining highways
US4226552A (en) * 1978-05-17 1980-10-07 Moench Frank F Asphaltic pavement treating apparatus and method
JPS61188605U (en) * 1985-05-16 1986-11-25
US4624575A (en) * 1985-08-30 1986-11-25 Lantz Construction Company Cement mobile mixer
US4781466A (en) * 1986-05-23 1988-11-01 Zimmerman Harold M Method and apparatus for producing concrete
US4768884A (en) * 1987-03-03 1988-09-06 Elkin Luther V Cement mixer for fast setting materials
US5044819A (en) * 1990-02-12 1991-09-03 Scanroad, Inc. Monitored paving system
FI901974A (en) * 1990-04-20 1991-10-21 Minkkinen Risto J SYSTEM FOR SPRIDNING AV MASS.
US5193935A (en) * 1991-01-07 1993-03-16 Cedarapids, Inc. Soil decontamination apparatus and methods of decontaminating soil
US5083870A (en) * 1991-01-18 1992-01-28 Sindelar Robert A Asphalt plant with segmented drum and zonal heating
FR2677383A1 (en) * 1991-06-04 1992-12-11 Colas Sa FINISHER TYPE PAVEMENT CONSTRUCTION MACHINE.
ES2116856B1 (en) * 1994-10-18 1999-03-01 Impergalicia S A MACHINE FOR THE HOT APPLICATION OF BITUMINOUS MASTIC, VINYL TAR OR SIMILAR WITH OR WITHOUT ALUMINUM ARMOR.
US5590976A (en) * 1995-05-30 1997-01-07 Akzo Nobel Ashpalt Applications, Inc. Mobile paving system using an aggregate moisture sensor and method of operation
US5824138A (en) * 1997-05-01 1998-10-20 Taylor, Iii; C. Milton System for removing noxious odors from a chemical tanker truck
US6161986A (en) * 1998-06-12 2000-12-19 Geff's Manufacturing, Inc. Aggregate spreading apparatus and methods
US6398453B1 (en) 1998-07-30 2002-06-04 Akzo Nobel Asphalt Applications, Inc. Telescoping spreader box with replaceable strike-off system
US5980153A (en) * 1998-07-30 1999-11-09 Akzo Nobel Asphalt Applications, Inc. Telescoping auger shaft and method of manufacture
CN100519940C (en) * 2004-12-29 2009-07-29 湖南力威液压设备有限公司 Car borne pulling typed maintaining machine for asphalt pavement
US7458746B1 (en) * 2005-08-22 2008-12-02 Zimmerman Harold M Mobile asphalt production machine
US7201536B1 (en) * 2005-09-20 2007-04-10 Mark Westbrook Road patching equipment
EP1837442B2 (en) * 2006-03-24 2016-04-13 Joseph Vögele AG Paving train
US7980484B1 (en) 2008-04-21 2011-07-19 Highway Equipment Company Automatic flow gap adjusting anti-slab method and apparatus
ES2346171B1 (en) * 2008-12-23 2011-08-12 Excavaciones Breogan- Hugo, S.L DEVICE FOR PLACEMENT OF CONCRETE CONCRETE ON SURFACES.
US8562247B2 (en) 2009-01-02 2013-10-22 Heatwurx, Inc. Asphalt repair system and method
US8556536B2 (en) 2009-01-02 2013-10-15 Heatwurx, Inc. Asphalt repair system and method
US8167513B2 (en) * 2009-06-18 2012-05-01 Bill Ryan Pothole patching machine
US9416499B2 (en) 2009-12-31 2016-08-16 Heatwurx, Inc. System and method for sensing and managing pothole location and pothole characteristics
US8801325B1 (en) * 2013-02-26 2014-08-12 Heatwurx, Inc. System and method for controlling an asphalt repair apparatus
FR2955946B1 (en) * 2010-02-02 2012-04-20 Famaro METHOD FOR DETERMINING THE FLOW OF BITUMEN OR HYDROCARBON BINDERS FOR INJECTION IN A CONTINUOUS COATING PLANT
PL2821551T3 (en) * 2013-07-05 2016-08-31 Voegele Ag J Construction machine with heatable bearing structures
USD700633S1 (en) 2013-07-26 2014-03-04 Heatwurx, Inc. Asphalt repair device
CN105178140A (en) * 2015-09-20 2015-12-23 四川人杰筑路机械有限公司 Independent-metering usage method for dust-removal mineral aggregates of bituminous concrete mixing equipment
US10583581B2 (en) 2015-09-21 2020-03-10 Flashfill Services, Llc Volumetric mobile powder mixer
CN105200902B (en) * 2015-10-26 2017-08-11 徐州徐工筑路机械有限公司 One kind insulation storing type comprehensive maintaining vehicle for bituminous pavement
US10688687B2 (en) 2016-11-08 2020-06-23 J&P Invesco Llc Volumetric concrete mixing system, equipment, and method
US20180142431A1 (en) * 2016-11-18 2018-05-24 Dragon Asphalt Equipment, LLC Portable paving material mixing apparatus
US10443211B2 (en) * 2017-04-28 2019-10-15 MK-1 Construction Services, LLC Self-propelled pavement material placing machine and methods for backfilling micro-trenches
US10480129B2 (en) * 2017-07-10 2019-11-19 Cimline, Inc. Methods and apparatus for repairing road surfaces
CN107386061A (en) * 2017-08-04 2017-11-24 浙江美通筑路机械股份有限公司 The Hot-blast Heating and dust removal integrated plant of a kind of asphalt pavement heat reclaiming maintenance vehicle
US10337154B2 (en) * 2017-10-24 2019-07-02 Renova Industries, LLC Asphalt recycler
IT201900002791A1 (en) * 2019-02-27 2020-08-27 Cavecon S R L Self-propelled machine for preparing hot bituminous mixtures.
CN110439287B (en) * 2019-07-31 2021-08-10 深圳市惠深博越智慧建造科技有限公司 One-step forming process for emery floor
CN110552276A (en) * 2019-09-05 2019-12-10 浙江海洋大学 Highway maintenance equipment
CN111608048A (en) * 2020-06-11 2020-09-01 孙国泉 Preparation equipment for highway construction material
CN111847952A (en) * 2020-06-12 2020-10-30 福建省铁拓机械股份有限公司 Composite drying roller with telescopic combustion chamber for heating RAP and aggregate
IT202000016135A1 (en) 2020-07-03 2022-01-03 Bunni S R L ROAD PAVING VEHICLE, METHOD AND FLEET
CN112376357B (en) * 2020-12-05 2022-11-29 江苏雷畅建设发展有限公司 Asphalt heating device for road maintenance

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5006012A (en) * 1989-03-09 1991-04-09 Sterner Carl L Combination road repair machine with improved crack-filling capabilities
CN114319016A (en) * 2021-11-24 2022-04-12 怀宁县四通混凝土制品有限公司 Modified epoxy asphalt concrete processing device and processing technology thereof
CN114319016B (en) * 2021-11-24 2024-01-26 怀宁县四通混凝土制品有限公司 Modified epoxy asphalt concrete processing device and processing technology thereof

Also Published As

Publication number Publication date
BR7307090D0 (en) 1974-07-25
CA987665A (en) 1976-04-20
FR2200409A1 (en) 1974-04-19
AU478692B2 (en) 1975-11-27
BE815770A (en) 1974-09-16
KE2778A (en) 1977-10-21
US3820914A (en) 1974-06-28
CH593391A5 (en) 1977-11-30
GB1442829A (en) 1976-07-14
AU6918974A (en) 1975-11-27
JPS4965628A (en) 1974-06-25
HK43777A (en) 1977-09-02

Similar Documents

Publication Publication Date Title
DE2346212A1 (en) MOBILE BITUMEN CONCRETE MIXING DEVICE
DE2850344A1 (en) METHOD AND DEVICE FOR REMOVING AND RE-COATING ROAD COVERINGS
EP0597176B1 (en) Process and apparatus for renovating damaged roadways
EP0316752B1 (en) Apparatus for reconstructing layers of road surfacings
DE2655984A1 (en) PROCEDURE FOR ROAD RENEWAL AND MACHINE FOR EXECUTING THE PROCEDURE
DE1469202B2 (en) Method and device for producing a cold asphalt mixture with a short breaking time
EP2428613A2 (en) Fitter with a storage container
DE2456143A1 (en) DEVICE AND METHOD FOR THE PRODUCTION OF BODIES FROM ASPHALT AND AGGREGATES
EP2377994A1 (en) Material transport system for road finisher and feeder
DE2645344A1 (en) DEVICE FOR THE PREPARATION OF MATERIAL FOR THE CONSTRUCTION AND REPAIR OF ROADS
DE2856635C2 (en) Machine for coating milled or peeled off road surfaces
DE3320682A1 (en) DEVICE FOR THE PREPARATION OF ROAD COVERINGS
EP0240594B1 (en) Device for putting concrete charges in readiness in underground workings
EP1176257B1 (en) Process for making an asphalt and mixing device
WO1981003352A1 (en) Process and device for removing the paving of a road and laying a new paving
AT8455U1 (en) DEVICE AND METHOD FOR PRODUCING AND USING LIQUID, BITUMINOUS COLD MIXTURE
EP0192234B1 (en) Mixing method for making concrete and/or mortar, and device for carrying out this method
EP2239120A2 (en) Transport vehicle for delivering a binder/aggregate mixture
WO1995018706A1 (en) Plant for making concrete in a tunnel
DE543375C (en) Concrete mixer and distributor
DE2645400A1 (en) DEVICE FOR APPLYING ROAD PAVING
AT379626B (en) METHOD AND DEVICE FOR REMOVING AND RE-COATING ROAD COVERINGS
EP1873313A2 (en) Paver and method for building a hard shoulder in reverse gear
CH645943A5 (en) Method and device for removing and recoating roadway coverings
DE4334880A1 (en) Machine for placing pourable track-construction material

Legal Events

Date Code Title Description
OHA Expiration of time for request for examination