DE2142365B2 - Prestressed concrete girder reinforced by haunches at the supports and the process for making it - Google Patents

Prestressed concrete girder reinforced by haunches at the supports and the process for making it

Info

Publication number
DE2142365B2
DE2142365B2 DE19712142365 DE2142365A DE2142365B2 DE 2142365 B2 DE2142365 B2 DE 2142365B2 DE 19712142365 DE19712142365 DE 19712142365 DE 2142365 A DE2142365 A DE 2142365A DE 2142365 B2 DE2142365 B2 DE 2142365B2
Authority
DE
Germany
Prior art keywords
prestressed concrete
concrete
girder
tendon
haunch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19712142365
Other languages
German (de)
Other versions
DE2142365C3 (en
DE2142365A1 (en
Inventor
Pavel Dipl.-Ing. Sibiu Pascu (Rumaenien)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INTREPRINDEREA DE CONSTRUCTII MONTAJ A JUDETULUI SIBIU SIBIU (RUMAENIEN)
Original Assignee
INTREPRINDEREA DE CONSTRUCTII MONTAJ A JUDETULUI SIBIU SIBIU (RUMAENIEN)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INTREPRINDEREA DE CONSTRUCTII MONTAJ A JUDETULUI SIBIU SIBIU (RUMAENIEN) filed Critical INTREPRINDEREA DE CONSTRUCTII MONTAJ A JUDETULUI SIBIU SIBIU (RUMAENIEN)
Priority to DE19712142365 priority Critical patent/DE2142365C3/en
Publication of DE2142365A1 publication Critical patent/DE2142365A1/en
Publication of DE2142365B2 publication Critical patent/DE2142365B2/en
Application granted granted Critical
Publication of DE2142365C3 publication Critical patent/DE2142365C3/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
    • E04C3/26Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members prestressed

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Bridges Or Land Bridges (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Description

f Fig.2 den Spannbetonträger nach Fig.I nach befindlichen Spangtiedbttndel 1 und 2 durch derenf Fig.2 the prestressed concrete beam according to Fig.I after the Spangtiedbttndel 1 and 2 by their

ι der Spannung der SpanngüedbUndel, Ablenkung von der anfänglich geradlinigen Lage in ι the tension of the SpanngüedbUndel, deflection from the initially straight position in

a Fig.3 den Querschnitt längs der Linie/I-4 in Richtung der inneren, unteren Ecken der Vouten a Fig.3 shows the cross section along the line / I-4 in the direction of the inner, lower corners of the haunches

II. Fig.2, mittels ta den Zeichnungen nicht dargestellter, amFig.2, by means of the drawings not shown, on

II Fig.4 einen Längsschnitt durch eine Ablenkvor- 5 oberen Teil des Spannbetonträgers angeordneter i richtung fur die SpanngliedbUndel, Zahnstangenwinde vorgenommen, welche die I Fig.5 einen Querschnitt der Ablenkvorrichtung Dorne? nach oben verschieben, auf die sich die I nachFig.4, SpanngUedbündel 1 und 2 abstützen. Die Verschleiß Fig.6 einen Längsschnitt durch eine weitere Ab- bung der Dorne7 lenkt die SpanngUedbündel 1 und 1 lenkvorrichtung für die SpanngUedbündei, io 2 ab, die infolge ihrer Verankerung an den EndenI I Fig.4 made a longitudinal section through a deflection 5 upper part of the prestressed concrete girder arranged direction for the tendon bundles, rack and pinion winch, which the I Fig.5 a cross section of the deflection mandrels? Move upwards, on which the I according to Fig. 4, tension bundle 1 and 2 are supported. The wear Fig. 6 a longitudinal section through a further bend of the mandrels 7 deflects the tensioning bundle 1 and 1 steering device for the tensioning bundle, io 2, which as a result of its anchoring at the ends r r Fig.7 einen Querschnitt der Ablenkvorrichtung gespannt werden. Die Blockierung der Spanngüedj5 nach F i g. 6, bündel in dieser SteUung wird mit Muttern 6 bewerk- * Fig.8 in scheroatischer DarsteUumg einen Längs- stelligt, die Halter 8 auf den Schraubenbolzen5 fest-I schnitt durch era weiteres Ausführungsbeispiel eines ziehen und damit auch die Dorne 7 und die Spann-' Spannbetonträgers nach der Erfindung vor der 15 gliedbündell und 2 in der abgelenkten Stellung ; Spannung der SpanngUedbündel, blockieren.7 shows a cross section of the deflection device to be stretched. The blocking of the Spanngüedj5 according to F i g. 6, bundle in this control is done with nuts 6 - * Fig. 8 in a scheroatic representation a longitudinal position, the holder 8 on the screw bolt 5, I cut through what another embodiment of a pull and thus also the mandrels 7 and the clamping 'Prestressed concrete beam according to the invention in front of the 15 member bundle and 2 in the deflected position; Tension of the tension bundle, block.

: Fig. 9 den Spannbetonträger nach Fig. 8 nach Der Schutz der SpanngUedbündel erfolgt mit: Fig. 9 shows the prestressed concrete beam according to fig

; der Spannung der SpanngUedbündel und einem durch Torkretierung in einer oder zwei Lagen; the tension of the tension bundle and one by means of gate locking in one or two layers

Fig. 10 den Querschnitt längs der Linie B-B in aufgebrachten Mörtelschicht9.10 shows the cross section along the line BB in an applied mortar layer9.

F i g. 9. 20 Zur Herstellung eines durchlaufenden Spannbeton-F i g. 9. 20 For the production of a continuous prestressed concrete

Zur Herstellung eines frei aufliegenden Spannbe- trägers mit Vouten, wie er in aen F i g. 8 und 9 dar-For the production of a free-lying tension beam with haunches, as shown in aen F i g. 8 and 9 show

tonträgers gemäß der Erfindung werder unterhalb gestellt ist, wird wie im Falle dta frei aufliegendenSound carrier according to the invention who is placed below, is freely resting as in the case of dta

und außerhalb einer Schalung Spanngliedbündel 1 Trägers vorgegangen, wobei jedoch die Spannglied-and outside a formwork tendon bundle 1 girder proceeded, however, the tendon

und 2 mit geradlinigem Verlauf in einem anfänglich bündel 10, 11, 12 und 13 verschiedene Längen undand 2 with a straight course in an initially bundle 10, 11, 12 and 13 different lengths and

kräftefreien Zustand angeordnet, wobei die einen 25 Stellungen im Feld besitzen, je nach der Größe derarranged force-free state, with one having 25 positions in the field, depending on the size of the

Enden der SpanngUedbündel in dem oberen Teil der Kräfte auf den Stützen des Trägers und in dessenEnds of the SpanngUedbündel in the upper part of the forces on the supports of the beam and in its

Schalung verankert sind. Des weiteren wird eine Feldern.Formwork are anchored. Furthermore, a fields.

Montagebewehrung 3 in den unteren und oberen Teil Zur Ablenkung der SpanngUedbündel in Höhe derAssembly reinforcement 3 in the lower and upper part To deflect the tension bundle at the height of the

der Schalung eingesetzt. Vouten können die bei den frei aufliegenden Trägernthe formwork used. Haunches can be found on the free-lying girders

Gleichzeitig werden im Bildungsbereich der 30 verwendeten Mittel angewandt werden oder auchAt the same time in the field of education of the 30 funds used will be applied or also

Trägervouten Verankerungen 4 und Schraubenbol- Verankerungen 14, die die Dorne 7 festhalten undSupport cove anchors 4 and screw bolt anchors 14, which hold the mandrels 7 and

zen5 eingesetzt, wonach ein entsprechender Beton die nach Verschiebung der Dorne und mithin derzen5 used, according to which a corresponding concrete after the shifting of the mandrels and therefore the

eingegossen wird. Nach dem Erstarren des Betons SpanngUedbündel gebogen werden, wodurch sie dieis poured. After the concrete has solidified, tensioning bundles are bent, causing them the

wird eine Verspannung der außerhalb der Schalung Dorne in der verschobenen Stellung blockieren.will block a tension of the mandrels outside the formwork in the shifted position.

Hierzu 4 Blatt ZeichnungenFor this purpose 4 sheets of drawings

Claims (1)

tonträger der eingangs genai oten Art dargestellt. DieSound carriers of the kind mentioned at the beginning are shown. the - Patentansprüche: Vouten dienern zur Verstärkung des Spannbetontra-S gers an den Auflagern. Die Spannfeder werdet 1. Spannbetonträger, der an den Auflagern nach Erhärten des Betons durch Pressen nach unter S durch Vouten verstärkt ist und Spanngliedbündel S gezogen und damit in die gewünschte Spannung ge· aufweist, die außerhalb des Spannbetonträgers an setzt. Um die Spannglieder in abgelenkter Stellung zi j dessen Unterseite angeordnet und durch eine halten, ist zwischen diesen und dem Spannbetontra· j Einrichtung gespannt sind, die die Spannglied- ger ein lotrechter Stab eingeführt, der tiUe Kräfte vor bündel von geradliniger Lage in zur Trägerlängs- den Spanngliedern an den Beton des trägers weiter· richtung senkrecht verlaufender Richtung ab- to gibt. Bei diesen bekannten Spannbetontri gern ist e> lenkt, dadurch gekennzeichnet, daß als nachteilig anzusehen, daß die Anordnung vor k die Ablenkeinrichtung aus einer in der unteren, Pressen und die Einfügung von Abstutzstaben relativ inneren Ecke zumindest einer Voute einbetonier- aufwendig ist. Zudem sind die Spannglieder, da sie :i ten Verankerung (4,14) gebildet ist, die einen in im Abstand von dem Beton des Trägers angeordnei f Trägerquerrichtung angeordneten Dorn (T) um- κ sind, ungeschützt und der Gefahr von mechanischer faßt, der die mit ihren einen Enden im Beton der Beschädigungen und der Korrosion ausgesetzt Voute verankerten Spanngliedbündel (1, 2,10 bis Der Erfindung liegt die Aufgabe zugrunde, einer 13) in in Richtung auf die untere, innere Ecke Spannbetonträger der eingangs genannten Art se der Voute eingerückter Stellung hält, und daß die auszubilden, daß er auf einfache Weise herstellbar isi Spanngliedbündel (1, 2, 10 bis 13) an der Unter- 20 und seine Spannglieder zugleich in möglichst geseite des Spannbetonträgers durch eine mittels schützter Lage angeordnet sind.
Torkretierung aufgebrachte Mörtelschicht (9) an- Diese Aufgabe wird gemäß der Erfindung dadurd: geheftet sind. gelöst, daß die Ablenkeinrichtung aus einer in de ι 2. Verfahren zur Herstellung eines Spannbe- unteren, inneren Ecke zumindest einer Voute einbc tonträgers nach Anspruch 1, bei dem außerhalb 25 tonierten Verankerung gebildet ist, die einen ir der Trägerschalung angeordnete Spanngliedbün- Trägerquerrichtung angeordneten Dorn umfaßt, dei del zunächst schlaff verlegt werden, anschließend die mit ihren einon Enden im Beton der Voute ver der Spannbetonträger in der Schalung gegossen ankerten Spanngliedbündel in in Richtung auf dit und darauf nach Erhärtung des Betons die untere, innere Ecke der Voute eingerückter Stellung Spanngüedb'.indel in zur Trägerlängsrichtung 30 hält, und daß die Spanngliedbündel an der Unterseil.«. senkrechter Richtung abgelenkt und damit ge- des Spannbetonträgers durch eine mittels Torkretie spannt werden, dadurch gekennzeichnet, daß vor rung aufgebrachte Mörtelschicht angeheftet sind,
dem Betonieren in der Schalung im Bereich der Neben den durch die Lösung der Aufgabe erreichunteren, inneren Ecke zumindest einer Voute ten Vorteilen weist der Spannbetonträger zuden eine Verankerung angeordnet wird, daß die einen 35 noch den Vorteil auf, daß er in Feldmitte eine gerin-Enden der Spanngliedbündel in die Schalung im gere Höhe aufweist, da die Spanngliedbündel unmit Bereich der Voute eingelegt werden, daß nach telbar an der Unterseite des Spannbetonträgers ver-Gießen des Betons und Erhärten desselben die laufen.
- Claims: Haunches serve to reinforce the prestressed concrete beam on the supports. The tension spring becomes 1. Prestressed concrete girder, which is reinforced on the supports after the concrete has hardened by pressing downwards by means of haunches and a bundle of tendons S is drawn and thus has the desired tension, which is applied outside the prestressed concrete girder. In order to arrange the tendons in a deflected position, the underside of which is held by a device, which is stretched between them and the pre-stressed concrete beam, the tendons are inserted into a vertical rod which bundles forces from a straight position to the longitudinal beam. The tendons are transferred to the concrete of the girder in the perpendicular direction . In these known Spannbetontri like is e> steers, characterized in that it is disadvantageous that the arrangement in front of k the deflection device from a in the lower, pressing and the insertion of support rods relatively inner corner of at least one haunch is concreting-consuming. In addition, the clamping members are, as it: is formed ith anchor (4,14) having a arranged in angeordnei f at a distance from the concrete of the beam support mandrel transverse direction (T) environmentally κ are, unprotected and the risk of mechanical gripping, which with their one ends in the concrete exposed to damage and corrosion, tendon bundles anchored (1, 2,10 to The invention is based on the object of a 13) in the direction of the lower , inner corner prestressed concrete girder of the type mentioned at the beginning se of the haunch holds the indented position, and that the train that it can be produced in a simple manner isi bundle of tendons (1, 2, 10 to 13) on the lower 20 and its tendons at the same time in the side as far as possible Prestressed concrete beams are arranged by means of a protected layer.
Torkretierung applied mortar layer (9). This object is dadurd according to the invention: are tacked. solved that the deflection device from a in de ι 2. method for producing a clamping lower, inner corner of at least one haunch einbc sound carrier according to claim 1, in which outside 25 toned anchoring is formed, which arranged a tendon beam arranged in the support formwork transverse direction Thorn comprises, dei del are initially laid slackly, then the tendon bundles anchored with their one ends in the concrete of the haunch ver the prestressed concrete girders cast in the formwork in the direction of dit and then after the concrete has hardened the lower, inner corner of the haunch indented position Spanngüedb Holds the spindle in the longitudinal direction of the girder 30, and that the tendon bundles are attached to the lower rope. deflected in the vertical direction and thus the prestressed concrete girder can be tensioned by means of a Torkretie, characterized in that the mortar layer applied prior to the laying is attached,
concreting in the formwork in the area of the addition of the inner corner of at least one haunch th advantages achieved by the solution of the task, the prestressed concrete girder has an anchorage that the one 35 still has the advantage that it has a narrow end in the middle of the field the tendon bundle has in the formwork in the more height, since the tendon bundles are inserted in the immediate area of the haunch that ver-pouring of the concrete and hardening of the same run after telbar on the underside of the prestressed concrete beam.
Spanngliedbündel mittels am oberen Teil des Das Verfahren zur Herstellung des Spannbetontra Spannbetonträgers angeordneter Zahnstangenge- 40 gers nach der Erfindung, bei dem außerhalb dei winde in Richtung auf die untere, innere Ecke Trägerschalung angeordnete Spanngliedbündel zu der Voute heraufgezogen werden, daß die so ge- nächst schlaff verlegt werden, anschließend dei spannten Spanngliedbündel in dieser Stellung Spannbetonträger in der Schalung gegossen und darmittels eines in Trägerquerrichtung angeordneten auf nach Erhärtung des Betons die Spanngliedbünde Domes, welcher Von der Verankerung umfaßt 45 in zur Trägerlängsrichtung senkrechter Richtung abwird, blockiert werden und daß danach die gelenkt und damit gespannt werden, ist dadurch ge Spanngliedbündel mittels einer durch Turkretie- kennzeichnet, daß vor dem Betonieren in der Scharung aufgebrachten Mörtelschicht an der Unter- lung im Bereich der unteren, inneren Ecke zumindes seite des Spannbetonträgers angeheftet werden. einer Voute eine Verankerung angeordnet wird, da£Tendon bundles by means of the upper part of the The process for making the prestressed concrete beam Prestressed concrete carrier arranged rack 40 gers according to the invention, in which outside dei Wind up the bundles of tendons arranged in the direction of the lower, inner corner of the girder formwork the haunch are drawn up so that they are laid next slack, then the tensioned tendon bundles in this position, prestressed concrete girders cast in the formwork and means one arranged in the transverse direction of the girder on the tendon collars after the concrete has hardened Domes, which is encompassed by the anchoring 45 in a direction perpendicular to the longitudinal direction of the girder, are blocked and that then the steered and thus tensioned, is thereby ge Tendon bundles by means of a turcretie signifies that before concreting in the cluster applied mortar layer on the sub-floor in the area of the lower, inner corner at least side of the prestressed concrete beam. an anchoring is arranged in a haunch, since £ 50 die einen Enden der Spanngliedbündel in die Scha lung im Bereich der Voute eingelegt werden, da£50 the one ends of the tendon bundles in the Scha in the area of the haunch, since £ nach Gießen des Betons und Erhärten desselben die after casting the concrete, and hardening the same, the Spanngliedbündel mittels am oberen Teil des SpannTendon bundle by means of the upper part of the instep betonträgers angeordneter Zahnstangengewinde irConcrete carrier arranged rack thread ir 55 Richtung auf die untere, innere Ecke der Voute her55 Direction towards the lower, inner corner of the haunch Die Erfindung betrifft einen Spannbetonträger, der aufgezogen werden, daß die so gespannten Spann-The invention relates to a prestressed concrete girder that is pulled up so that the so-tensioned tensioning an den Auflagern durch Vouten verstärkt ist und gliedbündel in dieser Stellung mittels eines in Trägeris reinforced at the supports by haunches and bundles of limbs in this position by means of an in support Spanngliedbündel aufweist, die außerhalb des Spann- querrichtung angeordneten Domes, welcher von deiHas tendon bundles, the outside of the tensioning transverse direction arranged dome, which of the dei betonträgers an dessen Unterseite angeordnet und Verankerung umfaßt wird, blockiert werden und dal concrete beam is arranged on the underside and comprises anchoring, are blocked and dal durch eine Einrichtung gespannt sind, die die Spann- 60 danach die Spanngliedbündel mittels einer durcr are tensioned by a device which the tensioning 60 then the tendon bundles by means of a durcr gliedbündel von geradliniger Lage in zur Träger- Torkretierung aufgebrachten Mörtelschicht an de;bundle of members of a straight position in the mortar layer applied to the girder Torkretierung an de; längsrichtung senkrecht verlaufender Richtung ab- Unterseite des Spannbetonträgers angeheftet werdenlongitudinally perpendicular direction from the underside of the prestressed concrete beam to be tacked lenkt. Ausführungsbeispiele gemäß der Erfindung sind irdirects. Embodiments according to the invention are ir Die Erfindung betrifft ferner ein Verfahren zur der Zeichnung dargestellt, die nachstehend näher erThe invention also relates to a method for the drawing shown in more detail below Herstellung eines derartigen Spannbetonträgers. 65 läutert werden. Es zeigtManufacture of such a prestressed concrete beam. 65 be purified. It shows In dem Buch »Spannbeton« von Hans Moll, F i g. 1 in schematischer Darstellung einen Längs In the book "Prestressed Concrete" by Hans Moll, F i g. 1 in a schematic representation a longitudinal erschienen in der Schriftenreihe »Technik von schnitt durch einen erfindungsgemäßen Spannbetonappeared in the series »Technique of cutting through prestressed concrete according to the invention Heute«, 1954, ist in Bild 30 auf S. 53 ein Spannbe- träger vor der Spannung der Spanngliedbündel, Today «, 1954, in Fig. 30 on p. 53 there is a prestressing beam in front of the tensioning of the tendon bundles,
DE19712142365 1971-08-24 1971-08-24 Prestressed concrete girder reinforced by haunches at the supports and the process for making it Expired DE2142365C3 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19712142365 DE2142365C3 (en) 1971-08-24 1971-08-24 Prestressed concrete girder reinforced by haunches at the supports and the process for making it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19712142365 DE2142365C3 (en) 1971-08-24 1971-08-24 Prestressed concrete girder reinforced by haunches at the supports and the process for making it

Publications (3)

Publication Number Publication Date
DE2142365A1 DE2142365A1 (en) 1973-03-08
DE2142365B2 true DE2142365B2 (en) 1974-08-29
DE2142365C3 DE2142365C3 (en) 1975-04-24

Family

ID=5817634

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19712142365 Expired DE2142365C3 (en) 1971-08-24 1971-08-24 Prestressed concrete girder reinforced by haunches at the supports and the process for making it

Country Status (1)

Country Link
DE (1) DE2142365C3 (en)

Also Published As

Publication number Publication date
DE2142365C3 (en) 1975-04-24
DE2142365A1 (en) 1973-03-08

Similar Documents

Publication Publication Date Title
DE2248472C3 (en) Process for the production of T-beams from prestressed concrete
DE2142365C3 (en) Prestressed concrete girder reinforced by haunches at the supports and the process for making it
CH662603A5 (en) REINFORCED CEILING BRACKET IN BRICK AND CONCRETE.
AT166309B (en) Method and device for generating prestressing in concrete reinforcement
DE1941329A1 (en) Device for the production of a pre-bent beam
DE2528114C3 (en) Feed scaffolding for the production of the superstructure of prestressed concrete bridges or similar supporting structures from prefabricated parts
AT330832B (en) STRUCTURAL STRUCTURE AND PROCESS FOR ITS PRODUCTION
AT258541B (en) Reinforced concrete slab, in particular prefabricated slab (permanent formwork) for ceilings
AT219255B (en) Process for the production of prestressed concrete beams
DE903219C (en) Process and device for the production of components and structures from prestressed concrete
DE1296773B (en) Shear safety bracket for reinforced concrete components
DE831764C (en) Reinforced concrete I-beam and process for its manufacture
DE2633821C2 (en) Prestressing steel for prestressed concrete components
AT223790B (en) Spatial lattice girder
DE810427C (en) Reinforced concrete beams for reinforced concrete ceilings laid without formwork
DE3017840A1 (en) PRE-FABRIC REINFORCED CONCRETE PANEL ELEMENT
AT257119B (en) Roof construction
AT241771B (en) Prestressed building structure
DE2139215A1 (en) Method for anchoring random packings in casting molds
DE1257818B (en) Process for the segmental production of bridge structures or the like elongated structures made of in-situ concrete and precast concrete component for carrying out the process
DE4228968A1 (en) T=shaped Concrete beam design - has reinforcements in concrete web and steel plates running length of beam along flange edges
DE2110598C3 (en) Beams made of steel or steel and concrete
AT251249B (en) Prestressed building structure
DE2143167C3 (en) Spacers for concrete reinforcement
DE2345202A1 (en) Insertable concrete reinforcement component spacer bar - with ends for support on form walling and slits to embrace reinforcing iron

Legal Events

Date Code Title Description
C3 Grant after two publication steps (3rd publication)