DE2142365C3 - Prestressed concrete girder reinforced by haunches at the supports and the process for making it - Google Patents

Prestressed concrete girder reinforced by haunches at the supports and the process for making it

Info

Publication number
DE2142365C3
DE2142365C3 DE19712142365 DE2142365A DE2142365C3 DE 2142365 C3 DE2142365 C3 DE 2142365C3 DE 19712142365 DE19712142365 DE 19712142365 DE 2142365 A DE2142365 A DE 2142365A DE 2142365 C3 DE2142365 C3 DE 2142365C3
Authority
DE
Germany
Prior art keywords
prestressed concrete
tendon
girder
concrete
bundles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19712142365
Other languages
German (de)
Other versions
DE2142365B2 (en
DE2142365A1 (en
Inventor
Pavel Dipl.-Ing. Sibiu Pascu (Rumaenien)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INTREPRINDEREA DE CONSTRUCTII MONTAJ A JUDETULUI SIBIU SIBIU (RUMAENIEN)
Original Assignee
INTREPRINDEREA DE CONSTRUCTII MONTAJ A JUDETULUI SIBIU SIBIU (RUMAENIEN)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INTREPRINDEREA DE CONSTRUCTII MONTAJ A JUDETULUI SIBIU SIBIU (RUMAENIEN) filed Critical INTREPRINDEREA DE CONSTRUCTII MONTAJ A JUDETULUI SIBIU SIBIU (RUMAENIEN)
Priority to DE19712142365 priority Critical patent/DE2142365C3/en
Publication of DE2142365A1 publication Critical patent/DE2142365A1/en
Publication of DE2142365B2 publication Critical patent/DE2142365B2/en
Application granted granted Critical
Publication of DE2142365C3 publication Critical patent/DE2142365C3/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
    • E04C3/26Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members prestressed

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Rod-Shaped Construction Members (AREA)

Description

F i g. 2 den Spannbetonträger nach F i g. 1 nach befindlichen Spangliedbündel 1 und 2 durch derenF i g. 2 the prestressed concrete beam according to FIG. 1 after located Spangliedbündel 1 and 2 by their

der Spannung der Spanngliedbündel, Ablenkung von der anfänglich geradlinigen Lage inthe tension of the tendon bundles, deflection from the initially straight position in

Fig. 3 den Querschnitt längs der Linie A-A in Richtung der inneren, unteren Ecken der Vouten3 shows the cross section along the line AA in the direction of the inner, lower corners of the haunches

^'S·2· mittels in den Zeichnungen nicht dargestellter, am^ 'S · 2 · by means of not shown in the drawings, am

Fig.4 einen Längsschnitt durch eine Ablenkvor- 5 oberen Teil des Spannbetonträgers angeordneter4 shows a longitudinal section through a deflecting front 5 arranged at the top of the prestressed concrete beam

richtung für die Spanngliedbündel, Zahnstangenwinde vorgenommen, welche diedirection for the tendon bundles, rack and pinion winch made which the

Fig.5 einen Querschnitt der Ablenkvorrichtung Dorne7 nach oben verschieben, auf die sich die5 a cross section of the deflection device mandrels 7 move upwards, on which the

nach F i g. 4, Spanngliedbündel 1 und 2 abstützen. Die Vcrschie-according to FIG. 4, support tendon bundles 1 and 2. The different

F i g. 6 einen Längsschnitt durch eine weitere Ab- bung der Dorne 7 lenkt die Spanngliedbündel 1 undF i g. 6 shows a longitudinal section through a further bend of the mandrels 7 directs the tendon bundles 1 and 2

lenkvorrichtung für die Spanngliedbündel, xo 2 ab, die infolge ihrer Verankerung an den Endensteering device for the tendon bundles, xo 2 from, which as a result of their anchoring at the ends

Fig. 7 einen Querschnitt der Ablenkvorrichtung gespannt werden. Die Blockierung der Spannglied-Fig. 7 shows a cross section of the deflection device being tensioned. The blocking of the tendon

nach F i g. 6, bündel in dieser Stellung wird mit Muttern 6 bewerk-according to FIG. 6, bundle in this position is done with nuts 6

Fig.8 in schematischer Darstellung einen Längs- stelligt, die Halter8 auf den Schraubenbolzen5 festschnitt durch ein weiteres Ausführungsbeispiel eines ziehen und damit auch die Dorne 7 und die Spann-Spannbetonträgers nach der Erfindung vor der 15 gliedbündel 1 und 2 in der abgelenkten Stellung Spannung der Spanngliedbündel, blockieren.8 in a schematic representation a longitudinal position, the holder 8 securely cut onto the screw bolt 5 by a further embodiment of a pull and thus also the mandrels 7 and the prestressed prestressed concrete beam according to the invention in front of the 15 link bundles 1 and 2 in the deflected position Tension of tendon bundles, block.

Fig. 9 den Spannbetonträger nach Fig. 8 nach Der Schutz der Spanngliedbündel erfolgt mitFIG. 9 shows the prestressed concrete beam according to FIG. 8 according to the protection of the tendon bundles

der Spannung der Spanngliedbündel und einem durch Torkretierung in einer oder zwei Lagenthe tension of the tendon bundles and one by gate locking in one or two layers

Fig. 10 den Querschnitt längs der LinieB-B in aufgebrachten Mörteischicht9.10 shows the cross section along the line B-B in applied mortar layer9.

F i g. 9. 20 Zur Herstellung eines durchlaufenden Spannbeton-F i g. 9. 20 For the production of a continuous prestressed concrete

Zur Herstellung eines frei aufliegenden Spannbe- trägers mit Vouten, wie er in den F i g. 8 und 9 dar-For the production of a freely resting tension beam with haunches, as shown in FIGS. 8 and 9 show

tonträgers gemäß der Erfindung werden unterhalb gestellt ist, wird wie im Falle des frei aufliegendenSound carriers according to the invention are placed below, as in the case of the free-standing

und außerhalb einer Schalung Spanngliedbündel ί Trägers vorgegangen, wobei jedoch die Spannglied-and outside a formwork tendon bundle ί girder proceeded, however, the tendon

und 2 mit geradlinigem Verlauf in einem anfänglich bündel 10, 11, 12 und 13 verschiedene Längen undand 2 with a straight course in an initially bundle 10, 11, 12 and 13 different lengths and

kräftefreien Zustand angeordnet, wobei die einen 25 Stellungen im Feld besitzen, je nach der Größe derarranged force-free state, with one having 25 positions in the field, depending on the size of the

Enden der Spanngliedbündel in dem oberen Teil der Kräfte auf den Stützen des Trägers und in dessenEnds of the tendon bundles in the upper part of the forces on the supports of the beam and in its

Schalung verankert sind. Des weiteren wird eine Feldern.Formwork are anchored. Furthermore, a fields.

Montagebewehrung 3 in den unteren und oberen Teil Zur Ablenkung der Spanngliedbündel in Höhe derAssembly reinforcement 3 in the lower and upper part To deflect the tendon bundles at the height of the

der Schalung eingesetzt. Vouten können die bei den frei aufliegenden Trägernthe formwork used. Haunches can be found on the free-lying girders

Gleichzeitig werden im Bildungsbereich der 30 verwendeten Mittel angewandt werden oder auchAt the same time in the field of education of the 30 funds used will be applied or also

Trägervouten Verankerungen 4 und Schraubenbol- Verankerungen 14, die die Dorne 7 festhalten undSupport cove anchors 4 and screw bolt anchors 14, which hold the mandrels 7 and

zen5 eingesetzt, wonach ein entsprechender Beton die nach Verschiebung der Dorne und mithin derzen5 used, according to which a corresponding concrete after the shifting of the mandrels and therefore the

eingegossen wird. Nach dem Erstarren des Betons Spanngliedbündel gebogen werden, wodurch sie dieis poured. After the concrete has solidified, tendon bundles are bent, causing them the

wird eine Verspannung der außerhalb der Schalung Dorne in der verschobenen Stellung blockieren.will block a tension of the mandrels outside the formwork in the shifted position.

Hierzu 4 Blatt ZeichnungenFor this purpose 4 sheets of drawings

Claims (2)

tonträger der eingangs genannten Art dargestellt. Die PatentansDriiche- Vouten dienen zur Verstärkung des Spannbetonträ- Pdtentansprucne. ^ ^ Auf,agem Die Spannglieder wsrdenSound carriers of the type mentioned above. The patent applications are used to reinforce the prestressed concrete. ^^ On, agem the tendons wsrden 1. Spannbetonträger, der an den Auflagern nach Erhärten des Betons durch Pressen nach unten durch Vouten verstärkt ist und Spanngliedbündel 5 gezogen und damit in die gewünschte Spannung geaufweist, die außerhalb des Spannbetonträgers an setzt Um die Spannglieder in abgelenkter Stellung zu dessen Unterseite angeordnet und durch eine halten, ist zwischen diesen und dem Spannbetontra-Einrichtung gespannt sind, die die Spannglied- ger ein lotrechter Stab eingeführt der die Kräfte von bündel von geradliniger Lage in zur Trägerlängs- den Spanngliedern an den Beton des Tragers weiterrichtung senkrecht verlaufender Richtung ab- io gibt. Bei diesen bekannten Spannbetontragern ist es lenkt, dadurch gekennzeichnet, daß als nachteilig anzusehen, daß die Anordnung von die Ablenkeinrichtuni aus einer in der unteren, Pressen und die Einfügung von Abstutzstaben relativ inneren Ecke zumindest einer Voute einbetonier- aufwendig ist Zudem sind die Spannglieder, da sie ten Verankerung (4, 14) gebildet ist, die einen in im Abstand von dem Beton des Tragers angeordnet Trägerquerrichtung angeordneten Dom (7) um- 15 sind, ungeschützt und der Gefahr von mechanischen faßt, der die mit ihren einen Enden im Beton der Beschädigungen und der Korrosion ausgesetzt.
Voute verankerten Spanngliedbündel (1, 2, 10 bis Der Erfindung liegt die Aufgabe zugrunde, einen 13) in in Richtung auf die untere, innere Ecke Spannbetonträger der eingangs genannten Art so der Voute eingerückter Stellung hält, und daß die auszubilden, daß er auf einfache Weise herstellbar ist Spanngliedbündel (1, 2, 10 bis 13) an der Unter- 20 und seine Spannglieder zugleich in möglichst geseite des Spannbetonträgers durch eine mittels schützter Lage angeordnet sind.
1. Prestressed concrete girder, which is reinforced on the supports after the concrete has hardened by pressing downwards through haunches and pulled tendon bundles 5 and thus has the desired tension that sets outside the prestressed concrete girder To arrange the tendons in a deflected position on its underside and through hold one, is stretched between this and the prestressed concrete device, which the tendon insert a vertical rod that transfers the forces from the bundle of a straight position in the longitudinal direction of the tendons to the concrete of the girder further perpendicular direction . In these known prestressed concrete girders it is steered, characterized in that it is to be regarded as disadvantageous that the arrangement of the deflecting device from one in the lower, pressing and the insertion of supporting rods relatively inner corner of at least one cove is concreting-consuming they th anchoring (4, 14) is formed, which are arranged in a distance from the concrete of the girder arranged in the transverse direction of the girder dome (7), unprotected and the risk of mechanical grips with one end in the concrete of the Exposed to damage and corrosion.
Haunch anchored tendon bundle (1, 2, 10 to The invention is based on the object of a 13) in the direction of the lower, inner corner prestressed concrete beam of the type mentioned so that the haunch holds the indented position, and that the train that it is easy It is possible to produce tendon bundles (1, 2, 10 to 13) on the lower 20 and its tendons at the same time as far as possible on the side of the prestressed concrete girder by means of a protected position.
Torkretierung aufgebrachte Mörtelschicht (9) an- Diese Aufgabe wird gemäß der Erfindung dadurchTorkretierung applied mortar layer (9). This object is achieved according to the invention geheftet sind. gelöst, daß die Ablenkeinrichtung aus einer in derare stapled. solved that the deflector from one in the
2. Verfahren zur Herstellung eines Spannbe- unteren, inneren Ecke zumindest einer Voute einbetonträgers nach Anspruch 1, bei dem außerhalb 25 tonierten Verankerung gebildet ist, die einen in der Trägerschalung angeordnete Spanngliedbün- Trägerquerrichtung angeordneten Dorn umfaßt, der del zunächst schlaff verlegt werden, anschließend die mit ihren einen Enden im Beton der Voute verder Spannbetonträger in der Schalung gegossen ankerten Spanngliedbündel in in Richtung auf die und darauf nach Erhärtung des Betons die untere, innere Ecke der Voute eingerückter Stellung Spanngliedbündel in zur Trägerlängsrichtung 30 hält, und daß die Spanngliedbündel an der Unterseite senkrechter Richtung abgelenkt und damit ge- des Spannbetonträgers durch eine mittels Torkretiespannt werden, dadurch gekennzeichnet, daß vor rung aufgebrachte Mörtelschicht angeheftet sind,
dem Betonieren in der Schalung im Bereich der Neben den durch die Lösung der Aufgabe erreichunteren, inneren Ecke zumindest einer Voute ten Vorteilen weist der Spannbetonträger zudem eine Verankerung angeordnet wird, daß die einen 35 noch den Vorteil auf, daß er in Feldmitte eine gerin-Enden der Spanngliedbündel in die Schalung im gere Höhe aufweist, da die Spanngliedbündel unmit-Bereich der Voute eingelegt werden, daß nach telbar an der Unterseite des Spannbetonträgers ver-Gießen des Betons und Erhärten desselben die laufen.
2. A method for producing a tensioning lower, inner corner of at least one cove einbetonträgers according to claim 1, in which outside 25 toned anchoring is formed, which comprises a mandrel arranged in the beam formwork tendon beam transverse direction, which is initially laid slack, then the tendon bundles anchored with their one ends in the concrete of the haunch verder prestressed concrete girders in the formwork in the direction of and then after the hardening of the concrete the lower, inner corner of the tapered position holds the tendon bundles in the longitudinal direction 30 of the girder, and that the tendon bundles at the The underside is deflected in the vertical direction and thus the prestressed concrete girder is tensioned by means of a Torkreties, characterized in that the mortar layer applied prior to the laying is attached,
concreting in the formwork in the area of the addition of the inner corner at least one haunch th advantages achieved by the solution of the task, the prestressed concrete girder also has an anchorage that one 35 still has the advantage that it has a narrow end in the middle of the field the tendon bundle has in the formwork in the more height, since the tendon bundles are inserted in the immediate area of the haunch, that after pouring the concrete on the underside of the prestressed concrete girder and hardening of the same, the run.
Spanngliedbündel mittels am oberen Teil des Das Verfahren zur Herstellung des Spannbetonträ-Tendon bundles by means of the upper part of the The process for producing the prestressed concrete Spannbetonträgers angeordneter Zahnstangenge- 40 gers nach der Erfindung, bei dem außerhalb der winde in Richtung auf die untere, innere Ecke Trägerschalung angeordnete Spanngliedbündel zuder Voute heraufgezogen werden, daß die so ge- nächst schlaff verlegt werden, anschließend der spannten Spanngliedbündel in dieser Stellung Spannbetonträger in der Schalung gegossen und darmittels eines in Trägerquerrichtung angeordneten auf nach Erhärtung des Betons die Spanngliedbündel Domes, welcher von der Verankerung umfaßt 45 in zur Trägerlängsrichtung senkrechter Richtung abwird, blockiert werden und daß danach die gelenkt und damit gespannt werden, ist dadurch ge-Spanngliedbündel mittels einer durch Torkretie- kennzeichnet, daß vor dem Betonieren in der Scharung aufgebrachten Mörtelschicht an der Unter- lung im Bereich der unteren, inneren Ecke zumindest sehe des Spannbetonträgers angeheftet werden. einer Voute eine Verankerung angeordnet wird, daßPrestressed concrete carrier arranged rack 40 gers according to the invention, in which outside the wind tendon bundles arranged in the direction of the lower, inner corner of the girder formwork The haunch can be pulled up so that they are laid as slack as possible, then the tensioned tendon bundles in this position, prestressed concrete girders cast in the formwork and means one arranged in the transverse direction of the girder on the tendon bundles after the concrete has hardened Dome, which is encompassed by the anchorage 45 in a direction perpendicular to the longitudinal direction of the girder, are blocked and that then the steered and thus tensioned, is thereby ge-tendon bundles by means of a by Torkretie- indicates that before concreting in the joint applied mortar layer on the sub-floor in the area of the lower, inner corner at least see the prestressed concrete beam being attached. an anchorage is arranged in a haunch that 50 die einen Enden der Spanngliedbündel in die Schalung im Bereich der Voute eingelegt werden, daß50 the one ends of the tendon bundles are inserted into the formwork in the region of the haunch that nach Gießen des Betons und Erhärten desselben dieafter the concrete has been poured and hardened Spanngliedbünde! mittels am oberen Teil des Spannbetonträgers angeordneter Zahnstangengewinde in 55 Richtung auf die untere, innere Ecke der Voute her-Tendon frets! by means of a rack thread arranged on the upper part of the prestressed concrete beam in 55 Direction towards the lower, inner corner of the haunch. Die Erfindung betrifft einen Spannbetonträger, der aufgezogen werden, daß die so gespannten Spannan den Auflagern durch Vouten verstärkt ist und gliedbündel in dieser Stellung mittels eines in Träger-Spanngliedbündel aufweist, die außerhalb des Spann- querrichtung angeordneten Domes, welcher von der betonträgers an dessen Unterseite angeordnet und Verankerung umfaßt wird, büockiert werden und daß durch eine Einrichtung gespannt sind, die die Spann- 60 danach die Spanngliedbündel mittels einer durch gliedbündel von geradliniger Lage in zur Träger- Torkretierung aufgebrachten Mörtelschicht an der längsrichtung senkrecht verlaufender Richtung ab- Unterseite des Spannbetonträgers angeheftet werden, lenkt. Ausführungsbeispiele gemäß der Erfindung sind inThe invention relates to a prestressed concrete beam which is pulled up so that the so tensioned Spannan the supports is reinforced by haunches and bundles of members in this position by means of a beam-tendon bundle has, the outside of the clamping transverse direction arranged dome, which of the concrete carrier is arranged on the underside and anchoring is included, büockiert and that are tensioned by a device, which the tensioning 60 then the tendon bundle by means of a Link bundle of straight position in the mortar layer applied to the carrier gate locking in the longitudinal direction perpendicular to the bottom of the prestressed concrete girder are attached, directs. Embodiments according to the invention are in Die Erfindung betrifft ferner ein Verfahren zur der Zeichnung dargestellt, die nachstehend näher erHerstellung eines derartigen Spannbetonträgers. 65 läutert werden. Es zeigtThe invention also relates to a method for the drawing shown, which will be shown in more detail below such a prestressed concrete beam. 65 be purified. It shows In dem Buch »Spannbeton« von Hans Moll, Fig. 1 in schematischer Darstellung einen Längserschienen in der Schriftenreihe »Technik von schnitt durch einen erfindungsgemäßen Spannbeton-Heute«, 1954, ist in Bild 30 auf S. 53 ein Spannbe- träger vor der Spannung der Spanngliedbündel,In the book "Prestressed Concrete" by Hans Moll, Fig. 1, a schematic representation of a longitudinal rail in the series of publications "Technique of cutting through a prestressed concrete according to the invention today", 1954, in Fig. 30 on p. 53 there is a prestressing beam in front of the tensioning of the tendon bundles,
DE19712142365 1971-08-24 1971-08-24 Prestressed concrete girder reinforced by haunches at the supports and the process for making it Expired DE2142365C3 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19712142365 DE2142365C3 (en) 1971-08-24 1971-08-24 Prestressed concrete girder reinforced by haunches at the supports and the process for making it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19712142365 DE2142365C3 (en) 1971-08-24 1971-08-24 Prestressed concrete girder reinforced by haunches at the supports and the process for making it

Publications (3)

Publication Number Publication Date
DE2142365A1 DE2142365A1 (en) 1973-03-08
DE2142365B2 DE2142365B2 (en) 1974-08-29
DE2142365C3 true DE2142365C3 (en) 1975-04-24

Family

ID=5817634

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19712142365 Expired DE2142365C3 (en) 1971-08-24 1971-08-24 Prestressed concrete girder reinforced by haunches at the supports and the process for making it

Country Status (1)

Country Link
DE (1) DE2142365C3 (en)

Also Published As

Publication number Publication date
DE2142365B2 (en) 1974-08-29
DE2142365A1 (en) 1973-03-08

Similar Documents

Publication Publication Date Title
DE2717869A1 (en) PROCESS FOR THE MANUFACTURING OF COMPONENTS FROM PRE-TENSIONED CONCRETE
DE2229093A1 (en) Assembly or fastening element for reinforcement or a reinforcement element in reinforced concrete construction
DE2058714A1 (en) Ribbed concrete slab
DE2142365C3 (en) Prestressed concrete girder reinforced by haunches at the supports and the process for making it
DE3738291C2 (en)
DE2248472A1 (en) PROCESS FOR THE MANUFACTURING OF COMPONENTS FROM STRENGTHEN CONCRETE
DE1941329A1 (en) Device for the production of a pre-bent beam
DE3004873A1 (en) Bridge support substructure bracing - has piers fastened to prestressed tension member with fixed point anchored ends
EP0361227A2 (en) Prestressed concrete railway sleeper
DE2528114C3 (en) Feed scaffolding for the production of the superstructure of prestressed concrete bridges or similar supporting structures from prefabricated parts
DE2633821C2 (en) Prestressing steel for prestressed concrete components
AT257119B (en) Roof construction
AT223790B (en) Spatial lattice girder
DE1296773B (en) Shear safety bracket for reinforced concrete components
AT330832B (en) STRUCTURAL STRUCTURE AND PROCESS FOR ITS PRODUCTION
DE810427C (en) Reinforced concrete beams for reinforced concrete ceilings laid without formwork
DE3017840A1 (en) PRE-FABRIC REINFORCED CONCRETE PANEL ELEMENT
DE2110598C3 (en) Beams made of steel or steel and concrete
AT219255B (en) Process for the production of prestressed concrete beams
DE2139215A1 (en) Method for anchoring random packings in casting molds
DE4228968A1 (en) T=shaped Concrete beam design - has reinforcements in concrete web and steel plates running length of beam along flange edges
AT404957B (en) Reinforcing element
DE2262321A1 (en) METHOD AND DEVICE FOR CLAMPING CONCRETE BEAM
AT249728B (en) Temporary or permanent joint in concrete beam structures
AT241771B (en) Prestressed building structure

Legal Events

Date Code Title Description
C3 Grant after two publication steps (3rd publication)