DE2056629A1 - Method and device for the production of multi-storey buildings - Google Patents

Method and device for the production of multi-storey buildings

Info

Publication number
DE2056629A1
DE2056629A1 DE19702056629 DE2056629A DE2056629A1 DE 2056629 A1 DE2056629 A1 DE 2056629A1 DE 19702056629 DE19702056629 DE 19702056629 DE 2056629 A DE2056629 A DE 2056629A DE 2056629 A1 DE2056629 A1 DE 2056629A1
Authority
DE
Germany
Prior art keywords
support members
recesses
sliding
formwork
windows
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE19702056629
Other languages
German (de)
Inventor
Die Anmelder Sind
Original Assignee
Wrede, Erwin, 6101 Seeheim; Mrosek, Florian, 6101 Traisa
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wrede, Erwin, 6101 Seeheim; Mrosek, Florian, 6101 Traisa filed Critical Wrede, Erwin, 6101 Seeheim; Mrosek, Florian, 6101 Traisa
Priority to DE19702056629 priority Critical patent/DE2056629A1/en
Priority to AT1176970A priority patent/AT314155B/en
Priority to CH1629071A priority patent/CH553891A/en
Priority to IT3113171A priority patent/IT941159B/en
Priority to SU1715522A priority patent/SU383328A1/en
Priority to FR7140917A priority patent/FR2115195B1/fr
Priority to BE775419A priority patent/BE775419A/en
Priority to LU64280D priority patent/LU64280A1/xx
Priority to BR768871A priority patent/BR7107688D0/en
Priority to ES397135A priority patent/ES397135A1/en
Priority to NL7115879A priority patent/NL7115879A/xx
Publication of DE2056629A1 publication Critical patent/DE2056629A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0023Building characterised by incorporated canalisations
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/35Extraordinary methods of construction, e.g. lift-slab, jack-block
    • E04B1/3505Extraordinary methods of construction, e.g. lift-slab, jack-block characterised by the in situ moulding of large parts of a structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/22Sliding forms raised continuously or step-by-step and being in contact with the poured concrete during raising and which are not anchored in the hardened concrete; Arrangements of lifting means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Description

Dipt.-ing. Walter JackisdhDipt.-ing. Walter Jackisdh

~i Stuttgart N, Menzelstraße 40 ~ i Stuttgart N, Menzelstrasse 40

Erwin Wrede, Architekt A Jl 895 - whErwin Wrede, architect A Jl 895 - wh

6101 Seeheim, Im Herffsgarten 1 17 m hm«6101 Seeheim, Im Herffsgarten 1 17 m hm «

Florian MrosekFlorian Mrosek

6IOI Traisa, Am Roten Berg 56IOI Traisa, Am Roten Berg 5

Verfahren und Vorrichtung zur Herstellung von mehrgeschossi-Method and device for the production of multi-story

gen Bautengen buildings

Die Erfindung betrifft ein Verfahren sowie eine Vorrichtung zur Herstellung von mehrgeschossigen Bauten, insbesondere von Hochhäusern oder dgl., unter Verwendung des Gleitverfahrens. The invention relates to a method and a device for the production of multi-storey buildings, in particular of high-rise buildings or the like, using the sliding method.

Es ist bereits bekannt, Hochhäuser im Gleitverfahren zu erstellen, wobei dieses Gleitverfahren im wesentlichen darin besteht, daß ganze Wände unter Mitnahme der Schalung hochgezogen werden und gleichzeitig mit dem Hochziehen Türen- und " Fensterelemente eingesetzt werden. Seither mußten für die Fenster und Türen besondere Aussparungen vorgesehen werden, welche erhebliche Schwierigkeiten bereitejc.derartige Aussparungen sind oft ungenau. Die Grude der Öffnungen ist von vornherein begrenzt und der Einbau der Türen und Fenster wird dadurch teuer und zeitraubend und ist überdies nur mit besonderen unwirtschaftlichen Verfahrensgängen durchzuführen·It is already known to build high-rise buildings using the sliding method, this sliding method essentially in that entire walls are pulled up with the formwork and door and window elements are used at the same time as they are pulled up These recesses are often imprecise. The size of the openings is limited from the start and the installation of the doors and windows becomes expensive and time-consuming and, moreover, can only be carried out with particularly uneconomical procedures.

Diese Nachteile können bei dem erfindungsgemäßen Verfahren dadurch vermieden werden, daß der Baukörper in streng vertikal aufragende Stützglieder aufgeteilt ist, die mit untereinander über alle Geschosse durchgehenden, gleichen Zwisohen-These disadvantages can be avoided in the method according to the invention in that the structure is strictly vertical towering support members is divided, which with each other over all floors continuous, identical intermediate

209822/0312209822/0312

BAD ORIGINALBATH ORIGINAL

- 2 - A 31 895 -- 2 - A 31 895 -

räumen ausgebildet werden, deren Breite der Breite der Fenster und der oberhalb und unterhalb der Fenster liegendenspaces are formed, the width of which is the width of the window and that lying above and below the window

Brüstungen entspricht. Bei dem erfindungsgemäßen VerfahrenParapets. In the method according to the invention StützgliederSupport members

werden demnach die einzelnen/in einem fortlaufenden Arbeltsgang auf einmal in ihrer Gesamthöhe im Gleitverfahren bis auf ihre endgültige Höhe hergestellt. Der gegenseitige Abstand der StUtzglleder bestimmt gleichzeitig die für alle Gesohossebenen gleiche Breite der Fensteröffnungen.accordingly, the individual / in a continuous work cycle at once in their total height in the sliding process up to made to their final height. The mutual distance between the leather supports determines the same for everyone Floor planes the same width of the window openings.

In weiterer Ausgestaltung der Erfindung können im gleichen Arbeitsgang bei der Herstellung der Stutzglieder während des Hochziehens der Schalungen Halfenschlenen oder dgl. mit eingebaut werden. Unter Halfenschlenen werden solche, beim Betonleren in die StUtzglleder einzubringende Schienen verstanden, welche aus einseitig offenen, im Querschnitt rechteckförmlgen Hohlprofilen hergestellt sind (Hütte III, 28. Auflage, S. 6o4).In a further embodiment of the invention can in the same operation in the production of the support members during the Pulling up the formwork Halfen Schlenen or the like. Be installed. Under Halfenschlenen there are those at Concrete rails understood to be introduced into the support leather, which are made of hollow profiles open on one side, rectangular in cross-section (Hut III, 28th edition, p. 6o4).

Die Verwendung derartiger Halfenschlenen o.dgl. bietet den Vorteil, daß man an Ihnen die Fenster- und die BrUstungsteile für die Außenfassade leicht und schnell montieren kann. Sie bieten die Möglichkeit, diese Teile als Normteile auszubilden und diese dann von oben oder seitlich einzuführen.The use of such Halfen Schlenen or the like. offers the The advantage is that you can easily and quickly assemble the window and parapet parts for the outer facade can. They offer the option of designing these parts as standard parts and then inserting them from above or from the side.

In weiterer Ausgestaltung der Erfindung 1st vorgesehen, daß in die Stützglieder während des im t}iel£«7örfahren erfolgenden Hochziehens Ringanker eingefügt werden, die als Auflage für einzelne Deckenbalken oder ganze Decken dienen können, mitIn a further embodiment of the invention, it is provided that the support members are moved into the support members during travel Hoisting ring anchors can be inserted, which can serve as a support for individual ceiling beams or entire ceilings

209822/0312 BAD209822/0312 BAD

A 31 895 -A 31 895 -

welchen die einzelnen Stützglieder gegeneinander abgesteift werden können. Vom Grundgedanken der Erfindung ausgehend« 1st es auch ohne weiteres möglich« beim Hochziehen der Gleitschalung für die StUtzglleder eine oder mehrere Decken mit in die Höhe zu nehmen und diese dann auf mehrere»auf die gleiche Höhe hochgezogene Stützglieder aufzulagern.which the individual support members can be stiffened against each other. Starting from the basic idea of the invention " Is it also easily possible «when pulling up the sliding formwork for the support leather to take one or more blankets up and then to several »on the to support raised support members at the same height.

TAn einfache und kraft schlüssige Auflagerungen der Decken oder Deckenbalken zu erzielen, können in weiterer Ausgestaltung der Erfindung in die einzelnen Stutzglieder Halfenschienen oder Lochleisten oder Leisten mit in Abständen voneinander angeordneten Aussparungen während des Hochziehens der StUtzglleder unmittelbar während des Betonlervorgangs eingebaut werden oder es können für die Aufnahme derartiger vertikaler Vorrichtungen von unten nach oben durchgehende Aussparungen im Querschnitt der Sttitzglieder vorgesehen sein, in welche nachträglich derartige Vorrichtungen eingebaut werden können. TAn simple and frictional support of the ceilings or To achieve ceiling beams, can in a further embodiment of the invention in the individual support members Halfen rails or perforated strips or strips with recesses arranged at a distance from one another while the support leather is being pulled up can be installed immediately during the concrete process or it can be used for the inclusion of such vertical Devices are provided from bottom to top through recesses in the cross section of the support members, in which Such devices can be installed subsequently.

Eine weitere wesentliche Vereinfachung beim Herstellungsverfahren ergibt sich, wenn die für die Kanalisation und für die Heizung, außerdem für die elektrische Anlage sowie die Nachrichtenverbindungen erforderlichen Steigleitungen, Rohre und dgl. ebenfalls während des Gleitverfahrens mit in die Sttitzglieder eingebracht werden. Hierb'ei können mit besonderem Vorteil nach einem weiteren Vorschlag der Erfindung NylonfUhrungen an der Gleitschalung angebracht werden, mit welchen der Nachteil von starren Führungen vermieden wird, der darin besteht, daß diese starren Führungen leicht abreißen.Another major simplification in the manufacturing process arises if the for the sewer system and for the heating, also for the electrical system as well as the Communication connections required risers, pipes and the like. Also during the sliding process with in the Support members are introduced. Here, according to a further proposal of the invention, nylon guides can be particularly advantageous be attached to the sliding formwork, with which the disadvantage of rigid guides is avoided, the therein is that these rigid guides tear easily.

209822/0312209822/0312

BADBATH

- 4 - A 51 895 - wh- 4 - A 51 895 - wh

An den erfindungsgemäß hergestellten, einzelnen Stützgliedern können die Außenverkleidungen leioht angebracht werden, wenn nach einem weiteren Vorschlag der Erfindung beim Hochziehen der Stützglieder in diese Befestigungselemente in Form von Halfenwschienen und dgl. eingebracht werden, an welchen die als Normteile ausgebildeten Verkleidungselemente von oben her oder von der Seite her leicht montiert werden können.The outer cladding can be attached to the individual support members produced according to the invention if, according to a further proposal of the invention, when the support members are pulled up in these fastening elements in the form of halves w rails and the like or can be easily mounted from the side.

Ein besonderer Vorteil des erfindungscemäßen Verfahrens besteht darin, daß bei seiner Durchführung keine Gerüste benötigt werden, was besonders bei hohen Bauten sehr erhebliche Einsparungen ermöglicht. Ein weiterer Vorteil gegenüber bekannten Verfahren ist darin zu sehen, daß wesentlich höhere öleitgeschwindigkeiten erreicht werden können, da das Gleitverfahren kontinuierlich durchgeführt werden lcann und nicht mehr für horizontale Einbauten unterbrochen/werden braucht.There is a particular advantage of the method according to the invention in the fact that no scaffolding is required when it is carried out, which is very considerable, especially in tall buildings Savings made possible. Another advantage over known methods is that they are much higher Oil speeds can be achieved because the sliding process can be carried out continuously and no longer needs to be interrupted for horizontal installations.

Das Prinzip der Erfindung beruht auf dem Prinzip des streng vertikal ausgerichteten Arbeitsablaufs. Aus lh« erwachsen die gesamten Funktionen des Baukörpers. Als Ergebnis des erfindungsgemäßen Verfahrens 1st die automatisierte Herstellung von Baukörpern der mannigfaltigsten Qrundrißformen und -arten möglich, wobei das Gleitverfahren elektronisch gesteuert werden kann und die einzelnen Arbeitsgänge automatisch ablaufen. Hierbei 1st es in weiterer Ausgestaltung der Erfindung ohne weiteres denkbar, daß die Bewehrung für die einzelnen Stutzglieder aus vorgefertigten Teilen besteht, die untereinander gleich ausgebildet oder genormt sind und mit fortschreitendem Gleitvorgang aufeinanderinontiert werden. Des weiteren kann in einer besonders vorteil-The principle of the invention is based on the principle of the strictly vertical workflow. Grown out of lh the entire functions of the structure. The result of the method according to the invention is automated production of structures of the most diverse plan shapes and types possible, the sliding process being electronic can be controlled and the individual operations run automatically. Here it is in a further embodiment the invention easily conceivable that the reinforcement for the individual support members consists of prefabricated parts, which are designed or standardized to be the same as one another and are mounted on top of one another as the sliding process progresses will. Furthermore, in a particularly advantageous

- 5 -209822/0312- 5 -209822/0312

BAD ORIGINALBATH ORIGINAL

- 5 - A 51 895 - wh- 5 - A 51 895 - wh

haften Ausgestaltung der Erfindung vorgesehen werden, auf dem Gleitgerüst Punktschweißmaschinen zu montieren und mit diesen in einem Durohlaufverfahren die Bewehrungseisen untereinander zur Bildung eines Stützkörpers zu verschweißen.adhere embodiment of the invention are provided to mount spot welding machines on the sliding frame and with the reinforcing iron in a Durohead process to be welded together to form a support body.

Ein weiteres wesentliches Merkmal ergibt sich dadurch« daß in weiterer Ausgestaltung der Erfindung die für die Heizung erforderlichen Versorgungsleitungen ebenfalls streng vertikal ausgerichtet sind. Hiernach werden die Heizkörper nicht mehr durch horizontale Verbindungsleitungen angeschlossen, sondern direkt an die Jeweiligen Steig- und PaIl^itungen angeschlossen. Sie benötigen demzufolge wesentlich kleinere Querschnitte.Another essential characteristic results from "that In a further embodiment of the invention, the supply lines required for heating are also strictly vertical are aligned. After that, the radiators will not work more connected by horizontal connecting lines, but directly to the respective risers and pipelines connected. You therefore need much smaller cross-sections.

Ein weiterer erheblicher Vorteil, eines in der erfindungsgemäßen Welse hergestellten Bauwerkes besteht darin, daß es infolge seiner vertikalen Ausrichtungen gegenüber Erschütterungen besonders widerstandsfähig 1st, was sich besondere in Erdbebengebieten auswirken kann·Another significant benefit of being one in the present invention Welse manufactured structure consists in the fact that it is due to its vertical orientations against vibrations is particularly resistant, which can have particular effects in earthquake areas

Vorteilhaft kann die zur Durchführung des erfindungsgemäßen Verfahrens dienende Vorrichtung in einer Gleitschalung .bestehen, die nach Art eines Baukastens aus im Vorrat gehaltenen Elementen zusammengesetzt werden kann, wobei die Zahl der Elementtypen klein gehalten und die Vorratshaltung erleichtert werden kann. In weiterer Ausgestaltung der Erfindung kann vorgesehen sein, daß die Elemente der Schalung in Wechselrahmen austauschbar und leicht zueanmeneetzbt»The device used to carry out the method according to the invention can advantageously consist of a sliding formwork, which can be put together in the manner of a construction kit from elements held in stock, with the number the element types can be kept small and stock keeping can be made easier. In a further embodiment of the invention it can be provided that the elements of the formwork in removable frames can be exchanged and easily attached »

209822/0312 "6"209822/0312 " 6 "

8A0 ORIGINAL 8 A0 ORIGINAL

- ο - A 51 895 -- ο - A 51 895 -

und auseinandernehmbar ausgebildet sind.and are designed to be detachable.

Weitere Einzelheiten und zweckmäßige Ausgestaltungen ergeben sich aus den nachstehend beschriebenen und in der Zeichnung dargestellten AusfOhrungsbeispielen.Further details and useful configurations emerge from those described below and in the drawing illustrated examples.

Es zeigernShow it

Fig. 1 einen auf das erfindungsgemäße Herstellungsverfahren zugeschnittenen Grundriß für ein insgesamt 11 Stockwerke umfassendes Wohn- und Geschäftshaus >1 shows a floor plan tailored to the production method according to the invention for a residential and commercial building comprising a total of 11 floors

Fig. 2 einen Teil der Seitenansicht eines anderen Bau-Werkes während der Herstellung und7 teilweiser schematischer Darstellung«2 shows a part of the side view of another building work during the production and 7 a partial schematic representation.

Flg. j5 den Grundriß für ein anderes in dem erfindungsgeaäßen Verfahren herzustellendes Gebäude,Flg. j5 the floor plan for another building to be produced using the method according to the invention,

Fig. 4 verschiedene Querschnittsformen für lotrecht in die Stützglieder gemäß der Erfindung einzubauende Befestigungsschienen«Fig. 4 different cross-sectional shapes for perpendicular in the support members to be installed according to the invention "

Fig. 5 eine schematische Darstellung für die Anordnung von untereinander in den Stützgliedern im Abstand zu haltenden Profilauflagern«5 shows a schematic representation of the arrangement of profile supports to be kept at a distance from one another in the support members.

Fig. 6 eine andere Ausführungsform von derartigen Profilauflagern undFig. 6 shows another embodiment of such profile supports and

209822/0312209822/0312

8AD ORIGINAL8AD ORIGINAL

- 7 - A 31 895 -- 7 - A 31 895 -

Fig. 7 eine Skizze für die Ummantelung von Stützgliedern. Fig. 7 is a sketch for the sheathing of support members.

Der in Fig. 1 dargestellte, auf das erfindungsgemäße Herstellungsverfahren zugeschnittene Grundriß läßt erkennen, daß die Innen- und Außenwände des vorgesehenen Bauwerks in einzelne ' Stützglieder 11 bis Zk aufgeteilt ist, wobei Jedes dieser Stütaglieder eine für sich herstellbare Eirihfeit bildet, welche von dem nicht dargestellten Fundament ausgehend mit gleich bleibendem Querschnitt im Gleitverfahren hochbetoniert werd«n. An den Außenfronten des Gebäudes sind zwischen zwei Stützsliedern Jeweils Zwischenräume vorgesehen, deren Breite ein jfchrfaehes der frontalen Breite a der schmälsten Sttitzglieder ausmacht und infolge dieser Normierung eine Vereinheitlichung der in die Zwischenräume einzusetzenden Fenster und Brüstungsteile erlaubt. Um das Einsetzen dieser Fenster und Brüstungsteile zu erleichtern, sind in den einander zugekehrten schmalen Stirnseiten der Stützglieder Befestigungs- λ schienen 25 beim Betonieren mit einsesetzt und hochgezogen, die vom Fundament bis zur Oberkante der VTände durchlaufen und eine der in Fig. 4 beispielsweise angegebenen Quersohnittsformen haben können. The plan shown in Fig. 1, tailored to the manufacturing process according to the invention, shows that the inner and outer walls of the intended structure is divided into individual 'support members 11 to Zk, each of these support members forming an Eirihfeit which can be produced by itself The foundation shown, starting with a constant cross-section, is poured into concrete using the sliding method. On the outer fronts of the building, there are spaces between two support members, the width of which is equal to the frontal width a of the narrowest support members and, as a result of this standardization, allows the windows and parapet parts to be used in the spaces to be standardized. In order to facilitate the insertion of the window and sill parts, are in the mutually facing narrow end faces of the support members mounting λ rails 25 during concreting with einsesetzt and pulled up, the run through and from the foundation up to the upper edge of the VTände one of Quersohnittsformen example shown in Fig. 4 can have.

Das erfindungsgemäße Verfahren eielt bevorzugt darauf ab, das Hochziehen der einzelnen Stützglieder Jeweils einzeln durchführen zu können und einen solchen für ein einzelnes Stützglied vorgesehenen Arbeitsgang nicht, wie seither üblich, zum Einziehen von Decken unterbrechen zu müssen. Deshalb ist vorgesehen, die Stützglieder an Ihrer Innenseite durch gleichzeitiges Einziehen von Ringankern, wie sie an den Stützgliedern 20, 21 und 22 sowie 15, 16 und 17 bei 27 angedeutet sindThe inventive method is preferably aimed at the To be able to pull up the individual support members individually and one for a single support member not having to interrupt the planned operation to pull in ceilings, as has been customary since then. Therefore provided the support members on your inside by simultaneous Drawing in of ring anchors, as indicated at 27 on the support members 20, 21 and 22 as well as 15, 16 and 17

209822/0312 - 8 -209822/0312 - 8 -

- δ - Λ }1 ο95 - wh- δ - Λ } 1 ο95 - wh

und als Auflager für Deckenbalken 28 dienen, auszusteifen. Bei dem im Gleitverfahren durchgeführten Hochbetonieren der Stützglieder kännen&ußerdem eine oder mehrere Decken mit in die Höhe genommen werden und auf die Stützgliedor aufgelagert werden.and serve as a support for ceiling beams 28 to stiffen. When pouring concrete using the sliding method of the support members can & also one or more ceilings be taken up and onto the support member be deposited.

Beim dargestellten Ausführungsbeispiel ist außerdem vorgesehen, daß mehrere auf hohe Biegebeanspruchung ausgelegte Deckenbalken 3.1 ver *egt werden. Um einfache und kraftflüssige Auflagerungen für diese Deckenbalken bzw. eine nicht dargestellte Decke zu erzielen, sind in die einzelnen Stützglieder, beim dargestellten Ausführungsbeispiel in die Stützglieder 11, 14, 19, 20 und 2),durchgehende vertikale Befestigungsschienen 32 eingebaut. Diese können als Halfenschienen, Lochleisten oder als Hohlleisten mit Aussparungen beliebiger Art ausgebildet sein. Sie können außerdem klappbare Auflagerungen tragen und während des Gleit-Prozesses mit in die Stützglieder eingebracht oder nachträglich in dort vorgesehene,vertikal durchlaufende Aussparungen eingebaut werden. Bei den in Fig. 2 dargestellten Ausführungsbeispiel ist vorgesehen, daß zwischen die Stützglieder 40, 41, 42 und 43 jeweils Brüstungsteile 44 eingesetzt werden. Diese können infolge der von unten nach oben übereinstimmenden Querschnitte der Stützglieder 40 bis 43 mit untereinander übereinstimmenden Abmessungen ausgeführt werden, wobei sich eine besonders einfache Befestigung dadurch ergibt, daß sie von oben her in Verstärkungs- oder Befestigungsschienen der in Fig. 1 \ßi 2f> angedeuteten Art eingesetzt werden können. In gleicher Weise können bei 45 angedeutete Fenster eingebracht und befestigt werden.In the illustrated embodiment, it is also provided that several ceiling beams 3.1 designed for high bending loads are twisted. In order to achieve simple and powerful supports for these ceiling beams or a ceiling (not shown), continuous vertical fastening rails 32 are built into the individual support members, in the illustrated embodiment in the support members 11, 14, 19, 20 and 2). These can be designed as Halfen rails, perforated strips or as hollow strips with recesses of any type. They can also carry hinged supports and can be incorporated into the support members during the sliding process or subsequently installed in vertically continuous recesses provided there. In the embodiment shown in Fig. 2 it is provided that between the support members 40, 41, 42 and 43 parapet parts 44 are used. As a result of the cross-sections of the support members 40 to 43 matching from bottom to top, these can be designed with mutually matching dimensions, whereby a particularly simple fastening results from the fact that they are inserted from above in reinforcing or fastening rails of the in Fig. 1 \ ßi 2f> indicated type can be used. In the same way, windows indicated at 45 can be introduced and fastened.

209822/0312 ' 9 "209822/0312 ' 9 "

BAD ORIGINALBATH ORIGINAL

- 9 - A 31 895 - wh- 9 - A 31 895 - wh

Der in Pig. 2 dargestellte Querschnitt des Stützgliedes 41 enthält nur eine einzige Aussparung 46 für die Aufnahme einer nicht dargestellten Tragschiene, welche als Auflager für einen der Deckenbalken 47 dient. Im Stützglied 42 hingegen ist noch eine zweite Aussparung 48 vorgesehen, die dazu bestimmt ist, Kanalisationsrohre und Versorgungsleitungen für Elektrizität, Wasser, Telefon und dgl. aufzunehmen.The one in Pig. 2 shown cross section of the support member 41 contains only a single recess 46 for receiving a Support rail, not shown, which serves as a support for one of the ceiling beams 47. In the support member 42, however a second recess 48 is provided, which is intended for sewer pipes and supply lines for To record electricity, water, telephone and the like.

Beim Ausführungsbeispiel nach Pig· 3 ist anhand des Deck-StÜtzgliedes/vorgezeigt, daß beim Hochziehen derartiger Stützglieder die notwendigen Bewehrungsstäbe 51 ebenfalls vertikal durchgehend eingebracht werden können. Da diese nur in begrenzten Stablängen vorrätig gehalten werden, ist es vorteilhaft,wenn auf der Arbeitsbühne beim Hochgleiten eine Schweißmaschine mitgenommen wird, die es erlaubt, die Bewehrungsstäbe zu einem Stützkörper untereinander zu verschweißen um eine von unten nach oben durchlaufende Bewehrung herzustellen. An dem zweiten Eek-Stützglied 52 ist dargestellt, daß abweichend von der bei 25 angedeuteten Ausbildung von Befestigungsschienen für die Fenster- und BrU-stu ngsteile auch Aussparungen 53 an der Innenkante der Stützglieder vorgesehen werden können, in welche nach dem Hochziehen der Stutzglieder die noch fehlenden Fassadenteile eingesetzt werden können.In the embodiment according to Pig 3 it is shown on the basis of the deck support member /, that when pulling up such support members the necessary reinforcing bars 51 also can be inserted vertically continuously. Since these are only kept in stock in limited rod lengths it is advantageous when gliding up on the work platform a welding machine is taken along, which allows the reinforcing bars to be welded together to form a support body to create reinforcement running from bottom to top. On the second Eek support member 52 is shown that different from the training indicated at 25 of fastening rails for the window and BrU-stu ngsteile also recesses 53 on the inner edge of the Support members can be provided, in which the missing facade parts after pulling up the support members can be used.

Die in Flg. 5 wiedergegebene Skizze zeigt eine weitere erfindungsgemäße Möglichkeit, als Auflager für die Decken dienende Profile 55 In ein bei 56 mit unterbrochenen Linien angedeutetes Profilglied mit einzubetonieren. Hierbei kann es besonders vorteilhaft sein,zwischen den einzelnen, waagerecht verlaufenden Profilschienen 55 Abstan&alter 58 vorzusehen, welche die richtige Höhenlage der Prof Uschi enei sichern.The in Flg. 5 reproduced sketch shows a further inventive Possibility of using profiles 55 in one at 56 with broken lines to support the ceilings indicated profile member to be concreted in. It can be particularly advantageous here between the individual, horizontally running profile rails 55 spacing & age 58 to be provided, which ensure the correct altitude of the Prof Uschi enei.

209822/0312 - 10 -209822/0312 - 10 -

ßADßAD

- 10 - A 31 895 - wh- 10 - A 31 895 - wh

Diese Profilsohienen können abweichend von der in Pig. 5 dargestellten rechteckigen Cuerschnittsform auch halbschalenartige Querschnitte wie bei 57 in Fig. 6 angedeutet,haben oder ringförmige Querschnitte wie bei den Profilschienen 59 haben.These profile rails can differ from the one in Pig. 5 shown rectangular cross-sectional shape also have half-shell-like cross-sections as indicated at 57 in FIG. 6, or are ring-shaped Have cross-sections as with the profile rails 59.

Das erfindungsgemäße Herstellungsverfahren bietet weiterhin die Möglichkeit die Stützglieder in einfacher V/eise mit einer Fassadenverkleidung aus einer von unten bis oben durchgehenden Kunststoffschicht zu versehen. Hierzu kann in der aus Fig. 7 erkennbaren Weise in den zur späteren Aufnahme der Fenster- und Brüstungsteile vorgesehenen Befestigungsschienen 6l der bei 60 wiedergegebenen Stützglieder eine Beschichtungsvorrichtung 62 geführt werden, die beheizbar ist und auf den Außenflächen der Stützglieder eine Fassadenschicht 63 aus thermoplastischem Kunststoff aufbringt, wobei es möglich 1st, zwischen dem Betonwerkstoff der Stützglieder 60 und der Kunststoffschicht 63 eine Zwischenlage aus wärmedämmenden Kunststoffschaum 64 anzubringen.The manufacturing method according to the invention also offers the possibility of providing the support members in a simple V / eise with a facade cladding made of a plastic layer that is continuous from bottom to top. For this purpose, a coating device 62 , which can be heated and applies a facade layer 63 made of thermoplastic synthetic material to the outer surfaces of the support members, can be guided in the manner shown in FIG It is possible to attach an intermediate layer of heat-insulating plastic foam 64 between the concrete material of the support members 60 and the plastic layer 63.

Zweckmäßig dient als Vorrichtung zur Durchführung des erfindungsgemäßen Herstellungsverfahrens eine Gleitschalung, an welcher Nylonführungen vorgesehen sind. Infolge der aus Flg. 1 erkennbaren Normierung nicht nur der Zwischenräume, sondern auch eines Großteils der zu den Außenwänden gehörenden Stützglieder auf eine Fassadenbreite a ist es ohne weiteres möglich, für die Gleitschalung baukastenartig zzsammensetzbare Elemente vorzusehen, welche nur wenige,untereinander verschiedene Typgrößen haben und daher leicht auf Lager gehalten werden können. Des weiteren ist es möglich, für diese ElementeAppropriately serves as a device for carrying out the invention Manufacturing process a sliding formwork on which nylon guides are provided. As a result of the Flg. 1 recognizable normalization not only of the gaps, but also of a large part of those belonging to the outer walls It is easily possible to assemble support members on a facade width a for the sliding formwork in a modular manner Provide elements that have only a few different type sizes and are therefore easily kept in stock can. It is also possible for these elements

209822/0312209822/0312

BAD ORIGINALBATH ORIGINAL

- 13 - A 31 895 -wh- 13 - A 31 895 -wh

Wechselrahmen vorzusehen und die Elemente und ihre Wechselrahmen so auszubilden, -laß ale leicht zusammengesetzt und auseinandergenommen werden können. Der besondere Vorteil des erfindungSti;ei.i'ij3eii Verfahrens und der zu seiner Durchführung dienenden Vorrichtung besteht darin, daß die Bauzeit erheblich verringert und die Baukosten stark gesenkt werden können, zumal die durch menschliche Arbeitskraft auszuführenden Arbeitsgänge erheblich reduziert sind und weitgehend durch mechanisch-automatisch ablaufende Arbeitsgänge ersetzt werden können, wobei sich die Möglichkeit bietet, durch elektrooptische Einrichtungen die notwendige Überwachung durchzuführen. Provide removable frames and the elements and their removable frames so to train - let ale be easily composed and can be taken apart. The special advantage of the fictionSti; ei.i'ij3eii method and the one for its implementation serving device is that the construction time can be significantly reduced and the construction costs can be greatly reduced, especially since the operations to be carried out by human labor are considerably reduced and largely by Mechanically-automatically running operations can be replaced, with the option of using electro-optical Facilities to carry out the necessary monitoring.

209822/0312209822/0312

Claims (13)

Erwin Wrede, Architekt A 31 89L· - wh Erwin Wrede, architect A 31 89L · - wh Seehejm, Im Herffsgarten 1Seehejm, Im Herffsgarten 1 Horian Mror.ek Horian Mror.ek Traisa, Am Roten Berg 5Traisa, Am Roten Berg 5 A η s ρ r_ ü ü hu A η s ρ r_ ü ü hu !Verfahren zur Herstellung von mehrgeschossigen !Betonbauten, insbesondere von Hochhäusern uiui dgl., unter Verwendung d«K GleitVerfahrens, dadurch gekennzeichnet, daß der Baukörper in streng vertikal aufragende Stütz/Glieder aufgeteilt ist, die mit untereinander über alle Geschosse durchgehenden gleichen Zwischenräumen ausgebildet werden, deren Breite der Breite der Fenster, TUren und anderer Ausnehmungen und der oberhalb und unterhalb der Fenster, Türen usw. liegenden Brüstungen entspricht, in die in einem Durchgang auf einmal auf ihre endgültige Höhe gebracht werden.Process for the production of multi-storey concrete structures, in particular high-rise buildings and the like, using the sliding process, characterized in that the structure is divided into strictly vertical supports / members which are formed with the same interstices extending across all storeys whose width corresponds to the width of the windows, doors and other recesses and the parapets above and below the windows, doors, etc., which are brought to their final height in one pass. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß in die Stützglieder (11 bis 24) senkrechte Schienen (25,?7>52) mit einbetoniert werden, welche Vorrichtungen zum Befestigen von vorzugsweise als Normteile ausgebildeten Fonstern und Brüstungsteilen (44, 45) oder von Deckenbalken (?8, 51, 47) oder Geschossdecken (49) enthalten. 2. The method according to claim 1, characterized in that in the support members (11 to 24) vertical rails (25,? 7> 52) are concreted in, which devices for attaching windows and parapet parts (44, 45) preferably designed as standard parts or from ceiling beams (? 8, 51, 47) or floor slabs (49). 3. Verfahren nach Anspruch 2, dadurch gekennzeichnet, daß beim Herstellen der Stützglieder gleichzeitig Ringanker (27) eingebaut werden, die als Auflager für Decken oder Deckenbalken (27) vorgesehen sind· 3. The method according to claim 2, characterized in that when the support members are produced, ring anchors (27) are installed at the same time, which are provided as supports for ceilings or ceiling beams (27) - 2 -209822/0312- 2 -209822/0312 SAO OPJGiNALSAO OPJGiNAL A 31 Β95 - whA 31 Β95 - wh 4. Verfahren nach einem dei* Ansprüche 1 bis 5, dadurch ge-Kwnnzeichnec, daß in den Stützgliedern von unten nach OLHiii durchlaufende Aussparungen (jS2) angebracht werden, insbeson.iöru an der lileitschalung ausgespart sind.4. The method according to any one of the claims 1 to 5, characterized in that recesses (jS2) running through recesses (jS2) are attached in the support members from below to OLHiii, in particular recesses on the lileit formwork. 5. Verfahren nach einem der Ansprüche 1 bis 4, dadurch ge- " kennzüiclinet, daß beim Hochziehen der Gleitschalung für die iitübzglieder eine oder mehrere Decken mit in die Höhe geuoriüaen werden.5. The method according to any one of claims 1 to 4, characterized in that " kennzüiclinet that when pulling up the sliding formwork for add one or more blankets to the Height geuoriüaen be. 6. Verfahren nach einem der Ansprüche 1 bis 5» dadurch gekennzeiclinofc, daß in den ütützgliedern vertikale Befestigung schienen, insbesondere Halfenschienen, Lochleisten oder Hohlleisten oder Bewehrungen eingebaut bzw. mit hochgezogen werden. 6. The method according to any one of claims 1 to 5 »characterized gekennzeiclinofc, that appeared in the support members vertical attachment, in particular Halfen rails, perforated strips or hollow strips or reinforcements are installed or pulled up with. 7. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß in Ausnehmungen der Stützen Heiz- und g FaIleitungen für Wasser, Heizung» Abwasser usw. eingezogen werden.7. The method according to any one of the preceding claims, characterized in that heating and g in recesses of the supports Pipelines for water, heating, sewage, etc. pulled in will. 8. Verfahren nach einem der vorhergehenden nsprüche, dadurch gekennzeichnet, daß zu jedem Raum mehrere Heiz- und/oder FaIleitungen geführt werden und die Heizkörper eines Raumes unter weitgehender Vermeidung einer eine Vielzahl von Heizkörpern versorgenden Verteilerleitung direkt an die Pleiz- bzw. Falle!tungen angeschlossen werden.8. The method according to any one of the preceding claims, characterized in that for each room several heating and / or FaI lines are led and the radiators of a room while largely avoiding a distribution line supplying a large number of radiators directly to the Picks and traps are connected. 209822/0312 bad CRiGlNAL209822/0312 bad CRiGlNAL - 3 - A J)I ό9ί> - wh - 3 - A J) I ό9ί> - wh 9. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß auf dem Gleitgerüst Verarbeitungstiuuschinen, wie Punktschweißii.aschinen, angeordnet sind, und daß im Durchlaufverfahren beispielsweise Bewehrungseisen oder andere Verbindungselemente miteinander verschweißt werden.9. The method according to any one of the preceding claims, characterized in that processing parts on the sliding frame, how spot welding machines are arranged, and that in the continuous process, for example, reinforcing iron or other connecting elements are welded together will. 10. Vorrichtung zur Durchführung des Verfahrens nach den Ansprüchen 1 bis 9, dadurch ^kennzeichnet, jau Ji0 Vorrichtung aus einer Gleitschalung besteht.10. Device for performing the method according to claims 1 to 9, characterized ^ indicates, j a u Ji 0 device consists of a sliding formwork. 11. Vorrichtung nach Ansprtlch 10, dadurch gekennzeichnet, daß die Gleitschalungen aus wenigen Elementen unterschiedlicher Form baukastenartig zusammensetzbar sind.11. Device according to claim 10, characterized in that the sliding formwork can be assembled in a modular manner from a few elements of different shapes. 12. Vorrichtung nach Anspruch 10 oder 11, dadurch gekennzeichnet, daß für die Schalungselemente Wechselrahmen vorgesehen sind.12. Apparatus according to claim 10 or 11, characterized in that that removable frames are provided for the formwork elements. 13. Vorrichtung nach einem der Ansprüche 10 bis 12, dadurch gekennzeichnet, daß an der Gleitschalung Nylonführungen angebracht sind.13. Device according to one of claims 10 to 12, characterized characterized in that nylon guides are attached to the sliding formwork are. 209822/0312209822/0312 BAD ORIGINALBATH ORIGINAL LeerseiteBlank page
DE19702056629 1970-11-18 1970-11-18 Method and device for the production of multi-storey buildings Pending DE2056629A1 (en)

Priority Applications (11)

Application Number Priority Date Filing Date Title
DE19702056629 DE2056629A1 (en) 1970-11-18 1970-11-18 Method and device for the production of multi-storey buildings
AT1176970A AT314155B (en) 1970-11-18 1970-12-31 Process for the production of multi-storey concrete structures
CH1629071A CH553891A (en) 1970-11-18 1971-11-09 PROCESS AND SLIDING FORMWORK FOR THE CONSTRUCTION OF MULTI-STORY BUILDINGS.
IT3113171A IT941159B (en) 1970-11-18 1971-11-16 METHOD AND DEVICE FOR THE CONSTRUCTION OF MULTI-STOREY BUILDINGS
SU1715522A SU383328A1 (en) 1971-11-16 METHOD OF CONSTRUCTION OF MULTILEVEL BUILDINGS
FR7140917A FR2115195B1 (en) 1970-11-18 1971-11-16
BE775419A BE775419A (en) 1970-11-18 1971-11-17 METHOD AND DEVICE FOR THE CONSTRUCTION OF MULTI-STOREY BUILDINGS
LU64280D LU64280A1 (en) 1970-11-18 1971-11-17
BR768871A BR7107688D0 (en) 1970-11-18 1971-11-18 NEW ELECTRONIC ENTERTAINMENT
ES397135A ES397135A1 (en) 1970-11-18 1971-11-18 Procedure for the construction of concrete buildings of various floors. (Machine-translation by Google Translate, not legally binding)
NL7115879A NL7115879A (en) 1970-11-18 1971-11-18

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19702056629 DE2056629A1 (en) 1970-11-18 1970-11-18 Method and device for the production of multi-storey buildings

Publications (1)

Publication Number Publication Date
DE2056629A1 true DE2056629A1 (en) 1972-05-25

Family

ID=5788411

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19702056629 Pending DE2056629A1 (en) 1970-11-18 1970-11-18 Method and device for the production of multi-storey buildings

Country Status (10)

Country Link
AT (1) AT314155B (en)
BE (1) BE775419A (en)
BR (1) BR7107688D0 (en)
CH (1) CH553891A (en)
DE (1) DE2056629A1 (en)
ES (1) ES397135A1 (en)
FR (1) FR2115195B1 (en)
IT (1) IT941159B (en)
LU (1) LU64280A1 (en)
NL (1) NL7115879A (en)

Also Published As

Publication number Publication date
AT314155B (en) 1974-03-25
FR2115195B1 (en) 1974-07-19
SU383328A3 (en) 1973-05-25
CH553891A (en) 1974-09-13
LU64280A1 (en) 1972-06-02
IT941159B (en) 1973-03-01
BE775419A (en) 1972-03-16
NL7115879A (en) 1972-05-23
ES397135A1 (en) 1974-05-01
BR7107688D0 (en) 1973-03-29
FR2115195A1 (en) 1972-07-07

Similar Documents

Publication Publication Date Title
DE1941281C3 (en) Building
DE2229264C2 (en) Process for the factory production of the storeys of a building and apparatus for carrying out the process
DE3016963A1 (en) INSERT BLOCK FOR BUILDING WALLS AND METHOD FOR CONSTRUCTING BUILDINGS USING SUCH BLOCKS
EP0658660B1 (en) Heat insulation structural member
DE60023159T2 (en) HOLLOW PLATE FOR PRODUCING A FLOOR FIELD INTO WHICH CABLES CAN BE BUILT AND METHOD FOR PRODUCING A FLOOR FIELD WITH CABLES
DE2102380C3 (en) Multi-storey building with a supporting structure and prefabricated space boxes
DE2706888A1 (en) MOLD FOR THE MANUFACTURE OF CONCRETE CEILINGS AND ROOFING
DE2100074C3 (en) Mantelfullstoffwand or the like
DE102005029648A1 (en) Balcony frame and method for manufacturing a precast balcony
DE4121253C2 (en) Process and prefabricated module for the production of structures and buildings
DE2056629A1 (en) Method and device for the production of multi-storey buildings
DE2532964C2 (en) Method for producing and manipulating a large-format prefabricated wall component
EP0106297A2 (en) Structural element for manufacturing concrete walls, and building wall produced with the same
DE2657310B2 (en) Method for installing horizontal tendons in a concrete structure made with sliding formwork and an annular wall as well as sliding formwork for carrying out the process
DE1759316A1 (en) Process for the construction of a multi-storey building and device for carrying out the process
DE2422586A1 (en) Underground or sunken wall prefabricated concrete component - comprises integral panel and ribs at equal intervals
DE2322920A1 (en) PRE-FABRICATED COMPONENT FOR THE MANUFACTURE OF BUILDINGS
DE2121503A1 (en) Enclosed building unit
DE2636168A1 (en) Frame integrated prefabricated component assembly building - has lost template frame for wall, ceiling and concrete type mass insertion
DE803949C (en) Formwork for wall recesses, especially windows
DE2514043C3 (en) Method for connecting and aligning room formwork and device for carrying out the method
CH645427A5 (en) Double garage
AT3742U1 (en) FINISHED COMPONENT SYSTEM FOR BUILDING CONSTRUCTIONS
DE2112335C3 (en) Prefabricated, transportable room element for the erection of structures
DE3531732A1 (en) Process for fitting a prefabricated add-on element, in particular an oriel, on an outer wall of a building, and add-on element therefor