DE2035166C3 - Construction for the force-fit connection of a hollow concrete column with a concrete element located under the hollow concrete column - Google Patents
Construction for the force-fit connection of a hollow concrete column with a concrete element located under the hollow concrete columnInfo
- Publication number
- DE2035166C3 DE2035166C3 DE19702035166 DE2035166A DE2035166C3 DE 2035166 C3 DE2035166 C3 DE 2035166C3 DE 19702035166 DE19702035166 DE 19702035166 DE 2035166 A DE2035166 A DE 2035166A DE 2035166 C3 DE2035166 C3 DE 2035166C3
- Authority
- DE
- Germany
- Prior art keywords
- concrete
- hollow
- column
- hollow concrete
- concrete column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/16—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
- E04B1/161—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material with vertical and horizontal slabs, both being partially cast in situ
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Description
Die Erfindung betrifft eine Konstruktion zum kraftschlüssigen Verbinden einer nach ihrem Versetzen mit Ortbeton zu verfallenden Betonhohlstütze mit einem weiteren, unter der Betonhohlstütze befindlichen Betonelement, z. B. einer Betondecke, mit einer Betonausgleichsschicht zwischen Stützenfuß und Betonelement. Bei bekannten Konstruktionen der beschriebenen Art (vgl. französische Patentschrift 687 286) wird zum Ableiten der Auflasten im allgemeinen lediglich der bewehrte Betonkern wirksam, da wegen der Unebenheiten am Hohstützenfuß und/oder an der Oberfläche des Betonelements beim trockenen Aufsetzen der Hohlstütze auf das fertige Betonelement die einen Kraftschluß zwischen diesen Teilen zulassenden Kontaktflächen wechselnde Größen haben und deshalb auch rechnerisch unberücksichtigt bleiben. Zum Ausgleich der Unebenheiten wird deshalb vor dem Aufsetzen der Betonhohlstütze ein Mörtelbett angeordnet, auf das die Betonhohlstütze aufgesetzt wird. Diese Anordnung eines Mörtelbettes ist umständlich.The invention relates to a construction for frictional connection of one after it has been moved with in-situ concrete to dilapidate hollow concrete column with another one located under the hollow concrete column Concrete element, e.g. B. a concrete ceiling, with a concrete leveling layer between the column base and concrete element. In known constructions of the type described (see French patent specification 687 286) generally only the reinforced concrete core is effective for transferring the surcharges, because of the bumps on the Hohstützenfuß and / or on the surface of the concrete element dry placement of the hollow support on the finished concrete element which creates a frictional connection between them Contact surfaces that allow parts have changing sizes and are therefore also not taken into account mathematically remain. To compensate for the unevenness, the hollow concrete column is therefore put on a mortar bed is arranged on which the hollow concrete column is placed. This arrangement of a mortar bed is awkward.
Ausgehend von diesem Stand der Technik liegt der Erfindung die Aufgabe zugrunde, eine Konstruktion der eingangs beschriebenen Art aufzufinden, die eine kraftschlüssige übertragung der Stützkräfte möglichst über den gesamten Querschnitt der Betonhohlstütze zuläßt.Based on this prior art, the invention is based on the object of a construction of the type described at the outset to find a non-positive transmission of the supporting forces as possible over the entire cross-section of the hollow concrete column.
Die Lösung dieser Aufgabe besteht erfindungsgemäß darin, daß die Wände der Betonhohlstütze auf der Hohlraumseite zum Aufsetzende hin sich konisch verjüngen. Beim Verfüllen des Stützenhohlraums fließt der Füllbeton zwangläufig im gleichen Arbeitsgang auch in diese Hohlraumerweiterung und bildet dort zwischen den Wänden der Betonhoh!- itütze und der Oberfläche des Betonelementes bzw. Betonbauteiles, auf das die Betonhohlstütze aufgesetzt ist, eine Auflasten ableitende Kontaktschicht. Besondere Maßnahmen, wie das Anordnen eines Mörtelbettes, erübrigen sich.The solution to this problem is that the walls of the hollow concrete column on the cavity side taper conically towards the bottom end. When filling the column cavity the filler concrete inevitably flows into this cavity expansion and in the same operation forms there between the walls the concrete high! - itütze and the surface of the concrete element or concrete component on which the hollow concrete column is placed is a load-dissipating contact layer. Special measures, such as arranging a Mortar bed, are unnecessary.
Nach einem weiteren Vorschlag der Erfindung soll bei einer Konstruktion der eingangs beschriebenen Gattung die Anordnung so getroffen werden, daß das Auisatzende der Betonhohlstütze Aufstellfüßchen aufweist. Auch mit dieser Ausführungsform wird erreicht, daß die Wandung der Betonhohlstütze voll in den tragenden Verband der Stützkonstruktion einbezogen wird, weil beim Verfüllen der Füllbeton. die zwischen den AufstellfüCchen gebildeten Hohlräume aurfüllt.According to a further proposal of the invention, the structure described at the outset should be used in a construction Type the arrangement can be made so that the outer end of the hollow concrete support Aufstellfüßchen having. With this embodiment it is achieved that the wall of the hollow concrete support fully in the load-bearing association of the supporting structure is included because the filling concrete is used when filling. the between the AufstellfüCchen formed cavities aurfills.
Gegenstand der Erfindung ist auch ein Verfahren der beschriebenen Verbindungskonstruktionen. Dieses Verfahren ist erfindungsgemäß dadurch gekennzeichnet, daß nach dem Versetzen der Betcnhohlstütze der Füllbeton zunächst nur in dem unterstenThe invention also relates to a method of the connection constructions described. This The method according to the invention is characterized in that after the relocation of the hollow bed support the filler concrete initially only in the lowest
ίο Bereich der Betonhohlstütze eingebracht wird, während das vollständige Verfüllen in einem späteren Zeitraum erfolgt. Sofern das Verfüllen in zwei Arbeitsgängen vorgenommen wird, nämlich in einem ersten Arbeitsgang nur im Bereich des Aufsetzendesίο Area of the hollow concrete column is introduced while the complete backfilling takes place in a later period. If the backfilling in two work steps is carried out, namely in a first step only in the area of the touchdown end
as der Betonhohlstütze und in einem zweiten Arbeitsgang im Bereich des Stützenhohl raum.., gegebenenfalls zusammen mit einer auf der Stütze aufzulagernden Betondecke od. dgl., ergibt sich der weitere Vorteil, daß die Betonhohlstütze an ihrer Aufsetzstelle ohne besondere sonst gebräuchliche Maßnahmen für die Vorbereitung weiterer Arbeitsgänge, wie Herstellung der nächsten Deckenschalung usw., fixiert ist.as the hollow concrete column and in a second work step in the area of the support cavity .., possibly together with one to be superimposed on the support Concrete ceiling or the like, there is the further advantage that the hollow concrete support at its placement point without special, otherwise customary measures for the preparation of further operations, such as production the next slab formwork, etc., is fixed.
Im folgenden wird die Erfindung an Hand einer lediglich Ausführungsbeispiele darstellenden Zeichnung näher erläutert. Es zeigtIn the following, the invention is illustrated by means of a drawing which merely shows exemplary embodiments explained in more detail. It shows
F i g. 1 einen Schnitt durch eine erfindungsgemäße Konstruktion,F i g. 1 shows a section through a construction according to the invention,
F i g. 2 eine andere Ausführungr'-orm des Gegenstands nach F i g. 1 in einem Schnitt undF i g. 2 another embodiment of the object according to FIG. 1 in one cut and
F i g. 3 den Gegenstand nach F 1 g. 2 ohne Schalkörper. F i g. 3 the item according to F 1 g. 2 without shell body.
In den Figuren ist ausschnittsweise eine Verbindungskonstruktion zwischen Betonhohlstützen 2, 5 und einer Betondecke 1 dargestellt. Die Betondecke ίIn the figures, a connection structure between hollow concrete supports 2, 5 is shown in detail and a concrete ceiling 1 is shown. The concrete ceiling ί
ruht auf einer Betonhohlstütze 2, welche einen Kern aus Ortbeton 3 besitzt. Auf der Oberseite 4 der Betondecke 1 ist eine weitere Betonhohlstütze 5 aufgestellt. Die der Oberseite 4 der Betondecke 1 zugewandte Stirnseite der Betonhohlsiütze S besitzt einen Iniienkonus, d. h., die Wände der Betonhohlstütze 5 verjüngen sich konisch zum Aufsetzende 7 hin. Wird nach dem Aufstellen der Betonhohlstütze 5 Ortbeton in die Betonhohlstütze 5 gegössen, so entsteht im Bereich des Aufsetzendes 7 der Betonhohlstütze 5 ein konisch ausgebildeter Stützenfuß 8, auf den sich die Wände der Betonhohlstütze 5 abstützen können. Imrests on a hollow concrete column 2, which has a core made of in-situ concrete 3. On the top 4 of the concrete ceiling 1 another hollow concrete column 5 is set up. The one facing the top 4 of the concrete ceiling 1 The end face of the hollow concrete support S has an iniien cone, d. i.e. the walls of the hollow concrete column 5 taper conically towards the contact end 7. Is cast in situ after setting up the hollow concrete column 5 When poured into the hollow concrete support 5, a hollow concrete support 5 is formed in the area of the contact end 7 conical column base 8 on which the walls of the hollow concrete column 5 can be supported. in the
• übrigen ist die Betonhohlsttitze S mit weiterem Ortbeton zur Bildung des Kernes 9 gefüllt.• The rest of the concrete hollow seats S is filled with more in-situ concrete to form the core 9.
Bei der in den Fig. 1 UMd 3 dargestellte«In the case of the "shown in Fig. 1 UMd 3"
Konstruktion sind im Bereich des Aufsetzendes 1 der Bet-inhohlstütze S Aufstellfüßchen Ü Vorgesehen. Bei einer Betonhohlstütze S mit quadratischem Querschnitt sind die Aüsstellfüßchen 11 an den vier Ecken der BetonhohlstUtze S angeordnet, Oie AufstellfÜß-Construction are provided in the area of the contact end 1 of the bed in hollow support S support feet Ü. In the case of a hollow concrete support S with a square cross-section, the adjustable feet 11 are arranged at the four corners of the hollow concrete support S , Oie AufstellfÜß-
6$ chen 11 schließen mit der Außenkofitur der Betonhohlstütze 5 ab, sie bestehen aus Stahl und besitzen beispielsweise eine Grundfläche von 1 x 1 cm sowie eine Höhe von 2 cm.6 $ surface 11 close with the outer fitting of the hollow concrete column 5, they are made of steel and have, for example, a base area of 1 x 1 cm as well a height of 2 cm.
Wird die Betonhohlstütze der in den F1 g. 2 und 3 dargestellten Konstruktion auf die Betondecke I aufgesetzt, so entsteht zwischen der Stirnseite iO der Hohlstiitze und der Oberseite 4 der Betondecke 1 ein Hohlraum IS, der sich zwischen den Aufstdifüßchen 11 erstreckt. Vor dem Füllen der Betonhohlstütze 5 mit Ortbeton wird im Bereich der Aufstellfüßchen 11 ein mehrfeiliger Rahmen 12 (vgl. Fig.2) gesetzt der verhindert, daß der Füllbeton zwischen den AufsIeII-frßchen Il wgflieiU. Auch bei dieser Konstruktion wird zunächst FüiSbeton in den Hohlraum 15 im Bereich des Aufsetzendes 7 eingebracht, wahrend das vollständige Verfüllen zu einem späteren Zeitpunkt erfolgt.If the hollow concrete column of the F1 g. 2 and 3 The construction shown is placed on the concrete ceiling I, the result is OK between the end face Hohlstiitze and the top 4 of the concrete ceiling 1 a cavity IS, which is between the Aufstdifüßchen 11 extends. Before filling the hollow concrete column 5 with in-situ concrete, a multi-part frame 12 (see FIG. 2) is set in the area of the feet 11 prevents the filling concrete from flowing between the pods. Even with this construction FüiSbeton is first introduced into the cavity 15 in the area of the attachment end 7, while the complete backfilling takes place at a later point in time.
Hieizu 1 Blatt Zeichnungen1 sheet of drawings
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19702035166 DE2035166C3 (en) | 1970-07-15 | 1970-07-15 | Construction for the force-fit connection of a hollow concrete column with a concrete element located under the hollow concrete column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19702035166 DE2035166C3 (en) | 1970-07-15 | 1970-07-15 | Construction for the force-fit connection of a hollow concrete column with a concrete element located under the hollow concrete column |
Publications (3)
Publication Number | Publication Date |
---|---|
DE2035166A1 DE2035166A1 (en) | 1972-03-09 |
DE2035166B2 DE2035166B2 (en) | 1973-08-09 |
DE2035166C3 true DE2035166C3 (en) | 1974-03-14 |
Family
ID=5776867
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19702035166 Expired DE2035166C3 (en) | 1970-07-15 | 1970-07-15 | Construction for the force-fit connection of a hollow concrete column with a concrete element located under the hollow concrete column |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE2035166C3 (en) |
-
1970
- 1970-07-15 DE DE19702035166 patent/DE2035166C3/en not_active Expired
Also Published As
Publication number | Publication date |
---|---|
DE2035166B2 (en) | 1973-08-09 |
DE2035166A1 (en) | 1972-03-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE1948985A1 (en) | Prefabricated building part and process for its manufacture | |
DE1584525B1 (en) | Battery formwork | |
DE2035166C3 (en) | Construction for the force-fit connection of a hollow concrete column with a concrete element located under the hollow concrete column | |
DE2233632C3 (en) | High-rise building from a central shaft with these ring-shaped surrounding floors | |
DE2407102A1 (en) | PROCESS FOR MANUFACTURING A MANHOLE CONSTRUCTION AND PREFABRICATION GAUGE FOR PERFORMING THE PROCESS | |
DE3115181C2 (en) | ||
DE2354706C2 (en) | Method for moving the superstructure of bridges in their longitudinal direction and sliding and tilting bearings for carrying out the method | |
DE2157669A1 (en) | PROCEDURE AND DEVICE FOR ASSEMBLING A STRUCTURE, IN PARTICULAR A GENTLE CRANE | |
DE1925059C3 (en) | Method for connecting and stacking nested insulating bodies to form a support insulator and insulating body for using the method | |
DE2136401C3 (en) | Device for room-sized structures made of reinforced concrete standing on a formwork frame | |
DE19621161A1 (en) | Manufacture of concrete blocks with at least one cavity | |
DE3616109C1 (en) | Method of constructing a superstructure supported on an arched supporting framework | |
DE1584525C (en) | Battery formwork | |
DE8212933U1 (en) | REPAIR STAND FOR MOTOR VEHICLE BODIES | |
DE810805C (en) | Process for the production of high pillars with a continuously decreasing cross-section from bottom to top | |
DE1295580C2 (en) | SCAFFOLDING FOR THE SECTION OF THE SUPERSTRUCTURE OF BRIDGES, HOCHSTRASSEN O.DGL. MADE OF REINFORCED CONCRETE OR STRENGTHENED CONCRETE | |
DE2743776C2 (en) | Cap connection for progressive expansion of the route | |
CH388166A (en) | Device for the simultaneous production of a number of concrete pipes | |
DE435071C (en) | Device for the production of iron-reinforced concrete slabs in several rows | |
DE3025172C2 (en) | Method and device for the production of plate-shaped concrete building elements | |
DE2901545A1 (en) | METHOD AND DEVICE FOR PRODUCING SHAPED STONES | |
DE1813119C3 (en) | Formwork carriage | |
DE3808754A1 (en) | Method of placing pressure piles and sheet-pile planks | |
DE824172C (en) | Device for the production of moldings | |
DE2922243C2 (en) | Procedure for relocating a warehouse |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C3 | Grant after two publication steps (3rd publication) | ||
E77 | Valid patent as to the heymanns-index 1977 | ||
EHJ | Ceased/non-payment of the annual fee |