DE202008015147U1 - Shuttering device for concreting cornices on an elongate structure - Google Patents

Shuttering device for concreting cornices on an elongate structure Download PDF

Info

Publication number
DE202008015147U1
DE202008015147U1 DE202008015147U DE202008015147U DE202008015147U1 DE 202008015147 U1 DE202008015147 U1 DE 202008015147U1 DE 202008015147 U DE202008015147 U DE 202008015147U DE 202008015147 U DE202008015147 U DE 202008015147U DE 202008015147 U1 DE202008015147 U1 DE 202008015147U1
Authority
DE
Germany
Prior art keywords
cornice
formwork
carriage
shuttering
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE202008015147U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BETOMAX GMBH & CO. KG, DE
Original Assignee
BETOMAX KUNSTSTOFF METALL
Betomax Kunststoff- und Metallwarenfabrik & Co KG GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BETOMAX KUNSTSTOFF METALL, Betomax Kunststoff- und Metallwarenfabrik & Co KG GmbH filed Critical BETOMAX KUNSTSTOFF METALL
Priority to DE202008015147U priority Critical patent/DE202008015147U1/en
Publication of DE202008015147U1 publication Critical patent/DE202008015147U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/06Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/06Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
    • E04G13/066Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall for overhangs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/283Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally

Abstract

Schalungsvorrichtung zum absatzweise Betonieren von Gesimsen (10) an einem lang gestreckten Bauwerk mit mindestens einem, insbesondere frei, auskragenden Rand,
bestehend aus an dem oder unterhalb des Rands (10A) angeordneten Schalungsträgern (112),
die eine Gesimsschalung (118) tragen,
die mittel- oder unmittelbar zu einem Gesimsschalungswagen (110) zusammengefasst sind,
der mittels an dem Bauwerk befestigbaren oder befestigten Führungen etwa parallel zu dem Rand (10A) vermittels Fahrgestellen verfahrbar und in den Betonierstellungen arretierbar sind, und
der an seinem bauwerksseitigen Endbereich Stützräder (122) trägt, zum Verfahren des Gesimsschalungswagens (110) entlang des Bauwerkrandes,
dadurch gekennzeichnet,
dass die Führungen aus Doppelführungsschienenabschnitten (210A) bestehen,
die einerseits an ihren Oberseiten an entlang des Bauwerkes beabstandet befestigbaren oder befestigten oberen Fahrgestellen (220A) verfahrbar sind, und
die, andererseits, an ihren Unterseiten die entlang des Bauwerks beabstandeten unteren Fahrgestellen (220B) des Gesimsschalungswagens (110) führen.
Shuttering device for the intermittent concreting of cornices (10) on an elongated building with at least one, in particular free, projecting edge,
consisting of formwork supports (112) arranged on or below the edge (10A),
wearing a cornice formwork (118),
which are combined directly or indirectly into a cornice formwork carriage (110),
the means of attachable to the building or fixed guides approximately parallel to the edge (10A) by means of chassis movable and can be locked in the concreting positions, and
carrying support wheels (122) on its building-side end area, for moving the cornice shuttering carriage (110) along the edge of the building,
characterized,
the guides consist of double guide rail sections (210A),
on the one hand on its upper sides to be spaced apart along the structure fastened or fixed upper chassis (220A) are movable, and
on the other hand, at their lower sides guide the lower chassis (220B) of the cornice shuttering carriage (110) spaced along the structure.

Figure 00000001
Figure 00000001

Description

GEBIET DER ERFINDUNGFIELD OF THE INVENTION

Die Erfindung betrifft eine Schalungsvorrichtung mit den Merkmalen des Oberbegriffs des Anspruchs 1. Demnach ist eine Schalungsvorrichtung zum Betonieren von Gesimsen, zum Teil auch Kappen genannt, an lang gestreckten Bauwerken, wie insbesondere an Brückenbauwerken, die mindestens einen frei auskragenden Rand aufweisen. Eine derartige Schalungsvorrichtung, die auch an einer senkrechten Wand, z. B. einem Brückenwiderlager oder einer Stützwand/Schlitzwand montiert sein kann, besteht zunächst aus Schalungsträgern, die, insbesondere rechtwinklig zu der Stirnseite des Randes des Bauwerkes und im wesentlichen parallel zu einander, unterhalb des Bauwerkrandes und seitlich auskrangend von diesem angeordnet sind. Dabei bedeutet „insbesondere rechtwinklig” eine Vorzugsrichtung der Schalungsträger. Grundsätzlich sind auch nicht rechtwinklige Orientierungen zum Bauwerksrand möglich. Ebenso bedeutet „im Wesentlichen parallel zu einander”, dass eine parallele Anordnung oder, im Falle von gekurvten Bauwerksrändern leicht strahlenförmig vorgesehene Anordnung der Schalungsträger den üblichen Normalfall darstellen, auf den die Erfindung allerdings nicht beschränkt ist. Die Schalungsträger tragen eine Gesimsschalung. Letztere kann gesondert vorgesehen oder integraler Bestandteil der Schalungsvorrichtung sein. Die Schalungsträger können der Höhe nach justierbar sein, d. h. hebbar und/oder neigbar und entsprechend absenkbar, um eine schnelle Anpassung an den gewünschten Gesimsquerschnitt zu ermöglichen. Hierzu kann eine Hubeinrichtung dienen. Ergänzend oder alternativ ist es auch möglich, die Schalung durch Zulagen aus z. B. Holz oder anderen abstandsbildenden Baumaterialien einzeln ausgerichtet werden. Eine mechanische Verstellbarkeit der Gesimsschalung durch „Hubeinrichtungen” im allgemeinsten Sinne ist aber wegen der Wiederholung des Betoniervorgangs entlang des langgestreckten Bauwerks in immer gleichen Querschnittsformen günstiger für das Ein- und Ausschalen.The The invention relates to a formwork device with the features of The preamble of claim 1. Accordingly, a shuttering device for Concreting of cornices, sometimes called caps, on elongated Structures, in particular at bridge structures, the at least one have freely projecting edge. Such a shuttering device, which also on a vertical wall, z. B. a bridge abutment or a support wall / slot wall can be mounted first of formwork beams, in particular perpendicular to the front of the edge of the building and essentially parallel to each other, below the edge of the building and laterally dangling are arranged by this. It means "in particular right angle "a preferred direction of the formwork beams. Basically, not even right angles to the Building edge possible. Likewise, "essentially parallel to each other "that a parallel arrangement or, slightly curved in the case of curved building edges intended arrangement of formwork supports the usual Represent normal case, but not limited to the invention is. The formwork beams carry a cornice formwork. The latter can provided separately or integral part of the formwork device be. The formwork beams can be the height to be adjustable, d. H. liftable and / or tiltable and corresponding Lowerable to quickly adapt to the desired cornice cross section to enable. For this purpose, a lifting device can be used. Additionally or alternatively, it is also possible the formwork by supplements of z. As wood or other distance-forming Building materials individually aligned. A mechanical adjustability the cornice formwork by "lifting devices" in But the most general sense is because of the repetition of the concreting process along the elongated structure in always the same cross-sectional shapes cheaper for putting in and taking off.

Die Schalungsvorrichtung umfasst ferner einen Gesimsschalungswagen dessen Bestandteil die Schalungsträger sind. Demnach sind die Schalungsträger mittelbar oder unmittelbar zu dem Gesimsschalungswagen zusammengefasst, wie z. B. durch entlang des Bauwerks verlaufenden Gurtungen. Der Gesimsschalungswagen ist mittels an dem Bauwerk befestigbaren oder befestigen Führungen und in der Regel parallel zum Bauwerksrand verfahrbar und in den einzelnen Betonierposition arretierbar. Der Gesimsschalungswagen trägt, z. B. an den inneren Enden der Schalungsträger, an seinen bauwerksseitigen Endbreichen Stützräder zum Verfahren des Gesimsschalungswagens entlang des Bauswerksrandes. Hierzu können Führungsschienen dienen, an oder in denen die Stützräder abrollen. Bevorzugt rollen die Stützräder an der Bauwerksunterseite oder an einem anderen in Längserstreckungsrichtung verlaufenden Bauwerksrand ab. Diese Stützräder können durch verlagerbare Stützen in der Betonierposition entlastbar sein.The Formwork device further comprises a cornice formwork car Part of the formwork beams are. Accordingly, the Formwork beams indirectly or directly to the cornice formwork car summarized, such. B. by running along the structure Booms. The cornice shuttering car is fastened by means of attachable to the building or attach guides and usually parallel to Movable edge of the building and lockable in the individual concreting position. The cornice formwork wears, z. B. at the inner ends the formwork support, on its building end Support wheels for moving the corn shuttering cart along the Bauswerksrandes. For this purpose, guide rails serve, on or in which the support wheels roll off. Preferably, the support wheels roll on the building base or at another extending in the longitudinal direction Building edge off. These support wheels can through displaceable supports in the concreting position relieved be.

TECHNOLOGISCHER HINTERGRUNDTECHNOLOGICAL BACKGROUND

Gattungsgemäße Schalungsvorrichtungen sind aus der DE 91 07 201 U1 bekannt. Der dort vorgeschlagene Gesimsschalungswagen ist in seiner Grundauslegung zweiteilig und besteht einerseits aus Schalungsträgern und der Gesimsschalung und andererseits aus unterhalb der Schalungsträger gelegenen Stützträgern. Die stützträger sind mittels daran fest angeordneter Fahrgestelle hängend an der mit dem Bauwerk fest verbundenen Führungsschiene verfahrbar, wobei zum Abfangen der Gewichtslast der auskragenden Schalung und Schalungsträger während des Verfahrens Stützräder am inneren Ende der tiefer liegenden Stützträger sich von unten oder seitlich an dem Bauwerk abstützen. Die Stützräder werden zum Betonieren durch ausfahrbare Stützen entlastet und die Schalungsträger sind samt der Schalung durch Hubeinrichtungen insgesamt bezüglich der tiefer liegenden Stützträger anheb- und absenkbar. Eine fest mit dem Bauwerk zu verankernder Führungsschienenabschnitt ist etwa doppelt so lang wie der Gesimsschalungswagen. Die Führungsschienenabschnitte können in Verfahrrichtung am hinteren Ende des Gesimsschaltungswagens abgebaut und an sein vorderes Ende versetzt werden. Dies geschieht manuell und erfordert eine hohe Genauigkeit bei der Ausrichtung der Schiene. Hierzu sind unter anderem keilförmige Befestigungsplatten vorgesehen, die die übliche Neigung an Gesimsunterseiten ausgleichen, so dass eine starre und extakt ausgerichtete horizontale Führungsbahn für die Fahrgestelle des Gesimsschalungswagens erzielt werden.Generic formwork devices are from the DE 91 07 201 U1 known. The cornice shutter carriage proposed there is in its basic design in two parts and consists of a formwork beams and the cornice formwork and on the other hand, located below the formwork beams support beams. The support beams are by means of fixedly arranged chassis hanging on the fixedly connected to the building guide rail movable, to support the weight load of the cantilever formwork and formwork during the process supporting wheels at the inner end of the lower support beams are supported from below or laterally to the building. The support wheels are relieved for concreting by extendable supports and the formwork beams are together with the formwork by lifting devices in total with respect to the underlying support beams can be raised and lowered. A fixed to the structure to be anchored guide rail section is about twice as long as the cornice formwork carriage. The guide rail sections can be dismantled in the direction of travel at the rear end of the trolley car and offset to its front end. This is done manually and requires a high accuracy in the alignment of the rail. For this purpose, inter alia, wedge-shaped mounting plates are provided which compensate for the usual tendency of cornice bottoms, so that a rigid and perfectly aligned horizontal guideway are achieved for the chassis of the cornice shuttering car.

Für solche Montagen und Demontagen werden üblicher Weise Montage- und Demontagewagen eingesetzt, die auf das Gesimse, wie eine Brücke aufgesetzt werden. Solche Wagen sind kostenaufwendig und behindern platzmäßig, da sie weit ausladen.For such assemblies and disassemblies are usually and dismantling car used, which put on the cornices, like a bridge become. Such cars are expensive and hinder in terms of space, as they unload far.

DARSTELLUNG DER ERFINDUNGPRESENTATION OF THE INVENTION

Der Erfindung liegt das Problem zugrunde, bei gattungsgemäßen Schalungsvorrichtungen die Montage und Demontage der Führungen für den Gesimsschalungswagen zu vereinfachen. Die Erfindung löst dieses Problem gemäß Anspruch 1 dadurch, dass bei einer gattungsgemäßen Schalungsvorrichtung die Führungen für den Gesimsschalungswagen aus Abschnitten von Doppelführungsschienen bestehen, die, einerseits, an ihren Oberseiten an entlang des Bauwerks beabstandet befestigbaren oder befestigten oberen Fahrgestellen verfahrbar sind und die, andererseits, an ihren Unterseiten die entlang des Bauwerks in Fahrrichtung beabstandeten Fahrgestelle des Gesimsschalungswagens, insbesondere rollend oder gleitend, führen. Die Erfindung beruht demnach auf dem Grundgedanken, den Gesimsschalungswagen an ihrerseits verfahrbaren Doppel-Führungsschienen zu befestigen.The invention is based on the problem of simplifying the assembly and disassembly of the guides for the cornice shuttering in generic formwork devices. The invention solves this problem according to claim 1, characterized in that in a generic formwork device, the guides for the cornice formwork car from sections of double guide rails best hen, on the one hand, on their upper sides spaced along the structure fastened or mounted upper chassis are movable and, on the other hand, on their undersides along the structure in the direction of travel spaced chassis of Gesimsschalungswagens, in particular rolling or sliding lead. The invention is therefore based on the idea to attach the cornice formwork carriage on their part movable double guide rails.

Hierdurch wird unter anderem erreicht, dass für das Fortschreiten der Schienenmontage alle Arbeiten mit schwergewichtigen Bauteilen, insbesondere die Doppelführungsschienenmontage aus einer gesicherten Position vom Gesimsschalungswagen aus, und Arbeiten mit leichteren Bauteilen, wie den Befestigungen und Rollenapparaten, von einem Mannkorb aus, der an der Führungsschiene einhängbar ist, erfolgen können. Auf Montage- oder Demontagewagen kann verzichtet werden und die Montage- und Demontagearbeiten können während der Betonierarbeit der Betonabbindung, d. h. bei geschlossener Schabung erfolgen.hereby Among other things, that is achieved for progression rail mounting all work with heavyweight components, especially the double guide rail mounting from a secured Position the cornice shutter wagon, and work with lighter ones Components, such as the fixtures and reel apparatuses, from a man basket out, which can be hung on the guide rail, can be done. On assembly or disassembly can can be omitted and the assembly and disassembly work can during concreting work of concrete bonding, d. H. at closed scraping done.

Von dem Gesimsschalungswagen aus, bzw. bei fortschreitender Schienenverlegung vom Mannkorb aus, werden einzeln oder zusammengefasst mehrere Gleit- oder Wälrzkörpereinrichtungen an der auskragenden Gesimsunterseite verankert. In der Regel nur vom Gesimsschalungwagen aus werden Abschnitte der Doppelführungsschiene an diesem Gleit- oder Wälzkörpern aufgelegt und vorgeschoben. An dem so – vom Gesimsschalungswagen aus betrachtet – auskragenden Abschnitt der Doppelführungsschiene kann ein Mannkorb vom Gesimsschalungswagen aus vorgeschoben werden, oder der Mannkorb ist bereits an dem vorgeschobenen Abschnitt der vordersten Doppelführungsschiene, d. h. am auskragenden Endbereich befestigt, so dass von dort aus die nächste Gleit- oder Wälzkörperhalterung für die Doppelführungsschiene am Bauwerkgesimse verankert werden kann. Um das Einschieben zu erleichtern, können die Gleit- oder Wälzkörper im Verhältnis zu mit dem Gesimse zu verankernden Ankerplatten lösbar verbindbar oder für seitliches Einhängen der Doppelführungsschienenabschnitte öffenbar sein. Die Verbindung zur Ankerplatte ist vorzugsweise schwenkbar ausgeführt, um eine Selbstausrichtung der Doppelführungsschiene entsprechend der anhängenden Lasten und Neigungen der Gesimsunterseite zu gestatten. Die Demontage der Doppelführungsschienen nach einem erfolgten Betonierabschnitt kann am rückwärtigen Ende des Gesimsschalungswagens in umgekehrter Reihenfolge wie die Montage der Doppelführungsschienen erfolgen. An der Unterseite der Doppelführungsschiene sind die Fahrgestelle des Gesimsschalungswagen in bekannter Weise z. B. wie bei der DE 91 07 201 U1 rollend oder gleitend verfahrbar.From the cornice formwork carriage, or as the rail installation progresses from the man basket, a plurality of sliding or wood body devices are anchored to the overhanging cornice underside individually or in a group. As a rule, only from the cornice shutter carriage sections of the double guide rail are placed on this slide or rolling elements and advanced. On the section of the double guide rail projecting from the cornice shutter carriage, a man basket can be pushed forward from the cornice shutter carriage, or the man basket is already fastened to the extended section of the foremost double guide rail, ie on the projecting end area, so that from there the next sliding section or Wälzkörperhalterung for the double guide rail can be anchored to the building cornices. In order to facilitate the insertion, the sliding or rolling elements can be releasably connectable in relation to anchor plates to be anchored to the cornices or openable for lateral attachment of the double guide rail sections. The connection to the anchor plate is preferably made pivotable to allow self-alignment of the double guide rail according to the appended loads and inclinations of the cornice underside. The disassembly of the double guide rails after a successful concreting can be done at the rear end of the cornice formwork carriage in reverse order as the mounting of the double guide rails. At the bottom of the double guide rail, the chassis of the cornice formwork carriage in a known manner z. B. as in the DE 91 07 201 U1 rolling or sliding movable.

An der Gesimsunterseite einzeln befestigbare Gleit- oder Wälzkörperanordnungen sind zwar für Gesimsschalungswagen am Markt bekannt. Diese müssen aber von einer gesonderten Hub- oder Kranbühne oder dergleichen aus oder vom Gesimsschalungswagen aus montiert werden. Bei Letzteren muss der Gesimswagen nach der Montage jeder einzelnen Leit- oder Wälzkörpereinrichtung ein kurzes Stück vorgeschoben werden, wobei die mit dem Gesimsschalungswagen starr verbundene Tragschiene in die neu montierte Gleit- oder Wälzkörperanordnung hinein gefahren wird, so dass diese die Traglasten des Gesimsschalungswagens mit übernimmt, während am hinteren Ende des Gesimsschalungswagen die von dem kurzen Tragschienenstück nunmehr entlastete letzte Gleit- oder Wälzköperanordnung demontiert werden muss. Diese bekannte Anordnung erfordert eine vergleichsweise zeitraubende Montage und Demontage und diese kann auch nur nach einem Entschalungsschritt erfolgen und ein neuer Schalungsschritt beginnt erst, wenn über die gesamte Länge des Gesimsschalwagens, welche durchaus in der Größenordnung von 20 Metern liegen kann, schrittweise von Befestigungspunkt zu Befestigungspunkt vorgefahren und die Befestigungspunke montiert bzw. demontiert worden sind. Bei diesem bekannten Gesimsschalungswagen nimmt die Tragschiene, die auch die Führungsschienenfunktion übernimmt, sämtliche Lasten des Gesimsschalungswagens und des Betonierens auf. Sie ist entsprechend groß dimensioniert und schwer zu handhaben. Außerdem erhöht sie die Gewichtslast an den Aufhängepunkten. Die Rollenapparate tragen permanent die Gesamtlast, was zu großer Dimensionierung führt.At the cornice underside individually attachable sliding or Wälzkörperanordnungen are known for cornice formwork cars on the market. These must but from a separate lifting or crane platform or the like be mounted from or from the cornice formwork car. For the latter must the Gesimswagen after assembly of each guide or Wälzkörpereinrichtung be advanced a short distance, with the with the Cornice formwork rigidly connected mounting rail in the newly mounted Slide or rolling element arrangement moved into it is, so that this takes over the loads of cornice shuttering carriage, while at the rear end of the cornice formwork carriage that of the short mounting rail piece now relieved last sliding or Wälzköperanordnung must be dismantled. This known arrangement requires a comparatively time-consuming assembly and disassembly and this can even after a de-scaling step and a new formwork step begins only when over the entire length of the Cornice scarf, which is quite on the order of magnitude of 20 meters, gradually from attachment point to Attached attachment point and the mounting points mounted or dismantled. In this known cornice formwork car takes the support rail, which also takes over the guide rail function, all loads of cornice shuttering and concreting on. It is correspondingly large and heavy to handle. It also increases the weight load at the suspension points. The reel machines carry permanently the total load, which leads to large sizing.

Demgegenüber wird durch die Erfindung erreicht, dass ein neues Trag- und Führungsschienenstück auf der Gesamtlänge des nächsten Betonierabschnittes vormontiert und das Trag- und Führungsschienenstück von dem letzten Betonierabschnitt demontiert werden kann, während aktuell ein Betonierabschnitt schalungsmäßig vorbereitet, armiert und ausgeführt wird, oder während der Abbindezeit des Betons, währenddessen die Gesimsschalung unter voller Belastung und unverrückbar am Ort des Betonierabschnittes im Einsatz ist. Die Doppelführungsschienen haben funktionell keinen Stabilitätsbeitrag für den Gesimsschalungswagen zu leisten und können entsprechend schlank und leichtgewichtig ausgeführt sein. Das verbessert auch ihre Handhabbarkeit.In contrast, is achieved by the invention that a new support and guide rail piece on the total length of the next concreting section pre-assembled and the support and guide rail piece can be dismantled from the last concreting section while currently a concreting section prepared by shuttering, armored and executed, or during the Setting time of the concrete, while the cornice formwork under full load and immovable at the location of the concreting section is in use. The double guide rails are functional no contribution to stability for the cornice formwork car afford and can be slim and lightweight accordingly be executed. This also improves their handling.

Es ist nun auf verschiedene Weise möglich, erfindungsgemäße Schalungsvorrichtungen weiter zu entwickeln:
Nach einer Ausgestaltung der Erfindung ist vorgesehen, bei einer Schalungsvorrichtung nach dem Oberbegriff von Anspruch 1, insbesondere nach Anspruch 1, mindestens eine Wagenlifteinrichtung zum Anheben oder zum Verschwenken des Gesimsschalungswagens bezüglich des Bauwerks vorzusehen. Die Wagenlifteinrichtung greift einerseits an dem Bauwerk an dessen Unterseite an und sie greift andererseits an dem Gesimsschalungswagen an und ist so ausgeführt, dass sie es gestattet, die Gesimsschalung in deren Betonierstellung in einer die Führung entlastenden Weise zu halten, und dem Gesimsschalungswagen in dessen Verfahrstellung ein Verfahren in eine neue Betonierposition zu gestatten. Eine derartige Wagenlifteinrichtung kann eine Kolben/Zylindereinheiten mit hydraulischen Antrieb umfassen, wobei die gesimsseitige Befestigung von den Schienenbefestigungspunkten auch unabhängig vorgesehen sein kann, um die anhängenden Lasten besser zu verteilen. Dabei braucht das Antriebselement, wie die Kolben/Zylinder-Einheit nicht unmittelbar an dem gesimsseitigen Befestigungspunkt anzugreifen. Stattdessen können Anpassstangen zwischengekoppelt sein. Die Befestigungspunkte zum Anheben müssen auch nicht unmittelbar an den Schalungsträgern sondern können auch zwischen benachbarten Schalungsträgern, z. B. an den diese verbindenden Gurtungen, d. h. an einer beliebige Stelle in Längserstreckungsrichtung des Bauwerks vorgesehen sein. Eine derartige Lifteinrichtung nach Anspruch 3 ist von eigenständig erfinderischer Bedeutung ist bewirkt nicht nur eine Beschleunigung des Schalvorganges, sondern auch eine Entlastung des Fahrwerks des Gesimsschalungswagens, das nunmehr auf verbesserte Laufeigenschaften hin ausgelegt sein kann und nicht mehr den Einschränkungen unterlegen ist, die sich bei dem Gesimsschalungswagen nach der DE 91 07 201 U1 dadurch ergeben, dass die Führungen auch von der Belastung aus dem Betonieren beansprucht sind.
It is now possible in various ways to further develop formwork devices according to the invention:
According to one embodiment of the invention is provided in a formwork device according to the preamble of claim 1, in particular according to claim 1, at least one Wagenlifteinrichtung for Anhe ben or to pivot the Gesimsschalungswagens with respect to the structure provided. On the other hand, the carriage lift device engages the building on its underside and, on the other hand, it engages with the cornice shuttering carriage and is designed to permit the cornice formwork to be held in its concreting position in a manner that relieves the guideway and the cornice formwork carriage to be moved in its travel position Allow process in a new concreting position. Such a vehicle lift device may comprise a piston / cylinder units with hydraulic drive, wherein the gesimsseitige attachment of the rail attachment points may also be provided independently to better distribute the suspended loads. In this case, the drive element, as the piston / cylinder unit does not need to attack directly on the corn side attachment point. Instead, fitting rods may be intercoupled. The attachment points for lifting must not be directly on the formwork beams but can also between adjacent formwork beams, z. B. at the connecting these tapes, ie be provided at an arbitrary position in the longitudinal direction of the structure. Such a lift device according to claim 3 is of inventive significance is not only causes an acceleration of the scarfing process, but also a relief of the landing gear of Gesimsschalungswagens, which can now be designed for improved runnability and is no longer inferior to the restrictions arising in the Cornice formwork car after the DE 91 07 201 U1 result in that the guides are also claimed by the burden of concreting.

Entlastungen der Führungsschienen von Gesimsschalungswagen sind zwar in Gestalt von Ankerstangen am Markt erhältlichen Gesimsschalungsvorrichtungen verfügbar, gestatten aber nicht ein spürbares Verschwenken der Schalungsträger zwischen einer Betonierposition und einer Entschalungsposition.reliefs The guide rails of cornice formwork cars are indeed in the form of anchor rods available on the market cornice formwork devices available, but do not allow a noticeable Swiveling the formwork beams between a concreting position and a demoulding position.

Gemäß einer anderen Ausführungsform der Erfindung ist vorgesehen, die Schalungsvorrichtungen so auszuführen, dass die Führungen an dem Bauwerk und/oder die Fahrgestelle an dem Gesimsschalungswagen quer zum auskragenden Rand des Bauwagens pendelnd befestigt sind. Eine derartige pendelnde Befestigung trägt nicht nur dazu bei, die oben erwähnte Ausrichtung der Führungsschienen bezüglich der Gesimsunterkante in selbsttätiger Form zu ermöglichen. Vielmehr wird es dadurch möglich, das in Positionbringen der Gesimsschalung sowie das Ausschalen einfacher zu gestalten, indem der Gesimsschalungswagen im Bereich seiner Trag- und Führungsschiene um mindestens eine entlang der Bauwerkslängserstreckung etwa parallel ausgerichtete Schwenkachse vor und nach einem Betonierschritt zu schwenken. Z. B. kann dann in einer ersten Schwenkbewegung zur Entlastung der bauwerksseitigen Stützräder ein Entlastungsriegel durch Verschwenken in Position gebracht werden, ohne dass hier eine Einstellarbeit zwingend erforderlich ist.According to one Another embodiment of the invention is provided which Formwork devices to perform so that the guides on the building and / or the chassis on the cornice formwork carriage Transversely mounted transversely to the projecting edge of the trailer. Such a swinging attachment not only contributes at, the above-mentioned alignment of the guide rails with respect to to allow the cornice lower edge in automatic form. Rather, it makes it possible to position this the cornice formwork as well as the stripping easier to design by the cornice formwork carriage in the area of its support and guide rail by at least one along the building longitudinal extension approximately parallel pivot axis before and after a concreting step to pan. For example, then in a first pivoting movement to Relief of the construction side support wheels Relief bars are brought into position by pivoting, without an adjustment work is mandatory here.

Ein Verschwenken des Gesimsschalungswagens als Ganzes im Sinne eines Anhebens der Gesimsschalung führt dazu, dass nach dem Verfahren des Gesimsschalungswagens in die Position des nächsten Betonierabschnittes die aufliegende Ge simsschalung durch den Verschwenkschritt an das Bauwerksgesimse dicht herangefahren wird, so dass sofort danach mit dem Einbringen der Betonarmierung in die so bereits fertig ausgerichtete Schalung begonnen werden kann. Als Schwenklager kann die Führungsaufhängung und/oder die Fahrgestellbefestigung dienen, während im Bereich des Stützrades eine an sich bekannte längenveränderliche Stütze das Schwenken bewirken oder in der Betonierstellung die Schwenklage fixieren kann.One Swiveling the cornice shuttering cart as a whole in the sense of a Lifting the cornice shuttering causes following the procedure of cornice shuttering carriage in the position of the next Betonierabschnittes the resting Ge simsschalung by the Verschwenkschritt is pulled close to the building cornices, so immediately then with the introduction of the concrete reinforcement in the already finished aligned formwork can be started. As a pivot bearing can the guide suspension and / or the chassis attachment serve, while in the area of the support wheel a per se known variable-length prop the Pivoting effect or in the concreting position the pivoting position can fix.

Wenn sowohl eine Stützradentlastung als auch eine Schalungsverschwenkung gewünscht sind, kann alternativ oder zusätzlich einer pendelnden Aufhängung der Führungen und/oder der Fahrgestelle eine gewisse Höhenveränderung im Führungsschienenbereich, z. B. mittels Langlöchern an den Befestigungselementen im Führungsbereich, vorgesehen werden. Man kann die Stützradentlastung in einem ersten Schwenkschritt durchführen und dann den nunmehr unter dem Bauwerksgesimse durch die Stützradentlastung entstandenen neuen Anlagepunkt des Gesimsschalungswagens am Bauwerkgesimse als erstes Stützlager verwenden, um das als Drehpunkt der Gesimsschalungswagen an seinem auskragenden Ende angehoben wird, bis die Gesimsschaltung an dem Bauwerksgesimse in der vorgesehen Endposition zur Anlage kommt. Eine hierfür geeignete Schwenkeinrichtung wird nachfolgend noch beschrieben werden. Die pendelnde Befestigung der Führungen an dem Bauwerk und/oder der Fahrgestelle an dem Gesimsschalungswagen sind von eigenständig erfinderischer Bedeutung. Sie verkürzen u. a. die Einrüstzeiten für die Gesimsschalung in der neuen Betonierposition beträchtlich.If Both a Stützradentlastung and a Schalungsverschwenkung are desired, may alternatively or additionally a pendulous suspension of the guides and / or the chassis a certain height change in the guide rail area, z. B. by means of slots on the fasteners in the guide area, provided become. You can the Stützradentlastung in a first Swing step perform and then the now under the Built-up cornices due to the Stützradentlastung incurred new attachment point of the cornice shuttering wagon on the building cornices as Use the first support bearing as the fulcrum of the cornice formwork car is raised at its projecting end until the cornice circuit on the building cornices in the intended end position to the plant comes. A suitable for this pivoting device is below yet to be described. The pendulum mounting of the guides on the building and / or the chassis on the cornice formwork carriage are of independently inventive meaning. They shorten u. a. the set-up times for the cornice formwork considerably in the new concreting position.

Die vorgenannten sowie die beanspruchten und in den Ausführungsbeispielen beschriebenen erfindungsgemäß zu verwendenden Bauteile unterliegen in ihrer Größe, Formgestaltung, Materialauswahl und technischen Konzeption keinen besonderen Ausnahmebedingungen, so dass die in dem Anwendungsgebiet bekannten Auswahlkriterien uneingeschränkt Anwendung finden könnenThe the aforementioned and the claimed and in the embodiments described to be used according to the invention Components are subject in size, shape design, Material selection and technical conception no special exceptions, so that the selection criteria known in the field of application unrestricted Application can be found

Weitere Einzelheiten, Merkmale und Vorteile des Gegenstandes der Erfindung ergeben sich aus den Unteransprüchen, sowie aus der nachfolgenden Beschreibung der zugehörigen Zeichnung und Tabelle, in der – beispielhaft – ein Ausführungsbeispiel einer Schalungsvorrichtung dargestellt ist.Further details, features and advantages of the subject matter of the invention will become apparent from the dependent claims, as well as from the following Description of the accompanying drawing and table, in which - by way of example - an embodiment of a shuttering device is shown.

KURZBESCHREIBUNG DER FIGURENBRIEF DESCRIPTION OF THE FIGURES

In der Zeichnung zeigenIn show the drawing

1 eine Schalungsvorrichtung montiert an einem auskragenden Bauwerkgesimse nach seinem Verfahren in eine neue in Betonierposition im Schnitt etwa rechtwinklig zur Bauwerklängserstreckung (Schnitt entlang der Linie I-I gemäß 4) und mit eingehängter Hubvorrichtung, vorbereitet zum Anheben aber Hubkolben noch ohne Kontakt zur Gurtung; 1 a shuttering device mounted on a cantilevered cornices according to its method in a new concreting in section approximately at right angles to the longitudinal structural extension (section along the line II according to 4 ) and with suspended lifting device, prepared for lifting but lifting piston still without contact with the belting;

2 dieselbe Schalungsvorrichtung in Betonierposition während der Aushärtphase; die Hubvorrichtung ist zwar noch eingehängt, die Betonierlast wird aber von den eingebauten Ankern abgetragen; 2 the same formwork device in concreting position during the Aushärtphase; the lifting device is still hooked, but the concreting load is removed by the built-in anchors;

3 dieselbe Schalungsvorrichtung nach dem Ausschalen mit ausgehängter Hubvorrichtung, bereit zum Verfahren; 3 the same formwork device after stripping with suspended lifting device, ready for the process;

4 dieselbe Schalungsvorrichtung in schematisierter Seitenansicht bei der Montage eines neuen Führungsabschnittes (Ansicht A-A gemäß 1); 4 the same formwork device in a schematic side view during the assembly of a new guide portion (view AA according to 1 );

5 die Schalungsvorrichtung nach 4 in einer Demontagephase der Trag- und Führungsschiene des vorangehenden Betonierabschnitts sowie 5 the shuttering device after 4 in a disassembly phase of the support and guide rail of the preceding concreting section as well

6 von derselben Schalungsvorrichtung eine Detaildarstellung eines unterhalb eines Gesimses angebrachten Verankerungselements. 6 from the same formwork device a detailed representation of an attached below a cornice anchoring element.

DETAILLIERTE DARSTELLUNG DES AUSFÜHRUNGSBEISPIELSDETAILED DESCRIPTION OF THE EMBODIMENT

Aus den 1 bis 3 ist ein frei auskragender Randbereich 10 einer rechtwinklig zur Bildfläche erstreckten Brücke ersichtlich. An diesem Gesims ist an dessen Unterseite eine seitlich auskragende Schalungsvorrichtung 100 an einbetonierten Verankerungsmitteln 234 befestigt. Die Schalungsvorrichtung besteht im Wesentlichen aus einem Gesimsschalungswagen 110, der parallel oder sternförmig zu einander angeordneten Schalungsträger 112 umfasst, wobei mit Abstand nebeneinander angeordnete Schalungsträger z. B. durch Gurte 114A, 114B zur Formung des Gesimsschalungswagens 110 miteinander verbunden sind. Die Gurte bestehen aus üblichen, mit Abstand und parallel zu einander angeordneten U-Profil-Eisen, welche mit dem etwa horizontal unter dem Gesimse sich erstreckenden ersten Schalungsträgerschenkel 112A z. B. durch Schrauben oder durch Schweißen fest verbunden sind. Ein nach außen weisender Endbereich des ersten Schalungsträgerschenkels 112A ist durch eine Schwenkbolzenverbindung mit einem nach unten gerichtet angeordneten zweiten Schalungsträgerschenkel 112B verbunden. Dieser stützt sich im Wesentlichen an der Druckstrebe 116A zur Ausbildung einer festen Winkellage ab. An ihm kann ein dritter Schalungsträgerschenkel 112C, welcher auskragend in etwa horizontaler Stellung nach außen weist, in verschiedenen Höhen über geeignete Bolzenverbindungen angelenkt werden, wobei die Länge einer Strebe 116B zwischen dem zweiten und dritten Schalungsträgerschenkel 112B und 112C die Neigung des dritten Schalungsträgers 112C festlegt. Die zweiten und dritten Schalungsträgerschenkel 112B, 112C tragen erste, zweite und dritte Gesimsschalungselemente 118A, B und C, 118C, wobei letzterer in kippbarer Weise von einem vierten Schalungsträgerschenkel 112D bezüglich des dritten Schalungsträgerschenkels 112C in Neigung und Abstand einstellbar ist. Hierzu dienen wieder um die üblichen Lochungen mit Bolzenverbindungen und eine Strebe 116C, die längenverstellbar ist. Hubeinrichtungen 120 tragen die dritte Gesimsschalungsplatte 118C und gestatten deren Feinjustage.From the 1 to 3 is a freely projecting edge area 10 a perpendicular to the surface of the image extended bridge visible. At this cornice is on the underside of a laterally projecting formwork device 100 on cast-in anchoring means 234 attached. The formwork device consists essentially of a cornice formwork carriage 110 , the formwork beam parallel or star-shaped to each other 112 includes, with spaced juxtaposed formwork support z. B. by straps 114A . 114B for forming the cornice shuttering carriage 110 connected to each other. The straps consist of conventional, spaced and parallel to each other arranged U-profile iron, which with the approximately horizontally extending below the cornice first formwork support legs 112A z. B. are firmly connected by screws or by welding. An outwardly facing end portion of the first formwork support leg 112A is by a pivot pin connection with a downward directed second formwork support legs 112B connected. This is essentially based on the strut 116A to form a fixed angular position. At him can a third formwork support leg 112C , which has a cantilever in approximately horizontal position to the outside, are articulated at different heights on suitable bolt connections, the length of a strut 116B between the second and third formwork support legs 112B and 112C the inclination of the third formwork support 112C sets. The second and third formwork support legs 112B . 112C carry first, second and third cornice formwork elements 118A , B and C, 118C the latter being tiltable from a fourth formwork support leg 112D with respect to the third formwork support leg 112C in inclination and distance is adjustable. Serve again for the usual holes with bolt connections and a strut 116C which is adjustable in length. lifting devices 120 Wear the third cornice formwork panel 118C and allow their fine adjustment.

Ein am inneren Ende des ersten Schalungsträgerschenkels 112A angeordnetes Stützrad 122 rollt mit etwa parallel zum Schalungsträger 112 angeordneter Drehachse an der Gesimsunterseite in bekannter Weise ab, wenn der Gesimsschalungswagen 110 in die nächste Betonierposition verfahren wird. In seinem Beto nierzustand stützt sich der Gesimsschalungswagen 110 über eine das Stützrad 120 außer Eingriff bringende Schwenkstütze an der Gesimsunterseite ab.A at the inner end of the first formwork support leg 112A arranged jockey wheel 122 rolls with approximately parallel to the formwork support 112 arranged axis of rotation on the cornice underside in a known manner from when the cornice formwork carriage 110 is moved to the next concreting position. In his Beto nierzustand the cornice formwork car 110 about a jockey wheel 120 disengaging pivot support on the cornice base.

Der eigentlichen Aufhängung und dem Verfahren des Gesimsschalungswagens 110 dient eine Schienen- und Fahrwerksanordnung 200. Diese besteht im Wesentlichen Abschnitten 210A aus einer Doppelführungsschiene 210, die im dargestellten und insoweit bevorzugten Ausführungsbeispiel als Doppel-T-Träger ausgeführt ist. Obere und untere Fahrgestelle 220A und 220B für das Zusammenwirken mit der Ober- und Unterseite der Doppelführungsschiene 210 sind mittels zugeordneter Koppelelemente 222A, 222B Verankerungselementen 224 bzw. dem Gesimsschalungswagen 210 schwenkbar verbunden. Die oberen und unteren Fahrgestelle 220A, 220B tragen zwecks widerstandsarmer Führung entlang der Doppelführungsschiene 210 Wälzkörper in Gestalt an sich bekannter horizontal und vertikal wirkender Rollenpaare, die an entsprechenden Laufflächen der Doppelführungsschiene 210 mit geringem Spiel abrollen. Verankerungsmittel 234 sind an der Gesimsunterseite bereits vorhanden oder werden dort in geeigneter Weise verankert. Die daran befestigten Verankerungselemente 214 tragen über eine Bolzenverbindung in schwenkbarer Weise das obere Koppelelement 222A welches wiederum das obere Fahrgestell 220A trägt oder mit diesem einteilig verbunden ist. Der obere Trag- und Schwenkbolzen 223A dient ggf. auch als Trennstelle der Doppelführungsschiene 210 von den Verankerungselementen 224. Das mit dem unteren Fahrgestell 220B fest verbundene oder damit einteilig ausgebildete Koppelelement 222B verfügt über ein Langloch 221 einer Länge von etwa 1 bis 10 cm, vorzugsweise von 2 bis 6 cm Länge, welches dem unteren Koppelelement 223B gegenüber dem ersten Schalungsträgerschenkel 112A eine beschränkte Vertikale Bewegungsmöglichkeit einräumt und in Verbindung mit dem unteren Trag- und Schwenkbolzen 223B eine weitere Schwenkverbindung bildet. Die Arbeitsweise der Doppelführungsschiene 210 wird im Zusammenhang mit den 4 und 5 erläutert werden.The actual suspension and the method of cornice formwork car 110 serves a rail and chassis arrangement 200 , This consists essentially sections 210A from a double guide rail 210 , which is executed in the illustrated and so far preferred embodiment as a double-T-carrier. Upper and lower chassis 220A and 220B for the interaction with the top and bottom of the double guide rail 210 are by means of associated coupling elements 222A . 222B anchoring elements 224 or the cornice shuttering cart 210 pivotally connected. The upper and lower chassis 220A . 220B wear for resistance-resistant guidance along the double guide rail 210 Rolling elements in the form of known horizontally and vertically acting pairs of rollers on corresponding running surfaces of the double guide rail 210 unroll with a small amount of play. anchoring means 234 are already present on the cornice underside or are anchored there in a suitable manner. The one about it attached anchoring elements 214 carry over a bolt connection in a pivotable manner, the upper coupling element 222A which in turn is the upper chassis 220A carries or is integrally connected with this. The upper support and pivot pin 223A possibly also serves as a separation point of the double guide rail 210 from the anchoring elements 224 , That with the lower chassis 220B firmly connected or thus integrally formed coupling element 222B has a slot 221 a length of about 1 to 10 cm, preferably 2 to 6 cm in length, which is the lower coupling element 223B opposite the first formwork support leg 112A a limited vertical movement possibility and in conjunction with the lower support and pivot pin 223B forms a further pivot connection. The operation of the double guide rail 210 will be related to the 4 and 5 be explained.

Aus 2 ist ersichtlich, wie in der Betonierposition das Stützrand 122 durch die ggf. längenveränderbare Schwenkstütze 124 ersetzt wird, die Gesimsschalungs platte 118A an das Gesimse 10 herangefahren und die Gesimsschalungsplatte 118C in ihrer Schließstellung an die Gesimsschalungsplatte 118B herangefahren und der erste Schalungsträgerschenkel 112A bezüglich des Langloches 221 hochgefahren ist. Durch Letzteres ist die Doppelführungsschiene 210 von der Gewichtslast des Gesimsschalungswagens 110 und der Betonierlast der Randkappe 10A völlig entlastet ist. Diese Lasten hängen jetzt gewünschtenfalls über Ankerstäbe 232 einen Ends an den Verankerungselementen 224 und anderen Ends an der Gurtung 114. Die Hub- oder Schwenkbewegung, bei der die Betonierlast noch nicht oder nicht mehr mitzutragen ist, wird durch eine Kolben/Hydraulikzylinder-Einheit als Hubeinrichtung 230 ermöglicht, die sich einen Ends an der Gurtung 114 abstützt und die anderen Ends an dem Verankerungselement 224 zum Gesimse hin mit dem Ende eines Verbindungsmittels 230A lösbar angehängt ist. Nach dem Hochschwenken des Gesimsschalungswagen 110 gegen das Gesimse 10 durch Hubeinrichtung 230 kann also die Gewichtslast des Gesimsschalungswagens 110 und des Frischbetons über die nebeneinander angeordneten Ankerstäben 232 übernommen werden, während die Doppelführungsschiene 210 so gut wie lastfrei ist. In dieser lastfreien Position empfiehlt sich auch die Montage weiterer Abschnitte 210A der Doppelführungsschiene 210 in Richtung des nächsten Betonierabschnittes und die Demontage im Bereich des vorangehenden Betonierabschnittes, wie nunmehr an hand der 4 und 5 erläutert wird.Out 2 can be seen as in the concreting the support edge 122 by the optionally variable length swivel support 124 is replaced, the cornice shuttering plate 118A to the cornice 10 moved up and the Gesimsschalungsplatte 118C in its closed position to the cornice formwork panel 118B moved up and the first formwork support legs 112A concerning the long hole 221 has started up. By the latter is the double guide rail 210 from the weight load of cornice formwork car 110 and the concreting load of the edge cap 10A is completely relieved. If desired, these loads now hang over anchor rods 232 a tail on the anchoring elements 224 and other ends on the harness 114 , The lifting or pivoting movement, in which the concreting load is not or no longer carry, is by a piston / hydraulic cylinder unit as a lifting device 230 Allowing one end to the strapping 114 supports and the other ends of the anchoring element 224 towards the cornice with the end of a lanyard 230A releasably attached. After swiveling up the cornice shuttering cart 110 against the cornice 10 by lifting device 230 So can the weight load of Gesimsschalungswagens 110 and the fresh concrete on the adjacently arranged anchor rods 232 be taken while the double guide rail 210 as good as no load. In this no-load position, it is also recommended to install further sections 210A the double guide rail 210 in the direction of the next concreting section and the disassembly in the area of the preceding concreting section, as now on hand of 4 and 5 is explained.

Die in 3 dargestellte Entschalungs- und Verfahrposition der Elemente der Schalungsvorrichtung entspricht dem wiederbelasteten Zustand der Doppelführungsschiene 210.In the 3 illustrated Entschalungs- and Verfahrposition of the elements of the formwork device corresponds to the reloaded state of the double guide rail 210 ,

Wie aus 4 ersichtlich, werden von den Gesimsschalungswagen 110 aus, neue Abschnitte 210A der Doppelführungsschiene 210 zunächst an die Verankerungselemente 224 angehängt, und nachfolgend über die oberen Fahrgestelle 220A in Richtung auf den nächsten Betonierabschnitt, in der Zeichnung mit Pfeil M für Montagerichtung dargestellt, vorgeschoben. Zuvor werden, zunächst von Gesimsschalungswagen 110 aus, weitere Verankerungselemente 224 an der Gesimsunterseite angebracht. Nachdem ein Abschnitt 210A der Doppelführungsschiene 210 daran angehängt ist, kann ein Mannkorb 240 an dem Doppelführungsschienenabschnitt 210A mittels mindestens eines unteren Fahrgestells, ähnlich dem Fahrgestell 220A angehängt und daran verfahren werden. Zum freien Ende hin greift eine Absturzsicherung. Von dem Mannkorb aus lassen sich weitere Verankerungselemente 224 befestigen. Ein weiterer Doppelführungsschienenabschnitt 210A wird unter Verlagerung der schon montierten Doppelführungsschienenabschnitte in Richtung M vorgeschoben, bis der nächste Doppelführungsschienenabschnitt in der so entstehenden Schienenlücke angekoppelt werden kann.How out 4 can be seen from the cornice formwork cars 110 out, new sections 210A the double guide rail 210 first to the anchoring elements 224 attached, and subsequently on the upper chassis 220A in the direction of the next concreting section, shown in the drawing with arrow M for mounting direction, advanced. Before that, first of cornice shuttering car 110 out, more anchoring elements 224 attached to the cornice underside. After a section 210A the double guide rail 210 attached to it, can be a man basket 240 at the double guide rail section 210A by means of at least one lower chassis, similar to the chassis 220A attached and handled. Towards the free end, a fall arrest device. From the man basket can be further anchoring elements 224 Fasten. Another double guide rail section 210A is advanced under displacement of the already mounted double guide rail sections in direction M until the next double guide rail section can be coupled in the resulting rail gap.

Die in 5 unter Fortlassen der betonierten Gesimskappe dargestellte Demontagesituation zeigt, wie vom Mannkorb 240 aus, die nicht mehr benötigten Verankerungselemente 224 entfernt werden und die nicht mehr benötigten Führungsschienenabschnitte 210A ausgehängt werden, um am gegenüberliegenden Ende des Gesimsschalungswagens 110 neu montiert zu werden.In the 5 showing disassembly situation shown by omitting the concreted cap, as shown by the man basket 240 out, the no longer required anchoring elements 224 be removed and no longer needed guide rail sections 210A be posted to the opposite end of the cornice shuttering cart 110 to be remounted.

Aus der in 6 dargestellten Detailansicht eines dargestellten und insoweit bevorzugten Verankerungselementes 224 ist ein U-Profil-Eisenabschnitt erkennbar, der über ein einbetoniertes Verankerungsmittel 234 mit dem Gesimse 10 an dessen Unterseite zugfest verbunden wird. Dieses Verankerungselement hat mindestens eine Aufnahme zur vorzugsweise durch Einschrauben hergestellten Verbindung mit einem Ankerstab 232. Eine weitere Aufnahme gestattet über einen Bolzen eine Zugverbindung mit dem oberen Koppelelement 222A, wobei dessen Schwenkbarkeit bezüglich des Verankerungselementes 224 durch Anschläge einseitig oder beidseitig begrenzt sein kann. Eine weitere Aufnahme 224C gestattet es, das Verankerungselement 224 mit dem oberen Ende einer Kolben- oder Verbindungsstange 230A der Hubeinreichung 230 lösbar zu verbinden. Mithin ist das einbetonierte Verankerungsmittel 234 multifunktionell in den verschiedenen Arbeitsphasen der Schalungsvorrichtung verwendbar.From the in 6 illustrated detail view of an illustrated and so far preferred anchoring element 224 is a U-profile iron section recognizable, which has a cast-anchoring means 234 with the cornice 10 is connected at the bottom tensile strength. This anchoring element has at least one receptacle for the connection preferably made by screwing with an anchor rod 232 , Another recording allows a bolt via a train connection with the upper coupling element 222A , Whose pivotability with respect to the anchoring element 224 may be limited by attacks on one side or on both sides. Another shot 224C allows the anchoring element 224 with the upper end of a piston or connecting rod 230A Hub Submission 230 releasably connect. Thus, the embedded anchoring means 234 multifunctional in the various phases of the shuttering device used.

1010
Gesimsecornices
10A10A
Randedge
100100
SchalungsvorrichtungFramework assembly
110110
GesimsschalungswagenGesimsschalungswagen
112112
Schalungsträgerformwork beams
112A112A
erster Schalungsträgerschenkelfirst Formwork support leg
112B112B
zweiter Schalungsträgerschenkelsecond Formwork support leg
112C112C
dritter Schalungsträgerschenkelthird Formwork support leg
112D112D
vierter Schalungsträgerschenkelfourth Formwork support leg
114114
Gurtungtaping
114A114A
erster Gurtfirst belt
114B114B
zweiter Gurtsecond belt
116116
Zugstreben (Druck und/oder Zug)tension struts (Pressure and / or train)
116A116A
erste Strebefirst strut
116B116B
zweite Strebesecond strut
116C116C
dritte Strebethird strut
118118
Gesimsschalungcornices
118A118A
erste Gesimsschalungsplattefirst Gesimsschalungsplatte
118B118B
zweite Gesimsschalungsplattesecond Gesimsschalungsplatte
118C118C
dritte Gesimsschalungsplattethird Gesimsschalungsplatte
122122
Stützradstabilizer
124124
Schwenkstützeswiveling support
200200
Schienen- und FahrwerksanordnungRails- and chassis arrangement
210210
DoppelführungsschieneDouble guide rail
210A210A
DoppelführungsschienenabschnitteDouble guide rail sections
220A220A
oberes Fahrgestellupper chassis
220B220B
unteres Fahrgestelllower chassis
221221
LanglochLong hole
222A222A
Koppelelementcoupling element
222B222B
Koppelelementcoupling element
223A223A
Trag- und Schwenkbolzensupporting and pivot pins
223B223B
Trag- und Schwenkbolzensupporting and pivot pins
224224
Verankerungselementeanchoring elements
224A224A
Aufnahmeadmission
224B224B
Aufnahmeadmission
224C224C
Aufnahmeadmission
230230
Hubeinrichtunglifting device
230A230A
Kolbenstangepiston rod
232232
Ankerstäbetie rods
232A232A
AnkerstabkonterungAnkerstabkonterung
234234
Verankerungsmittelanchoring means
240240
Mannkorbman basket
MM
Montage VerfahrrichtungAssembly traversing
DD
Demontage-VerfahrrichtungDisassembly traverse

ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list The documents listed by the applicant have been automated generated and is solely for better information recorded by the reader. The list is not part of the German Patent or utility model application. The DPMA takes over no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • - DE 9107201 U1 [0003, 0007, 0010] - DE 9107201 U1 [0003, 0007, 0010]

Claims (5)

Schalungsvorrichtung zum absatzweise Betonieren von Gesimsen (10) an einem lang gestreckten Bauwerk mit mindestens einem, insbesondere frei, auskragenden Rand, bestehend aus an dem oder unterhalb des Rands (10A) angeordneten Schalungsträgern (112), die eine Gesimsschalung (118) tragen, die mittel- oder unmittelbar zu einem Gesimsschalungswagen (110) zusammengefasst sind, der mittels an dem Bauwerk befestigbaren oder befestigten Führungen etwa parallel zu dem Rand (10A) vermittels Fahrgestellen verfahrbar und in den Betonierstellungen arretierbar sind, und der an seinem bauwerksseitigen Endbereich Stützräder (122) trägt, zum Verfahren des Gesimsschalungswagens (110) entlang des Bauwerkrandes, dadurch gekennzeichnet, dass die Führungen aus Doppelführungsschienenabschnitten (210A) bestehen, die einerseits an ihren Oberseiten an entlang des Bauwerkes beabstandet befestigbaren oder befestigten oberen Fahrgestellen (220A) verfahrbar sind, und die, andererseits, an ihren Unterseiten die entlang des Bauwerks beabstandeten unteren Fahrgestellen (220B) des Gesimsschalungswagens (110) führen.Formwork device for batch concreting of cornices ( 10 ) on an elongated structure with at least one, in particular free, projecting edge, consisting of at or below the edge ( 10A ) arranged formwork supports ( 112 ), which have a cornice formwork ( 118 ), directly or indirectly to a cornice formwork carriage ( 110 ) are summarized by means of attachable to the building or fixed guides approximately parallel to the edge ( 10A ) are movable by means of chassis and can be locked in the concreting positions, and at its construction-side end region support wheels ( 122 ), for moving the corn-formwork wagon ( 110 ) along the edge of the building, characterized in that the guides consist of double guide rail sections ( 210A ), on the one hand on their upper sides at spaced apart along the structure fastened or fixed upper chassis ( 220A ), and, on the other hand, at their lower sides the lower chassis spaced apart from the structure ( 220B ) of the cornice shuttering carriage ( 110 ) to lead. Schalungsvorrichtung nach dem Oberbegriff von Anspruch 1, insbesondere nach Anspruch 1, gekennzeichnet durch mindestens eine Wagenlifteinrichtung zum Anheben des Gesimsschalungswagens (110) bezüglich des Bauwerks (110), die einerseits an dem Bauwerk, insbesondere an dessen Unterseite, und die andererseits an dem Gesimsschalungswagen (110) angreift und die die Gesimsschalung (118) für deren Betonierstellung in eine die Führung gewichtsentlastenden angehobene Stellung bringt und in deren abgesenkten Verfahrstellung das Verfahren des Gesimsschalungswagens gestattet.Shuttering device according to the preamble of claim 1, in particular according to claim 1, characterized by at least one carriage lifting device for lifting the cornice shuttering carriage ( 110 ) concerning the structure ( 110 ), on the one hand on the building, in particular on its underside, and on the other hand on the cornice shutter carriage ( 110 ) and that the cornice formwork ( 118 ) for the concreting position in a guide weight relieving raised position brings and in the lowered travel position allows the process of cornice shuttering car. Schalungsvorrichtung nach dem Oberbegriff von Anspruch 1, insbesondere nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Führungen an dem Bauwerk und/oder die Fahrgestelle an dem Gesimsschalungswagen (110) quer zum austragenden Rand des Bauwerkes pendelnd befestigt sind.Shuttering device according to the preamble of claim 1, in particular according to claim 1 or 2, characterized in that the guides on the building and / or the chassis on the cornice shutter carriage ( 110 ) are mounted oscillating transversely to the discharging edge of the building. Schalungsvorrichtung, nach einem der Ansprüche 1 bis 3, gekennzeichnet durch einen Mannkorb (240) zum Anbringen oder zum demontieren von Verankerungselemente (224) für die verfahrbare Aufnahme von Doppelführungsschienenabschnitten (210A) unterhalb des Gesimses (10) wobei der Mannkorb (240) bezüglich der Doppelführungsschiene (210) verfahrbar ist.Formwork device according to one of claims 1 to 3, characterized by a man basket ( 240 ) for attaching or dismantling anchoring elements ( 224 ) for the movable recording of double guide rail sections ( 210A ) below the cornice ( 10 ) where the man basket ( 240 ) with respect to the double guide rail ( 210 ) is movable. Schalungsvorrichtung nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass Verankerungselemente (224) an dem oder unterhalb des Gesims/es (10) mittels in das Gesimse einbetonierter Verankerungsmittel (234) befestigt und derart ausgestaltet sind, dass sie ein Befestigungsende einer Hubeinrichtung und/oder ein Befestigungsende eines Ankerelementes in einer Betonierstellung des Gesimsschalungswagens aufnimmt.Formwork device according to one of claims 1 to 4, characterized in that anchoring elements ( 224 ) at or below the cornice / es ( 10 ) by means of anchoring means embedded in the cornice ( 234 ) and are configured such that it receives a fastening end of a lifting device and / or a fastening end of an anchor element in a concreting position of the cornice shuttering carriage.
DE202008015147U 2008-11-14 2008-11-14 Shuttering device for concreting cornices on an elongate structure Expired - Lifetime DE202008015147U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE202008015147U DE202008015147U1 (en) 2008-11-14 2008-11-14 Shuttering device for concreting cornices on an elongate structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE202008015147U DE202008015147U1 (en) 2008-11-14 2008-11-14 Shuttering device for concreting cornices on an elongate structure

Publications (1)

Publication Number Publication Date
DE202008015147U1 true DE202008015147U1 (en) 2010-04-08

Family

ID=42096731

Family Applications (1)

Application Number Title Priority Date Filing Date
DE202008015147U Expired - Lifetime DE202008015147U1 (en) 2008-11-14 2008-11-14 Shuttering device for concreting cornices on an elongate structure

Country Status (1)

Country Link
DE (1) DE202008015147U1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202009003114U1 (en) 2009-03-09 2010-07-22 Betomax Kunststoff- Und Metallwarenfabrik Gmbh & Co. Kg Fastening device for the suspended attachment of formwork and / or scaffolding parts to concrete parts
GB2488983A (en) * 2011-03-08 2012-09-19 Ideas Creative Design Ltd Suspended scaffolding system
CN106760511A (en) * 2016-12-16 2017-05-31 中国建筑第八工程局有限公司 Drip system and its construction method on a kind of clear water building cornice template
AT17062U1 (en) * 2018-04-12 2021-04-15 Quick Bauprodukte Ges Mit Beschraenkter Haftung Mobile working scaffold
CN113389148A (en) * 2021-06-30 2021-09-14 中国建筑第八工程局有限公司 Cooperative construction method for lifting and mounting guardrail formwork
CN114892529A (en) * 2022-05-23 2022-08-12 中国一冶集团有限公司 Recyclable template for municipal viaduct construction
CN115075239A (en) * 2022-06-30 2022-09-20 重庆亿扬建筑工程有限公司 Guide wall formwork assembly for preventing eccentric load and using method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3115239A1 (en) * 1981-04-15 1982-11-04 Winfried Dipl.-Ing. 6365 Rosbach Schnabel Device as a scaffold for driving, in sections, under concrete bridges
DE9107201U1 (en) 1990-09-21 1991-08-08 Alfred Kunz Gmbh & Co, 8000 Muenchen, De
DE19858186A1 (en) * 1998-01-16 1999-07-22 Domesle Stahlverschalungs Gmbh Formwork for concreting cantilevered concrete components, especially caps, cornices and superstructures

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3115239A1 (en) * 1981-04-15 1982-11-04 Winfried Dipl.-Ing. 6365 Rosbach Schnabel Device as a scaffold for driving, in sections, under concrete bridges
DE9107201U1 (en) 1990-09-21 1991-08-08 Alfred Kunz Gmbh & Co, 8000 Muenchen, De
DE19858186A1 (en) * 1998-01-16 1999-07-22 Domesle Stahlverschalungs Gmbh Formwork for concreting cantilevered concrete components, especially caps, cornices and superstructures

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE202009003114U1 (en) 2009-03-09 2010-07-22 Betomax Kunststoff- Und Metallwarenfabrik Gmbh & Co. Kg Fastening device for the suspended attachment of formwork and / or scaffolding parts to concrete parts
GB2488983A (en) * 2011-03-08 2012-09-19 Ideas Creative Design Ltd Suspended scaffolding system
GB2488983B (en) * 2011-03-08 2014-04-16 Jerzy Jan Meldner Suspended structure, scaffolding or framework system
US9556625B2 (en) 2011-03-08 2017-01-31 Jerzy Meldner Suspended scaffolding system
US11028602B2 (en) 2011-03-08 2021-06-08 Jerzy J. MELDNER Suspended scaffolding system
CN106760511A (en) * 2016-12-16 2017-05-31 中国建筑第八工程局有限公司 Drip system and its construction method on a kind of clear water building cornice template
AT17062U1 (en) * 2018-04-12 2021-04-15 Quick Bauprodukte Ges Mit Beschraenkter Haftung Mobile working scaffold
CN113389148A (en) * 2021-06-30 2021-09-14 中国建筑第八工程局有限公司 Cooperative construction method for lifting and mounting guardrail formwork
CN114892529A (en) * 2022-05-23 2022-08-12 中国一冶集团有限公司 Recyclable template for municipal viaduct construction
CN114892529B (en) * 2022-05-23 2023-10-24 中国一冶集团有限公司 Recyclable template for municipal viaduct construction
CN115075239A (en) * 2022-06-30 2022-09-20 重庆亿扬建筑工程有限公司 Guide wall formwork assembly for preventing eccentric load and using method
CN115075239B (en) * 2022-06-30 2024-02-13 重庆亿扬建筑工程有限公司 Guide wall template assembly capable of preventing eccentric load and use method

Similar Documents

Publication Publication Date Title
DE2607805C3 (en) Device for the section-by-section, free front construction of multi-span bridge structures made of reinforced or prestressed concrete
DE202008015147U1 (en) Shuttering device for concreting cornices on an elongate structure
DE2622840A1 (en) CLIMBING SCAFFOLDING WITH APPROPRIATE FORMWORK
EP3899167B1 (en) Construction site device with climbing formwork and elevator system
DE1255695B (en) Method and device for the construction of multi-span bridges or similar structures in sections
DE3390026C2 (en)
EP2288770A2 (en) Device for demolishing constructions
DE902188C (en) Sliding circuit for concrete structures
DE2217584C3 (en) Climbing formwork for a concrete wall formwork
EP2035314B1 (en) Lifting platform and method for setting up a lifting platform
DE2550030B1 (en) Tunnel shuttering with support carriage - has adjustable flexible panelling on support and extensible bearers off main frame
DE102007023083B3 (en) Mobile superstructure formwork for steel-reinforced concrete bridge has holding elements at intervals on underside of steel support that carry rollers one above the other offset by 90 degrees, one with horizontal, one with vertical axis
DE2461251C3 (en) Device for pre-assembly, transport and installation of a route or tunnel extension
DE202008003536U1 (en) Mobile superstructure for bridges, in particular steel composite bridges
DE3733627A1 (en) Method and apparatus for the sectional construction of prestressed-concrete bridges independently of terrain
AT298553B (en) Device for the section-wise production of a structure supported on pillars, in particular a multi-span bridge made of reinforced or prestressed concrete
DE1759284C (en) Movable device for producing the superstructure of multi-span bridges or similar structures in sections
DE3346921C1 (en) Device for removal and installation of bridge bearings or parts thereof arranged on piers
DE3016057C2 (en) Method for erecting a bridge arch consisting of two arch halves
AT372997B (en) DEVICE FOR SECTION-FREE STOCKING OF MULTI-SPREADED BRIDGE STRUCTURES MADE OF STEEL OR prestressed concrete
DE202023105638U1 (en) External formwork device for the construction of a continuous beam
DE10022662C2 (en) Device for the gradual movement of formwork on a concrete structure
AT337418B (en) PROCEDURE FOR ERECTING STRUCTURES AND LIFTING DEVICE FOR PERFORMING THE PROCEDURE
DE1658587C (en) Device for the production of multi-span structures, in particular bridge structures, made of steel or prestressed concrete
DE2264585C3 (en) Device for the section-by-section front construction of bridge structures made of reinforced or prestressed concrete

Legal Events

Date Code Title Description
R163 Identified publications notified
R207 Utility model specification

Effective date: 20100512

R150 Term of protection extended to 6 years
R150 Term of protection extended to 6 years

Effective date: 20120217

R082 Change of representative

Representative=s name: GROSSE, SCHUMACHER, KNAUER, VON HIRSCHHAUSEN, DE

R081 Change of applicant/patentee

Owner name: BETOMAX GMBH & CO. KG, DE

Free format text: FORMER OWNER: BETOMAX KUNSTSTOFF- UND METALLWARENFABRIK GMBH & CO. KG, 41460 NEUSS, DE

Effective date: 20120613

R082 Change of representative

Representative=s name: GROSSE, SCHUMACHER, KNAUER, VON HIRSCHHAUSEN, DE

Effective date: 20120613

R157 Lapse of ip right after 6 years