DE19713778A1 - Joint in poured concrete building structure - Google Patents

Joint in poured concrete building structure

Info

Publication number
DE19713778A1
DE19713778A1 DE1997113778 DE19713778A DE19713778A1 DE 19713778 A1 DE19713778 A1 DE 19713778A1 DE 1997113778 DE1997113778 DE 1997113778 DE 19713778 A DE19713778 A DE 19713778A DE 19713778 A1 DE19713778 A1 DE 19713778A1
Authority
DE
Germany
Prior art keywords
joint
concrete
boom
attached
band body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
DE1997113778
Other languages
German (de)
Inventor
Thomas Walliser
Edgar Schoemig
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ed Zueblin AG
Original Assignee
Ed Zueblin AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ed Zueblin AG filed Critical Ed Zueblin AG
Priority to DE1997113778 priority Critical patent/DE19713778A1/en
Priority to DE29723149U priority patent/DE29723149U1/en
Publication of DE19713778A1 publication Critical patent/DE19713778A1/en
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The system used in a building seals the joint between two masses of poured concrete. A concrete wall (1) with a separating layer (11) attached to it stands on a floor (12) forming part of a shuttering assembly. The separating layer (11) on the wall stops short of the floor. A flexible hollow (6) seal member at the bottom has an upstanding flange (3) nailed (7) to the already poured concrete and a horizontal flange (4) with a bulbous edge (5) extending into the space (13) yet to be filled with concrete. The thick part of the seal member is held in an upright U-section channel (10) integrated with a broad foot (8) of trapezoidal cross-section, which stands on the floor. The edges of the trapezoidal foot have sealing strips (9) which press against the floor.

Description

Es ist üblich, größere Betonbauwerke durch Fugen in Einzelabschnitte zu unterteilen. Gründe hierfür sind im wesentlichen die Vermeidung von Rißbil­ dung durch Überschreitung der aufnehmbaren Betonzugspannungen durch Formänderungen des Betons beim Herstellprozeß oder bei Temperaturände­ rungen, sowie rein praktische Belange bei der Bauabwicklung, z. B. günstige Arbeitstakte für Schalen, Bewehren oder Betonieren. Die Zeitdauer, die ein Bauwerk nutzbar ist, ist in hohem Maße von der Dichtigkeit gegen Wasser abhängig. Fugen müssen daher gewöhnlich was­ serdicht ausgeführt werden, wofür der Stand der Technik Dichtungsbänder unterschiedlicher Bauweise angibt (siehe z. B. S. 11 bis 116 bei Norbert Kla­ wa, Alfred Haack: "Tiefbaufugen", Ernst & Sohn Verlag für Architektur und technische Wissenschaften, Berlin, 1990). Einbetonierte Dichtungsbänder (nur Dichtfunktion) haben dabei den Vorteil, nicht mehr aus der Fuge heraus­ fallen zu können (z. B. als Folge großer Kälte) und auch dichter abzuschlie­ ßen. Zur Verschönerung der Fugen und zum Schutz gegen Spritzwasser ist es außerdem üblich, Fugenabschlußbänder in die Fugen einzubringen. Dies ge­ schieht dadurch, daß die Fugentrennplatte (meist eine Mineralfaserplatte), die beim Betonieren die Fuge frei hält, am Rande der Fuge herausgeschält, - gekratzt oder - gefräst wird (meist 5-6 Zentimeter tief) und anschließend ein den Fugenabstand ausfüllendes Abschlußband in den freigewordenen Raum eingebracht (z. B. hineingeklopft oder eingepreßt) wird. Ein Nachteil solcher Bänder ist, daß sie bei Bewegungen der benachbarten Blöcke oder auch bei tiefen Temperaturen herausfallen können. Ein weiteres Problem an der Fuge stellen auch die Fugenkanten dar: Werden sie rechtwinklig eingeschalt betoniert, so brechen sie beim Ausscha­ len leicht unschön aus. An rechtwinkligen Kanten tritt auch gerne das Pro­ blem des Ausblutens auf: Feinanteile des Betons entweichen dort durch Rit­ zen in der Schalung. Um dieses zu verhindern, existieren Profilleisten mit im wesentlichen trapezförmigem Querschnitt, die vor dem Betonierprozeß auf einseitig einbetonierte Fugendichtungsbänder aufgesteckt werden und nach der Erhärtung des anschließenden Bauabschnitts abgezogen werden.It is common for large concrete structures to be jointed into individual sections divide. The main reasons for this are the avoidance of cracks by exceeding the recordable concrete tensile stresses Changes in the shape of the concrete during the manufacturing process or during temperature changes stungen, as well as purely practical matters in construction, z. B. cheap Work cycles for formwork, reinforcement or concreting. The length of time that a building can be used is to a large extent different from that Water tightness dependent. Joints usually have to do something be executed watertight, for which the state of the art sealing tapes of different designs (see e.g. p. 11 to 116 by Norbert Kla wa, Alfred Haack: "Tiefbaufugen", Ernst & Sohn publishing house for architecture and technical sciences, Berlin, 1990). Concrete sealing tapes (only sealing function) have the advantage of no longer coming out of the joint to fall (e.g. as a result of extreme cold) and also to close more tightly eat. It is to beautify the joints and to protect against splash water also usual to insert joint sealing tapes into the joints. This ge happens because the joint separating plate (usually a mineral fiber plate), that keeps the joint free during concreting, peeled out at the edge of the joint, is scratched or milled (usually 5-6 centimeters deep) and then a finishing tape filling the gap in the vacated space introduced (e.g. knocked in or pressed in). A disadvantage of such Bands is that they move when the neighboring blocks or even low temperatures can fall out. Another problem at the joint is the joint edge: If they are concreted in at right angles, they break when they are scrapped len out ugly. The pro likes to step on right-angled edges  Bleeding out: Fine parts of the concrete escape there through rit zen in the formwork. To prevent this, there are profile strips with im essential trapezoidal cross-section before the concreting process joint sealing tapes concreted in on one side and after deducted from the hardening of the subsequent construction phase.

Es existieren Dichtungsbänder für Fugen, die in beiden fugenbildenden Betonteilen über Ausleger einbetoniert werden und auf die eine Profilleiste abziehbar aufgesteckt werden kann. Probleme bereitet dabei die Komplexität der zu verwendenden Schalung (unterbrochene Stirnschalung).There are sealing tapes for joints that form joints in both Concrete parts are concreted over the boom and onto a profile bar removable can be plugged on. Complexity creates problems the formwork to be used (interrupted face formwork).

Es besteht also weiterhin der Bedarf nach einem einfachen Verfahren und einer einfachen Vorrichtung für einen schönen Fugenabschluß.So there is still a need for a simple process and a simple device for a beautiful joint finish.

Die Erfindung gibt hierfür ein Fugenabschlußband an, das es erlaubt, auf das mühselige Herausschälen der Fugentrennplatte zu verzichten, gleichzei­ tig in der Lage ist hinreichend abzudichten und zusätzlich durch Aufstecken einer wiederverwendbaren Profilleiste die Schaffung schöner Kanten ermög­ licht.For this purpose, the invention specifies a joint sealing tape that allows it to to forego the tedious peeling of the joint separating plate, at the same time is able to seal adequately and additionally by pushing on a reusable profile strip enables the creation of beautiful edges light.

Die Aufgabe wird dadurch gelöst, daß das erfindungsgemäße Fugenab­ schlußband nur auf einer Seite über einen horizontalen Ausleger einbetoniert wird, wohingegen es an der anderen Seite über einen senkrechten Ausleger durch Tacker oder ähnliche Mittel einfach an dem bereits erstellten und ent­ schalten Betonbauteil befestigt wird.The object is achieved in that the joints according to the invention closing band concreted in on one side only via a horizontal bracket whereas it is on the other side via a vertical boom by staple gun or similar means simply on the already created and ent switch concrete component is attached.

Der horizontale, später einbetonierte Ausleger kann zum besseren Verbund mit dem Beton Profile aufweisen, oder auch Durchbrüche (Löcher).The horizontal, later concreted boom can be used for a better bond have profiles with the concrete, or openings (holes).

Gleichzeitig kann zur Abschrägung der Fugenkanten zur Fugenöffnung hin eine Profilleiste mit im wesentlichen trapezförmigem Querschnitt über daran befindliche, bevorzugt leistenförmige Greifer aufgesteckt werden, die nach Beendigung des Betonierens und nach dem Entschalen einfach abge­ zogen und wiederverwendet werden kann. At the same time, the joint edges can be chamfered to the joint opening towards a profile strip with an essentially trapezoidal cross section attached, preferably strip-shaped grippers are attached, the after finishing the concreting and after demoulding, simply abge can be pulled and reused.  

An dem im wesentlichen trapezförmige Teil der Profilleiste sitzen dabei die Greifer bevorzugt nicht, wie üblich, direkt an den Ecken der kürzeren Tra­ pezseite, sondern sind auf dieser Seite nach innen versetzt, so daß eine waagerechte Fläche gebildet wird. Diese waagerechte Fläche (siehe Fig. 1) verhindert ein Verrutschen der Profilleiste relativ zum erstellten Betonteil, wenn das Schalungsblech von unten gegen die Profilleiste gedrückt wird, um einen dichtenden Abschluß für die auf diese Weise gebildete neue Schalung zu erreichen. Weiche Dichtungslippen an den Ecken der längeren Trapezsei­ te verbessern die Dichtwirkung.On the substantially trapezoidal part of the profile bar, the grippers preferably do not sit, as usual, directly at the corners of the shorter tra pezseite, but are offset inwards on this side, so that a horizontal surface is formed. This horizontal surface (see Fig. 1) prevents slipping of the profile bar relative to the concrete part created when the formwork sheet is pressed from below against the profile bar to achieve a sealing seal for the new formwork formed in this way. Soft sealing lips on the corners of the longer trapezoidal side improve the sealing effect.

Es hat sich auch gezeigt, daß ein sicheres Festklemmen der Profilleiste über die Greiferleisten eine Höhe des die Fuge ausfüllenden Teils des Ban­ des, im folgenden als Bandkörper bezeichnet, von ungefähr 40 Millimeter erfordert. Der Bandkörper kann an seiner Außenseite strukturiert (z. B. gerif­ felt) sein, um eine bessere Haftung an den Greifern zu bewirken.It has also been shown that the profile strip is securely clamped a height of the part of the ban filling the joint via the gripper bars des, hereinafter referred to as the band body, of about 40 millimeters required. The outside of the belt body can be structured (e.g. ribbed felt) to ensure better grip on the grippers.

Ein Ausführungsbeispiel eines erfindungsgemäßen Fugenabschlußban­ des in Anwendung an einer neu zu betonierenden Fuge, im Verein mit einer dazu passenden erfindungsgemäßen Profilleiste zur Kantenabschrägung wird in Fig. 1 gezeigt.An embodiment of a joint termination tape according to the invention, which is used in a joint to be concreted, in combination with a matching profile strip according to the invention for beveling edges, is shown in FIG. 1.

Das Verfahren zur Anwendung des beschriebenen Fugenabschlußban­ des sieht vor, nach Entschalung des einen die zukünftige Fuge bildenden Betonteils ein erfindungsgemäßes Abschlußband mittels seines vertikalen Auslegers an diesem anzubringen (z. B. durch Anheften oder Ankleben), eine Profilleiste auf dessen Bandkörper aufzustecken, eine Fugentrennplatte an­ zubringen (dies kann selbstverständlich auch vor Anbringen des Fugenab­ schlußbandes geschehen, so, wie auch andere Verfahrensschritte zeitlich anders arrangiert werden können), den Schalwagen heranzufahren und das Schalungsblech anzuheben, bis die Profilleiste oder daran befindliche Dich­ tungslippen eine Dichtungswirkung für die neuentstandene Schalung aus­ üben und die entstandene Schalung mit Beton zu verfüllen, wobei der hori­ zontale Ausleger des Abschlußbandes eingebettet wird.The procedure for using the joint closing tape described This provides for the future joint to be formed after the formwork has been removed Concrete part of an end tape according to the invention by means of its vertical To attach the boom to this (e.g. by tacking or gluing), a To attach the profile strip to the tape body, a joint separating plate to be brought in (this can of course also be done before final band happen, as well as other procedural steps in time can be arranged differently), to drive up the formwork carriage and that Raise the formwork sheet until the profile strip or you are there sealing lips for the newly created formwork  practice and fill the resulting formwork with concrete, the hori zonal boom of the final tape is embedded.

BezugszeichenlisteReference list

1 erstelltes Betonteil
2 Bandkörper
3 vertikaler Ausleger
4 horizontaler Ausleger
5 Betonverbundprofil
6 Hohlraum
7 Nagel
8 trapezförmige Profilleiste
9 Dichtungslippe
10 Greifer
11 Fugentrennplatte
12 Schalungsblech
13 zu verfüllender Schalungshohlraum
1 created concrete part
2 belt bodies
3 vertical arms
4 horizontal arms
5 composite concrete profile
6 cavity
7 nail
8 trapezoidal profile strips
9 sealing lip
10 grippers
11 joint separating plate
12 formwork sheet
13 formwork cavity to be filled

Claims (5)

1. Vorrichtung zum Abschluß von Fugen an Bauwerken, die aus mehreren Untereinheiten aufgebaut sind, bestehend aus einem Bandkörper (2) mit davon seitlich abstehenden Auslegern (3, 4) mindestens zweier unter­ schiedlicher Arten, dadurch gekennzeichnet, daß
  • a.) die eine Art des Auslegers einen Vertikalausleger (3) (durchgehendes oder unterbrochenes Band) des Bandkörpers darstellt, der so ausgestaltet ist, daß er als Verlängerung der dem schon erstellten Betonteil (1) anlie­ genden Seite des Bandkörpers (2) ausgebildet ist, dort am Beton anliegt und durch mechanische oder klebende Befestigungsmittel an eben die­ sem Beton befestigt wird,
  • b.) die andere Art des Auslegers (durchgehendes oder unterbrochenes Band) auf der gegenüberliegenden Seite des Dichtungsbandes und im wesentlichen senkrecht (Winkel größer 450) zu dem erstgenannten Verti­ kalausleger in Form eines Horizontalauslegers (4) ausgebildet ist, der im folgenden Betonierprozeß in das zweite fugenbildende Betonteil mit einbe­ toniert wird.
1. A device for closing joints on structures that are constructed from several sub-units, consisting of a band body ( 2 ) with laterally projecting arms ( 3 , 4 ) at least two different types, characterized in that
  • a.) which is a type of boom, a vertical boom ( 3 ) (continuous or interrupted belt) of the belt body, which is designed so that it is designed as an extension of the already created concrete part ( 1 ) lying side of the belt body ( 2 ) , lies there against the concrete and is attached to this concrete by mechanical or adhesive fasteners,
  • b.) the other type of boom (continuous or interrupted tape) on the opposite side of the sealing tape and substantially perpendicular (angle greater than 450) to the first vertical boom in the form of a horizontal boom ( 4 ), which is in the following concreting process in the second joint-forming concrete part is toned with einbe.
2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß der den Fugenabstand ausfüllende Band­ körper (2), an dem die Ausleger (3, 4) angebracht sind, einen im wesentli­ chen rechteckigen oder ovalen äußeren Querschnitt aufweist, auf den im Falle einer Fugenformung eine Profilleiste (8) aufsteckbar ist, die sich mit zwei parallelen, bevorzugt leistenförmigen Greifern (10) auf beiden Seiten des Bandkörpers (2) festklemmt und nach dem Aushärten des Betons ab­ gezogen werden kann.2. Apparatus according to claim 1, characterized in that the gap spacing filling band body ( 2 ) on which the brackets ( 3 , 4 ) are attached has a substantially rectangular or oval outer cross-section on which in the case of a joint formation a profile strip ( 8 ) can be plugged on, which is clamped with two parallel, preferably strip-shaped grippers ( 10 ) on both sides of the belt body ( 2 ) and can be pulled off after the concrete has hardened. 3. Vorrichtung nach mindestens einem der Ansprüche 1 und 2, dadurch gekennzeichnet, daß der Querschnitt des Bandkörpers (2) grö­ ßenordnungsmäßig eine Breite von 25 Millimeter und eine Höhe von 40 Millimeter aufweist und die Vertikalausleger (3) größenordnungsmäßig 35 Millimeter und die Horizontalausleger (4), die auch noch Profile (5) oder Durchbrüche aufweisen können, größenordnungsmäßig 25 Millimeter ab­ stehen.3. Device according to at least one of claims 1 and 2, characterized in that the cross section of the band body ( 2 ) has a size of a width of 25 millimeters and a height of 40 millimeters and the vertical boom ( 3 ) is of the order of 35 millimeters and the horizontal boom ( 4 ), which can also have profiles ( 5 ) or openings, are on the order of 25 millimeters. 4. Vorrichtung nach mindestens einem der Ansprüche 1 bis 3, dadurch ge­ kennzeichnet, daß der Bandkörper im Querschnitt ein oder mehrere Hohl­ räume (6) in Art von Hohlprofilen aufweist.4. The device according to at least one of claims 1 to 3, characterized in that the band body in cross section has one or more cavities ( 6 ) in the manner of hollow profiles. 5. Verfahren zum Fugenabschluß unter Zuhilfenahme einer Vorrichtung ge­ mäß mindestens einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß ohne strikte Festlegung der Reihenfolge
  • a.) an das bereits erstellte Betonteil (1) einer künftigen Fuge, welches im unteren Bereich durch die Form seiner Schalung gebrochene Kanten auf­ weist, die im wesentlichen der Form der Profilleisten nach Anspruch 2 ent­ sprechen, ein Fugenband und Profilleisten (8) gemäß mindestens einem der Ansprüche 1 bis 4 mechanisch oder durch Kleben vermittels seines Vertikalauslegers angebracht wird;
  • b.) Fugentrennplatten (11) zum Freihalten der Fuge angebracht werden und auf den Bandkörper (2) eine Profilleiste (8) der beschriebenen Art vermittels ihrer Greifer (10) aufgesteckt wird;
  • c.) die Schalung für das zweite fugenbildende Betonteil erstellt oder her­ angefahren wird,
  • d.) ein Betonierprozeß durchgeführt wird, durch den der Horizontalausle­ ger (4) einbettet wird,
  • e.) nach dem Ausschalen die Profilleiste (8) abgezogen wird.
5. A method for sealing joints with the aid of a device according to at least one of claims 1 to 4, characterized in that without strictly determining the sequence
  • a.) to the already created concrete part ( 1 ) of a future joint, which has broken edges in the lower area due to the shape of its formwork, which essentially correspond to the shape of the profile strips according to claim 2, a joint tape and profile strips ( 8 ) according to at least one of claims 1 to 4 is attached mechanically or by gluing by means of its vertical boom;
  • b.) joint separating plates ( 11 ) for keeping the joint free and a profiled strip ( 8 ) of the type described is attached to the band body ( 2 ) by means of its gripper ( 10 );
  • c.) the formwork for the second joint-forming concrete part is created or started up,
  • d.) a concreting process is carried out, through which the horizontal boom ( 4 ) is embedded,
  • e.) the profile strip ( 8 ) is removed after stripping.
DE1997113778 1997-04-03 1997-04-03 Joint in poured concrete building structure Ceased DE19713778A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE1997113778 DE19713778A1 (en) 1997-04-03 1997-04-03 Joint in poured concrete building structure
DE29723149U DE29723149U1 (en) 1997-04-03 1997-04-03 Device for forming, closing and simultaneously sealing joints on concrete structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1997113778 DE19713778A1 (en) 1997-04-03 1997-04-03 Joint in poured concrete building structure

Publications (1)

Publication Number Publication Date
DE19713778A1 true DE19713778A1 (en) 1998-02-19

Family

ID=7825347

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1997113778 Ceased DE19713778A1 (en) 1997-04-03 1997-04-03 Joint in poured concrete building structure

Country Status (1)

Country Link
DE (1) DE19713778A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10146678A1 (en) * 2001-09-21 2003-04-10 Zementol Gmbh Profile for sealing working or expansion joints between two building elements comprises at least two legs respectively fastened to the existing element and embedded into the concrete of the element being produced
EP1229177A3 (en) * 2001-02-01 2003-12-17 Jutta Quinting Building joint sealing process and corresponding sealing strip

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1889943U (en) * 1959-08-22 1964-03-26 Herbert Ender PARALLELOGRAM-LIKE DEFORMABLE EXPANSION JOINT STRAND.
DE9315679U1 (en) * 1993-10-14 1995-02-09 Illbruck Gmbh, 51381 Leverkusen Joint closure
DE29622270U1 (en) * 1996-12-21 1997-08-21 Betonol Planung von Sperrbetonsystemen GmbH, 01237 Dresden Joint tape

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1889943U (en) * 1959-08-22 1964-03-26 Herbert Ender PARALLELOGRAM-LIKE DEFORMABLE EXPANSION JOINT STRAND.
DE9315679U1 (en) * 1993-10-14 1995-02-09 Illbruck Gmbh, 51381 Leverkusen Joint closure
DE29622270U1 (en) * 1996-12-21 1997-08-21 Betonol Planung von Sperrbetonsystemen GmbH, 01237 Dresden Joint tape

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
DE LIT: KLAWA, HAACK: Tiefbaufugen, S.36 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1229177A3 (en) * 2001-02-01 2003-12-17 Jutta Quinting Building joint sealing process and corresponding sealing strip
DE10146678A1 (en) * 2001-09-21 2003-04-10 Zementol Gmbh Profile for sealing working or expansion joints between two building elements comprises at least two legs respectively fastened to the existing element and embedded into the concrete of the element being produced

Similar Documents

Publication Publication Date Title
EP3662116B1 (en) Ceiling formwork and method for producing a ceiling element
DE19722449A1 (en) Shuttering element
DE2526062B2 (en) DEVICE FOR FASTENING AN EXTERNAL FRAME TO BE CONCRETED INTO A CONCRETE SLAB FOR A SLIDING WINDOW OR THE LIKE. ON THE HORIZONTAL FLOOR OF A SHAPE
DE4040943C2 (en) Device for the thermal insulation of a window or door reveal
DE19713778A1 (en) Joint in poured concrete building structure
WO2017032663A1 (en) Edge shuttering device
DE2730542A1 (en) Concreting formwork joint gap seal - is cold setting elastomer which takes up unevenness between abutting surfaces
EP0003720B1 (en) Method of making a crack-proof, impervious joint between an asphaltic surfacing and part of a structure, set of shaped elements for carrying out the method and structure built according to the method
DE912465C (en) Cable duct
EP1422355B1 (en) Shuttering plate and methods of making and installing same
DE29723149U1 (en) Device for forming, closing and simultaneously sealing joints on concrete structures
DE2252408A1 (en) METHODS AND DEVICES FOR PRODUCING A PREFABRICATED WALL PART FROM GLASS BUILDING BLOCKS
DE3726216A1 (en) Prefabricated flooring comprising concrete slabs, in particular industrial flooring comprising in-situ-concrete slabs, and process for the production thereof
DE69025775T2 (en) METHOD FOR PRODUCING A HEAT-INSULATED / HEAT-DAMPABLE REINFORCED CONCRETE COMPONENT
DE3637853C1 (en) Process for grouting cracks in a double-leaf masonry structure, and apparatus for carrying out the process
DE29602697U1 (en) formwork
EP2765258B1 (en) Method for creating a concrete formwork and a stop end and formwork element used for the method
DE1459965A1 (en) Method and device for building a tile partition
DE19653816A1 (en) Sealing strip for gaps between garage and cellar walls etc
DE2918362A1 (en) Water and corrosion proof connection - is for concrete sections and uses synthetic cement filling in space formed by shuttering behind joint
AT88801B (en) Formwork for the production of window and door openings in monolithic concrete buildings.
DE1895646U (en) PRE-FABRICATED CONCRETE SLAB WITH FACE REAR ARM.
CH664997A5 (en) METHOD FOR PRODUCING FINISHED GARAGES WITH A STRUCTURED SIGHT SIDE AND DEVICE FOR IMPLEMENTING THE SAME.
EP0878282A1 (en) Process for making a reinforced concrete building element and shuttering used for carrying out the process
DE2053519A1 (en) Process for bricking up and, if necessary, one or two-sided plastering of walls and equipment for carrying out the process

Legal Events

Date Code Title Description
OAV Applicant agreed to the publication of the unexamined application as to paragraph 31 lit. 2 z1
OP8 Request for examination as to paragraph 44 patent law
8131 Rejection