DE1148373B - Conveyor tower in steel construction - Google Patents

Conveyor tower in steel construction

Info

Publication number
DE1148373B
DE1148373B DEG29456A DEG0029456A DE1148373B DE 1148373 B DE1148373 B DE 1148373B DE G29456 A DEG29456 A DE G29456A DE G0029456 A DEG0029456 A DE G0029456A DE 1148373 B DE1148373 B DE 1148373B
Authority
DE
Germany
Prior art keywords
tower
posts
hoisting machine
additional
headframe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DEG29456A
Other languages
German (de)
Inventor
Dr-Ing Hermann Schaefer
Dipl-Ing Hugo Pruess
Dipl-Ing Guenter Sander
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gutehoffnungshutte Sterkrade AG
Original Assignee
Gutehoffnungshutte Sterkrade AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gutehoffnungshutte Sterkrade AG filed Critical Gutehoffnungshutte Sterkrade AG
Priority to DEG29456A priority Critical patent/DE1148373B/en
Publication of DE1148373B publication Critical patent/DE1148373B/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • E04H12/10Truss-like structures
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B17/00Hoistway equipment
    • B66B17/02Hoistway equipment mounted in head-frames

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Description

Förderturm in Stahlkonstruktion Zum Stand der Technik gehören Fördergerüste mit mehreren übereinander angeordneten Seilscheibenbühnen. Diese haben nur die Belastung aufzunehmen, die sich aus der Umlenkung der von der Flurfördermaschine kommenden Seile in den Schacht ergibt.Headframe in steel construction Headframes belong to the state of the art with several pulley platforms arranged one above the other. These only have the burden take up, resulting from the deflection of the coming from the floor conveyor Ropes into the shaft yields.

Demgegenüber hat ein Förderturm außer den Seillasten auch die Fördermaschine zu tragen, die auf einer Bühne im Kopf des Förderturmes, und zwar auf einem den Turm durchsetzenden Trägerrost, gelagert ist. Dieser Trägerrost wird nach den Seillasten, dem Eigengewicht der Fördermaschine, deren Bremskräften und sonstigen Betriebsbelastungen ausgelegt. Zudem unterscheidet sich ein Förderturm von einem Fördergerüst dadurch, daß in einem Turm das umfangreiche Fördermaschinenzubehör untergebracht und zu diesem Zweck unterhalb der Fördermaschine eine oder mehrere Zusatzbühnen vorgesehen werden. Demgemäß sind die Belastungsverhältnisse ebenso wie die räumlichen Verhältnisse beim Förderturm grundsätzlich anders als beim Fördergerüst, das - weil von der Flurfördermaschine und deren Zubehör getrennt - nur- die Seilumlenkscheiben aufzunehmen hat.In contrast, in addition to the rope loads, a headframe also has the hoisting machine to carry them on a stage in the head of the headframe, namely on one of the Tower penetrating girder grid, is stored. This girder grid is built according to the rope loads, the dead weight of the hoisting machine, its braking forces and other operating loads designed. In addition, a headframe differs from a headframe in that that housed the extensive hoisting machine accessories in a tower and to this Purpose one or more additional platforms are provided below the hoisting machine. The load conditions as well as the spatial conditions are accordingly the headframe is fundamentally different from the headframe, because of the floor conveyor and their accessories separately - only - has to take up the rope deflection sheaves.

Der Erfindung liegt die Aufgabe zugrunde, die Mängel zu vermeiden, die bei der üblichen Anordnung der Fördermaschine auf einem Trägerrost dadurch entstehen, daß dieser Rost den Raum zwischen der Fördermaschinenbühne und der ersten darunter angeordneten Zusatzbühne durchsetzt.The invention is based on the object of avoiding the shortcomings which arise with the usual arrangement of the hoisting machine on a support grid, that this grate covers the space between the carrier platform and the first one below arranged additional stage interspersed.

Zur Lösung dieser Aufgabe wird erfindungsgemäß vorgeschlagen, bei einem Förderturm in Stahlkonstruktion mit einer wenigstens eine Fördermaschine aufnehmenden Bühne und mindestens einer darunter angeordneten Zusatzbühne die Fördermaschinenbühne und die Zusatzbühne bzw. die Zusatzbühnen über gemeinsame Pfosten auf einem in der Turmwandung gelagerten Trägerrost abzustützen und die Pfosten in der Nähe der Turmachse wenigstens angenähert unter den Lagern der Fördermaschinentreibscheibe bzw. -treibscheiben anzuordnen.To solve this problem it is proposed according to the invention at a steel construction headframe with at least one hoisting machine Stage and at least one additional stage arranged below the hoisting machine stage and the additional platform or platforms via common posts on one in the Support the support grid supported by the tower wall and the posts near the tower axis at least approximately below the bearings of the conveyor machine drive pulley or drive pulleys to arrange.

Der Trägerost wird also um das Maß des für die Einbauten unterhalb der Fördermaschinenbühne benötigten Raumes abwärts verlagert. Auf diese Weise bleibt der Raum wenigstens der obersten Zusatzbühne für die Einbauten ungeschmälert verfügbar, weil er von den die Fördermaschinenlast abfangenden Trägern nicht durchsetzt wird. Infolgedessen gestalten sich nicht nur die Einbauarbeiten, sondern auch etwaige Reparaturen, Bedienung und überwachung wesentlich einfacher.The support grid is so the same measure as for the fixtures below of the carrier platform is relocated downwards. That way it stays the space of at least the uppermost additional stage is fully available for the built-in components, because it is not penetrated by the carriers that support the load of the carrier. As a result, not only the installation work, but also any Repairs, operation and monitoring are much easier.

Ob der Trägerrost bei Anlagen mit mehreren Zusatzbühnen nur bis zu der obersten Zusatzbühne oder noch weiter, etwa bis zur untersten Zusatzbühne, abgesenkt wird, hängt von den Umständen des Einzelfalles ab. Das erfindungsgemäß angestrebte Ziel ist grundsätzlich bereits erreicht, wenn nur der Raum zwischen der Fördermaschine und der obersten Zusatzbühne freigehalten wird, weil es in erster Linie darauf ankommt, für eine bequeme Zugänglichkeit des in diesen Raum eingebauten Zubehörs, vornehmlich der Fördermaschinenbremse und des Bremsapparates (mit Zylinder und Steuerung) sowie der Belüftungseinrichtung für den Fördermaschinenmotor, zu sorgen.Whether the girder grid in systems with several additional platforms is only up to the uppermost additional platform or even further, for example to the lowest additional platform, lowered depends on the circumstances of the individual case. The aim of the invention The goal is basically already achieved, if only the space between the hoisting machine and the uppermost additional stage is kept free, because it primarily depends on for easy access to the accessories built into this room, primarily the carrier brake and the braking device (with cylinder and control) as well as the ventilation device for the hoisting machine motor.

Die Erfindung bietet außerdem den bemerkenswerten Vorzug einer im Endergebnis besseren Werkstoffausnutzung der die großen Lasten abstützenden Träger. Dies erklärt sich wie folgt: Zur Berücksichtigung des Katastrophenfalles (Seilbruch) dürfen nach den geltenden Bestimmungen die Träger unter Zugrundelegung einer zulässigen Spannung von z. B. 2400 kg/cm2 für St. 37 berechnet werden. Bei der bisher üblichen Anordnung der Träger unmittelbar unter der Fördermaschinenbühne werden die Träger beim normalen Betrieb nur mit einem Bruchteil, und zwar etwa nur ein Siebentel der genannten Spannung, beansprucht. Dies ist grundsätzlich anders bei der erfindungsgemäßen Ausführung, weil bei dieser der Trägerrost im Normalbetrieb zusätzlich mit der Last einer oder mehrerer Zusatzbühnen belastet ist und deshalb für den Normalfall die Beanspruchung des Trägerrostes steigt unter Minderung der Differenz zwischen der Normalbeanspruchung und der im Katastrophenfall auftretenden Beanspruchung.The invention also offers the notable advantage of an im The end result is better material utilization of the beams supporting the heavy loads. This is explained as follows: To take into account the disaster (broken rope) may, according to the applicable provisions, the carrier on the basis of a permissible Voltage of z. B. 2400 kg / cm2 for St. 37 can be calculated. With the usual one Placing the girders directly under the winder platform will be the girders in normal operation only with a fraction, namely only about a seventh of that called voltage. This is fundamentally different in the case of the invention Execution, because with this the girder grid in normal operation also with the load one or more additional platforms is loaded and therefore normally the The load on the girder grid increases while the difference between the Normal use and the stress that occurs in the event of a disaster.

Das Verhältnis der Spannungen im Katastrophenfall einerseits und beim Normalbetrieb andererseits verschiebt sich im Sinne einer besseren Werkstoffausnutzung um so mehr, je mehr Zusatzbühnen unterhalb der Fördermaschinenbühne über Pfosten auf dem Trägerrost abgestützt sind.The relationship between the tensions in the event of a disaster on the one hand and in the Normal operation, on the other hand, shifts in terms of better material utilization the more so, the more additional platforms below the hoisting machine platform over posts are supported on the support grid.

Eine noch weitergehende Werkstoffeinsparung ist dann gegeben, wenn in Weiterentwicklung der Erfindung die in der Nähe der Turmachse angeordneten Pfosten zugleich Teile des Führungsgerüstes sind.There is even more material savings if in a further development of the invention, the posts arranged in the vicinity of the tower axis are also parts of the guide structure.

Die Zeichnung veranschaulicht ein Ausführungsbeispiel des Erfindungsgegenstandes, und zwar zeigt Fig. 1 einen Förderturm mit einer Fördermaschinenbühne und drei untereinander angeordneten Zusatzbühnen im Aufriß gemäß der Linie 1-I in Fig. 3, Fig. 2 den in Fig. 1 dargestellten Förderturm im Seitenriß gemäß der Linie II-II in Fig. 3 und Fig. 3 einen Querschnitt gemäß der Linie 111-11I in Fig. 1.The drawing illustrates an embodiment of the subject matter of the invention, namely Fig. 1 shows a winding tower with a hoisting machine platform and three under each other arranged additional platforms in elevation along the line 1-I in Fig. 3, Fig. 2 shows the in Fig. 1 shown conveyor tower in side elevation along the line II-II in Fig. 3 and FIG. 3 shows a cross section along the line III-III in FIG. 1.

Bei der dargestellten Ausführung handelt es sich um eine zweitrümige Ein- oder Mehrseilförderung mit zwei auf einer Fördermaschinenbühne 1 montierten Fördermaschinen, von deren Treibscheibe 2 bzw. 3 das eine Seiltrum über eine Ablenkscheibe 4 bzw. 5 in den Schacht geführt ist. Unterhalb der Fördermaschinenbühne 1 sind im Abstand untereinander drei Zusatzbühnen 6, 7 und 8 in den Förderturm eingebaut. Diese Zusatzbühnen nehmen das gesamte Fördermaschinenzubehör im engeren und weiteren Sinne auf und stützen sich, ebenso wie die Fördermaschinenbühne 1, über mehrere Pfosten 9 und 10 auf einem Trägerrost ab.The illustrated embodiment is a two-legged single or multi-rope conveyor with two hoisting machines mounted on a hoisting machine platform 1, one of the traction sheaves 2 or 3 of which is guided into the shaft via a deflection pulley 4 or 5. Below the hoisting machine stage 1, three additional stages 6, 7 and 8 are built into the hoisting tower at a distance from one another. These additional platforms take on the entire conveyor machine accessories in the narrower and broader sense and, like the conveyor machine platform 1, are supported by several posts 9 and 10 on a support grid.

Der Trägerrost besteht aus zwei quer zueinander angeordneten Paaren von Trägern 11 und 12. Die unter den Achsen der Treibscheiben 2 und 3 angeordneten Pfosten 9 ruhen auf den Trägern 11 und sind bei der dargestellten Ausführung zugleich als Eckstiele des Führungsgerüstes vorgesehen. Die Pfosten 9 sind demgemäß mit horizontal verlaufenden Riegeln 13 verbunden, die den rechteckigen Querschnitt F des Führungsgerüstes umschließen. Die beiden Träger 11 stützen sich, gegebenenfalls mit überkragenden Enden, auf den Trägern 12 ab, die sich über die gesamte Breite des Förderturmquerschnittes, d. h. von einem Außenpfosten 14 der Turmstahlkonstruktion zum gegenüberliegenden Außenpfosten 15, erstrecken. In Längsrichtung des Förderturmquerschnittes sind die Träger 12 zwischen den inneren Pfosten 9 und den an den Seiten des Turmes vorgesehenen Außenpfosten 16 angeordnet.The support grid consists of two pairs arranged at right angles to one another of beams 11 and 12. Those arranged under the axes of the traction sheaves 2 and 3 Posts 9 rest on the supports 11 and are at the same time in the illustrated embodiment intended as corner posts of the guide frame. The posts 9 are accordingly horizontal extending bolts 13 connected, which have the rectangular cross-section F of the guide frame enclose. The two carriers 11 are supported, possibly with overhanging ones Ends, on the girders 12, which extend over the entire width of the headframe cross-section, d. H. from an outer post 14 of the steel tower structure to the opposite one Outer post 15, extend. In the longitudinal direction of the headframe cross-section are the Beams 12 between the inner posts 9 and those provided on the sides of the tower Outer post 16 arranged.

Die Träger 11 und 12 können, wie die dargestellte Ausführung veranschaulicht, als Fachwerkkonstruktion ausgebildet sein.The supports 11 and 12 can, as the illustrated embodiment illustrates, be designed as a framework construction.

Claims (3)

PATENTANSPRÜCHE: 1. Förderturm in Stahlkonstruktion mit einer wenigstens eine Fördermaschine aufnehmenden Bühne und mindestens einer darunter angeordneten Zusatzbühne, dadurch gekennzeichnet, daß die Fördermaschinenbühne (1) und die Zusatzbühne bzw. die Zusatzbühnen (6, 7 und 8) über gemeinsame Pfosten (9 und 10) auf einem in der Turmwandung gelagerten Trägerrost (11, 12) abgestützt sind und daß die Pfosten (9) in der Nähe der Turmachse wenigstens angenähert unter den Lagern der Fördermaschinentreibscheibe bzw. -treibscheiben (2 und 3) angeordnet sind. PATENT CLAIMS: 1. Headframe in steel construction with at least one a hoisting machine receiving stage and at least one arranged below it Additional platform, characterized in that the hoisting machine platform (1) and the additional platform or the additional platforms (6, 7 and 8) via common posts (9 and 10) on one in the tower wall mounted support grid (11, 12) are supported and that the posts (9) in the vicinity of the tower axis at least approximately below the bearings of the hoisting machine drive pulley or drive pulleys (2 and 3) are arranged. 2. Förderturm nach Anspruch 1, dadurch gekennzeichnet, daß die in der Nähe der Turmachse angeordneten Pfosten (9) zugleich Teile des Führungsgerüstes sind. 2. Headframe according to claim 1, characterized characterized in that the posts (9) arranged in the vicinity of the tower axis are at the same time Are parts of the guide structure. 3. Förderturm nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß der Trägerrost aus zwei Paaren von quer zueinander angeordneten Trägern (11 und 12) besteht, von denen die Träger (11) des einen Paares mindestens die in der Nähe der Turmachse angeordneten Pfosten (9) abstützen und die Träger (12) des anderen Paares zwischen diesen Pfosten und der Turmwandung verlaufen. In Betracht gezogene Druckschriften: Deutsche Patentschrift Nr. 826 972.3. conveyor tower according to claim 1 or 2, characterized in that that the support grid consists of two pairs of transversely arranged supports (11 and 12), of which the carriers (11) of one pair are at least those in the Support post (9) arranged near the tower axis and the supports (12) of the other Couple run between these posts and the tower wall. Considered Publications: German Patent No. 826 972.
DEG29456A 1960-04-13 1960-04-13 Conveyor tower in steel construction Pending DE1148373B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DEG29456A DE1148373B (en) 1960-04-13 1960-04-13 Conveyor tower in steel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DEG29456A DE1148373B (en) 1960-04-13 1960-04-13 Conveyor tower in steel construction

Publications (1)

Publication Number Publication Date
DE1148373B true DE1148373B (en) 1963-05-09

Family

ID=7123745

Family Applications (1)

Application Number Title Priority Date Filing Date
DEG29456A Pending DE1148373B (en) 1960-04-13 1960-04-13 Conveyor tower in steel construction

Country Status (1)

Country Link
DE (1) DE1148373B (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE826972C (en) * 1950-05-03 1952-01-07 Aug Kloenne Fa Strut framework for shaft conveyor systems

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE826972C (en) * 1950-05-03 1952-01-07 Aug Kloenne Fa Strut framework for shaft conveyor systems

Similar Documents

Publication Publication Date Title
DE69808826T2 (en) Elevator with adjustable double deck
DE69407100T3 (en) Traction sheave elevator
DE69107509T2 (en) Working platform of an elevator shaft.
DE60106618T2 (en) INTEGRATED LIFTING TOOL FOR LIFT ASSEMBLY
DE3528996C1 (en) Telescopic column
EP0501140A1 (en) Erecting scaffold moveable along an elevator shaft for erecting shaft equipment
EP1056678B1 (en) Preassembled elevator shaft
EP1224142B1 (en) Cable elevator
DE19632850A1 (en) Traction sheave elevator
DE29924832U1 (en) Traction elevator
DE3802386A1 (en) TOW ROPE ELEVATOR SYSTEM
DE69004382T2 (en) Setting a driver for an elevator.
EP0767134A2 (en) Elevator system and its building method
EP3246282B1 (en) Lift for small shaft dimensions
DE69925021T2 (en) Lifting platform for motor vehicles with four columns
DE1148373B (en) Conveyor tower in steel construction
EP1302432B1 (en) Arrangement to install a hoisting machine in an elevator shaft
DE1000138B (en) Traction sheave elevator installed in an elevator shaft for persons or persons and loads
DE69913173T2 (en) LIFT DEVICE
EP0187326B1 (en) Manipulator and method for moving parts from a base to their fitting position
EP2114812B1 (en) Cable guide for an elevator drive
EP1338546B1 (en) Machine frame with deflecting roller support for elevator machine
DE4216479A1 (en) Chain-guided parking system
EP1623951B1 (en) Lifting device
DE2707614A1 (en) High facade working platform - has travelling carriage with single support cable running over offset rollers and counter running catch cable