DE10325165A1 - Cross girder installation for replacing existing wall screen, involves arranging cross girder in plane of wall screen such that load applied by roof on wall screen is transferred to cross girder - Google Patents
Cross girder installation for replacing existing wall screen, involves arranging cross girder in plane of wall screen such that load applied by roof on wall screen is transferred to cross girder Download PDFInfo
- Publication number
- DE10325165A1 DE10325165A1 DE2003125165 DE10325165A DE10325165A1 DE 10325165 A1 DE10325165 A1 DE 10325165A1 DE 2003125165 DE2003125165 DE 2003125165 DE 10325165 A DE10325165 A DE 10325165A DE 10325165 A1 DE10325165 A1 DE 10325165A1
- Authority
- DE
- Germany
- Prior art keywords
- pöttges
- wall
- ceiling
- cross girder
- wall screen
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0274—Temporary shoring of wall opening
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Floor Finish (AREA)
Abstract
Description
Die Erfindung betrifft den Ersatz der statischen Funktion einer vorhandenen insbesondere tragenden Wandscheibe durch einen Unterzug in der selben Ebene.The Invention relates to the replacement of the static function of an existing one in particular load-bearing wall pane through a beam in the same Level.
Dazu wird bisher zum Abfangen der Deckenlast die Wandscheibe in Teilbereichen geschlitzt und jeweils ein die Wandscheibe durchdringender Träger angeordnet, der beidseitig der Wandscheibe durch Steifen (Sprieße) abgestützt ist. Danach wird die Wandscheibe entfernt und eine Schalung für den Unterzug angeordnet, Bewehrung eingebracht und mit Beton verfüllt.To So far, the wall panel in some areas has been used to intercept the ceiling load slotted and arranged in each case a support penetrating the wall panel, which is supported on both sides of the wall panel by stiffening (sprouts). Then the wall panel is removed and a formwork for the joist arranged, reinforcement inserted and filled with concrete.
Nachteilig bei dieser Verfahrensweise sind insbesondere der Platzbedarf für die Steifen und der Schalungsaufwand, denn jeder der die Wandscheibe durchdringenden Träger muss gesondert in die Schalung eingearbeitet werden, sowie das notwendige Abtrennen der die Wandscheibe durchdringenden Träger nach Fertigstellung des Unterzuges und der hohe Materialbedarf für die Steifen.adversely in this procedure, in particular, the space required for the stiffeners and the formwork, because each of the penetrating the wall panel carrier must be worked into the formwork separately, as well as the necessary separation the carrier penetrating the wall panel after completion of the Beam and the high material requirements for the stiffeners.
Aufgabe der Erfindung ist es, das Einbringen eines Unterzuges beim Ersatz einer bestehenden Wandscheibe deutlich zu vereinfachen.task the invention is the introduction of a beam when replacing to simplify an existing wall panel significantly.
Gelöst wird diese Aufgabe mit den Merkmalen des Verfahrensanspruches 1. Anspruch 12 beschreibt einen Unterzug. Vorteilhafte Ausgestaltungen sind Gegenstand der Unteransprüche.Is solved this task with the features of the process claim 1. claim 12 describes a beam. Advantageous configurations are Subject of the subclaims.
Das erfindungsgemäße Verfahren zum Einbringen eines Unterzuges zum Ersatz einer bestehenden Wandscheibe sieht vor, dass das Abfangen der Deckenlast und/oder der Last der über dem Unterzug verbleibenden Wandscheibe bei der Herstellung des Unterzuges ausschließlich in der Ebene der Wandscheibe erfolgt.The inventive method for inserting a beam to replace an existing wall panel provides that the ceiling load and / or the load of the above the Beam wall panel remaining in the manufacture of the beam exclusively takes place in the plane of the wall pane.
Dazu wird in einer bevorzugten Ausführung die zu ersetzende Wandscheibe im Bereich des herzustellenden Unterzuges in Teilbereichen geschlitzt, in den Schlitzen wird jeweils ein Pöttges angeordnet, der die Deckenlast und/oder die Last der über dem Unterzug verbleibenden Wandscheibe aufnimmt und sich nach unten in der Wandscheibe abstützt, die Wandscheibe wird mindestens in der Höhe des herzustellenden Unterzuges zwischen den geschlitzten Bereichen entfernt, der so entstandene offene Bereich wird unter Einschluss der Pöttges eingeschalt, bewehrt, zugeschalt und ausbetoniert und nach dem Aushärten des so hergestellten Unterzuges wird der darunterliegende Rest der Wandscheibe abgebrochen.To is in a preferred embodiment Wall pane to be replaced in the area of the beam to be manufactured slotted in sections, a Pöttges is arranged in each of the slits the ceiling load and / or the load of those remaining above the beam Takes up the wall panel and is supported downwards in the wall panel, the wall panel will be at least in height of the beam to be produced between the slotted areas removed, the resulting open area is included the Pöttges shuttered, reinforced, switched on and concreted and after the hardening of the the beam made in this way becomes the rest of the wall pane underneath canceled.
Dieses Verfahren hat wesentliche Vorteile. Der Platzbedarf und der Materialaufwand für Steifen außerhalb der Ebene der Wandscheibe entfällt. Der Schalungsaufwand wird reduziert. Es ist kein Abtrennen von die Wandscheibe durchdringenden Trägern nach Fertigstellung des Unterzuges notwendig.This The process has significant advantages. The space requirement and the material expenditure for stiffeners outside the level of the wall pane is omitted. The formwork effort is reduced. It is not a detachment from them Wall pane penetrating beams Completion of the joist necessary.
Als Pöttges werden bevorzugt I-Profile mit Steg und Flanschen verwendet, wobei es sich als zweckmäßig erwiesen hat, den Steg des I-Profils bei der Montage jeweils parallel zur Wandebene anzuordnen.As Pöttges I-profiles with web and flanges are preferred, whereby it turned out to be useful has, the web of the I-profile during assembly each parallel to To arrange wall level.
In einer bevorzugten Ausführung ist die Höhe der Pöttges gleich der Höhe des Unterzuges und die Schalung schließt innen mit dem Fuß der Pöttges ab. Das hat den Vorteil, dass es nach dem Aushärten des Betons und dem Entfernen der Schalung keiner Nacharbeit mehr bedarf.In a preferred embodiment is the amount of Pöttges equal to the height of the joist and the formwork ends with the foot of the Pöttges. The has the advantage that after the concrete has hardened and removed the formwork no longer requires rework.
Das Verfahren sieht weiterhin vor, dass bei der Anordnung der Schalung bis zur Decke von oberhalb der Decke Öffnungen zum Einbringen des Betons in die Schalung gebrochen werden.The The method also provides for the arrangement of the formwork up to the ceiling from above the ceiling openings for introducing the Concrete is broken into the formwork.
Ein erfindungsgemäß hergestellter Unterzug besteht aus bewehrtem Beton, wobei im Beton beabstandet Pöttges einbetoniert sind, die bei der Herstellung des Unterzuges die Decken- und/oder die Last der über dem Unterzug verbliebenen Wand in der Wandebene aufgenommen und übertragen haben.On manufactured according to the invention The beam is made of reinforced concrete, being spaced in the concrete Pöttges are concreted in, which the ceiling and / or the burden of over the wall remaining in the wall plane is recorded and transferred to have.
Das Verfahren und der so hergestellte Unterzug sollen anhand der Zeichnungen erläutert werden. Es zeigen:The The method and the girder produced in this way should be based on the drawings explained become. Show it:
In
Die
Form der Pöttges
Der
Steg der als I-Profil ausgebildeten Pöttges
Die
Schlitze haben eine Höhe,
die gleich oder etwas größer als
die künftige
Höhe des
Unterzuges
Die
Pöttges
Jetzt
wird die Wandscheibe
Da
die Schalung oben mit der Decke
Unten
schließt
die Schalung innen mit dem Fuß der
Pöttges
Natürlich kann
die Schalung innen auch tiefer gelegt werden als der Fuß der Pöttges
Nach
dem Aushärten
des so hergestellten Unterzuges
- 11
- Wandscheibeshear wall
- 22
- Deckeblanket
- 33
- Fußbodenfloor
- 4.14.1
- Stützesupport
- 4.24.2
- Stützesupport
- 55
- PöttgesPöttges
- 66
- Unterfütterungrelining
- 77
- UnterzugBeam
Claims (17)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2003125165 DE10325165A1 (en) | 2003-05-27 | 2003-05-27 | Cross girder installation for replacing existing wall screen, involves arranging cross girder in plane of wall screen such that load applied by roof on wall screen is transferred to cross girder |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE2003125165 DE10325165A1 (en) | 2003-05-27 | 2003-05-27 | Cross girder installation for replacing existing wall screen, involves arranging cross girder in plane of wall screen such that load applied by roof on wall screen is transferred to cross girder |
Publications (1)
Publication Number | Publication Date |
---|---|
DE10325165A1 true DE10325165A1 (en) | 2004-12-23 |
Family
ID=33482468
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE2003125165 Withdrawn DE10325165A1 (en) | 2003-05-27 | 2003-05-27 | Cross girder installation for replacing existing wall screen, involves arranging cross girder in plane of wall screen such that load applied by roof on wall screen is transferred to cross girder |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE10325165A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2924459A1 (en) * | 2007-06-25 | 2009-06-05 | Bouygues Batiment Ile De Franc | MANUABLE STOOL. |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1188786B (en) * | 1963-04-30 | 1965-03-11 | Walter Christmann Dipl Ing | Method for creating wall fractures |
DE1220990B (en) * | 1964-11-24 | 1966-07-14 | Walter Christmann Dipl Ing | Method for creating wall fractures |
GB2201184A (en) * | 1987-01-27 | 1988-08-24 | David Frederick Martin | Composite self propping beam for use as a lintel when forming an opening in an existing wall |
-
2003
- 2003-05-27 DE DE2003125165 patent/DE10325165A1/en not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1188786B (en) * | 1963-04-30 | 1965-03-11 | Walter Christmann Dipl Ing | Method for creating wall fractures |
DE1220990B (en) * | 1964-11-24 | 1966-07-14 | Walter Christmann Dipl Ing | Method for creating wall fractures |
GB2201184A (en) * | 1987-01-27 | 1988-08-24 | David Frederick Martin | Composite self propping beam for use as a lintel when forming an opening in an existing wall |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2924459A1 (en) * | 2007-06-25 | 2009-06-05 | Bouygues Batiment Ile De Franc | MANUABLE STOOL. |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3521557B1 (en) | Multi-function frame for tubular structures | |
DE2736524A1 (en) | PROCESS FOR SECTIONAL PRODUCTION OF AN IN-SITE CONCRETE SLAB AND EQUIPMENT FOR CARRYING OUT THE PROCESS | |
AT398218B (en) | CEILING CONSTRUCTION AND METHOD FOR PRODUCING THE SAME | |
DE2102380C3 (en) | Multi-storey building with a supporting structure and prefabricated space boxes | |
DE598730C (en) | Construction process using components produced in the workshop | |
DE10325165A1 (en) | Cross girder installation for replacing existing wall screen, involves arranging cross girder in plane of wall screen such that load applied by roof on wall screen is transferred to cross girder | |
DE69813187T2 (en) | METHOD FOR PRODUCING A FLOOR OF A WATER TREATMENT FILTER | |
DE69910846T2 (en) | FLEXIBLE BRICK TRACK AND METHOD FOR THE ARCHIVING OF ARCHES BY THIS TRACK | |
DE19837080A1 (en) | Waste water treatment filter basin wall parapet reinforcement spreads gantry weight and provides weather protection | |
DE10132649C1 (en) | Open-air extension to road or railway tunnel through mountain for protection against avalanche is constructed using lost shuttering and metal frames erected on floor plate | |
DE102006029102A1 (en) | Tub-shaped concrete foundation for accommodating high voltage transformer, has prefabricated side wall units and base plate, where adjacent side wall units are arranged in edge areas such that ends of inner sides form inner edge | |
DE19720637C1 (en) | Process for producing a component from reinforced concrete and formwork for carrying out the process | |
DE4019280C2 (en) | Mesh mat and method for producing a reinforcement for at least one-shell shotcrete expansion using the mesh mat | |
DE102018006790A1 (en) | Beam reinforcement composite | |
DE3505458A1 (en) | Method of producing a cavity floor | |
EP0099090B1 (en) | Method of erecting a concrete cover shaped as a dome, cone or pyramid for high and low rise structures | |
WO2004059216A1 (en) | Prefabricated structural element, especially ceiling or wall element from a solidified material and method for producing such a structural element | |
DE2734262A1 (en) | Prefabricated brick external building wall - has flat metal reinforcement embedded in horizontal joints | |
DE2949963C2 (en) | Method for repairing and strengthening roadway construction and suitable lagging mat | |
EP0949387A1 (en) | Concrete floor element | |
WO2015059008A1 (en) | Machine table foundation | |
DE102009026005A1 (en) | Bridge lining renewal method, involves roughening concrete layer by high-pressure water jet or by fine milling, applying mat reinforcement on roughened concrete layer, and applying new pavement on bridge | |
DE4006663A1 (en) | Prodn. of double floor - uses under-floor installation, hollow space, and at least one floor plate of hydration-binding material | |
EP4083344A1 (en) | Shaft element for an elevator facility and method for producing a shaft | |
DE2346827A1 (en) | PREFABRICATED COMPONENT |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
8139 | Disposal/non-payment of the annual fee |