DE102022127342A1 - Structural glazing construction - Google Patents

Structural glazing construction Download PDF

Info

Publication number
DE102022127342A1
DE102022127342A1 DE102022127342.3A DE102022127342A DE102022127342A1 DE 102022127342 A1 DE102022127342 A1 DE 102022127342A1 DE 102022127342 A DE102022127342 A DE 102022127342A DE 102022127342 A1 DE102022127342 A1 DE 102022127342A1
Authority
DE
Germany
Prior art keywords
profile
clamp
holding
structural glazing
glazing construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DE102022127342.3A
Other languages
German (de)
Inventor
Torsten Hinrichs
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schueco International KG
Original Assignee
Schueco International KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schueco International KG filed Critical Schueco International KG
Priority to DE102022127342.3A priority Critical patent/DE102022127342A1/en
Publication of DE102022127342A1 publication Critical patent/DE102022127342A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Securing Of Glass Panes Or The Like (AREA)

Abstract

Eine Structural-Glazing-Konstruktion umfasst eine Isolierglasscheibe (2), an der zumindest an einer Seite ein Halteprofil (3) angeklebt ist, und eine Tragkonstruktion mit einem Tragprofil (6), an dem das Halteprofil (3) über Befestigungsmittel fixiert ist, wobei die Befestigungsmittel mindestens eine Klammer (7) umfassen, die auf einen Halteabschnitt (30) des Halteprofils (3) und einen Tragabschnitt (63) des Tragprofils (6) aufgesteckt ist. Dadurch kann die Isolierglasscheibe mit dem Halteprofil effektiv montiert und demontiert werden.A structural glazing construction comprises an insulating glass pane (2) to which a holding profile (3) is glued on at least one side, and a supporting structure with a supporting profile (6) to which the holding profile (3) is fixed via fastening means, wherein the fastening means comprise at least one clamp (7) which is plugged onto a holding section (30) of the holding profile (3) and a supporting section (63) of the supporting profile (6). This allows the insulating glass pane to be effectively assembled and disassembled with the holding profile.

Description

Die vorliegende Erfindung betrifft eine Structural-Glazing-Konstruktion mit einer Isolierglasscheibe, an der zumindest an einer Seite ein Halteprofil angeklebt ist, und einer Tragkonstruktion mit einem Tragprofil, an dem das Halteprofil über Befestigungsmittel fixiert ist.The present invention relates to a structural glazing construction with an insulating glass pane to which a retaining profile is glued on at least one side, and a supporting construction with a supporting profile to which the retaining profile is fixed via fastening means.

Aus der EP 1 167 647 B1 ist eine Structural-Glazing-Konstruktion bekannt, bei der an einer Isolierglasscheibe randseitig ein Halteprofil festgeklebt ist, das über mehrere Halter an Pfosten oder Riegeln fixiert wird. Die Halter werden dabei in einer Schraubnut des Pfostens oder Riegels festgelegt, so dass die Montage und Demontage einer Isolierglasscheibe die Anbringung zahlreicher Schraubverbindungen erfordert, was vergleichsweise aufwändig ist. Eine ähnliche Structural-Glazing-Konstruktion zeigt auch die EP 2 431 561 B1 . Durch das Verschrauben der Halteteile besteht zudem der Nachteil, dass eine starre Verbindung erzeugt wird, die keine Bewegungen an der Fassade ermöglicht, , wenn eine gewisse Relativbewegung zwischen Fassade und Gebäude möglich sein soll, was gerade z. B. auch für Erdbebengebiete nachteilig ist.From the EP 1 167 647 B1 A structural glazing construction is known in which a retaining profile is glued to the edge of an insulating glass pane and is fixed to posts or transoms using several holders. The holders are fixed in a screw groove in the post or transom, so that the assembly and disassembly of an insulating glass pane requires the attachment of numerous screw connections, which is comparatively complex. A similar structural glazing construction is also shown in the EP 2 431 561 B1 . Screwing the retaining parts together also has the disadvantage that a rigid connection is created that does not allow any movement on the facade if a certain relative movement between the facade and the building is to be possible, which is particularly disadvantageous in earthquake zones, for example.

Es ist daher Aufgabe der vorliegenden Erfindung, eine Structural-Glazing-Konstruktion zu schaffen, die effektiv montiert werden kann und eine optimierte Befestigung von Isolierglasscheiben ermöglicht.It is therefore an object of the present invention to provide a structural glazing construction which can be effectively assembled and enables an optimized fastening of insulating glass panes.

Diese Aufgabe wird mit einer Structural-Glazing-Konstruktion mit den Merkmalen des Anspruches 1 gelöst.This object is achieved with a structural glazing construction having the features of claim 1.

Bei der erfindungsgemäßen Structural-Glazing-Konstruktion ist an zumindest einer Seite einer Isolierglasscheibe ein Halteprofil angeklebt, wobei das Halteprofil über Befestigungsmittel an einem Tragprofil einer Tragkonstruktion fixiert ist und die Befestigungsmittel mindestens eine Klammer umfassen, die auf einen Halteabschnitt des Halteprofils und einen Tragabschnitt des Tragprofils aufgesteckt ist. Durch das Aufstecken der mindestens einen Klammer kann eine effektive Montage des Halteprofils an dem Tragprofil erfolgen, da durch die Steckverbindung eine form- und/oder kraftschlüssige Verbindung bereitgestellt wird, die leicht zu montieren ist und bei Bedarf auch wieder demontiert werden kann. Das Aufstecken der mindestens einen Klammer erfolgt mit geringerem Montageaufwand als die umlaufend angeordneten Schraubverbindungen gemäß dem Stand der Technik.In the structural glazing construction according to the invention, a holding profile is glued to at least one side of an insulating glass pane, the holding profile being fixed to a support profile of a support structure via fastening means and the fastening means comprising at least one clamp which is plugged onto a holding section of the holding profile and a support section of the support profile. By plugging in the at least one clamp, the holding profile can be effectively mounted on the support profile, since the plug-in connection provides a positive and/or non-positive connection which is easy to install and can also be removed again if necessary. Plugging in the at least one clamp requires less installation effort than the circumferentially arranged screw connections according to the prior art.

Die mindestens eine Klammer kann bevorzugt im Querschnitt U-förmig mit zwei Schenkeln ausgebildet sein, wobei zwischen den beiden Schenkeln der Halteabschnitt und der Tragabschnitt angeordnet sind. Dabei kann die Klammer auf den Halteabschnitt und den Tragabschnitt klemmend aufgesteckt werden, so dass die beiden Schenkel in der montierten Position den Halteabschnitt und den Tragabschnitt kraftschlüssig zusammendrücken. Dies ergibt eine stabile Fixierung bei geringem Montageaufwand. Optional kann auch eine Verrastung der Klammer erfolgen, so dass die Montage haptisch und akustisch erfasst werden kann. Die Schenkel der Klammer können dabei als Raststege eingesetzt werden.The at least one clamp can preferably be U-shaped in cross-section with two legs, with the holding section and the support section being arranged between the two legs. The clamp can be clamped onto the holding section and the support section so that the two legs press the holding section and the support section together in a force-fitting manner in the mounted position. This results in a stable fixation with little assembly effort. Optionally, the clamp can also be locked so that the assembly can be detected haptically and acoustically. The legs of the clamp can be used as locking webs.

Die Klammer ist bevorzugt so montiert, dass das Halteprofil geringfügig zu dem Tragprofil bewegbar bleibt, so dass gewisse Ausgleichsbewegungen in alle Raumrichtungen, also x-, y- und/oder z-Richtung zugelassen werden und die Verbindung nicht so starr ist wie bei einer Schraubverbindung.The clamp is preferably mounted in such a way that the holding profile remains slightly movable relative to the support profile, so that certain compensating movements in all spatial directions, i.e. x, y and/or z directions, are permitted and the connection is not as rigid as with a screw connection.

Die Tragkonstruktion mit dem Tragprofil kann dabei als Pfosten-Riegel-Konstruktion ausgebildet sein, so dass ein Tragprofil einen Pfosten oder einen Riegel ausbildet. Alternativ kann als Tragkonstruktion auch eine Elementfassade eingesetzt werden, bei der einzelne Rahmenelemente vorgefertigt und dann an einer Fassade oder einem Lichtdach zusammenmontiert werden.The supporting structure with the supporting profile can be designed as a post-and-beam construction, so that a supporting profile forms a post or a beam. Alternatively, a prefabricated facade can be used as the supporting structure, in which individual frame elements are prefabricated and then assembled on a facade or a skylight.

Zwischen der mindestens einen Klammer und dem Tragprofil ist vorzugsweise ein Sicherungselement eingefügt, das eine Demontage der mindestens einen Klammer verhindert. Die Klammer wird bei der Montage in eine Montagerichtung aufgesteckt, so dass das Sicherungselement eine Bewegung der Klammer in entgegengesetzte Richtung zur Montagerichtung begrenzt oder verhindert. Die Montagerichtung kann beispielsweise parallel zur Ebene der Isolierglasscheibe ausgerichtet sein. Optional sind auch andere Montagerichtungen möglich, wie senkrecht zur Ebene der Isolierglasscheibe.A securing element is preferably inserted between the at least one clamp and the support profile, which prevents the at least one clamp from being dismantled. During assembly, the clamp is attached in an assembly direction so that the securing element limits or prevents movement of the clamp in the opposite direction to the assembly direction. The assembly direction can, for example, be aligned parallel to the plane of the insulating glass pane. Other assembly directions are also optionally possible, such as perpendicular to the plane of the insulating glass pane.

Das Sicherungselement kann beispielsweise als elastisches Dichtprofil ausgebildet sein, das in eine Nut oder Aufnahme zwischen der Klammer und dem Tragprofil eingesteckt ist. Statt einem elastischen Dichtprofil können auch andere Sicherungselemente, beispielsweise Klemmelemente, Federbleche oder Anschlagselemente aus Metall oder Kunststoff vorgesehen sein, die optional auch mit dem Tragprofil verschraubt werden können, um eine versehentliche Demontage zu verhindern. Das Sicherungselement kann dabei eine Erstreckung in eine Richtung parallel zu den Schenkeln der Klammer von 2 mm bis 12 mm aufweisen. Für eine Demontage kann das Sicherungselement dann entfernt werden, so dass die Klammer um eine bestimmte Wegstrecke entgegen der Aufsteckrichtung bewegt werden kann, beispielsweise zwischen 2 bis 12 mm, um die Verbindung des Halteprofils von dem Tragprofil zu lösen.The securing element can, for example, be designed as an elastic sealing profile that is inserted into a groove or receptacle between the clamp and the support profile. Instead of an elastic sealing profile, other securing elements can also be provided, for example clamping elements, spring plates or stop elements made of metal or plastic, which can optionally also be screwed to the support profile to prevent accidental disassembly. The securing element can have an extension in a direction parallel to the legs of the clamp of 2 mm to 12 mm. The securing element can then be removed for disassembly so that the clamp can be moved a certain distance in the opposite direction to the insertion direction, for example between 2 and 12 mm, in order to release the connection of the holding profile from the support profile.

In einer bevorzugten Ausgestaltung ist an der Isolierglasscheibe an vier Seiten jeweils ein Halteprofil aufgeklebt, wobei jedes Halteprofil über mindestens eine Klammer an einem Tragprofil fixiert ist. Sowohl die Tragprofile als auch die Halteprofile bilden somit einen umlaufenden Rahmen aus, um die Isolierglasscheibe an der Tragkonstruktion festzulegen. An jede Seite kann an dem Halteprofil dabei mindestens eine Klammer vorgesehen sein, die sich optional im Wesentlichen über die gesamte Länge des Halteprofils erstreckt. Alternativ können auch mehrere Klammern vorgesehen sein, die eine geringere Länge haben als das Halteprofil, so dass das Halteprofil in gewissen Abständen über mindestens eine Klammer an dem Tragprofil fixiert wird.In a preferred embodiment, a retaining profile is glued to the insulating glass pane on four sides, with each retaining profile being fixed to a support profile via at least one clamp. Both the support profiles and the retaining profiles thus form a circumferential frame to secure the insulating glass pane to the support structure. At least one clamp can be provided on the retaining profile on each side, which optionally extends essentially over the entire length of the retaining profile. Alternatively, several clamps can be provided that are shorter than the retaining profile, so that the retaining profile is fixed to the support profile at certain intervals via at least one clamp.

Für eine effektive Montage und Demontage kann an der mindestens einen Klammer eine Werkzeugaufnahme ausgebildet sein, beispielsweise in Form einer Nut, Aufnahme, Öffnung oder einer anderen Profilierung, in die ein Werkzeugkopf zur Montage oder Demontage der mindestens einen Klammer einfügbar ist. Dann kann die Klammer nach Positionierung an dem Tragprofil und dem Halteprofil über das Werkzeug aufgesteckt werden und für die Demontage in gegenläufige Richtung bewegt werden.For effective assembly and disassembly, a tool holder can be formed on the at least one clamp, for example in the form of a groove, holder, opening or other profile into which a tool head can be inserted for assembling or disassembling the at least one clamp. Then, after positioning on the support profile and the holding profile, the clamp can be placed over the tool and moved in the opposite direction for disassembly.

Die Isolierglasscheibe ist bevorzugt mit dem Halteprofil an einer Gebäudeaußenseite des Tragprofils festgelegt, so dass sowohl die Montage als auch die Demontage der Isolierglasscheiben von der Außenseite an der Tragkonstruktion erfolgt.The insulating glass pane is preferably fixed to the outside of the supporting profile on the building using the retaining profile, so that both the installation and removal of the insulating glass panes takes place from the outside on the supporting structure.

Das an Isolierglasscheibe festgelegte Halteprofil ist vorzugsweise als extrudiertes Profil aus Aluminium oder Kunststoff hergestellt, das an einer Seite mit einer Oberfläche einer Glasscheibe der Isolierglasscheibe verklebt ist. An dieser Seite kann optional auch noch eine Dichtung vorgesehen sein, um den Bereich des Klebemittels abzugrenzen, so dass von einer Außenseite bevorzugt nur eine Dichtung zwischen Glasscheibe und Halteprofil sichtbar ist. Optional kanns ich die Klebeschicht auch bis zum Ende des Halteprofil erstrecken.The retaining profile attached to the insulating glass pane is preferably made as an extruded profile made of aluminum or plastic, which is glued on one side to the surface of a glass pane of the insulating glass pane. A seal can optionally also be provided on this side to delimit the area of the adhesive, so that from the outside only a seal between the glass pane and the retaining profile is visible. Optionally, the adhesive layer can also extend to the end of the retaining profile.

Für eine stabile Befestigung der Isolierglasscheibe kann die mindestens eine Klammer aus Metall hergestellt sein, beispielsweis aus Aluminium, Kunststoff oder einem Stahlblech.To ensure stable fastening of the insulating glass pane, at least one clamp can be made of metal, for example aluminum, plastic or sheet steel.

Die Erfindung wird nachfolgend anhand mehrerer Ausführungsbeispiele mit Bezug auf die beigefügten Zeichnungen näher erläutert. Es zeigen:

  • 1 eine Schnittansicht durch ein erstes Ausführungsbeispiel einer erfindungsgemäßen Structural-Glazing-Konstruktion;
  • 2 eine Schnittansicht durch ein zweites Ausführungsbeispiel einer Structural-Glazing-Konstruktion;
  • 3 eine Schnittansicht durch ein drittes Ausführungsbeispiel einer Structural-Glazing-Konstruktion;
  • 4 eine Schnittansicht durch ein viertes Ausführungsbeispiel einer Structural-Glazing-Konstruktion;
  • 5 eine Schnittansicht durch ein fünftes Ausführungsbeispiel einer Structural-Glazing-Konstruktion, und
  • 6 eine Schnittansicht durch ein sechstes Ausführungsbeispiel einer Structural-Glazing-Konstruktion.
The invention is explained in more detail below using several embodiments with reference to the accompanying drawings. They show:
  • 1 a sectional view through a first embodiment of a structural glazing construction according to the invention;
  • 2 a sectional view through a second embodiment of a structural glazing construction;
  • 3 a sectional view through a third embodiment of a structural glazing construction;
  • 4 a sectional view through a fourth embodiment of a structural glazing construction;
  • 5 a sectional view through a fifth embodiment of a structural glazing construction, and
  • 6 a sectional view through a sixth embodiment of a structural glazing construction.

Eine Structural-Glazing-Konstruktion 1 umfasst eine Isolierglasscheibe 2, die mehrere Glasscheiben 20 umfasst, die über Abstandshalter 21 positioniert wind. Die Glasscheiben 20 besitzen die gleiche Größe, wobei randseitig optional auch eine oder mehrere Glasscheiben hervorstehen können. In dem dargestellten Ausführungsbeispiel ist an einer Oberfläche einer der Glasscheiben 20 ein Halteprofil 3 über ein Klebemittel 4 fixiert. Zwischen dem Halteprofil 3 und der Glasscheibe 20 der Isolierglasscheibe 2 ist eine Dichtung 5 vorgesehen, die die Aufnahme zum Einbringen des Klebemittels 4 begrenzt, so dass von einer Außenseite nur die Dichtung 5, aber nicht das Klebemittel 4 sichtbar sind. Die Dichtung 5 schließt dabei flächenbündig mit einer Seite des Halteprofils 3 und einem benachbart angeordneten Tragprofil 6 ab.A structural glazing construction 1 comprises an insulating glass pane 2 which comprises a plurality of glass panes 20 which are positioned via spacers 21. The glass panes 20 are the same size, and one or more glass panes can optionally protrude at the edge. In the exemplary embodiment shown, a holding profile 3 is fixed to a surface of one of the glass panes 20 via an adhesive 4. A seal 5 is provided between the holding profile 3 and the glass pane 20 of the insulating glass pane 2, which delimits the receptacle for introducing the adhesive 4, so that from the outside only the seal 5 and not the adhesive 4 is visible. The seal 5 is flush with one side of the holding profile 3 and an adjacent support profile 6.

Das Tragprofil 6 ist Bestandteil einer Tragkonstruktion, beispielsweise einer Pfosten-Riegel-Konstruktion oder einer Elementfassade, bei der aus einzelnen Rahmen eine Fassade zusammengesetzt ist, wobei das Tragprofil 6 im Querschnitt stufenförmig ausgebildet ist und einen dickeren Abschnitt 60 aufweist, von dem ein dünner Ausleger 61 hervorsteht. Der dünnere Ausleger 61 ist benachbart zu einer Stirnseite der Isolierglasscheibe 2 angeordnet und umfasst einen Endabschnitt 62, der im Wesentlichen flächenbündig mit einer Außenseite der Isolierglasscheibe 2 abschließt.The support profile 6 is part of a support structure, for example a post-and-beam construction or an element facade in which a facade is composed of individual frames, the support profile 6 being stepped in cross-section and having a thicker section 60 from which a thin bracket 61 protrudes. The thinner bracket 61 is arranged adjacent to an end face of the insulating glass pane 2 and comprises an end section 62 which is essentially flush with an outer side of the insulating glass pane 2.

Um das Halteprofil 3 an dem Tragprofil 6 festzulegen, ist eine Klammer 7 vorgesehen, die im Querschnitt U-förmig ausgebildet ist und auf das Halteprofil 3 und das Tragprofil 6 aufgesteckt wird. Die Montagerichtung der Klammer 7 ist dabei parallel zur Ebene der Isolierglasscheibe 2 ausgerichtet.In order to fix the holding profile 3 to the support profile 6, a clamp 7 is provided which is U-shaped in cross section and is placed on the holding profile 3 and the support profile 6. The mounting direction of the clamp 7 is aligned parallel to the plane of the insulating glass pane 2.

An dem Halteprofil 3 befindet sich ein Halteabschnitt 30, und an dem Tragprofil 6 befindet sich ein Tragabschnitt 63, und in der montierten Position sind der Halteabschnitt 30 und der Tragabschnitt 63 zwischen den beiden Schenkeln der U-förmigen Klammer 7 angeordnet und werden dort kraft- und/oder formschlüssig zusammengehalten. An dem Halteprofil 3 befindet sich ein Positioniersteg 31, der optional auch an dem Tragprofil 6 vorgesehen sein kann, um die Ausrichtung des Halteprofils 3 zu dem Tragprofil 6 vorzugeben. Ferner kann zwischen dem Halteprofil 3 und dem Tragprofil 6 ein Dichtelement 8 vorgesehen sein, um das Eindringen von Feuchtigkeit in die Konstruktion zu verhindern.A holding section 30 is located on the holding profile 3 and a supporting section 63 is located on the supporting profile 6, and in the assembled position the holding section 30 and the supporting section 63 are arranged between the two legs of the U-shaped bracket 7 and are held together there in a force-fitting and/or form-fitting manner. A positioning web 31 is located on the holding profile 3, which can optionally also be provided on the support profile 6 in order to specify the alignment of the holding profile 3 to the support profile 6. Furthermore, a sealing element 8 can be provided between the holding profile 3 and the support profile 6 in order to prevent moisture from penetrating the structure.

Zwischen einer Stirnseite der Isolierglasscheibe 2 und dem Ausleger 61 ist eine Aufnahme 9 ausgebildet, die einen Zugang zu der Klammer 7 schafft, die an der Innenseite der Isolierglasscheibe 2 angeordnet ist. Um die Klammer 7 in der montierten Position zu sichern, ist ein Sicherungselement 10 vorgesehen, das eine Bewegung der Klammer 7 entgegen der Montagerichtung begrenzt. Das Sicherungselement 10 kann als Bolzen, Schraube, Steg oder Abstandshalter ausgebildet sein, der über die Aufnahme 9 montiert werden kann. Dadurch wird verhindert, dass die Klammer 7 entgegen der Montagerichtung bewegt werden kann.A receptacle 9 is formed between an end face of the insulating glass pane 2 and the bracket 61, which provides access to the clamp 7, which is arranged on the inside of the insulating glass pane 2. In order to secure the clamp 7 in the mounted position, a securing element 10 is provided, which limits movement of the clamp 7 against the mounting direction. The securing element 10 can be designed as a bolt, screw, web or spacer, which can be mounted over the receptacle 9. This prevents the clamp 7 from being moved against the mounting direction.

In 1 ist die Befestigung der Isolierglasscheibe 2 nur an einer Seite gezeigt, wobei an den anderen drei Seiten der gleiche Aufbau zur Befestigung eingesetzt werden kann. Sowohl das Halteprofil 3 als auch das Tragprofil 6 kann umlaufend als Rahmen ausgebildet sein, um eine sichere Fixierung der Isolierglasscheibe 2 an der Tragkonstruktion zu gewährleisten.In 1 the fastening of the insulating glass pane 2 is only shown on one side, whereby the same fastening structure can be used on the other three sides. Both the holding profile 3 and the support profile 6 can be designed as a frame all around in order to ensure that the insulating glass pane 2 is securely fixed to the support structure.

In den 2 bis 6 werden modifizierte Ausführungsbeispiele der Structural-Glazing-Konstruktion 1 gezeigt, wobei gleiche Bauteile mit den gleichen Bezugszeichen versehen sind. Es wird nachfolgend nur auf die jeweilige Änderung an der Konstruktion eingegangen.In the 2 to 6 Modified embodiments of the structural glazing construction 1 are shown, with identical components being provided with the same reference numerals. Only the respective changes to the construction will be discussed below.

In 2 ist eine modifizierte Klammer 7 zur Fixierung des Halteprofils 3 an dem Tragprofil 6 gezeigt. Die Klammer 7 umfasst zwei Schenkel 70, die im Wesentlichen parallel zu der Ebene der Glasscheiben 20 ausgerichtet sind. Zwischen den beiden Schenkeln 70 ist ein Halteabschnitt 30 des Halteprofils 3 und ein Tragabschnitt 63 des Tragprofils 6 angeordnet. An einer Außenseite der Schenkel 70 ist eine Werkzeugaufnahme 71 ausgebildet, insbesondere eine Nut, in die ein Werkzeugkopf 41 eines Werkzeuges 40 einfügbar ist, wie dies mit den gestrichelten Linien dargestellt ist. Soll die Klammer 7 montiert oder demontiert werden, kann der Werkzeugkopf 41 in die Werkzeugaufnahme 71 eingefügt werden, um die Klammer 7 entsprechend zu verschieben.In 2 a modified clamp 7 for fixing the holding profile 3 to the support profile 6 is shown. The clamp 7 comprises two legs 70 which are aligned essentially parallel to the plane of the glass panes 20. A holding section 30 of the holding profile 3 and a support section 63 of the support profile 6 are arranged between the two legs 70. A tool holder 71 is formed on an outer side of the legs 70, in particular a groove into which a tool head 41 of a tool 40 can be inserted, as shown with the dashed lines. If the clamp 7 is to be assembled or disassembled, the tool head 41 can be inserted into the tool holder 71 in order to move the clamp 7 accordingly.

Die Klammer 7 ist in der montierten Position durch ein Sicherungselement 15 gegen eine Bewegung entgegen der Aufsteckrichtung gesichert, wobei das Sicherungselement 15 als elastisches Dichtungsprofil, beispielsweise aus EPDM, ausgebildet ist. Durch die Konstruktion mit der Klammer 7 und dem elastischen Sicherungselement 15 ist das Halteprofil 3 mit der Isolierglasscheibe 2 geringfügig relativ zu dem Tragprofil 6 bewegbar, was gerade für Konstruktionen in Erdbebengebieten vorteilhaft sein kann, weil eine gewisse Flexibilität der Konstruktion zugelassen wird, um Gebäudebewegungen in einem gewissen Umfang aufnehmen zu können.In the mounted position, the clamp 7 is secured against movement in the opposite direction to the direction of attachment by a securing element 15, the securing element 15 being designed as an elastic sealing profile, for example made of EPDM. Due to the construction with the clamp 7 and the elastic securing element 15, the holding profile 3 with the insulating glass pane 2 can be moved slightly relative to the support profile 6, which can be particularly advantageous for constructions in earthquake zones because a certain flexibility of the construction is permitted in order to be able to absorb building movements to a certain extent.

Um den Bereich der Klammer 7 nach außen abzudichten, ist zwischen einer Stirnseite der Isolierglasscheibe 2 und dem Ausleger 61 an dem Endabschnitt 62 eine Dichtung 11 vorgesehen, insbesondere ein aufgeklebter Dichtstreifen. Um die Klammer 7 zu entfernen, muss diese Dichtung 11 entfernt werden, damit das Werkzeug 40 mit dem Werkzeugkopf 41 in die Werkzeugaufnahme 71 an der Klammer 7 eingreifen kann, damit diese nach der Entfernung des Sicherungselementes 15 entgegen der Montagerichtung verschoben werden kann. Dieser Vorgang kann an allen Seiten der Isolierglasscheibe 2 wiederholt werden, bevor diese von den Tragprofilen abgenommen werden kann.In order to seal the area of the clamp 7 from the outside, a seal 11, in particular an adhesive-bonded sealing strip, is provided between one end face of the insulating glass pane 2 and the bracket 61 on the end section 62. In order to remove the clamp 7, this seal 11 must be removed so that the tool 40 with the tool head 41 can engage in the tool holder 71 on the clamp 7 so that it can be moved in the opposite direction to the installation direction after the securing element 15 has been removed. This process can be repeated on all sides of the insulating glass pane 2 before it can be removed from the support profiles.

In 3 ist eine modifizierte Structural-Glazing-Konstruktion gezeigt, bei der als Sicherungselement kein Dichtprofil vorgesehen ist, sondern ein Sicherungselement 13 in Form einer Schraube, die von einer Hülse 14 aus einem elastischen Material, insbesondere EPDM, umgeben ist. Ein solches Sicherungselement 13 kann in das Tragprofil 6 eingeschraubt sein und muss für eine Demontage wieder entfernt werden, wobei hierfür die Dichtung 11 zwischen dem Ausleger 61 und der Isolierglasscheibe 2 entfernt wird, um dann das Sicherungselement 13 herausdrehen zu können. Nach dem Entfernen des Sicherungselementes 13 kann dann die Klammer 7 entgegen der Aufsteckrichtung bewegt werden, um die Isolierglasscheibe 2 bei Bedarf von dem Tragprofil 6 lösen zu können.In 3 a modified structural glazing construction is shown in which no sealing profile is provided as a securing element, but rather a securing element 13 in the form of a screw which is surrounded by a sleeve 14 made of an elastic material, in particular EPDM. Such a securing element 13 can be screwed into the support profile 6 and must be removed again for disassembly, whereby the seal 11 between the bracket 61 and the insulating glass pane 2 is removed for this purpose in order to then be able to unscrew the securing element 13. After removing the securing element 13, the clamp 7 can then be moved in the opposite direction to the insertion direction in order to be able to release the insulating glass pane 2 from the support profile 6 if necessary.

In 4 ist eine Structural-Glazing-Konstruktion gezeigt, bei der eine Klammer 7 wie bei dem vorangegangenen Ausführungsbeispiel zwei Schenkel 70 umfasst, zwischen denen ein Tragabschnitt 63 des Tragprofils 6 und ein Halteabschnitt 30 des Halteprofils 3 angeordnet ist. An einer Außenseite der Schenkel 70 sind Werkzeugaufnahmen 71 in Form einer Nut ausgebildet. Die Klammer 7 ist über ein Sicherungselement 16 in Form einer elastischen Dichtung gesichert, die über eine Profilierung in eine Aufnahme an der Rückseite der Klammer 7 eingreift und dort formschlüssig oder kraftschlüssig festgelegt ist. Um die Klammer 7 demontieren zu können, wird zunächst die Dichtung 11 zwischen dem Ausleger 61 und der Isolierglasscheibe 2 entfernt und dann das Sicherungselement 16 aus der Aufnahme 9 herausgenommen. Dann kann über ein Werkzeug 40 die Klammer 7 entgegen der Montagerichtung bewegt werden, um die Verbindung zwischen dem Halteprofil 3 und dem Tragprofil 6 zu lösen.In 4 a structural glazing construction is shown in which a clamp 7, as in the previous embodiment, comprises two legs 70, between which a support section 63 of the support profile 6 and a holding section 30 of the holding profile 3 are arranged. Tool holders 71 in the form of a groove are formed on an outer side of the legs 70. The clamp 7 is secured by a securing element 16 in the form of an elastic seal, which engages via a profiling in a receptacle on the back of the clamp 7 and is fixed there in a form-fitting or force-fitting manner. In order to be able to dismantle the clamp 7, the seal 11 between the bracket 61 and the insulating glass pane 2 is first removed and then the securing element 16 is removed from the mounting. 9 is removed. The clamp 7 can then be moved against the mounting direction using a tool 40 in order to release the connection between the holding profile 3 and the supporting profile 6.

In 5 ist eine Structural-Glazing-Konstruktion gezeigt, bei der verglichen mit 3 eine modifizierte Klammer 7 eingesetzt ist. Die Klammer 7 umfasst zwei Schenkel 70, zwischen denen ein Halteabschnitt 30 des Halteprofils 3 und ein Tragabschnitt 63 des Tragprofils 6 angeordnet sind. Auf der zu den Schenkeln 70 gegenüberliegenden Seite sind zwei Stege 72 angeformt, die hakenförmig ausgebildet sind und zwischen denen eine Nut gebildet ist. Durch die hakenförmige Ausbildung der Stege 72 ist eine Werkzeugaufnahme 73 an den Stegen 72 ausgebildet, in die ein Werkzeugkopf 41 eines Werkzeuges 40 einfügbar ist.In 5 A structural glazing construction is shown, in which compared with 3 a modified clamp 7 is inserted. The clamp 7 comprises two legs 70, between which a holding section 30 of the holding profile 3 and a support section 63 of the support profile 6 are arranged. On the side opposite the legs 70, two webs 72 are formed, which are designed in the shape of a hook and between which a groove is formed. Due to the hook-shaped design of the webs 72, a tool holder 73 is formed on the webs 72, into which a tool head 41 of a tool 40 can be inserted.

In 5 ist als Sicherungselement 13 eine Schraube vorgesehen, die in das Tragprofil 6 eingeschraubt ist und die von einer Hülse 14 aus einem elastischen Material umgeben ist.In 5 A screw is provided as a securing element 13, which is screwed into the support profile 6 and which is surrounded by a sleeve 14 made of an elastic material.

In 6 ist die Klammer 7 der 5 über ein modifiziertes Sicherungselement 16 in Form einer elastischen Dichtung gesichert. Im Übrigen entsprechen die beiden Konstruktionen einander.In 6 is bracket 7 of the 5 secured by a modified securing element 16 in the form of an elastic seal. Otherwise, the two designs correspond to each other.

In den dargestellten Ausführungsbeispielen erfolgt die Fixierung des Halteprofils 3 an dem Tragprofil 6 jeweils über eine Klammer 7, die in eine Aufsteckrichtung bewegt wird, die parallel zur Ebene der Isolierglasscheibe 2 ausgerichtet ist, wobei die Klammer 7 an einer Innenseite der Isolierglasscheibe 2 angeordnet ist. Über die U-förmige Klammer 7 kann ein Halteabschnitt 30 des Halteprofils 3 und ein Tragabschnitt 63 des Tragprofils 6 kraft- und/oder formschlüssig gesichert werden, wobei eine Bewegung der Klammer 7 entgegen der Montagerichtung durch verschiedene Sicherungselemente verhindert werden kann. Die Klammer 7 kann sich optional über die gesamte Länge des Halteprofils 3 erstrecken, kann aber auch aus mehreren Abschnitten gebildet sein, die an einer Seite für eine Verbindung des Halterprofils 3 an dem Tragprofil 6 sorgen. Die Klammer 7 kann bevorzugt aus Metall, insbesondere Aluminium oder einem Stahlblech, hergestellt sein.In the exemplary embodiments shown, the holding profile 3 is fixed to the support profile 6 using a clamp 7 that is moved in a plug-on direction that is aligned parallel to the plane of the insulating glass pane 2, with the clamp 7 being arranged on an inner side of the insulating glass pane 2. A holding section 30 of the holding profile 3 and a support section 63 of the support profile 6 can be secured in a force-fitting and/or form-fitting manner using the U-shaped clamp 7, with movement of the clamp 7 counter to the mounting direction being prevented by various securing elements. The clamp 7 can optionally extend over the entire length of the holding profile 3, but can also be formed from several sections that ensure a connection of the holding profile 3 to the support profile 6 on one side. The clamp 7 can preferably be made of metal, in particular aluminum or a steel sheet.

Die dargestellten Ausführungsbeispiele können beliebig miteinander kombiniert werden, beispielsweise können die Sicherungselemente unabhängig von der Gestaltung der jeweiligen Klammer 7 ausgewählt werden.The illustrated embodiments can be combined with one another as desired; for example, the securing elements can be selected independently of the design of the respective clamp 7.

BezugszeichenlisteList of reference symbols

11
Structural-Glazing-KonstruktionStructural glazing construction
22
IsolierglasscheibeInsulating glass pane
33
HalteprofilHolding profile
44
KlebemittelAdhesives
55
Dichtungpoetry
66
TragprofilSupport profile
77
Klammerbracket
88th
DichtelementSealing element
99
AufnahmeRecording
1010
SicherungselementSecuring element
1111
Dichtungpoetry
1313
SicherungselementSecuring element
1414
HülseSleeve
1515
SicherungselementSecuring element
1616
SicherungselementSecuring element
2020
GlasscheibeGlass pane
2121
AbstandshalterSpacers
3030
HalteabschnittHolding section
3131
PositionierstegPositioning bar
4040
WerkzeugTool
4141
WerkzeugkopfTool head
6060
AbschnittSection
6161
Auslegerboom
6262
EndabschnittEnd section
6363
TragabschnittSupport section
7070
Schenkelleg
7171
WerkzeugaufnahmeTool holder
7272
Stegweb
7373
WerkzeugaufnahmeTool holder

ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDED IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of documents listed by the applicant was generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA accepts no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • EP 1167647 B1 [0002]EP 1167647 B1 [0002]
  • EP 2431561 B1 [0002]EP 2431561 B1 [0002]

Claims (11)

Structural-Glazing-Konstruktion mit einer Isolierglasscheibe (2), an der zumindest an einer Seite ein Halteprofil (3) angeklebt ist, und einer Tragkonstruktion mit einem Tragprofil (6), an dem das Halteprofil (3) über Befestigungsmittel fixiert ist, dadurch gekennzeichnet, dass die Befestigungsmittel mindestens eine Klammer (7) umfassen, die auf einen Halteabschnitt (30) des Halteprofils (3) und einen Tragabschnitt (63) des Tragprofils (6) aufgesteckt ist.Structural glazing construction with an insulating glass pane (2), to which a holding profile (3) is glued on at least one side, and a supporting construction with a supporting profile (6), to which the holding profile (3) is fixed via fastening means, characterized in that the fastening means comprise at least one clamp (7) which is plugged onto a holding section (30) of the holding profile (3) and a supporting section (63) of the supporting profile (6). Structural-Glazing-Konstruktion nach Anspruch 1, dadurch gekennzeichnet, dass die mindestens eine Klammer (7) im Querschnitt U-förmig mit zwei Schenkeln (70) ausgebildet ist und zwischen den beiden Schenkeln (70) der Halteabschnitt (30) und der Tragabschnitt (63) angeordnet sind.Structural glazing construction according to Claim 1 , characterized in that the at least one clamp (7) is U-shaped in cross section with two legs (70) and the holding section (30) and the supporting section (63) are arranged between the two legs (70). Structural-Glazing-Konstruktion nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die mindestens eine Klammer (7) klemmend fixiert ist.Structural glazing construction according to Claim 1 or 2 , characterized in that the at least one clamp (7) is fixed in a clamping manner. Structural-Glazing-Konstruktion nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass zwischen der mindestens einen Klammer (7) und dem Tragprofil (6) ein Sicherungselement (10, 13, 15, 16) eingefügt ist, das eine Demontage der mindestens einen Klammer (7) verhindert.Structural glazing construction according to one of the preceding claims, characterized in that a securing element (10, 13, 15, 16) is inserted between the at least one clamp (7) and the support profile (6), which prevents dismantling of the at least one clamp (7). Structural-Glazing-Konstruktion nach Anspruch 4, dadurch gekennzeichnet, dass das Sicherungselement (10, 15, 16) als elastisches Dichtprofil ausgebildet ist.Structural glazing construction according to Claim 4 , characterized in that the securing element (10, 15, 16) is designed as an elastic sealing profile. Structural-Glazing-Konstruktion nach Anspruch 4 oder 5, dadurch gekennzeichnet, dass das Sicherungselement (10, 13, 15, 16) eine Erstreckung in eine Richtung parallel zu den Schenkeln (70) der Klammer (7) zwischen 2 mm bis 12 mm aufweist.Structural glazing construction according to Claim 4 or 5 , characterized in that the securing element (10, 13, 15, 16) has an extension in a direction parallel to the legs (70) of the clamp (7) of between 2 mm and 12 mm. Structural-Glazing-Konstruktion nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass an der Isolierglasscheibe (2) an vier Seiten jeweils ein Halteprofil (3) angeklebt ist, und jedes Halteprofil (3) über mindestens eine Klammer (7) an einem Tragprofil (6) fixiert ist.Structural glazing construction according to one of the preceding claims, characterized in that a holding profile (3) is glued to the insulating glass pane (2) on four sides, and each holding profile (3) is fixed to a support profile (6) via at least one clamp (7). Structural-Glazing-Konstruktion nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass an der mindestens einen Klammer (7) eine Werkzeugaufnahme (71, 73) ausgebildet ist, in die Werkzeugkopf (41) zur Demontage der mindestens einen Klammer (7) einfügbar ist.Structural glazing construction according to one of the preceding claims, characterized in that a tool holder (71, 73) is formed on the at least one clamp (7), into which the tool head (41) can be inserted for dismantling the at least one clamp (7). Structural-Glazing-Konstruktion nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Tragkonstruktion eine zu einer Gebäudeinnenseite gewandte Seite und eine zu einer Gebäudeaußenseite gewandte Seite aufweist und die Isolierglasscheibe (2) mit dem Halteprofil (3) an einer Gebäudeaußenseite des Tragprofils (6) festgelegt ist.Structural glazing construction according to one of the preceding claims, characterized in that the supporting structure has a side facing an inside of the building and a side facing an outside of the building and the insulating glass pane (2) is fixed to an outside of the building of the supporting profile (6) by means of the holding profile (3). Structural-Glazing-Konstruktion nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass das Halteprofil (3) aus einem extrudierten Profil aus Aluminium oder Kunststoff hergestellt ist.Structural glazing construction according to one of the preceding claims, characterized in that the holding profile (3) is made of an extruded profile made of aluminum or plastic. Structural-Glazing-Konstruktion nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die mindestens eine Klammer (7) aus Metall hergestellt ist.Structural glazing construction according to one of the preceding claims, characterized in that the at least one clamp (7) is made of metal.
DE102022127342.3A 2022-10-18 2022-10-18 Structural glazing construction Pending DE102022127342A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102022127342.3A DE102022127342A1 (en) 2022-10-18 2022-10-18 Structural glazing construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102022127342.3A DE102022127342A1 (en) 2022-10-18 2022-10-18 Structural glazing construction

Publications (1)

Publication Number Publication Date
DE102022127342A1 true DE102022127342A1 (en) 2024-04-18

Family

ID=90469617

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102022127342.3A Pending DE102022127342A1 (en) 2022-10-18 2022-10-18 Structural glazing construction

Country Status (1)

Country Link
DE (1) DE102022127342A1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1167647B1 (en) 2000-06-24 2006-02-08 SCHÜCO International KG Supporting element for facade covering
EP2431561B1 (en) 2010-09-15 2017-11-01 SCHÜCO International KG Structural glazing structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1167647B1 (en) 2000-06-24 2006-02-08 SCHÜCO International KG Supporting element for facade covering
EP2431561B1 (en) 2010-09-15 2017-11-01 SCHÜCO International KG Structural glazing structure

Similar Documents

Publication Publication Date Title
EP0531869A2 (en) Mounting clamp
EP0180837B2 (en) Locating device kit for curtain walls
EP1286401B1 (en) Mounting system for framed solar modules
DD237529A5 (en) PLATE-ENVIRONMENTAL CONSTRUCTION AND CONSTRUCTION CONSTRUCTION WITH SUCH COMPONENTS
DE102022127342A1 (en) Structural glazing construction
DE102019132571A1 (en) Profile system for the formation of a sub-frame for the acceptance of floor coverings and connection element
DE4005106A1 (en) Screws and clamping strips - are used to fasten panels or glass panes to supporting frames
DE4000969C2 (en) Arrangement for fastening building panels to building walls
DE3943087C1 (en)
DE2123909B2 (en) DEVICE FOR FASTENING A PANEL-SHAPED ELEMENT
DE8814200U1 (en) Compensation element for formwork panels
EP1061194A2 (en) Glass pane holding device
DE3822940C2 (en)
DE102009049178A1 (en) Formwork i.e. prefabricated-dual wall, has concrete plates arranged together with intermediate space, and holder provided for holding mounting part and embedded in concrete plates, where one of side pieces is extended into space
CH695126A5 (en) Free-standing column for mounting printed and indicatory support strips has support frame to which strips are clipped, central support tube being provided to which distance profiles
EP3323954B1 (en) Post and crossmember structure
DE102022115118A1 (en) Support profile construction
DE2751520A1 (en) Industrial noise deadening cladding panel - has paired metal clamps with connecting screw establishing joint width under cover
DE102022128646A1 (en) Facade construction and method for assembling a facade construction
DE102015100525A1 (en) Method for assembling a mullion-transom construction and mullion-transom construction
DE202018103814U1 (en) module
DE102022124992A1 (en) Frame for enclosing at least one pane and device comprising the frame and a frame
EP1260644A2 (en) Roof element, building and method for assembling such a building
CH510811A (en) Frame for holding glass panels in buildings
AT15464U1 (en) fence system