DE102020107549B3 - Method for erecting a jib of a large crane - Google Patents
Method for erecting a jib of a large crane Download PDFInfo
- Publication number
- DE102020107549B3 DE102020107549B3 DE102020107549.9A DE102020107549A DE102020107549B3 DE 102020107549 B3 DE102020107549 B3 DE 102020107549B3 DE 102020107549 A DE102020107549 A DE 102020107549A DE 102020107549 B3 DE102020107549 B3 DE 102020107549B3
- Authority
- DE
- Germany
- Prior art keywords
- boom
- crane
- force
- luffing
- guy stand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/26—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
- B66C23/34—Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes
- B66C23/344—Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes adapted for transport purposes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/82—Luffing gear
Abstract
Die Erfindung betrifft ein Verfahren zum Aufrichten des Auslegersystems eines Großkrans umfassend einen wipparen Teleausleger sowie einer am Kopf des Teleauslegers montierten Televerlängerung, wobei am Teleausleger und/oder an der Televerlängerung wenigstens ein Abspannbock zur Abspannung zumindest eines Teils der Televerlängerung angelenkt ist, mit den Schritten: Ablegen des Hauptauslegers und Montage der Televerlängerung, Aufwippen des Auslegersystems durch Betätigung des Wippzylinders unter gleichzeitiger Aufbringung einer Kraft auf den Abspannbock zur Erzeugen eines den Wippzylinder entlastenden Aufrichtemoments auf das Auslegersystem.The invention relates to a method for erecting the boom system of a large crane comprising a luffing telescopic boom and a telescopic extension mounted on the head of the telescopic boom, with at least one bracing frame for bracing at least part of the telescopic extension being articulated on the telescopic boom and / or the telescopic extension, with the following steps: Laying down of the main boom and assembly of the telescopic extension, luffing the boom system by actuating the luffing cylinder while simultaneously applying a force to the guy stand to generate an erecting moment on the boom system that relieves the luffing cylinder.
Description
Die Erfindung betrifft ein Verfahren zum Aufrichten des Auslegersystems eines Großkrans umfassend einen wippbaren Teleausleger sowie eine am Kopf des Teleauslegers montierte Televerlängerung, wobei am Teleausleger und/oder der Televerlängerung wenigstens ein Abspannbock zur Abspannung zumindest eines Teils der Televerlängerung angelenkt ist.The invention relates to a method for erecting the boom system of a large crane comprising a luffing telescopic boom and a telescopic extension mounted on the head of the telescopic boom, with at least one bracing frame for bracing at least part of the telescopic extension being articulated on the telescopic boom and / or the telescopic extension.
Um die erzielbare Hakenhöhe bzw. Kranausladung bei Großkranen mit Teleskopausleger weiter zu steigern, werden Televerlängerungen am Teleskopausleger derartiger Großkrane angebaut. Üblicherweise begrenzt der Aufrichteprozess die maximal mögliche Länge der Televerlängerung, da hier der Wippzylinder des Hauptauslegers schnell an seine Belastungsgrenze gelangt. Eine beliebig starke Dimensionierung des Wippzylinders scheidet bereits wegen des nur begrenzt verfügbaren Bauraums am Kranoberwagen aus. Zudem lassen sich Zylinderabmessung und Zylindergewicht auch im Hinblick auf die gemäß Straßenzulassung begrenzten Werte für das Fahrzeuggewicht und die Fahrzeughöhe nicht vernachlässigen. Da der Wippzylinder nicht nur beim Aufrichtevorgang benötigt wird, sondern die Wippbewegung des Hauptauslegers während der eigentlichen Kranarbeit im Vordergrund steht, sollte und darf der Wippzylinder auch nicht speziell auf den Aufrichtevorgang optimiert werden, da eine solche Optimierung gegebenenfalls negative Auswirkungen auf den regulären Kranbetrieb hätte.In order to further increase the achievable hook height or crane radius for large cranes with telescopic booms, telescopic extensions are attached to the telescopic boom of such large cranes. The erecting process usually limits the maximum possible length of the telescopic extension, since here the luffing cylinder of the main boom quickly reaches its load limit. Any size of the luffing cylinder is ruled out because of the limited space available on the crane superstructure. In addition, cylinder dimensions and cylinder weight cannot be neglected with regard to the values for the vehicle weight and the vehicle height, which are limited in accordance with the road approval. Since the luffing cylinder is not only required during the erection process, but rather the luffing movement of the main boom is in the foreground during the actual crane work, the luffing cylinder should not and must not be optimized specifically for the erection process, as such an optimization could have negative effects on regular crane operation.
Diesem Problem hat man in Vergangenheit bereits durch mehrere Lösungen versucht Herr zu werden. Bekannt wurde bereits eine Lösung, bei dieser die Spitze des Auslegersystems zunächst abgewinkelt bleibt, auf einem Rollenwagen abgelegt und während des Aufrichtens des Hauptauslegers in Richtung des Kranwagens gezogen wird.In the past, attempts have been made to overcome this problem with several solutions. A solution has already been known in which the tip of the boom system initially remains angled, is placed on a roller carriage and is pulled in the direction of the crane carriage while the main boom is being erected.
Ferner ist aus dem Stand der Technik die
Zudem ist aus der
Ein weiterer Lösungsansatz basiert auf der Verwendung eines Hilfskrans, der die montierte Televerlängerung während des Aufrichtevorgangs zusammen mit dem Wippzylinder anhebt.Another approach is based on the use of an auxiliary crane that lifts the mounted telescopic extension together with the luffing cylinder during the erection process.
Die Aufgabe der vorliegenden Erfindung setzt sich zum Ziel, einen weiteren Lösungsansatz zum Aufrichten des Auslegersystems eines Teleskopgroßkrans aufzuzeigen, um eine weitere Vergrößerung des maximal möglichen Aufrichtemomentes zu erzielen, d.h. um ein größeres Auslegersystem aufrichten zu können.The aim of the present invention is to provide a further approach to erecting the boom system of a large telescopic crane in order to achieve a further increase in the maximum possible erecting moment, i.e. to be able to erect a larger boom system.
Gelöst wird diese Aufgabe durch ein Verfahren gemäß den Merkmalen des Anspruchs 1. Vorteilhafte Ausführungen des Verfahrens sind Gegenstand der abhängigen Ansprüche.This object is achieved by a method according to the features of
Erfindungsgemäß kommt das Verfahren bei einem Großkran mit wippbarem Teleausleger zum Einsatz, insbesondere bei einem mobilen Großkran, vorzugsweise mit Strassenfahrwerk. Das Auslegersystem des Großkrans umfasst einen Teleausleger als Hauptausleger, d.h. einen teleskopierbaren Hauptausleger. Ergänzend ist am Kopf des Teleauslegers eine Televerlängerung montiert. Eine solche Televerlängerung kann aus einer Montageeinheit, einer Auslegerverlängerung und/oder einer Wippspitze bestehen.According to the invention, the method is used in a large crane with a luffing telescopic boom, in particular in a mobile large crane, preferably with a road running gear. The boom system of the large crane includes a telescopic main boom, i.e. a telescopic main boom. In addition, a telescopic extension is mounted on the head of the telescopic boom. Such a telescopic extension can consist of an assembly unit, a boom extension and / or a rocker jib.
Zusätzlich ist wenigstens ein Abspannbock zur Abspannung wenigstens eines Teils des Auslegersystems am Teleausleger oder an der Televerlängerung montiert. Denkbar ist eine schwenkbare Lagerung am Teleausleger oder der Televerlängerung, dies ist jedoch nicht zwingend erforderlich. Der Abspannbock kann bspw. im Kopfbereich des Anlenkstückes montiert sein, denkbar ist jedoch auch eine Anlenkung an der Televerlängerung, insbesondere an der Montageeinheit, vorzugsweise im Bereich der Montagestelle mit dem Teleausleger. Der Abspannbock dient im Kranbetrieb zur Abspannung zumindest eines Teils des Auslegersystems.In addition, at least one bracing stand for bracing at least part of the boom system is mounted on the telescopic boom or on the telescopic extension. A pivotable mounting on the telescopic boom or the telescopic extension is conceivable, but this is not absolutely necessary. The guy stand can, for example, be mounted in the head area of the articulation piece, but articulation on the telescopic extension, in particular on the assembly unit, is also conceivable, preferably in the area of the assembly point with the telescopic boom. The guy stand is used in crane operation to guy at least part of the boom system.
Erfindungsgemäß wird vorgeschlagen, dass im ersten Ausführungsschritt der Hauptausleger abgelegt und die Televerlängerung vollständig am Hauptausleger montiert wird. Dies betrifft ebenso etwaige Bauteile zur Kranabspannung. Im Anschluss kann das Auslegersystem durch Betätigung des Wippzylinders aufgewippt werden. Da die Kraft des Wippzylinders jedoch für das Anheben des verlängerten Auslegersystems nicht ausreicht, wird gleichzeitig ein den Wippzylinder unterstützendes Aufrichtemoment auf das Auslegersystem erzeugt. Dies erfolgt durch geeignete Zugkraftaufbringung auf den Abspannbock, wobei die Zugkraft aufgrund der Hebelwirkung wiederrum das gewünschte, den Wippzylinder unterstützenden Aufrichtemoment auf das Auslegersystem erzeugt. Das resultierende Aufrichtemoment ist in Summe größer als jedes der durch Wippzylinder sowie Abspannbock erzeugten Einzelmomente. Das erfindungsgemäße Verfahren gestattet daher ein verlängertes Auslegersystem eines Großkrans ohne zusätzliche Hilfsmittel aufzurichten.According to the invention it is proposed that in the first execution step the main boom is put down and the telescopic extension is completely mounted on the main boom. This also applies to any components for crane bracing. The boom system can then be activated by pressing the Luffing cylinder are luffed up. However, since the force of the luffing cylinder is not sufficient for lifting the extended boom system, a righting moment supporting the luffing cylinder is generated on the boom system at the same time. This is done by applying a suitable tensile force to the guy stand, the tensile force in turn generating the desired righting moment on the boom system, which supports the luffing cylinder, due to the leverage effect. The resulting righting moment is greater in total than each of the individual moments generated by the luffing cylinder and bracing frame. The method according to the invention therefore allows an extended boom system of a large crane to be erected without additional aids.
Dem Verfahren liegt zudem die Erkenntnis zugrunde, dass der Hebelarm des Wippzylinders bei abgelegtem Hauptausleger verhältnismäßig ungünstig ist. Mit zunehmendem Wippwinkel, insbesondere bis zum aufgewipptem Zustand, nimmt der Hebelarm deutlich zu. Vor diesem Hintergrund ist es nicht erforderlich, dass der Wippzylinder über den gesamten Aufrichtevorgang unterstützt wird. Vielmehr kann es ausreichen, eine Unterstützung mittels des Abspannbockes nur für einen Wippbereich von der Montageposition mit etwa 0 Grad (abgelegte Stellung des Auslegers) bis zu einem definierten Maximalwinkel auszuführen. Der definierbare Maximalwinkel kennzeichnet eine Wippstellung des Auslegers, in dieser der Hebel des Wippzylinders ausreichend groß ist, so dass keine externe Unterstützung des Wippzylinders mehr benötigt wird. Denkbar ist es, dass eine Unterstützung durch den Abspannbock lediglich bis zu einem Wippwinkel von 20 Grad erfolgt. Bevorzugt genügt ein Wippwinkel von 10 Grad, besonders bevorzugt benötigt der Wippzylinder lediglich eine Unterstützung bis zu einem Aufrichtewinkel von etwa 5 Grad.The method is also based on the knowledge that the lever arm of the luffing cylinder is relatively unfavorable when the main boom is put down. With an increasing luffing angle, in particular up to the luffed state, the lever arm increases significantly. Against this background, it is not necessary that the luffing cylinder is supported over the entire erecting process. Rather, it can be sufficient to provide support by means of the guy stand only for a luffing area from the assembly position at approximately 0 degrees (stored position of the boom) up to a defined maximum angle. The definable maximum angle characterizes a luffing position of the boom in which the lever of the luffing cylinder is sufficiently large so that no external support for the luffing cylinder is required. It is conceivable that support by the guy stand is only provided up to a luffing angle of 20 degrees. A luffing angle of 10 degrees is preferably sufficient, particularly preferably the luffing cylinder only needs support up to an erecting angle of approximately 5 degrees.
Die auf den Abspannbock aufzubringende Kraft zur Generierung des unterstützenden Aufrichtemomentes ist bevorzugt eine Zugkraft in Richtung des Kranoberwagens. Die benötigte Zugkraft auf den Abspannbock kann mittels einer speziellen Verseilung und/oder eines Verstellantriebes des Abspannbockes aufgebracht werden, wobei letzterer im regulären Kranbetrieb zur Verstellung des schwenkbar angelenkten Anspannbockes dient. Über eine Winde am Kranoberwagen lässt sich die erforderliche Zugkraft kontrolliert auf den Abspannbock aufbringen. Möglich ist der Einsatz des Hubseils oder einer sonstigen Verseilung, die temporär am Abspannbock für den Aufrichtevorgang anzubringen ist.The force to be applied to the guy stand to generate the supporting righting moment is preferably a tensile force in the direction of the crane superstructure. The required tensile force on the guy stand can be applied by means of a special stranding and / or an adjusting drive of the guy stand, the latter being used in regular crane operation to adjust the pivotably linked clamping block. The required tensile force can be applied to the guy stand in a controlled manner using a winch on the crane superstructure. It is possible to use the hoist rope or other stranding that is temporarily attached to the guy stand for the erection process.
Gemäß einer bevorzugten Ausführung wird ein Y-Abspannbock einer räumlichen Abspannung des Auslegersystems als Abspannbock für den Aufrichtevorgang genutzt. In diesem Fall lässt sich ein Hubseil des Krans mit dem Y-Abspannbock verbinden und durch Betätigung der Hubseilwinde eine ausreichende Zugkraft auf den Y-Abspannbock zur Momentengenerierung aufbringen. Der Y-Abspannbock wird dazu vor dem Aufrichten bereits in eine aufgestellte Position am Teleausleger verbracht und die räumliche Abspannung gespannt, bspw. vom Kranoberwagen über die Stangen des Y-Abspannbockes bis zur Televerlängerung.According to a preferred embodiment, a Y-bracing frame of a spatial bracing of the boom system is used as a bracing frame for the erection process. In this case, a hoist rope of the crane can be connected to the Y-bracing frame and, by operating the hoisting rope winch, a sufficient tensile force can be applied to the Y-bracing frame to generate torque. For this purpose, the Y-bracing frame is already brought into an erected position on the telescopic boom before it is erected and the spatial bracing is tensioned, for example from the crane superstructure via the rods of the Y-bracing frame to the telescopic extension.
Die Befestigung des Hubseils am Y-Abspannbock kann mittels einer die Einzelböcke des Y-Abspannbockes verbindenden Traverse erfolgen, die dann zentral zwischen den Einzelstangen das Hubseil aufnimmt. Die Traverse kann mit wenigstens einer Umlenkrolle zur Umlenkung und Rückführung des Hubseils zum Kranaufbau ausgestattet sein. Möglich ist es jedoch ebenso, das freie Hubseilende unmittelbar an der Traverse zu befestigen.The hoisting rope can be fastened to the Y-bracing frame by means of a cross-member which connects the individual brackets of the Y-bracing frame and which then receives the hoisting rope centrally between the individual rods. The traverse can be equipped with at least one deflection pulley for deflecting and returning the hoist rope to the crane structure. However, it is also possible to attach the free end of the hoist rope directly to the crossbeam.
Nach dem erfolgreichen Aufrichtevorgang bzw. nach Erreichen des vordefinierten Maximalwinkels kann das Seil von der Traverse gelöst werden. Im Anschluss lässt sich diese platzsparend zur Seite an eine der beiden Einzelböcke des Y-Abspannbocks verschwenken und kann dort während des Kranbetriebs verbleiben.After the successful erection process or after reaching the predefined maximum angle, the rope can be detached from the traverse. This can then be swiveled to the side to one of the two single frames of the Y-bracing frame to save space and can remain there while the crane is in operation.
Die Traverse wird vorzugsweise im Anlenkbereich des Y-Abspannbockes am Teleausleger montiert. Die Anbindung erfolgt mittels Verbolzung. Die wenigstens eine Umlenkrolle der Traverse kann schwenkbar gelagert sein, insbesondere um eine Horizontalachse schwenkbar.The traverse is preferably mounted in the articulation area of the Y-bracing frame on the telescopic boom. The connection is made by means of bolts. The at least one deflection roller of the traverse can be mounted pivotably, in particular pivotable about a horizontal axis.
Wie bereits zuvor angemerkt, kann alternativ zu einem Hubseil gegebenenfalls auch auf eine ohnehin vorgesehene Verstellwinde des Abspannbockes zurückgegriffen werden. Möglich ist dies beispielsweise bei Verwendung eines A-Bockes als Abspannbock zur Generierung des entlastenden Aufrichtemomentes. Ein solcher A-Bock ist üblicherweise an einer Montageeinheit der Televerlängerung schwenkbar angelenkt und lässt sich mittels einer Verstellwinde um seine Horizontalachse nach hinten in Richtung des Kranoberwagens verschwenken. Im Kranbetrieb wird ein solcher A-Bock zur Verstellung einer Wippspitze benötigt. Zur Momenterzeugung muss ein geeigneter Anschlag vorgesehen sein, der die Schwenkbewegung des A-Bock begrenzt. Denkbar ist es bspw., dass der A-Bock mittels der Verstellwinde zunächst soweit in Richtung des Kranoberwagens nach hinten verschwenkt wird, bis dieser gegen einen geeigneten Anschlag, insbesondere am Teleausleger, anschlägt. Bei weiterer Betätigung der Verstellwinde lässt sich dann das unterstützende Aufrichtemoment auf das Auslegersystem aufbringen. Bevorzugt ist es, wenn der Anschlag den Winkel des A-Bockes gegenüber der Horizontalen auf einen Winkel im Bereich von 10° bis 40°, vorzugsweise 20°-30° Grad begrenzt.As already noted above, as an alternative to a hoist rope, an adjusting winch of the guy stand, which is provided anyway, can also be used. This is possible, for example, when using an A-frame as a bracing frame to generate the relieving righting moment. Such an A-frame is usually pivotably linked to an assembly unit of the telescopic extension and can be pivoted backwards around its horizontal axis in the direction of the crane superstructure by means of an adjusting winch. In crane operation, such an A-frame is required to adjust a luffing jib. A suitable stop that limits the pivoting movement of the A-frame must be provided to generate the torque. It is conceivable, for example, that the A-frame is initially pivoted backwards in the direction of the crane superstructure by means of the adjusting winch until it strikes against a suitable stop, in particular on the telescopic boom. With further actuation of the adjustment winch, the supporting righting moment can then be applied to the boom system. It is preferred if the stop limits the angle of the A-frame relative to the horizontal to an angle in the range from 10 ° to 40 °, preferably 20 ° -30 ° degrees.
Ein geeigneter Anschlag lässt sich mittels ein oder mehrerer Stützen umsetzen, die sich beispielsweise von den Eckstielen der Montageeinheit in Richtung des A-Bocks erstrecken. Denkbar ist es, die Stützen schwenkbar an der Montageeinheit zu lagern, um für den Transportzustand ein vollständiges zurückklappen des A-Bockes zu ermöglichen.A suitable stop can be implemented by means of one or more supports which, for example, extend from the corner posts of the assembly unit in the direction of the A-frame. It is conceivable to mount the supports pivotably on the assembly unit in order to enable the A-frame to be folded back completely for the transport state.
Für das Verfahren ist es besonders bevorzugt, wenn die Kransteuerung während des Aufrichtevorgangs die relevanten Antriebe, d.h. den Wippzylinder und Verstellwinde/Hubwinde des Krans synchronisiert ansteuert. Insbesondere regelt die Steuerung beide Antriebe, um eine Überlastung der beteiligten Komponenten zu vermeiden. Das Verhältnis der beiden, von den Antrieben erzeugten Einzelaufrichtmomente ist für die Verfahrensausführung unerheblich und kann idealerweise frei gewählt werden. Denkbar ist ein Verhältnis von 50/50. Genauso gut kann jedoch einer der Antrieb auf Volllast betrieben werden und der zweite Antrieb greift lediglich unterstützend ein.For the process, it is particularly preferred if the crane control controls the relevant drives, i.e. the luffing cylinder and adjusting winch / hoisting winch of the crane, in a synchronized manner during the erection process. In particular, the control regulates both drives in order to avoid overloading the components involved. The ratio of the two individual righting moments generated by the drives is irrelevant for the execution of the process and can ideally be freely selected. A ratio of 50/50 is conceivable. However, one of the drives can just as well be operated at full load and the second drive only intervenes in a supporting manner.
Ferner kann vorgesehen sein, dass durch die Steuerung wenigstens eine Überlastsicherung ausgeführt wird, die insbesondere Belastungen im Abspannbock oder des die Kraft auf den Abspannbock aufbringenden Seils überwacht und gegebenenfalls gegen Grenzwerte vergleicht. Insbesondere ist vorgesehen, dass die Kraftaufbringung auf den Abspannbock auf eine Maximalkraft begrenzt wird, um etwaige Überlastungen der Kranstruktur zu vermeiden. Die Überlastsicherung kann beispielsweise durch Druckmessung in der Verstell- und/oder Hubseilwinde und/oder durch eine Kraftmessung in ein oder mehreren Einzelböcken des Abspannbockes erfolgen. Möglich ist es ebenso, dass die Traverse mit ein oder mehreren Sensoren zur Kraftmessung ausgestattet wird, um auch hier eine punktuelle Überlastsituation erkennen zu können.Furthermore, it can be provided that at least one overload protection device is implemented by the control, which monitors in particular loads in the guy stand or the cable applying the force to the guy stand and, if necessary, compares them against limit values. In particular, it is provided that the force applied to the guy stand is limited to a maximum force in order to avoid any overloading of the crane structure. The overload protection can take place, for example, by measuring the pressure in the adjusting and / or hoisting cable winch and / or by measuring the force in one or more individual frames of the guy stand. It is also possible for the crossbeam to be equipped with one or more sensors for force measurement in order to be able to detect a punctual overload situation here as well.
Das erfindungsgemäße Verfahren bzw. des vorteilhafte Ausführungen lassen sich nicht nur für den Aufrichtevorgang, sondern natürlich ebenfalls für den Prozess zum Ablegen des Auslegersystems anwenden. In diesem Fall werden die Einzelschritte einfach in umgekehrter Reihenfolge ausgeführt.The method according to the invention and the advantageous embodiment can be used not only for the erecting process, but of course also for the process for putting down the boom system. In this case, the individual steps are simply carried out in reverse order.
Neben dem erfindungsgemäßen Verfahren betrifft die vorliegende Erfindung ebenso einen Kran zur Durchführung des erfindungsgemäßen Verfahrens. Der Kran zeichnet sich demnach durch dieselben Vorteile und Eigenschaften aus, wie sie bereits vorstehend anhand des erfindungsgemäßen Verfahrens aufgezeigt wurden. Auf eine wiederholende Beschreibung wird aus diesem Grund verzichtet. Ferner deckt ein Aspekt der Erfindung eine Traverse zur Anbindung des Hubseils an einem Y-Abspannbock einer räumlichen Kranabspannung ab. Zur Ausführung der erfindungsgemäßen Traverse wird auf die vorstehende Ausführung verwiesen.In addition to the method according to the invention, the present invention also relates to a crane for performing the method according to the invention. The crane is therefore characterized by the same advantages and properties as were already shown above using the method according to the invention. For this reason, a repetitive description is dispensed with. Furthermore, one aspect of the invention covers a traverse for connecting the hoist rope to a Y-bracing frame of a spatial crane bracing. For the implementation of the cross-member according to the invention, reference is made to the preceding explanation.
Weitere Vorteile und Eigenschaften der Erfindung sollen nachfolgend anhand mehrerer in den Figuren dargestellter Ausführungsbeispiel erläutert werden. Es zeigen:
-
1 : ein Ausführungsbeispiel eines Krans für die Durchführung des erfindungsgemäßen Aufrichteverfahrens, -
2a : eine Detaildarstellung der Traverse für die Verbindung des Abspannbockes mit dem Hubseil, -
2b : eine modifizierte Ausführungsform der Traverse, -
3a : eine Detaildarstellung des Y-Abspannbockes mit montierter Traverse während des Aufrichtevorgangs, -
3b : die Darstellung gemäß3a mit demontierter Traverse, -
4 : ein alternatives Ausführungsbeispiel eines Großkrans für die Verfahrensdurchführung gemäß einer modifizierten Ausführung, -
5a : eine Detaildarstellung der Montageeinheit der Televerlängerung und -
5b : die Darstellung der Montageeinheit gemäß5a während des Aufrichtevorgangs.
-
1 : an embodiment of a crane for carrying out the erecting method according to the invention, -
2a : a detailed representation of the traverse for the connection of the guy stand with the hoist rope, -
2 B : a modified version of the traverse, -
3a : a detailed representation of the Y-bracing frame with mounted traverse during the erection process, -
3b : the representation according to3a with dismantled crossbeam, -
4th : an alternative embodiment of a large crane for carrying out the method according to a modified version, -
5a : a detailed representation of the assembly unit of the telescopic extension and -
5b : the representation of the assembly unit according to5a during the raising process.
Anhand des in
An der Spitze des Teleauslegers
Zusätzlich verfügt der Kran über eine räumliche Y-Abspannung, die Einzelböcke
Für das Aufrichten des vormontierten Auslegersystems ist der oder die Wippzylinder
Mit dieser zusätzlichen Kraft kann die problematische 0°-Position des Auslegersystems überwunden werden. Wenn der Ausleger
Durch die Position (Steuern des Hebelarmes) der Traverse
Zur Steuerung der beiden Aktoren
Die Aufteilung der Momente ist nicht erfindungsrelevant. Es können beide Kranaktoren
Die Überlastung kann sich auf den Gesamtkran beziehen, auf die zusätzlichen Bauteile, wie zum Beispiel Traverse
Eine alternative Umsetzung des Verfahrens wird nun anhand der
Nach der vollständigen Montage der Televerlängerung
Wenn das Auslegersystem ausreichend weit aufgewippt wurde und der Wippzylinder
Bei dieser Lösung wird durch die Steuerung die Maximalkraft der Verstellwinde
Die beiden oben dargestellten Ausführungsformen und die jeweilige Verfahrensausführung lassen sich ebenfalls für den Vorgang zum Ablegen des Auslegersystems anwenden. In diesem Fall werden die Einzelschritte einfach in umgekehrter Reihenfolge ausgeführt.The two embodiments presented above and the respective execution of the method can also be used for the process of depositing the boom system. In this case, the individual steps are simply carried out in reverse order.
Claims (16)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102020107549.9A DE102020107549B3 (en) | 2020-03-19 | 2020-03-19 | Method for erecting a jib of a large crane |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102020107549.9A DE102020107549B3 (en) | 2020-03-19 | 2020-03-19 | Method for erecting a jib of a large crane |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102020107549B3 true DE102020107549B3 (en) | 2021-06-17 |
Family
ID=76085524
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102020107549.9A Active DE102020107549B3 (en) | 2020-03-19 | 2020-03-19 | Method for erecting a jib of a large crane |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102020107549B3 (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202005009317U1 (en) * | 2005-06-14 | 2006-10-19 | Liebherr-Werk Ehingen Gmbh | Telescopic crane, has bracing device with V-shaped bracing supports which are bent opposite to rocker level, where bracing supports are supported according to type of derrick mechanism at revolving stage |
DE102007051539A1 (en) * | 2007-10-29 | 2009-05-07 | Liebherr-Werk Ehingen Gmbh | Method for erecting a crane jib |
-
2020
- 2020-03-19 DE DE102020107549.9A patent/DE102020107549B3/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202005009317U1 (en) * | 2005-06-14 | 2006-10-19 | Liebherr-Werk Ehingen Gmbh | Telescopic crane, has bracing device with V-shaped bracing supports which are bent opposite to rocker level, where bracing supports are supported according to type of derrick mechanism at revolving stage |
DE102007051539A1 (en) * | 2007-10-29 | 2009-05-07 | Liebherr-Werk Ehingen Gmbh | Method for erecting a crane jib |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102007056289B4 (en) | Method for erecting a crane jib | |
EP1666401B1 (en) | Mobile crane | |
DE102007051539B4 (en) | Method for erecting a crane jib | |
DE102005049606B4 (en) | Mobile crane with additional boom and procedure for disassembling the jib | |
DE102013011489A1 (en) | Tower Crane | |
DE102009048846A1 (en) | crane | |
EP2067737B1 (en) | Side bracing for a grid extension of a crane | |
AT523743A2 (en) | Mobile crane and method of reducing the load on its boom | |
DE102010023275B4 (en) | Procedure for moving large cranes in the upgraded system and system for performing this procedure | |
EP3793930B1 (en) | Support for the rear anchoring line of a telescopic crane | |
DE102015009156B4 (en) | Telescopic boom of a crane with guy as well as crane | |
DE102020107549B3 (en) | Method for erecting a jib of a large crane | |
EP3558858A1 (en) | Crane having a collapsible jib | |
DE102012002040A1 (en) | Method for operating crane of crane system, involves connecting auxiliary crane having telescopic boom with crane as erecting crane ballast and adjusting erecting crane ballast radius through telescopic boom of auxiliary crane | |
DE102019131914B4 (en) | Crane with luffing boom extension | |
DE102018106753B4 (en) | Mobile crane with a two-part luffing jib and a method for erecting the boom system of such a mobile crane | |
DE102011014585A1 (en) | Method for erecting beam of crane, particularly for erecting lattice jib, involves erecting beam from laid down position, in which traction force is exerted on beam by traction element, particularly restraint | |
DE102013015311B4 (en) | Method of erecting and / or putting down a long boom system | |
DE102022132028B3 (en) | Crane with guy frame and method for guying the same | |
DE102013002415B4 (en) | Method for erecting a long boom and crane | |
AT526450A2 (en) | Mobile crane with a detachable attached superstructure and setup process for this | |
DE102015000473B4 (en) | Crane with bracing | |
DE102020128161A1 (en) | tower crane | |
EP3943438A1 (en) | Mobile crane with separable a frame | |
WO2021032529A1 (en) | Telescopic jib with swing-out mast |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R012 | Request for examination validly filed | ||
R079 | Amendment of ipc main class |
Free format text: PREVIOUS MAIN CLASS: B66C0023687000 Ipc: B66C0023820000 |
|
R016 | Response to examination communication | ||
R018 | Grant decision by examination section/examining division | ||
R020 | Patent grant now final |