DE102020105239A1 - Joint tape - Google Patents

Joint tape Download PDF

Info

Publication number
DE102020105239A1
DE102020105239A1 DE102020105239.1A DE102020105239A DE102020105239A1 DE 102020105239 A1 DE102020105239 A1 DE 102020105239A1 DE 102020105239 A DE102020105239 A DE 102020105239A DE 102020105239 A1 DE102020105239 A1 DE 102020105239A1
Authority
DE
Germany
Prior art keywords
joint tape
manhole
joint
manhole frame
collar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
DE102020105239.1A
Other languages
German (de)
Inventor
Thomas Tekaat
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tekaat GmbH
Original Assignee
Tekaat GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tekaat GmbH filed Critical Tekaat GmbH
Priority to DE102020105239.1A priority Critical patent/DE102020105239A1/en
Publication of DE102020105239A1 publication Critical patent/DE102020105239A1/en
Ceased legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers
    • E02D29/149Annular gaskets
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/12Manhole shafts; Other inspection or access chambers; Accessories therefor
    • E02D29/14Covers for manholes or the like; Frames for covers
    • E02D29/1409Covers for manholes or the like; Frames for covers adjustable in height or inclination

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

Die Erfindung betrifft ein Fugenband (30) für den Straßenbau, welches sich in besonderer Weise zum Einsatz bei selbstnivellierenden oder einwalzbaren Schachtabdeckungen (4) eignet und die Arbeitsschritte bei deren Einbau in einen zugehörigen Schacht (2) vereinfacht. Erfindungsgemäß weist das Fugenband (30) zu diesem Zweck im Querschnitt betrachtet ein U-Profil auf.The invention relates to a joint tape (30) for road construction, which is particularly suitable for use in self-leveling or roll-in manhole covers (4) and simplifies the work steps involved in installing them in an associated manhole (2). According to the invention, the joint tape (30) has a U-profile for this purpose, viewed in cross section.

Description

Die Erfindung betrifft ein Fugenband, insbesondere ein bituminöses Fugenband, vorzugsweise zum Einsatz an/in einer Fuge zwischen einem Schachtrahmen und einer Deckschicht in einem Straßenkörper. Dier Erfindung betrifft ferner eine Schachtabdeckung mit einem derartigen Fugenband.The invention relates to a joint tape, in particular a bituminous joint tape, preferably for use on / in a joint between a manhole frame and a cover layer in a road body. The invention also relates to a manhole cover with such a joint tape.

Ein derartiges Fugenband ist beispielsweise aus der EP 0 792 973 A1 bekannt.Such a joint tape is for example from EP 0 792 973 A1 known.

Fugenbänder werden insbesondere im Straßenbau zur Herstellung von Nähten und von Anschlüssen verwendet. Nähte entstehen bei einem Verbund von nebeneinanderliegenden Einbaubahnen aus Mischgut mit vergleichbaren Eigenschaften. Als Anschlüsse werden bezeichnet die Verbindungen von Einbaubahnen aus Mischgut mit unterschiedlichen Eigenschaften. Dazu gehören Walzasphalt (Asphaltbeton, Split, Mastixasphalt) an Gussasphalt und umgekehrt. Die Verbindung von Gussasphalt an Gussasphalt ist ebenfalls als Anschluss herzustellen.Joint tapes are used in particular in road construction to produce seams and connections. Seams are created in a combination of adjacent paving tracks made of mixed material with comparable properties. Connections are the connections between paving tracks made of mixed material with different properties. This includes rolled asphalt (asphalt concrete, split, mastic asphalt) to mastic asphalt and vice versa. The connection between mastic asphalt and mastic asphalt must also be established as a connection.

Darüber hinaus kommen Fugenbänder auch zum Einsatz bei Einbauten wie beispielsweise Kanaldeckeln, Abläufen und dergleichen, an welche Mischgut angewalzt wird. Ihre wesentliche Aufgabe besteht in der Abdichtung der Fuge zwischen Einbauteil und umliegender Deckschicht, so dass kein Wasser in den Straßenkörper eindringen kann. Die durch das Fugenband geschaffene Verbindung soll sich unter Verkehrslasten und Klimaeinwirkungen nicht öffnen. Zugleich ist eine Flexibilität zum Ausgleich von Ausdehnungen der Deckschicht durch Hitze oder durch mechanische Beanspruchungen einschließlich Erschütterungen gewünscht.In addition, waterstops are also used for fixtures such as manhole covers, drains and the like, on which mix is rolled. Their main task is to seal the joint between the built-in part and the surrounding surface layer so that no water can penetrate the road structure. The connection created by the joint tape should not open under traffic loads and climatic influences. At the same time, flexibility to compensate for expansions of the cover layer due to heat or mechanical loads, including vibrations, is desired.

Speziell bei sogenannten selbstnivellierenden oder einwalzbaren Schachtabdeckungen besteht ein Bedarf, die Arbeitsabläufe und die Zuverlässigkeit der Abdichtung beim Einsatz von Fugenbändern zu vereinfachen, insbesondere bei Sanierungsarbeiten aber auch bei Neubauten. Derartige Schachtabdeckungen zeichnen sich dadurch aus, dass sie einen in der Regel metallischen Schachtrahmen aufweisen, der ein nach außen überstehendes und im Einbauendzustand sich auf dem Straßenkörper abstützendes, in der Regel ringförmiges Element besitzt, hier als Kragen bezeichnet. Das Fugenband soll die Fuge zwischen dem Kragen und der in radialer Richtung angrenzenden Deckschicht abdichten.Particularly in the case of so-called self-leveling or roll-in manhole covers, there is a need to simplify the work processes and the reliability of the seal when using waterstops, especially in renovation work but also in new buildings. Such manhole covers are characterized in that they have a usually metallic manhole frame, which has an outwardly protruding and in the final installation state is supported on the road body, usually ring-shaped element, here referred to as a collar. The joint tape is intended to seal the joint between the collar and the outer layer adjoining in the radial direction.

Aufgabe der Erfindung ist es demnach, ein Fugenband der eingangs erwähnten Art bereitzustellen, welches sich in besonderer Weise zum Einsatz bei selbstnivellierenden oder einwalzbaren Schachtabdeckungen eignet und die Arbeitsschritte bei deren Einbau in einen zugehörigen Schacht vereinfacht.The object of the invention is therefore to provide a joint tape of the type mentioned above, which is particularly suitable for use in self-leveling or roll-in manhole covers and simplifies the work steps when installing them in an associated manhole.

Diese Aufgabe wird erfindungsgemäß gelöst durch ein Fugenband mit den Merkmalen des Anspruchs 1.This object is achieved according to the invention by a joint tape with the features of claim 1.

Demnach zeichnet sich das erfindungsgemäße Fugenband dadurch aus, dass es im Querschnitt betrachtet ein U-Profil aufweist.Accordingly, the joint tape according to the invention is characterized in that, viewed in cross section, it has a U-profile.

Das erfindungsgemäße Fugenband ist vor allem für den Einsatz an/in einer Fuge zwischen einem Schachtrahmen und einer Deckschicht, insbesondere einer Asphalt-Deckschicht, in einem Straßenkörper konzipiert.The joint tape according to the invention is designed primarily for use on / in a joint between a manhole frame and a cover layer, in particular an asphalt cover layer, in a road body.

Aufgrund seiner Form ermöglicht das erfindungsgemäße Fugenband das Ausbilden einer mit den maßgeblichen Richtlinien für den Straßenbau konformen Fuge bei selbstnivellierenden bzw. einwalzbaren Schachtabdeckungen.Due to its shape, the joint tape according to the invention enables the formation of a joint that conforms to the relevant guidelines for road construction in the case of self-leveling or roll-in manhole covers.

Bevorzugt besitzt das U-Profil eine Basis und zwei im rechten Winkel von der Basis abstehende Flanken. Eine alternative Umschreibung des Sachverhalts besteht darin, dass das Profil die Form einer Klammer [hat, welche in der Einbaulage den nach außen abstehenden Kragen des Schachtrahmens umgreift.The U-profile preferably has a base and two flanks protruding from the base at right angles. An alternative description of the situation is that the profile has the shape of a clip [which, in the installed position, encompasses the outwardly protruding collar of the manhole frame.

Durch die klammerartige Form umgreift das Fugenband den Schachtrahmen von außen. Dadurch besteht während der Montagephase eine formschlüssige Verbindung zum Schachtrahmen, weshalb kein Voranstrich bzw. Kleber notwendig ist. Due to the clamp-like shape, the joint tape encompasses the manhole frame from the outside. As a result, there is a form-fitting connection to the manhole frame during the assembly phase, which is why no primer or adhesive is necessary.

Zudem wird das Fugenband durch den Formschluss beim Einwalzen oder Einrütteln des Schachtrahmens nicht nach oben abgestreift. Schließlich gibt es an der Oberseite des Schachtrahmens eine überstehende Materialanhäufung, die nach dem Einwalzen sich nach Art eines Nietkopfes nach beiden Seiten über den Rand der Fuge erstreckt und der Ausbildung von Kornausbüchen vorbeugt.In addition, the joint tape is not stripped upwards when the manhole frame is rolled or vibrated in due to the form fit. Finally, there is a protruding accumulation of material on the upper side of the manhole frame which, after rolling in, extends over the edge of the joint on both sides like a rivet head and prevents the formation of grain bulges.

Gattungsgemäße Fugenbänder sind in aller Regel auf Basis von Bitumen hergestellt. Sie werden maschinell als vorgeformte thermoplastische Bandprofile hergestellt. Unter Wärmezufuhr sind diese zumindest anschmelzbar, um eine Verbindung mit dem umliegenden Mischgut wie vorstehend beschrieben einzugehen. Üblicherweise weisen aus dem Stand der Technik bekannte Fugenbänder Zusätze von Kunststoffen, Weichmachern und/oder mineralischen Füllstoffen auf.Joint tapes of the generic type are usually made on the basis of bitumen. They are machine-made as preformed thermoplastic strip profiles. With the supply of heat, these can at least be melted in order to establish a connection with the surrounding mix as described above. Joint tapes known from the prior art usually have additives of plastics, plasticizers and / or mineral fillers.

Durch die beschriebene Erfindung ist es erstmals möglich, selbstnivellierende / einwalzbare Schachtabdeckungen gemäß den in Deutschland gültigen „Zusätzlichen Technischen Vertragsbedingungen und Richtlinien für Fugen in Verkehrsflächen“ einzubauen. Die ZTV Fug-StB 15 schreibt nämlich Fugenband an den Kanten zu allen Straßeneinbauten wie Schachtabdeckungen vor, wurde aber in der Praxis bislang weitgehend ignoriert: https://www.fgsv-verlag.de/ztv-fug-stb-15The invention described makes it possible for the first time to install self-leveling / roll-in manhole covers in accordance with the “Additional Technical Contractual Conditions and Guidelines for Joints in Traffic Areas” valid in Germany. The ZTV Fug-StB 15 writes namely, joint tape on the edges of all road fixtures such as manhole covers, but has been largely ignored in practice: https://www.fgsv-verlag.de/ztv-fug-stb-15

Neben der vorstehend beschriebenen Anwendung im Zusammenhang mit selbstnivellierenden oder einwalzbaren Schachtabdeckungen sind für das erfindungsgemäße Fugenband noch weitere Anwendungen im Bereich baulicher oder straßenbaulicher Abdichtungen denkbar, bei denen das U-Profil ein zugeordnetes Objekt umgreift.In addition to the above-described application in connection with self-leveling or roll-in manhole covers, other applications in the area of structural or road construction seals are also conceivable for the joint tape according to the invention, in which the U-profile encompasses an assigned object.

Ein Ausführungsbeispiel der Erfindung wird im Folgenden anhand einer Zeichnung erläutert.

  • 1 zeigt einen schematischen Längsschnitt durch einen Schacht in einem Straßenkörper mit einem darin eingesetzten Schachtrahmen, nämlich einen einwalzbaren Schachtrahmen, wobei der Straßenkörper eine Deckschicht aufweist und wobei ein erfindungsgemäßes Fugenband in einer Fuge zwischen dem Schachtrahmen und der Deckschicht angeordnet ist.
  • 2 zeigt einen vergrößerten Querschnitt durch das Fugenband.
An exemplary embodiment of the invention is explained below with reference to a drawing.
  • 1 shows a schematic longitudinal section through a manhole in a road body with a manhole frame inserted therein, namely a rollable manhole frame, the road body having a cover layer and a joint tape according to the invention being arranged in a joint between the manhole frame and the cover layer.
  • 2 shows an enlarged cross-section through the joint tape.

Konkret zeigt 1 einen Längsschnitt durch einen Schacht 2 in einem Straßenkörper oder in einer sonstigen Verkehrsfläche mit einem darin eingesetzten Schachtrahmen 4 in Einbauendlage. Der eingewalzte Schachtrahmen 4 dient als Träger eines Schachtdeckels 6. Der Schachtrahmen 4 und der Schachtdeckel 6 bilden zusammen eine Schachtabdeckung 8, in diesem Fall eine sogenannte selbstnivellierende Schachtabdeckung. Die Schachtabdeckung 8 ist im Wesentlichen symmetrisch zu einer Symmetrieachse 10 ausgebildet und hat in der Draufsicht eine kreisförmige Kontur. Eine eckige Kontur wäre aber ebenfalls möglich.Specifically shows 1 a longitudinal section through a shaft 2 in a road body or in another traffic area with a manhole frame inserted therein 4th in final installation position. The rolled-in manhole frame 4th serves as a support for a manhole cover 6th . The manhole frame 4th and the manhole cover 6th together form a manhole cover 8th , in this case a so-called self-leveling manhole cover. The manhole cover 8th is essentially symmetrical about an axis of symmetry 10 formed and has a circular contour in plan view. However, an angular contour would also be possible.

Der Straßenkörper weist eine Deckschicht 12 auf, die üblicherweise aus Asphalt oder Bitumen besteht. Darunter befindet sich eine Bindeschicht 14, unter der wiederum sich eine Tragschicht 16 befindet. Zur Ausbildung des Schachts 2 sind die Schichten in diesem Bereich entsprechend ausgehoben und entfernt.The road body has a covering layer 12th on, which usually consists of asphalt or bitumen. There is a tie layer underneath 14th , under which in turn there is a base layer 16 is located. For the formation of the shaft 2 the layers in this area are dug out and removed accordingly.

Der Schachrahmen 4 umfasst einen Metallgussrahmen mit einem hohlzylindrischen oder rohrförmigen, in den Schacht hineinragenden Unterteil 18 und einem im Wesentlichen radial nach außen abstehenden ringförmigen Oberteil 20. Der Metallgussrahmen ist vorzugsweise integral, also einstückig ausgebildet. Am Übergang zwischen Oberteil 20 und Unterteil 18 ist eine ringförmige Vertiefung mit einer Auflagefläche und einer umfänglichen Einfassung ausgeformt, in die ein zugehöriger Schachtdeckel 6 eingesetzt werden kann. Die Vertiefung bildet somit ein Schachtdeckelauflager. In der Einbauendlage schließt der Schachtdeckel 6 an der Oberseite bündig mit der Oberseite des Oberteils 20 ab, welches seinerseits bündig an die umliegende Deckschicht 12 der Straßendecke anschließt, so dass insgesamt eine glatte Straßenoberfläche ohne herausstehende oder abgesenkte Teile verwirklicht ist.The chess frame 4th comprises a metal cast frame with a hollow cylindrical or tubular lower part protruding into the shaft 18th and a substantially radially outwardly projecting annular upper part 20th . The cast metal frame is preferably formed integrally, that is to say in one piece. At the transition between the upper part 20th and lower part 18th is an annular recess with a support surface and a circumferential border formed into which an associated manhole cover 6th can be used. The recess thus forms a manhole cover support. The manhole cover closes in the final installation position 6th at the top flush with the top of the top 20th which in turn is flush with the surrounding top layer 12th the road surface connects, so that overall a smooth road surface without protruding or lowered parts is achieved.

Der Schachtrahmen 4 stützt sich in der Einbauendlage beispielsweise am Übergang zwischen Oberteil 20 und Unterteil 18 auf einer korrespondierenden ringförmigen Stufe der Tragschicht 16 ab. Des Weiteren steht das ringförmige Oberteil 20 des Metallgussrahmens an seinem Außenumfang radial nach außen über. Der überstehende Kragen 22 stützt sich dabei in der Einbauendlage auf der unter ihm befindlichen Bindeschicht 14 oder auf einer verbleibenden Deckschicht 12 von geringerer Dicke als im restlichen Straßenkörper ab. Die Deckschicht 12 ist dazu im Bereich des Kragens 22 entsprechend dünn ausgebildet oder entfernt. Insgesamt werden durch Verkehrslasten verursachte Kräfte auf den Schachtrahmen in Richtung der den Lastabtrag 24 symbolisierenden Pfeile seitlich schräg in den Straßenkörper abgeleitet, was einer unerwünschten Absenkung des Schachtrahmens 4 im Betrieb entgegenwirkt.The manhole frame 4th is supported in the final installation position, for example, at the transition between the upper part 20th and lower part 18th on a corresponding ring-shaped step of the base course 16 away. Furthermore, there is the ring-shaped upper part 20th of the cast metal frame on its outer circumference radially outwards. The protruding collar 22nd is supported in the final installation position on the binding layer below it 14th or on a remaining top layer 12th of less thickness than in the rest of the road body. The top layer 12th is in the area of the collar 22nd accordingly thin or removed. Overall, forces caused by traffic loads on the manhole frame in the direction of the load transfer 24 symbolizing arrows laterally derived obliquely into the road body, resulting in an undesirable lowering of the manhole frame 4th counteracts in operation.

Die konkrete Einbausituation kann von Fall zu Fall variieren. Insbesondere kann alternativ oder zusätzlich ein Ringfundament zur Abstützung des Schachtrahmens 4 vorgesehen sein, auf das es jedoch vorliegend nicht ankommt. Auf eventuell vorhandene weitere Schachteinbauten (wie etwa den Führungsring 26) und Schachtauskleidungen kommt es in diesem Zusammenhang ebenfalls nicht an.The specific installation situation can vary from case to case. In particular, as an alternative or in addition, a ring foundation can be used to support the manhole frame 4th be provided, which, however, does not matter in the present case. Any other manhole installations (such as the guide ring 26th ) and manhole linings are also irrelevant in this context.

Des Weiteren kann die Schichtung des Straßenkörpers hinsichtlich Art, Reihenfolge und Schichtdicke variieren und von der in 1 rein exemplarisch gezeigten Schichtung abweichen. Demnach kann auch die Art der Abstützung des Schachtrahmens 4 innerhalb des Schachtes 2 variieren.Furthermore, the stratification of the road body can vary in terms of type, sequence and layer thickness and differ from that in FIG 1 The layering shown purely as an example may differ. Accordingly, the type of support of the manhole frame 4th inside the shaft 2 vary.

Wesentlich hingegen ist, dass der Schachtrahmen 4 einen nach außen abstehenden ringförmigen Kragen aufweist 22, dessen Oberseite sich in der Einbauendlage auf gleicher Höhe wie die Oberseite der umliegenden Deckschicht 12 befindet. Der Kragen 22 des Schachtrahmens 4 ist gewissermaßen unter Ausbildung eines ringförmigen Spaltes oder einer ringförmigen Fuge 28 in eine korrespondierende, in der Draufsicht kreisförmige Aussparung der Deckschicht 12 eingelassen. Eine Besonderheit liegt auch darin, dass sich in bevorzugter Ausgestaltung der Schachtrahmen 4 im Einbauendzustand mit Hilfe des Kragens 22 zumindest teilweise, vorzugsweise sogar überwiegend auf der Deckschicht 12 bzw. Asphaltschicht der Fahrbahn abstützt, und nur zum Teil auf dem Schachtkonus.What is essential, however, is that the manhole frame 4th has an outwardly protruding annular collar 22nd , the top of which in the final installation position is at the same level as the top of the surrounding top layer 12th is located. The collar 22nd of the manhole frame 4th is to a certain extent with the formation of an annular gap or an annular joint 28 into a corresponding recess of the cover layer, which is circular in plan view 12th let in. A special feature is that, in a preferred embodiment, the manhole frame 4th in the final state of installation with the help of the collar 22nd at least partially, preferably even predominantly, on the top layer 12th or asphalt layer of the roadway is supported, and only partially on the manhole cone.

Zur Abdichtung der Fuge 28 ist ein bituminöses Fugenband 30 vorgesehen. Erfindungsgemäß weist das Fugenband 30 im Querschnitt gemäß 2 betrachtet ein U-Profil auf. Bevor der Schachtrahmen 4 in den Schacht 2 eingesetzt wird, wird das Fugenband 30 vorzugsweise unter Erwärmung, beispielsweise mittels Gasbrenner, umlaufend um den Umfang des Kragens 22 gelegt, so dass es den äußeren Rand des Kragens 22 nach Art einer Klammer von außen umgreift. Die Breite bzw. Höhe der U-Basis 32 entspricht der Höhe des Kragens 22 in diesem Bereich und beträgt beispielsweise 15 mm. Die beiden rechtwinklig von der U-Basis 32 abstehenden Schenkel oder Flanken 34 des U-Profils liegen demnach mit ihren Innenflächen bündig an der Oberseite bzw. Unterseite des Kragens 22 an, stehen insgesamt also oben und unten etwas über und zeigen im Schnitt gemäß 1 betrachtet zum Zentrum des Schachtrahmens 4. Die Länge der beiden Flanken 34 beträgt vorzugsweise jeweils 5 mm.For sealing the joint 28 is a bituminous joint tape 30th intended. According to the invention, the joint tape 30th in cross section according to 2 looks at a U-profile. Before the manhole frame 4th into the shaft 2 is used, the joint tape 30th preferably with heating, for example by means of a gas burner, circumferentially around the circumference of the collar 22nd placed so that it is the outer edge of the collar 22nd encompassed from the outside in the manner of a clamp. The width or height of the U-base 32 corresponds to the height of the collar 22nd in this area and is, for example, 15 mm. The two at right angles from the U base 32 protruding legs or flanks 34 of the U-profile are therefore flush with their inner surfaces on the top or bottom of the collar 22nd on, so overall they protrude a little above and below and show in section accordingly 1 viewed towards the center of the manhole frame 4th . The length of the two flanks 34 is preferably 5 mm in each case.

Anmerkung: In 1 ist das Fugenband 30 nur auf der rechten Seite des Kragens 22 eingezeichnet. In Wirklichkeit umschließt das Fugenband 30 bevorzugt den gesamten Umfang des Kragens 22 und wäre dementsprechend in der gewählten Schnittdarstellung auch noch links einzuzeichnen.Note: In 1 is the joint tape 30th only on the right side of the collar 22nd drawn. In reality, the joint tape encloses 30th prefers the entire circumference of the collar 22nd and would accordingly also have to be drawn on the left in the selected sectional view.

Anstelle eines scharfkantigen U-Profils kann auch ein abgerundetes oder abgeschrägtes U-Profil vorgesehen sein. Die Flanken 34 müssen im Grundzustand vor der bestimmungsgemäßen Verwendung nicht unbedingt rechtwinklig von der Basis 32 abstehen, sondern können gegenüber dem bevorzugten rechten Winkel leicht schief ausgerichtet sein. Die Länge der beiden Flanken 34 ist in einer möglichen Variante gleich groß, kann aber auch unterschiedlich sein. Alternativ kann ein bogenförmiges U-Profil vorgesehen sein, welches einer C-Form angenähert ist, und welches beim Anpressen an den Kragen 22 des Schachtrahmens 4 und beim Einwalzen seine endgültige, der Fuge 28 bzw. deren Umrandung angepasste Form annimmt.Instead of a sharp-edged U-profile, a rounded or beveled U-profile can also be provided. The flanks 34 do not necessarily have to be at right angles from the base in their basic state before intended use 32 stick out, but can be aligned slightly obliquely with respect to the preferred right angle. The length of the two flanks 34 is the same size in one possible variant, but can also be different. Alternatively, an arcuate U-profile can be provided, which approximates a C-shape, and which when pressed against the collar 22nd of the manhole frame 4th and when rolling in its final, the joint 28 or their border assumes an adapted shape.

Das Fugenband 30 ist vorteilhafterweise auf Bitumenbasis aufgebaut, und kann insbesondere mineralische Füllstoffe umfassen. Mineralische Füllstoffe können dabei beispielsweise in Form von Mehl oder Fasern, beispielsweise als Gesteinsmehl, vorliegen. Zusätzlich können auch Kunststoffe zugesetzt sein, auch in Form von Fasern. Insbesondere können dabei natürlicher oder synthetischer Kautschuk, insbesondere Butylkautschuk, aber auch sonstige Kohlenwasserstoffharze zugesetzt sein. Aber auch der Zusatz von Styrol-Butadien-Styrol-Blockcopolymeren und/oder Styrol-Isopren-Styrol-Blockcopolymeren ist möglich.The joint tape 30th is advantageously based on bitumen, and can in particular include mineral fillers. Mineral fillers can for example be in the form of flour or fibers, for example rock flour. In addition, plastics can also be added, also in the form of fibers. In particular, natural or synthetic rubber, in particular butyl rubber, but also other hydrocarbon resins can be added. The addition of styrene-butadiene-styrene block copolymers and / or styrene-isoprene-styrene block copolymers is also possible.

Im einbaubereiten Zustand liegt das Fugenband 30 somit umfänglich am Kragen 22 des Schachtrahmens 4 an. Aufgrund der Form des Fugenbands 30 besteht eine formschlüssige Verbindung zum Kragen 22, weshalb kein klebriger Voranstrich bzw. keine Klebeschicht auf der dem Kragen 22 zugewandten Innenseite des U-Profils zum Halten in dieser Montageposition notwendig ist.The joint tape is in the ready-to-install condition 30th thus extensively on the collar 22nd of the manhole frame 4th at. Due to the shape of the joint tape 30th there is a positive connection to the collar 22nd , which is why no sticky primer or no adhesive layer on the collar 22nd facing inside of the U-profile to hold in this mounting position is necessary.

Der Straßenkörper wird bei einer Sanierung für den Einbau des Schachtrahmens 4 vorbereit, indem ein in der Draufsicht ringförmiger Abschnitt der Deckschicht 12 herausgefräst wird, und zwar bis zu einem Radius R, der deutlich größer ist als der Radius des einzusetzenden Schachtrahmens 4 an dessen Kragen 22. Der ringförmige Abschnitt wird nun mit heißen Asphalt gefüllt, und noch vor der Erkaltung wird der Schachtrahmen 4 mit dem um den Kragen 22 gelegten Fugenband 30 eingesetzt. Optional kann das Fugenband 30 dabei vorgewärmt bzw. an der nach außen (zum Asphalt zeigenden) Oberfläche angeschmolzen sein. Es ist aber auch eine Kaltverarbeitung möglich. Überschüssiger Asphalt unterhalb des Kragens 22 wird beim Einsetzen des Schachtrahmens 4 automatisch zur Seite gedrückt und füllt den verbleibenden Ringraum zwischen dem Außenradius des Kragens und dem Radius R.The road body will be used during renovation for the installation of the manhole frame 4th prepared by adding a section of the cover layer which is ring-shaped in plan view 12th is milled out to a radius R. , which is significantly larger than the radius of the manhole frame to be used 4th on his collar 22nd . The ring-shaped section is now filled with hot asphalt, and the manhole frame is made before it cools down 4th with the one around the collar 22nd laid joint tape 30th used. Optionally, the joint tape 30th be preheated or melted on the surface facing outwards (towards the asphalt). However, cold processing is also possible. Excess asphalt below the collar 22nd when inserting the manhole frame 4th automatically pushed to the side and fills the remaining annular space between the outer radius of the collar and the radius R. .

Schließlich wird der Schachtrahmen 4 in die Einbauendlage eingewalzt oder eingerüttelt, wobei die Asphaltschicht im umgebenden ringförmigen Abschnitt nivelliert und geglättet wird und die oben überstehende Flanke 34 des Fugenbandes 30 nach Art eines Nietkopfes breit- bzw. flach gewalzt wird. Durch das U-Profil wird das Fugenband 30 beim Einwalzen oder Einrütteln nicht abgestreift, sondern bleibt sicher in der gewünschten Lage.Finally the manhole frame 4th rolled or vibrated into the final paving position, the asphalt layer in the surrounding annular section being leveled and smoothed and the flank protruding above 34 of the joint tape 30th is rolled wide or flat in the manner of a rivet head. The joint tape becomes through the U-profile 30th not stripped off when rolling in or shaking in, but remains securely in the desired position.

BezugszeichenlisteList of reference symbols

22
SchachtManhole
44th
SchachtrahmenManhole frame
66th
SchachtdeckelManhole cover
88th
SchachtabdeckungManhole cover
1010
SymmetrieachseAxis of symmetry
1212th
DeckschichtTop layer
1414th
BindeschichtTie layer
1616
TragschichtBase course
1818th
UnterteilLower part
2020th
OberteilTop
2222nd
Kragencollar
2424
LastabtragLoad transfer
2626th
FührungsringGuide ring
2828
FugeGap
3030th
FugenbandJoint tape
3232
BasisBase
3434
FlankeFlank
RR.
Radiusradius

ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDED IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant was generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturPatent literature cited

  • EP 0792973 A1 [0002]EP 0792973 A1 [0002]

Claims (6)

Fugenband (30) für den Straßenbau, insbesondere zum Einsatz an/in einer Fuge (28) zwischen einem Schachtrahmen (4) und einer Deckschicht (12) in einem Straßenkörper, dadurch gekennzeichnet, dass das Fugenband (30) im Querschnitt betrachtet ein U-Profil aufweist.Joint tape (30) for road construction, in particular for use on / in a joint (28) between a manhole frame (4) and a cover layer (12) in a road body, characterized in that the joint tape (30) viewed in cross section is a U- Has profile. Fugenband (30) nach Anspruch 1, wobei das U-Profil eine Basis (32) und zwei im rechten Winkel von der Basis (32) abstehende Flanken (34) besitzt.Joint tape (30) Claim 1 , wherein the U-profile has a base (32) and two flanks (34) projecting at right angles from the base (32). Fugenband (30) nach einem der vorherigen Ansprüche, welches aus einem bituminösen Material besteht.Joint tape (30) according to one of the preceding claims, which consists of a bituminous material. Fugenband (30) nach einem der vorherigen Ansprüche, dessen Abmessungen derart gewählt sind, dass das Fugenband (30) einen Kragen (22) eines zugeordneten Schachtrahmens (4) nach Art einer Klammer umgreifen kann.Joint tape (30) according to one of the preceding claims, the dimensions of which are selected such that the joint tape (30) can encompass a collar (22) of an associated manhole frame (4) in the manner of a clamp. Schachtabdeckung (8) in einem Straßenkörper mit einem unter Ausbildung einer Fuge (28) in eine umliegende Deckschicht (12) eingebetteten Schachtrahmen (4), wobei die Fuge (28) durch ein Fugenband (30) nach einem der vorherigen Ansprüche abgedichtet ist.Manhole cover (8) in a road body with a manhole frame (4) embedded in a surrounding cover layer (12) to form a joint (28), the joint (28) being sealed by a joint tape (30) according to one of the preceding claims. Schachtabdeckung (8) nach Anspruch 5, wobei der Schachtrahmen (4) einen radial nach außen abstehenden Kragen (22) mit einem äußeren Rand aufweist und das Fugenband (30) den Rand klammerartig umgreift.Shaft cover (8) Claim 5 wherein the manhole frame (4) has a radially outwardly protruding collar (22) with an outer edge and the joint tape (30) engages around the edge like a clamp.
DE102020105239.1A 2020-02-27 2020-02-27 Joint tape Ceased DE102020105239A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102020105239.1A DE102020105239A1 (en) 2020-02-27 2020-02-27 Joint tape

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102020105239.1A DE102020105239A1 (en) 2020-02-27 2020-02-27 Joint tape

Publications (1)

Publication Number Publication Date
DE102020105239A1 true DE102020105239A1 (en) 2021-09-02

Family

ID=77271448

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102020105239.1A Ceased DE102020105239A1 (en) 2020-02-27 2020-02-27 Joint tape

Country Status (1)

Country Link
DE (1) DE102020105239A1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH687261A5 (en) 1993-04-15 1996-10-31 Werner Ott Mounting for cast-iron frame accommodating manhole cover
EP0792973A1 (en) 1996-02-03 1997-09-03 DENSO-Holding GmbH & Co. Cold processable joint strip and process for installing a joint strip
DE19932166A1 (en) 1999-02-24 2000-09-21 Gottfried Schwarz Device for covering manholes and separating device for exposing manhole covers
DE102016124979A1 (en) 2016-12-20 2018-06-21 Kolja Hester System for preventing formation of joints after the installation of a road cap in a road surface

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH687261A5 (en) 1993-04-15 1996-10-31 Werner Ott Mounting for cast-iron frame accommodating manhole cover
EP0792973A1 (en) 1996-02-03 1997-09-03 DENSO-Holding GmbH & Co. Cold processable joint strip and process for installing a joint strip
DE19932166A1 (en) 1999-02-24 2000-09-21 Gottfried Schwarz Device for covering manholes and separating device for exposing manhole covers
DE102016124979A1 (en) 2016-12-20 2018-06-21 Kolja Hester System for preventing formation of joints after the installation of a road cap in a road surface

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
FGSV: Arbeitsgruppe Betonbauwesen: Zusätzliche Technische Vertragsbedingungen und Richtlinien für Fugen in Verkehrsflächen (ZTV Fug-StB 15). Ausgabe 2015. Köln : FGSV Verlag GmbH, 2015. Deckblatt u. Inhaltsverzeichnis. - ISBN 978-3-86446-162-0. URL: https://www.fgsv-verlag.de/pub/media/pdf/897_1.i.pdf [abgerufen am 2020-06-02].

Similar Documents

Publication Publication Date Title
EP2072837A2 (en) Sealing element
DE102009015232A1 (en) Sealing arrangement for shaft and tunnel constructions
AT524281B1 (en) Channel body, connecting device, end wall, drainage channel, arrangement and method
EP3075908B1 (en) Slotted channel
DE102020105239A1 (en) Joint tape
DE4009885C2 (en)
EP2647763B1 (en) Joint strip for introducing in connecting or repairing joints in the upper region of a street covering
DE202012102396U1 (en) Joint profile and arrangement of several joint profiles for joints in a concrete pavement
DE19649476C2 (en) Process and joint seal for the subsequent sealing of building joints between concrete components
EP2108739B1 (en) Road construction system for sealing joints
DE102010029736A1 (en) Roadway transition system
CH708410A2 (en) Mounting profile for a termination element.
DE7432945U (en) Joint sealing profile for prefabricated lining parts in tunnel structures
EP2088240B1 (en) System and method for filling a fugue between a rail and a neighbouring surface
EP3321545B1 (en) Sealing profile, and sealing arrangement equipped with the same
DE3425654A1 (en) Refurbishment gully
EP2540911B1 (en) Water stop for street construction
DE2613854C3 (en) Tubbing segment for tunnel lining with joint sealing
DE3841553A1 (en) Adhesive connection of plastic waterproof membranes
DE102004053934B4 (en) Device for passing at least one cable or pipe through a bottom-side concrete slab of a building
EP2447421B1 (en) Joining of a frame to a surface
DE10113752A1 (en) Sealing arrangement for bridging gap between two concrete components and has grooves provided in anchoring feet in base surface of seal profile
DE3542427A1 (en) Socketed-pipe connection
DE2200406C3 (en) Compensating ring washer on a canalisation or well shaft pipe
EP3054055A1 (en) Manhole shaft structure

Legal Events

Date Code Title Description
R012 Request for examination validly filed
R002 Refusal decision in examination/registration proceedings
R003 Refusal decision now final