DE102015012635A1 - Assembly platform for in particular the construction of tower segments of Windkraftanlangen - Google Patents

Assembly platform for in particular the construction of tower segments of Windkraftanlangen Download PDF

Info

Publication number
DE102015012635A1
DE102015012635A1 DE102015012635.0A DE102015012635A DE102015012635A1 DE 102015012635 A1 DE102015012635 A1 DE 102015012635A1 DE 102015012635 A DE102015012635 A DE 102015012635A DE 102015012635 A1 DE102015012635 A1 DE 102015012635A1
Authority
DE
Germany
Prior art keywords
assembly platform
arms
movable
baskets
mast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE102015012635.0A
Other languages
German (de)
Other versions
DE102015012635B4 (en
Inventor
Ralf Hermmans
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Goracon Engineering GmbH
Original Assignee
Goracon Engineering GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Goracon Engineering GmbH filed Critical Goracon Engineering GmbH
Priority to DE102015012635.0A priority Critical patent/DE102015012635B4/en
Publication of DE102015012635A1 publication Critical patent/DE102015012635A1/en
Application granted granted Critical
Publication of DE102015012635B4 publication Critical patent/DE102015012635B4/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • B66F11/04Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • B66F11/04Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
    • B66F11/042Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations actuated by lazy-tongs mechanisms or articulated levers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • B66F11/04Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
    • B66F11/044Working platforms suspended from booms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F03MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
    • F03DWIND MOTORS
    • F03D13/00Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
    • F03D13/20Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Sustainable Development (AREA)
  • Sustainable Energy (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • General Engineering & Computer Science (AREA)
  • Wind Motors (AREA)

Abstract

Die Erfindung betrifft eine Montagebühne 1 für insbesondere den Aufbau von Turmsegmenten 8 von Windkraftanlagen mit bewegbaren Arbeitskörben, die an einem Stützmast 5 befestigt sind, wobei an dem Stützmast 5 und in einer Stützmasthochebene zumindest zwei ausfahrbare und in einer ausgefahrenen Stellung feststellbare Kletterarme 9 vorgesehen sind.The invention relates to a mounting platform 1 for in particular the construction of tower segments 8 of wind turbines with movable work baskets which are attached to a support mast 5, wherein at least two extendable and lockable in an extended position climbing arms 9 are provided on the support mast 5 and in a Stützmasthöchbene.

Description

Die Erfindung bezieht sich auf einen Montageturm für insbesondere den Aufbau von Turmsegmenten von Windkraftanlagen mit bewegbaren Arbeitskröben, die an einem Stützmast befestigt sind.The invention relates to a mounting tower for in particular the construction of tower segments of wind turbines with movable Arbeitskröben, which are attached to a support mast.

Türme von Windkraftanlagen werden herkömmlicherweise aus Betonringen hergestellt, die sich kegelstumpfartig verjüngend bis zum oberen Bereich erstrecken, an denen das Windrad drehbeweglich abgestützt ist. Alternativ sind Gittermasten als Stützmasten für Windkraftanlagen bekannt, die ebenfalls abschnittsweise aufgebaut werden.Towers of wind turbines are conventionally made of concrete rings which taper in a frustoconical manner to the upper portion where the wind turbine is rotatably supported. Alternatively, lattice towers are known as support masts for wind turbines, which are also constructed in sections.

Zur Herstellung derartiger Stützmasten werden Lifteinrichtungen verwendet mit Armen, zwischen denen ein Seil gespannt ist mit Kranhaken und zusätzlichen Befestigungsvorrichtungen. Solche herkömmlichen Montagebühnen sind aufwendig und erfordern einen hohen Installationsaufwand. Auch der Deinstallationsaufwand ist nicht unerheblich, da aufgrund der sich nach oben hin verjüngenden Geometrie eines Turmes, die in einem unteren Bereich sehr langen Stützteile aus oberen Bereichen und mit einem erhöhten Aufwand herauszubringen sind.For the preparation of such support poles lifting devices are used with arms, between which a rope is stretched with crane hooks and additional fasteners. Such conventional mounting platforms are expensive and require a high installation cost. Also, the Deinstallationsaufwand is not insignificant, since due to the upwardly tapered geometry of a tower, which are in a lower region very long support parts from the upper areas and bring out an increased effort.

Es ist Aufgabe der vorliegenden Erfindung, eine Montagebühne für insbesondere den Bau von Windkraftanlagen aus Turmsegmenten zur Verfügung zu stellen, die mit einem verminderten Installationsaufwand betrieben werden kann.It is an object of the present invention to provide a mounting platform for in particular the construction of wind turbines tower segments available that can be operated with a reduced installation cost.

Zur Lösung dieser Aufgabe zeichnet sich die Montagebühne der eingangs genannten Art dadurch aus, dass das an dem Stützmast (5) und in einer Stützmasthochebene zumindest zwei ausfahrbare und in einer ausgefahrenen Stellung feststellbare Kletterarme (9) vorgesehen sind. Damit ist vorgesehen, dass die dass die Montagebühne als Klettermontagebühne ausgebildet ist. Dazu kann sie in einer Ausgestaltung mit entsprechend ausfahrbaren und arretierbaren bzw. feststellbaren Kletterarmen ausgerüstet sein, die sich an Innenwandungen von Turmsegmenten arretieren und/oder mit diesen verbinden lassen. Bevorzugterweise sind wiederum in zwei verschiedenen Hochebenen jeweils eine Gruppe aus zwei, drei oder mehr Kletterarmen vorgesehen, die relativ zueinander bewegbar sind. Zwischen den zwei Gruppen von Kletterarmen kann eine Hebevorrichtung, beispielsweise in Gestalt einer Scherenhebevorrichtung, vorgesehen sein, so dass nach Arretierung der Montagebühne durch eine Gruppe von Kletterarmen die andere gelöst und über die Hebevorrichtung in eine andere Höhenposition bewegt werden kann und danach dort an der Innenwandung eines Turmsegmentes montiert wird. Danach kann die andere Gruppe von Kletterarmen nachgeführt sein.To solve this problem, the mounting platform of the type mentioned is characterized in that on the support mast ( 5 ) and in a Stützmasthöchbene at least two extendable and lockable in an extended position climbing arms ( 9 ) are provided. It is thus provided that that the assembly platform is designed as a climbing mounting platform. For this purpose, it can be equipped in one embodiment with appropriately extendable and lockable or lockable climbing arms, which can be locked to inner walls of tower segments and / or connect with them. Preferably, in turn, a group of two, three or more climbing arms are provided in two different plateaus, which are movable relative to each other. Between the two groups of climbing arms, a lifting device, for example in the form of a scissor lift, be provided, so that after locking the mounting platform by a group of climbing arms, the other can be solved and moved via the lifting device in a different height position and then there on the inner wall a tower segment is mounted. After that, the other group of climbing arms can be tracked.

Es ist ebenfalls eine Montagebühne zur Verfügung gestellt, bei der die Arbeitskörbe in eine eng aneinander liegende Ruheposition gebracht werden können, so dass damit Außenabmessungen eingenommen werden können, die es ermöglichen, dass die Montagebühne auch durch relativ kleine Öffnungen wieder aus einem hochgebauten Turm herausgebracht werden kann. Es ist ebenfalls es möglich, mit Arbeitskörben Turmsegmente mit relativ großem Innendurchmesser zu erreichen, indem die jeweils um die horizontalen Achsen schwenkbaren Arbeitskörbe über die Gelenkarme zu verfahren sind. Vorzugsweise sind in verschiedenen Hochebenen des Stützmastes jeweils Arbeitskörbe vorgesehen, insbesondere jeweils zwei, die eine Arbeitsplattform haben mit annähernd halbkreisförmiger Gestalt, so dass diese in der Ruhstellung sich im Bereich des Stützmastes eine eng anliegende Ruhestellung einnehmen können und sich somit in etwa zu einer kreisförmigen Gestalt ergänzen.There is also provided a mounting platform in which the work baskets can be brought into a closely spaced rest position so that external dimensions can be taken which allow the assembly platform to be brought out of a tall tower even through relatively small openings can. It is also possible to achieve with working baskets tower segments with a relatively large inner diameter by the workhorses pivoting about the horizontal axes are about the articulated arms to move. Preferably, work baskets are provided in each case in different high levels of the support mast, in particular two, which have a work platform with an approximately semicircular shape, so that they can assume a close resting position in the rest position in the area of the support mast and thus approximately in a circular shape complete.

Alternativ ist es jedoch auch möglich, die Montagebühne mit einem Gittermast auszurüsten, der entsprechende Verfahrschienen hat, an denen zum Beispiel ein Drehkranz, an dem die Arbeitskörbe festgelegt sind, vertikal verfahrbar montiert ist. An dem Drehkranz können die Arbeitskörbe über entsprechende Gelenkarme wieder verfahren werden. Ist dieser rund ausgebildet, kann der Arbeitskorb eine entsprechende 360° aber auch 180°-Bewegung nach links und rechts durchführen.Alternatively, however, it is also possible to equip the assembly platform with a lattice mast, which has corresponding travel rails on which, for example, a turntable on which the work baskets are fixed, is mounted vertically movable. On the turntable, the work baskets can be moved again via appropriate articulated arms. If this is round, the work basket can perform a corresponding 360 ° but also 180 ° movement to the left and right.

Zur weiteren Erläuterung der Erfindung wird auf weitere Unteransprüche, die nachfolgende Beschreibung und die Zeichnung verwiesen.To further explain the invention, reference is made to further subclaims, the following description and the drawings.

In der Zeichnung zeigen:In the drawing show:

1: ausschnittsweise einen Turm einer Windkraftanlage während der Bauphase, mit einem Ausführungsbeispiel der Montagebühne; 1 a partial view of a tower of a wind turbine during the construction phase, with an embodiment of the assembly platform;

2: eine zu 1 analoge Darstellung bei weiterem Baufortschritt mit drei Turmsegmenten und zwei Gruppen von Kletterarmen; 2 : one too 1 analogue representation with further construction progress with three tower segments and two groups of climbing arms;

3: eine Einzeldarstellung von einander zugeordenten Arbeitskörben mit Gelenkarmen und Kletterarmen; 3 an individual representation of associated working baskets with articulated arms and climbing arms;

4: vergrößert die Gelenkarme und den Drehkranz der Montagebühne nach den 1 bis 3; 4 : increases the articulated arms and the turntable of the assembly platform to the 1 to 3 ;

5: ausschnittsweise eine Seitendarstellung auf das Ausführungsbeispiel nach den 1 bis 4; 5 : partial page presentation on the embodiment of the 1 to 4 ;

6: ein alternatives Ausführungsbeispiel einer Montagebühne nach der Erfindung mit einem Gittermast als Stützmast; 6 an alternative embodiment of a mounting platform according to the invention with a lattice mast as a support mast;

7: vergrößert das Ausführungsbeispiel nach 6 und 7 : enlarges the embodiment after 6 and

8: nochmals vergrößert einen Teilbereich des Stützmast mit Arbeitskorb. 8th : again increases a portion of the support mast with work basket.

In dem ersten Ausführungsbeispiel der Montagebühne nach den 1 bis 5 hat die Montagebühne 1 jeweils in zwei Hochebenen jeweils zwei Arbeitskörbe 2.1 und 2.2, beziehungsweise 3.1 und 3.2. Diese Arbeitskörbe 2.1, 2.2, 3.1, 3.2 sind jeweils an Gelenkarmen 4 befestigt, die bei den Arbeitskörben 3.1 und 3.2 in aufrechter Stellung an dem Stützmast 5 eng anliegend angeordnet sind, so dass die Arbeitskörbe 3.1 und 3.2 in dieser Ruheposition einen nur geringen Raum beanspruchen. Die Arbeitskörbe 2.1 und 2.2 befinden sich in einer ausgefahrenen Arbeitsstellung. Die Gelenkarme 4 sind jeweils an einem Drehkranz 6 und dem Stützmast 5 festgelegt (siehe auch vergrößerte Darstellung nach 4). Die Gelenkarmabschnitte sind um horizontale Achsen 7 schwenkbar. So können sie in verschiedenen Höhenlagen und mit verschiedenen Abständen zum Stützmast 5 an ein Turmsegment 8 heranbewegt werden.In the first embodiment of the assembly platform according to the 1 to 5 has the assembly platform 1 two work baskets each in two plateaus 2.1 and 2.2 , respectively 3.1 and 3.2 , These work baskets 2.1 . 2.2 . 3.1 . 3.2 are each on articulated arms 4 attached to the work baskets 3.1 and 3.2 in an upright position on the support mast 5 are arranged snugly, leaving the work baskets 3.1 and 3.2 occupy only a small space in this rest position. The work baskets 2.1 and 2.2 are in an extended working position. The articulated arms 4 are each on a turntable 6 and the support mast 5 fixed (see also enlarged illustration after 4 ). The Gelenkarmabschnitte are about horizontal axes 7 pivotable. So you can at different altitudes and with different distances to the support pole 5 to a tower segment 8th be moved up.

Die Montagebühne 1 ist über Kletterarme 9, 10 an der Innenwandung der Turmsegmente 8 festzuklemmen. Dazu sind die Kletterarme 9 in der oberen Hochebene und die Kletterarme 10 in einer darunter befindlichen Hochebene angeordnet. Zwischen der Gruppe mit den Kletterarmen 9 und der Gruppe mit den Kletterarmen 10 ist eine Hebevorrichtung 11 in Gestalt einer Scherenhebevorrichtung vorgesehen (siehe auch 5), so dass die Arbeitskörbe 2.1, 2.2 und 3.1, 3.2 einen unterschiedlichen Höhenabstand zueinander einnehmen können, wie dies die 2 zeigt.The assembly platform 1 is about climbing arms 9 . 10 on the inner wall of the tower segments 8th clamp. These are the climbing arms 9 in the upper plateau and the climbing arms 10 arranged in an underlying plateau. Between the group with the climbing arms 9 and the group with the climbing arms 10 is a lifting device 11 provided in the form of a scissor lift (see also 5 ), so the work baskets 2.1 . 2.2 and 3.1 . 3.2 can take a different height distance from each other, as the 2 shows.

In der 2 sind die oberen Arbeitskörbe 2.1 und 2.2 über die Hebevorrichtung 11 verfahren, wobei auch die Klemmarme 9 und 10 einen größeren Abstand zueinander einnehmen. So ist nicht nur in unterschiedlichen Hochebenen zu arbeiten. Vielmehr kann auch durch das wechselseitige Festklemmen der Klemmarme 9 mit der Innenwandung der Mauersegmente 8 ein autarkes Klettern der Montagebühne 1 erfolgen. Die Kletterarme 9 und 10 sind teleskopierbar, beispielsweise durch entsprechende hydraulische Mittel und über die Anschlag 10.1 bzw. 9.1 mit der Innenwandung der Turmsegmente 8 zu verspannen. Anstelle einer Scherenhebeeinrichtung können selbstverständlich auch andere geeignete Hebemittel Einsatz finden.In the 2 are the upper work baskets 2.1 and 2.2 over the lifting device 11 procedure, whereby also the clamping arms 9 and 10 occupy a greater distance from each other. This is not just working in different high levels. Rather, can also by the mutual clamping of the clamping arms 9 with the inner wall of the wall segments 8th a self-sufficient climbing of the assembly platform 1 respectively. The climbing arms 9 and 10 are telescopic, for example, by appropriate hydraulic means and the stop 10.1 respectively. 9.1 with the inner wall of the tower segments 8th to tense. Of course, other suitable lifting means can be used instead of a scissors lifting device.

Wie 5 veranschaulicht, können alle Teile in eine Ruheposition überführt werden, in der die gesamte Montagebühne außerordentlich klein und schmal baut, so dass diese auch noch aus hochemporragenden Türmen wie von Windkraftanlagen nach oben heraus gehoben werden kann, obgleich in einer Anfangsbauphase, wie diese in 1 und in 2 dargestellt ist, die Montagebühne auch Innenwandungen von Mauersegmenten erreichen kann, die einen recht großen Innendurchmesser aufweisen.As 5 illustrated, all parts can be transferred to a rest position in which the entire assembly platform is extremely small and narrow, so that it can be lifted even from towering towers such as wind turbines upwards, albeit in an initial phase, such as in 1 and in 2 is shown, the mounting platform can also reach the inner walls of wall segments, which have a fairly large inner diameter.

In den 6 bis 8 ist eine alternative Ausführungsvariante der Montagebühne 1 dargestellt mit einem Gittermasten als Stützmast 5, der wiederum in zwei unterschiedlichen Hochebenen Arbeitskörbe 2.1 und 2.2 sowie 3.1 und 3.2 aufweist, die über Gelenkarme 9 bzw. 10 an einem Drehkranz 13 entlang verfahrbar festgelegt sind, so dass sie sich über drei Segmente im Inneren der Turmsegmente 8 entlang verfahren lassen. Diese Drehkränze 13 sind ebenfalls auf- und abzuverfahren über Führungsschienen 14 entlang von Vertikalpfosten des Stützmastes 5.In the 6 to 8th is an alternative embodiment of the assembly platform 1 represented with a lattice mast as a support mast 5 who in turn works baskets in two different plateaus 2.1 and 2.2 such as 3.1 and 3.2 which has articulated arms 9 respectively. 10 on a turntable 13 are set along movable so that they are spread over three segments inside the tower segments 8th to be moved along. These slewing rings 13 are also moved up and down via guide rails 14 along vertical posts of the support mast 5 ,

Claims (16)

Montagebühne (1) für insbesondere den Aufbau von Turmsegmenten (8) von Windkraftanlagen mit bewegbaren Arbeitskörben, die an einem Stützmast (5) befestigt sind, dadurch gekennzeichnet, dass an dem Stützmast (5) und in einer Stützmasthochebene zumindest zwei ausfahrbare und in einer ausgefahrenen Stellung feststellbare Kletterarme (9) vorgesehen sind.Assembly platform ( 1 ) for in particular the construction of tower segments ( 8th ) of wind turbines with moveable baskets mounted on a support pole ( 5 ) are fastened, characterized in that on the support mast ( 5 ) and in a Stützmasthöchbene at least two extendable and lockable in an extended position climbing arms ( 9 ) are provided. Montagebühne (1) nach Anspruch 2, dadurch gekennzeichnet, dass in einer zweiten Stützmasthochebene des Stützmastes (5) eine zweite Gruppe von ausfahrbaren und feststellbaren Kletterarmen (10) vorgesehen sind.Assembly platform ( 1 ) according to claim 2, characterized in that in a second Stützmasthöchbene the support mast ( 5 ) a second group of extendable and lockable climbing arms ( 10 ) are provided. Montagebühne (1) nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Kletterarme (9) der einen Stützmasthochebene relativ bewegbar sind zu den Kletterarmen (10) der anderen Stützmasthochebene.Assembly platform ( 1 ) according to claim 1 or 2, characterized in that the climbing arms ( 9 ) of a Stützmasthochebene are relatively movable to the climbing arms ( 10 ) of the other support mast plateau. Montagebühne (1) nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass zwischen den beiden Stützmasthochebenen der Kletterarme (9, 10) ein ausfahrbarer und einfahrbarer Stützmastabschnitt vorgesehen ist.Assembly platform ( 1 ) According to one of claims 1 to 3, characterized in that (between the two supporting mast high levels of climbing arms 9 . 10 ) an extendable and retractable support pole section is provided. Montagebühne (1) nach Anspruch 4, dadurch gekennzeichnet, dass der ein- und ausfahrbare Stützmastabschnitt als Scherenhebevorrichtung (11) ausgebildet ist.Assembly platform ( 1 ) according to claim 4, characterized in that the retractable and extendable support pole section as a scissor lift device ( 11 ) is trained. Montagebühne (1) nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass die Kletterarme (9, 10) als Teleskoparme ausgebildet sind. Assembly platform ( 1 ) according to one of claims 1 to 5, characterized in that the climbing arms ( 9 . 10 ) are designed as telescopic arms. Montagebühne (1) nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass in zumindest einer Arbeitshochebene des Stützmastes (5) zumindest zwei unabhängig voneinander und relativ zueinander horizontal und vertikal von dem Stützmast (5) weg und auf diesen zu bewegbare Arbeitskörbe (2.1, 2.2, 3.1, 3.2) vorgesehen sind, die jeweils um eine vertikale Achse schwenkbar und/oder verfahrbar am Stützmast (5) festgelegt sind.Assembly platform ( 1 ) according to one of claims 1 to 6, characterized in that in at least one working plateau of the support mast ( 5 ) at least two independently and relative to each other horizontally and vertically from the support mast ( 5 ) away and on these movable work baskets ( 2.1 . 2.2 . 3.1 . 3.2 ) are provided, each pivotable about a vertical axis and / or movable on the support mast ( 5 ). Montagebühne (1) nach Anspruch 7, dadurch gekennzeichnet, dass die Arbeitskörbe (2.1, 2.2, 3.1, 3.2) über Gelenkarme (4) mit dem Stützmast (5) verbunden sind.Assembly platform ( 1 ) according to claim 7, characterized in that the working baskets ( 2.1 . 2.2 . 3.1 . 3.2 ) via articulated arms ( 4 ) with the support mast ( 5 ) are connected. Montagebühne (1) nach Anspruch 7 oder 8, dadurch gekennzeichnet, dass die Gelenkarme (4) um horizontale Achsen schwenkbar aufeinander zu und voneinander weg bewegbare Armteile aufweisen.Assembly platform ( 1 ) according to claim 7 or 8, characterized in that the articulated arms ( 4 ) pivotable about horizontal axes towards each other and away from each other movable arm parts. Montagebühne (1) nach einem der Ansprüche 7 bis 9, dadurch gekennzeichnet, dass zumindest zwei aufeinander zu und voneinander wegbewegbare Arbeitskörbe (2.1, 2.2, 3.1, 3.2) vorgesehen sind, die in eine Ruhestellung aufeinander zu bewegbar sind, in der sie aneinander angrenzend angeordnet sind.Assembly platform ( 1 ) according to any one of claims 7 to 9, characterized in that at least two working baskets movable towards and away from each other ( 2.1 . 2.2 . 3.1 . 3.2 ) are provided, which are movable towards each other in a rest position in which they are arranged adjacent to each other. Montagebühne (1) nach Anspruch 10, dadurch gekennzeichnet, dass ein Arbeitskorb (2.1, 2.2, 3.1, 3.2) im Wesentlichen eine halbkreisähnliche Gestalt hat.Assembly platform ( 1 ) according to claim 10, characterized in that a work basket ( 2.1 . 2.2 . 3.1 . 3.2 ) has a substantially semi-circular shape. Montagebühne (1) nach einem der Ansprüche 2 bis 11, dadurch gekennzeichnet, dass die Gelenkarme (4) der Arbeitskörbe (2.1, 2.2, 3.1, 3.2) an einem Drehkranz (6) des Montageturms befestigbar sind.Assembly platform ( 1 ) according to one of claims 2 to 11, characterized in that the articulated arms ( 4 ) of the work baskets ( 2.1 . 2.2 . 3.1 . 3.2 ) on a turntable ( 6 ) of the assembly tower can be fastened. Montagebühne (1) nach Anspruch 12, dadurch gekennzeichnet, dass der Drehkranz (6) ortsfest an dem Stützmast (5) befestigt ist.Assembly platform ( 1 ) according to claim 12, characterized in that the turntable ( 6 ) fixed to the supporting mast ( 5 ) is attached. Montagebühne (1) nach Anspruch 13, dadurch gekennzeichnet, dass der Drehkranz (6, 13) vertikal beweglich an dem Stützmast (5) befestigt ist.Assembly platform ( 1 ) according to claim 13, characterized in that the turntable ( 6 . 13 ) vertically movable on the support mast ( 5 ) is attached. Montagebühne (1) nach Anspruch 14, dadurch gekennzeichnet, dass an dem Drehkranz (13) ein Arbeitskorb (2.1, 2.2, 3.1, 3.2) verfahrbar ist.Assembly platform ( 1 ) according to claim 14, characterized in that on the turntable ( 13 ) a work basket ( 2.1 . 2.2 . 3.1 . 3.2 ) is movable. Montagebühne (1) nach einen der Ansprüche 1 bis 15, dadurch gekennzeichnet, dass in verschiedenen Stützmasthochebenen jeweils eine Gruppe von Arbeitskörben (2.1, 2.2, 3.1, 3.2) vorgesehen sind.Assembly platform ( 1 ) according to any one of claims 1 to 15, characterized in that in different Stützmasthöchbenen each a group of work baskets ( 2.1 . 2.2 . 3.1 . 3.2 ) are provided.
DE102015012635.0A 2015-09-30 2015-09-30 Assembly platform for in particular the construction of tower segments of Windkraftanlangen Active DE102015012635B4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102015012635.0A DE102015012635B4 (en) 2015-09-30 2015-09-30 Assembly platform for in particular the construction of tower segments of Windkraftanlangen

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102015012635.0A DE102015012635B4 (en) 2015-09-30 2015-09-30 Assembly platform for in particular the construction of tower segments of Windkraftanlangen

Publications (2)

Publication Number Publication Date
DE102015012635A1 true DE102015012635A1 (en) 2017-03-30
DE102015012635B4 DE102015012635B4 (en) 2017-11-09

Family

ID=58281453

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102015012635.0A Active DE102015012635B4 (en) 2015-09-30 2015-09-30 Assembly platform for in particular the construction of tower segments of Windkraftanlangen

Country Status (1)

Country Link
DE (1) DE102015012635B4 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018098330A1 (en) * 2016-11-23 2018-05-31 Zavitz Bryant Method and apparatus for constructing a concrete structure in stages

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1417198A (en) 1964-09-21 1965-11-12 App Atmo Soc D Device to facilitate the construction of chimneys, especially intended for high chimneys
WO2010136026A2 (en) 2009-05-29 2010-12-02 Ebf Dresden Gmbh Device for inspection and maintenance work on rotor blades and/or the tower surface of large wind power plants, particularly off-shore plants
US20130112500A1 (en) 2010-07-16 2013-05-09 Marc Keersmaekers Lift Unit for Ascending and Descending a Scaffold
US20130228397A1 (en) 2012-03-02 2013-09-05 Tom D. Horn Wind tower maintenance platforms and techniques
WO2014019852A1 (en) 2012-07-30 2014-02-06 Palfinger Systems Gmbh Maintenance device
DE202013105758U1 (en) 2013-12-18 2014-02-07 Holger Müller Holding, lifting and securing device for attachment to tall, tower-like structures

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1417198A (en) 1964-09-21 1965-11-12 App Atmo Soc D Device to facilitate the construction of chimneys, especially intended for high chimneys
WO2010136026A2 (en) 2009-05-29 2010-12-02 Ebf Dresden Gmbh Device for inspection and maintenance work on rotor blades and/or the tower surface of large wind power plants, particularly off-shore plants
US20130112500A1 (en) 2010-07-16 2013-05-09 Marc Keersmaekers Lift Unit for Ascending and Descending a Scaffold
US20130228397A1 (en) 2012-03-02 2013-09-05 Tom D. Horn Wind tower maintenance platforms and techniques
WO2014019852A1 (en) 2012-07-30 2014-02-06 Palfinger Systems Gmbh Maintenance device
DE202013105758U1 (en) 2013-12-18 2014-02-07 Holger Müller Holding, lifting and securing device for attachment to tall, tower-like structures

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018098330A1 (en) * 2016-11-23 2018-05-31 Zavitz Bryant Method and apparatus for constructing a concrete structure in stages
US10435913B2 (en) 2016-11-23 2019-10-08 Tindall Corporation Method and apparatus for constructing a concrete structure in stages

Also Published As

Publication number Publication date
DE102015012635B4 (en) 2017-11-09

Similar Documents

Publication Publication Date Title
DE202012007550U1 (en) Self-propelled aerial work platform
DE2400313A1 (en) AUXILIARY DEVICE FOR A CABLE NET COOLING TOWER
DE1603179C3 (en) Ferris wheel
DE102015012634A1 (en) Assembly platform for in particular the construction of tower segments of wind turbines
EP3047083B1 (en) Variable protective roof
DE202014106139U1 (en) platform
WO2015090282A1 (en) Retaining, lifting, and securing device for attaching to tall tower-like structures
DE102005053782B4 (en) Self-climbing device
DE102017002525B4 (en) Working platform for the construction of tower segments and towers of wind turbines, for example
EP2035314B1 (en) Lifting platform and method for setting up a lifting platform
DE102015012635B4 (en) Assembly platform for in particular the construction of tower segments of Windkraftanlangen
EP2316754B1 (en) Subterranean waste collection device
DE10308239A1 (en) Method and device for installing a wind turbine
DE2324843C2 (en) Device for assembling multi-part masts
AT506952B1 (en) MAINTENANCE SYSTEM
DE1291079B (en) Collapsible crane with a telescopic mast
DE102014110824B4 (en) A tower-like amusement device and method for constructing an amusement device
DE202014104436U1 (en) sandpit
DE19704967A1 (en) Portal crane, especially for erecting buildings
DE974047C (en) Procedure for assembling a large ball container
DD294313A5 (en) ARRANGEMENT FOR THE WELDING OF STAINLESS STEEL MASTING
DE3911044C2 (en)
DE759687C (en) For the heaviest loads, it can be dismantled and easily erected
DE2403412A1 (en) LIFTING DEVICE FOR HEAVY LOADS
DE202007001615U1 (en) Work platform for the formwork of a concrete container wall

Legal Events

Date Code Title Description
R082 Change of representative

Representative=s name: BUSSE & BUSSE PATENT- UND RECHTSANWAELTE PARTN, DE

R012 Request for examination validly filed
R016 Response to examination communication
R018 Grant decision by examination section/examining division
R020 Patent grant now final