DE102011112899B4 - Method for erecting a component and erecting device - Google Patents

Method for erecting a component and erecting device Download PDF

Info

Publication number
DE102011112899B4
DE102011112899B4 DE102011112899.2A DE102011112899A DE102011112899B4 DE 102011112899 B4 DE102011112899 B4 DE 102011112899B4 DE 102011112899 A DE102011112899 A DE 102011112899A DE 102011112899 B4 DE102011112899 B4 DE 102011112899B4
Authority
DE
Germany
Prior art keywords
slide
erecting
abutment
guide rail
working
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE102011112899.2A
Other languages
German (de)
Other versions
DE102011112899A1 (en
Inventor
Manfred Müller
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Schachtbau Nordhausen GmbH
Original Assignee
Schachtbau Nordhausen GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schachtbau Nordhausen GmbH filed Critical Schachtbau Nordhausen GmbH
Priority to DE102011112899.2A priority Critical patent/DE102011112899B4/en
Publication of DE102011112899A1 publication Critical patent/DE102011112899A1/en
Application granted granted Critical
Publication of DE102011112899B4 publication Critical patent/DE102011112899B4/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
    • E04G21/168Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements used for tilting, e.g. from horizontal to vertical position or vice versa

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Verfahren zum Aufrichten eines Bauteils (2) mit einer Aufrichtvorrichtung (10), bei dem
- eine Basis (12) der Aufrichtvorrichtung (10) an einer Grundfläche (8) verankert wird,
- das zu bewegende Bauteil (2) an einem Arbeitsschlitten (20) der Aufrichtvorrichtung (10), welcher an einem an der Basis (12) gelagerten Führungsholm (14, 16) linear verschiebbar gelagert ist, angelenkt wird,
- zum Ausführen eines ersten Aufrichtschrittes der Arbeitsschlitten (20) mittels mindestens eines größer dimensionierten, einfach wirkenden Vorschubzylinders (54) relativ zu einem an dem Führungsholm (14, 16) linear verschiebbar gelagerten und verriegelten Widerlagerschlitten (22) verfahren wird,
- der Arbeitsschlitten (20) an dem Führungsholm (14, 16) verriegelt wird,
- der Widerlagerschlitten (22) entriegelt und dem Arbeitsschlitten (20) mittels mindestens eines kleiner dimensionierten, doppelt wirkenden Vorschubzylinders (52) nachgefahren wird und
- der Widerlagerschlitten (22) an dem Führungsholm (14, 16) verriegelt und der Arbeitsschlitten (20) entriegelt wird, so dass ein weiterer Aufrichtschritt durchführbar ist.

Figure DE102011112899B4_0000
Method for erecting a component (2) with an erecting device (10), in which
- A base (12) of the erecting device (10) is anchored to a base (8),
- The component (2) to be moved is articulated on a working slide (20) of the erecting device (10), which is mounted so as to be linearly displaceable on a guide rail (14, 16) mounted on the base (12),
- To carry out a first erecting step, the working slide (20) is moved by means of at least one larger-sized, single-acting feed cylinder (54) relative to an abutment slide (22) that is linearly displaceable on the guide rail (14, 16) and is locked,
- the working slide (20) is locked on the guide rail (14, 16),
- the abutment slide (22) is unlocked and the working slide (20) is followed by means of at least one smaller, double-acting feed cylinder (52) and
- The abutment slide (22) is locked on the guide rail (14, 16) and the working slide (20) is unlocked, so that a further erecting step can be carried out.
Figure DE102011112899B4_0000

Description

Die Erfindung betrifft ein Verfahren zum Aufrichten eines Bauteils und eine entsprechende Aufrichtvorrichtung.The invention relates to a method for erecting a component and a corresponding erecting device.

Zum Aufrichten großer und schwerer Bauteile, beispielsweise eines Tragbogens einer Stahlbrücke oder eines Pfahles einer Windenergieanlage, werden bisher üblicherweise Kräne eingesetzt. Der Einsatz von Kränen ist jedoch teuer und erfordert einen nicht unerheblichen Platz neben dem aufzurichtenden Bauteil.To erect large and heavy components, for example a supporting arch of a steel bridge or a pile of a wind turbine, cranes have been used so far. However, the use of cranes is expensive and requires a considerable amount of space next to the component to be erected.

DE 35 21 212 A1 beschreibt ein Verfahren und eine Vorrichtung zum Aufrichten von Gehäuseplatten. Die Vorrichtung umfasst ein Widerlager, ein Drucklager, eine Schließe, eine Aufrichtsäule und eine Hebeeinheit, welche durch pneumatisch oder hydraulisch oder mechanisch erzeugte Friktion an der Aufrichtsäule emporklettert. DE 35 21 212 A1 describes a method and an apparatus for erecting housing panels. The device comprises an abutment, a pressure bearing, a clasp, an erecting column and a lifting unit, which climbs up on the erecting column by pneumatically or hydraulically or mechanically generated friction.

Aus der DE 25 10 083 B2 ist eine Kletterhebevorrichtung mit zwei Kletterabschnitten bekannt, die über doppelt wirkende Klinkenhebelsätze an einer Klettersäule verriegelbar sind.From the DE 25 10 083 B2 a climbing lifting device with two climbing sections is known which can be locked to a climbing column via double-acting ratchet lever sets.

Aus der US 5 368 125 A ist eine Vorrichtung zum Anheben einer Gerüstplattform bekannt mit doppel wirkenden Hydraulikzylindern.From the U.S. 5,368,125 A a device for lifting a scaffold platform is known with double-acting hydraulic cylinders.

Die US 5 579 865 A beschreibt eine modulare Gerüstanordnung mit einer Plattform, die kontinuierlich auf und ab bewegt werden kann, unter Verwendung mehrerer Hydraulikzylinder.The U.S. 5,579,865 A describes a modular gantry assembly with a platform that can be continuously moved up and down using multiple hydraulic cylinders.

Der Erfindung liegt die Aufgabe zugrunde, ein Verfahren und eine Vorrichtung zum Aufrichten eines Bauteils anzugeben, welche ein platzsparendes und wirtschaftliches Aufrichten eines Bauteils ermöglichen.The invention is based on the object of specifying a method and a device for erecting a component which enable a component to be erected in a space-saving and economical manner.

Die Aufgabe wird erfindungsgemäß durch ein Verfahren mit den Merkmalen des Anspruchs 1 und eine Vorrichtung mit den Merkmalen des Anspruchs 4 gelöst. Bevorzugte Ausgestaltungen der Erfindung sind in den jeweils abhängigen Ansprüchen angegeben.The object is achieved according to the invention by a method with the features of claim 1 and a device with the features of claim 4. Preferred embodiments of the invention are specified in the respective dependent claims.

Bei dem erfindungsgemäßen Verfahren ist vorgesehen, dass eine Basis einer Aufrichtvorrichtung an einer Grundfläche verankert wird, das zu bewegende Bauteil an einem Arbeitsschlitten der Aufrichtvorrichtung, welcher an einem an der Basis gelagerten Führungsholm linear verschiebbar gelagert ist, angelenkt wird, zum Ausführen eines ersten Aufrichtschrittes der Arbeitsschlitten mittels einer Vorschubeinrichtung relativ zu einem an dem Führungsholm linear verschiebbar gelagerten und verriegelten Widerlagerschlitten verfahren wird, der Arbeitsschlitten an dem Führungsholm verriegelt wird, der Widerlagerschlitten entriegelt und dem Arbeitsschlitten nachgefahren wird und der Widerlagerschlitten an dem Führungsholm verriegelt und der Arbeitsschlitten entriegelt wird, so dass ein weiterer Aufrichtschritt durchführbar ist.In the method according to the invention, it is provided that a base of an erecting device is anchored to a base, the component to be moved is articulated to a working slide of the erecting device, which is mounted linearly displaceably on a guide rail mounted on the base, for performing a first erecting step of Working slide is moved by means of a feed device relative to an abutment slide which is linearly displaceably mounted and locked on the guide rail, the work slide is locked on the guide rail, the support slide is unlocked and the work slide is followed, and the support slide is locked on the guide rail and the work slide is unlocked so that a further erecting step can be carried out.

Die erfindungsgemäße Aufrichtvorrichtung umfasst einen Führungsholm, welcher schwenkbar an einer Basis lagerbar ist, einen an dem Führungsholm linear verschiebbar gelagerten Arbeitsschlitten, einen an dem Führungsholm linear verschiebbar gelagerten Widerlagerschlitten und eine Vorschubeinrichtung zum Verfahren des Arbeitsschlittens und des Widerlagerschlittens relativ zueinander. Der Arbeitsschlitten weist einen Anschlussadapter auf, an welchen das zu bewegende Bauteil anschließbar ist und der Arbeitsschlitten und der Widerlagerschlitten weisen jeweils Verriegelungseinrichtungen auf, mit welchen der Arbeitsschlitten beziehungsweise der Widerlagerschlitten an dem Führungsholm festlegbar ist.The erecting device according to the invention comprises a guide rail which can be pivotably mounted on a base, a work slide mounted on the guide rail so as to be linearly displaceable, an abutment slide mounted on the guide rail so as to be linearly displaceable, and a feed device for moving the work slide and the support slide relative to one another. The work slide has a connection adapter to which the component to be moved can be connected, and the work slide and the abutment slide each have locking devices with which the work slide or the abutment slide can be fixed to the guide rail.

Ein Grundgedanke der Erfindung kann darin gesehen werden, das Bauteil entlang eines starren Führungsholms aufzurichten, wobei das Aufrichten diskontinuierlich in mehreren aufeinander folgenden Aufrichtschritten erfolgt, in welchen der Arbeitsschlitten um einen definierten Betrag an dem Führungsholm hochfährt. Der Arbeitsschlitten stützt sich dabei an dem Widerlagerschlitten ab, welcher während eines Aufrichtschrittes gegenüber dem Führungsholm verriegelt beziehungsweise arretiert ist.A basic idea of the invention can be seen in erecting the component along a rigid guide bar, the erection taking place discontinuously in several successive erecting steps in which the working slide moves up the guide bar by a defined amount. The working slide is supported on the abutment slide, which is locked or arrested with respect to the guide rail during an erecting step.

Nach einem erfolgten Aufrichtschritt wird die Arretierung des Widerlagerschlittens gelöst und der Widerlagerschlitten wird wieder an den Arbeitsschlitten herangefahren, so dass in einem weiteren Hubvorgang der Arbeitsschlitten erneut entlang des Führungsholms hochfahren kann. Das Aufrichten des Bauteils erfolgt also schrittweise durch ein abwechselndes Bewegen von Arbeitsschlitten und Widerlagerschlitten entlang des Führungsholms. Arbeitsschlitten und Widerlagerschlitten klettern entlang des Führungsholms nach oben.After an erecting step has taken place, the locking of the abutment slide is released and the abutment slide is moved back to the work slide so that in a further lifting process the work slide can again move up along the guide rail. The component is erected step by step by alternately moving the work slide and the abutment slide along the guide rail. The work carriage and abutment carriage climb up along the guide rail.

Das Bauteil, beispielsweise ein Tragbogen einer Stahlbrücke oder ein Pfahl einer Windenergieanlage, wird durch die Aufrichtvorrichtung nach oben gedrückt und nicht, wie im Stand der Technik bekannt, mittels eines Seiles gezogen. Die Aufrichtvorrichtung ist hierzu einerseits an einer Grundfläche verankert und andererseits mit dem Bauteil so verbunden, dass Druckkräfte übertragen werden können. The component, for example a supporting arch of a steel bridge or a pile of a wind power plant, is pushed upwards by the erecting device and not, as is known in the prior art, pulled by means of a rope. For this purpose, the erecting device is anchored on the one hand to a base and on the other hand connected to the component in such a way that compressive forces can be transmitted.

Verfahrensmäßig ist insbesondere vorgesehen, dass die genannten Arbeitsschritte in der angegebenen Reihenfolge durchgeführt werden.In terms of the method, it is provided in particular that the work steps mentioned are carried out in the order given.

Ein weiterer Grundgedanke der Erfindung besteht in der schwenkbaren Lagerung des Führungsholmes an der Basis. Dies ermöglicht es, dass sich der Führungsholm während des Aufrichtvorgangs, insbesondere während eines Aufrichtschrittes des Arbeitsschlittens, gegenüber der Basis drehen und zusammen mit dem Bauteil aufrichten kann.Another basic idea of the invention consists in the pivotable mounting of the guide rail on the base. This makes it possible for the guide rail to rotate relative to the base during the erecting process, in particular during an erecting step of the work carriage, and to be able to erect together with the component.

Vorzugsweise umfasst der Führungsholm zur schwenkbaren Lagerung gegenüber der Basis ein Lagerauge und/oder einen Lagerbolzen, durch welche zumindest ein Teil eines Schwenkgelenks gebildet wird. Das Lagerauge kann auch als Augenanschluss bezeichnet werden.For the pivotable mounting relative to the base, the guide rail preferably comprises a bearing eye and / or a bearing pin, by means of which at least part of a swivel joint is formed. The bearing eye can also be referred to as an eye connection.

Die Basis kann als Teil der Aufrichtvorrichtung auch als Fuß, insbesondere als Schwenkfuß, bezeichnet werden. Der Fuß ist an der Grundfläche verankerbar, beispielsweise verschraubbar und/oder verschweißbar. Vorzugsweise wird die Basis nach erfolgter Aufrichtung des Bauteils von der Grundfläche gelöst und entfernt, so dass sie für einen weiteren Aufrichtvorgang zur Verfügung steht. Zum Verankern beziehungsweise Befestigen der Basis an der Grundfläche sind Befestigungseinrichtungen, zum Beispiel Schrauben, vorgesehen. Vorzugsweise umfasst die Basis eine Grundplatte zum Anlegen an die Grundfläche der Umgebung.As part of the erecting device, the base can also be referred to as a foot, in particular as a swivel foot. The foot can be anchored to the base surface, for example screwed and / or welded. After the component has been erected, the base is preferably detached from the base surface and removed so that it is available for a further erection process. Fastening devices, for example screws, are provided for anchoring or fastening the base to the base surface. The base preferably comprises a base plate for placing on the base of the environment.

Alternativ kann die Basis auch als Bestandteil der Umgebung direkt an der Grundfläche, beispielsweise in Form eines dort angeordneten Lagers, vorgesehen sein.Alternatively, the base can also be provided as a component of the surroundings directly on the base area, for example in the form of a bearing arranged there.

Vorzugsweise umfasst die Basis einen Gegenanschluss für den Augenanschluss des Führungsholmes, insbesondere mindestens ein Lagerauge und/oder mindestens einen Lagerbolzen. Durch den Augenanschluss des Führungsholmes und den Gegenanschluss der Basis wird ein Schwenkgelenk gebildet.The base preferably comprises a mating connection for the eye connection of the guide rail, in particular at least one bearing eye and / or at least one bearing bolt. A swivel joint is formed by the eye connection of the guide rail and the mating connection of the base.

Zum Verbinden des Bauteils mit der Aufrichtvorrichtung ist es bevorzugt, dass an dem Bauteil ein Anschlusselement, beispielsweise eine Anschlussplatte mit einem Anschlussauge, angebracht wird, welches mit einem Anschlussadapter des Arbeitsschlittens schwenkbar verbunden wird. Der Anschlussadapter kann beispielsweise einen Anschlussbolzen umfassen, welcher in das Anschlussauge des Bauteils eingeführt wird und so eine schwenkbare und auf Druck belastbare Verbindung zwischen Arbeitsschlitten und Bauteil bereitstellt.To connect the component to the erecting device, it is preferred that a connection element, for example a connection plate with a connection eye, be attached to the component, which connection element is pivotably connected to a connection adapter of the work carriage. The connection adapter can, for example, comprise a connection bolt which is inserted into the connection eye of the component and thus provides a pivotable connection between the working slide and the component that can be subjected to pressure.

Vorzugsweise wird ein Anschlussbolzen der Aufrichtvorrichtung in ein Anschlussauge des Bauteils eingeführt und anschließend an einem Adaptergrundkörper des Arbeitsschlittens montiert. Der Anschlussbolzen wird hierzu zunächst von dem Adaptergrundkörper des Arbeitsschlitten gelöst, zum Bilden eines Schwenkgelenks mit dem Anschlussauge des Bauteils verbunden und anschließend erneut an dem Adaptergrundkörper des Arbeitsschlittens montiert. Dies ermöglicht eine sichere und schnelle Befestigung des Bauteils an dem Arbeitsschlitten, da der Vorgang des Einführens des Anschlussbolzens in das Anschlussauge, welcher eine besonders große Präzision erfordert, abseits der restlichen Aufrichtvorrichtung erfolgt.A connecting bolt of the erecting device is preferably inserted into a connecting eye of the component and then mounted on an adapter base body of the work carriage. For this purpose, the connecting bolt is first detached from the adapter base body of the work slide, connected to the connection eye of the component to form a swivel joint and then mounted again on the adapter base body of the work slide. This enables the component to be securely and quickly fastened to the working slide, since the process of inserting the connecting bolt into the connecting eye, which requires particularly great precision, takes place away from the rest of the erecting device.

Weiterhin ist es erfindungsgemäß, dass der Arbeitsschlitten mittels eines ersten Vorschubzylinders relativ zum dem Widerlagerschlitten verfahren wird und dass der Widerlagerschlitten mittels eines zweiten Vorschubzylinders dem Arbeitsschlitten nachgefahren wird. Die insbesondere unterschiedlichen Vorschubzylinder ermöglichen eine gezielte Anpassung an die jeweiligen Anforderungen. Der erste Vorschubzylinder ist ein kräftiger Vorschubzylinder und der zweite Vorschubzylinder ein weniger kräftiger, aber dafür gegebenenfalls schnellerer Vorschubzylinder. Außerdem ist es vorteilhaft, dass der erste Vorschubzylinder ein einseitig und der zweite Vorschubzylinder ein beidseitig arbeitender Vorschubzylinder ist. Das Einfahren des ersten, einseitig arbeitenden Vorschubzylinders kann durch die Betätigung des zweiten Vorschubzylinders beim Nachfahren des Widerlagerschlittens erfolgen.Furthermore, it is according to the invention that the working slide is moved relative to the abutment slide by means of a first feed cylinder and that the abutment slide is moved after the work slide by means of a second feed cylinder. The particularly different feed cylinders enable targeted adaptation to the respective requirements. The first feed cylinder is a powerful feed cylinder and the second feed cylinder is a less powerful, but possibly faster feed cylinder. It is also advantageous that the first feed cylinder is a one-sided and the second feed cylinder is a double-sided feed cylinder. The retraction of the first, one-sided working feed cylinder can take place by actuating the second feed cylinder when following the abutment slide.

Die Verriegelung des Arbeitsschlittens und/oder des Widerlagerschlittens erfolgt vorzugsweise mittels Verriegelungsbolzen, welche in Verriegelungslöcher eingreifen.The work slide and / or the abutment slide are preferably locked by means of locking bolts which engage in locking holes.

Vorrichtungsmäßig ist es bevorzugt, dass der Anschlussadapter einen Anschlussbolzen umfasst, an welchen ein Anschlussauge des zu bewegenden Bauteils anschließbar ist. Durch den Anschlussbolzen und das Anschlussauge wird ein Drehgelenk gebildet.In terms of the device, it is preferred that the connection adapter comprises a connection bolt to which a connection eye of the component to be moved can be connected. A swivel joint is formed by the connecting bolt and the connecting eye.

Ein leichtes und schnelles Anschließen des Bauteils an die Aufrichtvorrichtung kann dadurch erzielt werden, dass der Anschlussbolzen lösbar und erneut festlegbar an einem Adaptergrundkörper des Anschlussadapters montiert ist. Der Anschlussbolzen kann unabhängig von dem Adaptergrundkörper zum Bilden des Schwenkgelenks in das Anschlussauge des Bauteils eingeführt und anschließend an dem Adaptergrundkörper gelagert werden.An easy and quick connection of the component to the erecting device can be achieved in that the connection bolt is mounted on an adapter base body of the connection adapter so as to be detachable and fixable again. The connection bolt can be inserted into the connection eye of the component independently of the adapter base body to form the swivel joint and then be supported on the adapter base body.

Besonders bevorzugt ist es in diesem Zusammenhang, dass der Anschlussadapter einen mit einem Grundkörper des Arbeitsschlittens verbundenen Adapterfuß und einen lösbar an dem Adapterfuß befestigten Adapterkopf aufweist, wobei der Anschlussbolzen lösbar und erneut festlegbar zwischen dem Adapterfuß und dem Adapterkopf angeordnet ist. Durch Auseinanderfahren von Adapterfuß und Adapterkopf kann der Anschlussbolzen entnommen und durch ein Zusammenfahren von Adapterfuß und Adapterkopf erneut am Adaptergrundkörper festgelegt werden. Vorzugsweise ist der Anschlussbolzen in einer gabelförmigen Aufnahme zwischen Adapterfuß und Adapterkopf angeordnet.In this context, it is particularly preferred that the connection adapter has an adapter foot connected to a base body of the work slide and an adapter head releasably attached to the adapter foot, the connecting bolt being arranged releasably and re-fixable between the adapter foot and the adapter head. The connection bolt can be removed by moving the adapter base and adapter head apart and by moving the adapter foot and adapter head together again on the adapter body. The connecting bolt is preferably arranged in a fork-shaped receptacle between the adapter foot and the adapter head.

Zum Bewegen des Arbeitsschlittens und des Widerlagerschlittens entlang des Führungsholmes ist als Vorschubzylinder vorzugsweise ein hydraulischer Arbeitszylinder vorgesehen. Zum Betreiben des Hydraulikzylinders umfasst die Aufrichtvorrichtung ein Hydraulikaggregat.For moving the work slide and the abutment slide along the guide rail, a hydraulic work cylinder is preferably provided as the feed cylinder. To operate the hydraulic cylinder, the erecting device comprises a hydraulic unit.

Eine effektive Betriebsweise der Aufrichtvorrichtung kann dadurch bereitgestellt werden, dass mindestens zwei unterschiedliche Vorschubzylinder vorgesehen sind. Die Vorschubeinrichtung weist mindestens einen doppelt wirkenden Vorschubzylinder und einen einfach wirkenden Vorschubzylinder auf. Der einfach wirkende Vorschubzylinder wird zum Bewegen des Arbeitsschlittens und der doppelt wirkende Vorschubzylinder zum Bewegen des Widerlagerschlittens eingesetzt. Da der Arbeitshub, also die Bewegung des Arbeitsschlittens, erheblich größere Kräfte erfordert, ist der entsprechende Vorschubzylinder größer dimensioniert als der Vorschubzylinder zum Bewegen des Widerlagerschlittens. Die Vorschub- beziehungsweise Hydraulikzylinder können auch als hydraulische Pressen bezeichnet werden.An effective mode of operation of the erecting device can be provided in that at least two different feed cylinders are provided. The feed device has at least one double-acting feed cylinder and one single-acting feed cylinder. The single-acting feed cylinder is used to move the working slide and the double-acting feed cylinder is used to move the abutment slide. Since the working stroke, that is to say the movement of the working slide, requires considerably greater forces, the corresponding feed cylinder is dimensioned larger than the feed cylinder for moving the abutment slide. The feed or hydraulic cylinders can also be referred to as hydraulic presses.

Erfindungsgemäß ist es bevorzugt, dass mindestens zwei Führungsholme vorgesehen sind, entlang welchen der Führungsschlitten und der Widerlagerschlitten geführt sind. Die Führungsholme sind vorzugsweise parallel zueinander und nebeneinander angeordnet. Durch die mindestens zwei Führungsholme ist ein zwei- beziehungsweise mehrspuriger Betrieb der Schlitten möglich, so dass die Schlitten besonders sicher, insbesondere gegen Verkippungen geschützt, geführt werden können. Des Weiteren ist es bevorzugt, dass mindestens ein erster Aufnahmebereich für einen Vorschubzylinder zwischen den Führungsholmen und mindestens ein zweiter Aufnahmebereich für einen Vorschubzylinder seitlich eines der Führungsholme vorgesehen ist. Die mindestens zwei Aufnahmebereiche für jeweils einen Vorschubzylinder der Vorschubeinrichtung gewährleisten eine flexible Anpassungsmöglichkeit an die konkreten Einsatzbedingungen der Aufrichtvorrichtung. So kann die Aufrichtvorrichtung wahlweise mit einem oder mehreren Vorschubzylindern ausgestattet werden, wobei die Vorschubzylinder entweder zwischen den Führungsholmen, seitlich der Führungsholme oder sowohl zwischen als auch seitlich der Führungsholme angeordnet werden können.According to the invention, it is preferred that at least two guide bars are provided along which the guide carriage and the abutment carriage are guided. The guide bars are preferably arranged parallel to one another and next to one another. The at least two guide bars enable two-lane or multi-lane operation of the carriages, so that the carriages can be guided particularly safely, in particular protected against tilting. Furthermore, it is preferred that at least one first receiving area for a feed cylinder is provided between the guide bars and at least one second receiving area for a feed cylinder is provided on the side of one of the guide bars. The at least two receiving areas for one feed cylinder of the feed device each ensure a flexible adaptation option to the specific application conditions of the erecting device. The erecting device can optionally be equipped with one or more feed cylinders, the feed cylinders being able to be arranged either between the guide bars, to the side of the guide bars or both between and to the side of the guide bars.

Bei einem zwei- oder mehrspureigen Betrieb der Aufrichtvorrichtung ist es insbesondere bevorzugt, dass ein Anschlussbereich des Anschlussadapters, insbesondere ein Anschlussbolzen, mittig zwischen zwei Führungsholmen angeordnet ist. Dies ermöglicht eine gleichmäßige Einleitung der Gewichtskraft des aufzurichtenden Bauteils in die Aufrichtvorrichtung. Der Anschlussbolzen ist vorzugsweise in der Ebene der Führungsholme angeordnet, wobei sich eine Längsachse des Anschlussbolzens quer zur Längsachse der Führungsholme erstreckt.In the case of two-track or multi-track operation of the erecting device, it is particularly preferred that a connection area of the connection adapter, in particular a connection bolt, is arranged centrally between two guide rails. This enables a uniform introduction of the weight of the component to be erected into the erecting device. The connecting bolt is preferably arranged in the plane of the guide bars, with a longitudinal axis of the connecting bolt extending transversely to the longitudinal axis of the guide bars.

Eine Anpassung der Aufrichtvorrichtung an unterschiedliche Einsatzbedingungen lässt sich erfindungsgemäß dadurch erzielen, dass die Führungsholme eine Kopplungseinrichtung aufweisen, welche eine Kopplung der Führungsholme an ihren Längsenden ermöglichen. Damit können die Führungsholme für einen einspurigen Betrieb koaxial zueinander angeordnet werden. Entsprechend können der Arbeitsschlitten und der Widerlagerschlitten, insbesondere durch ein Versetzen ihrer Führungsprofile in einen mittigen Bereich, für einen einspurigen Betrieb umrüstbar sein. Dies ermöglicht es, auf einfache Weise, den Verfahrweg der Schlitten zu verdoppeln.An adjustment of the erecting device to different conditions of use can be achieved according to the invention in that the guide bars have a coupling device which enables the guide bars to be coupled at their longitudinal ends. The guide bars can thus be arranged coaxially to one another for single-track operation. Correspondingly, the working slide and the abutment slide can be converted for single-track operation, in particular by relocating their guide profiles into a central area. This makes it possible, in a simple manner, to double the travel path of the carriages.

Zum Führen der Schlitten weist der Führungsholm an seiner Vorderseite und/oder Rückseite vorzugsweise eine Führungsleiste auf, welche mit einem Führungsprofil des Arbeitsschlittens und/oder des Widerlagerschlittens in Eingriff ist. Die Führungsleiste ist vorzugsweise auf einen insbesondere rohrförmigen Grundkörper des Führungsholms aufgebracht und erstreckt sich im Wesentlichen entlang der Gesamtlänge des Grundkörpers. Unter einer Vorderseite beziehungsweise Rückseite des Führungsholms ist insbesondere diejenige Seite zu verstehen, in dessen Richtung der Führungsholm beim Verschwenken um die Basis bewegt wird.To guide the slide, the guide rail preferably has a guide strip on its front and / or rear side, which is in engagement with a guide profile of the work slide and / or the abutment slide. The guide bar is preferably applied to an in particular tubular base body of the guide rail and extends essentially along the entire length of the base body. A front or rear side of the guide bar is to be understood in particular as that side in the direction of which the guide bar is moved when pivoting about the base.

Vorzugsweise umfassen die Verriegelungseinrichtungen jeweils mindestens einen Verriegelungsbolzen, welcher mit einem Verriegelungsloch in Eingriff bringbar ist. Die Führungsleiste des Führungsholms umfasst vorzugsweise mehrere Verriegelungslöcher, die in einem konstanten Raster angeordnet sind. Die Verriegelungsbolzen sind vorzugsweise am Arbeitsschlitten und am Widerlagerschlitten, insbesondere im Bereich des Führungsprofils des Arbeitsschlittens beziehungsweise des Widerlagerschlittens, gelagert. Den Verriegelungsbolzen ist vorzugsweise jeweils ein Hubzylinder zum Bewegen der Verriegelungsbolzen zugeordnet.The locking devices each preferably comprise at least one locking bolt which can be brought into engagement with a locking hole. The guide bar of the guide rail preferably comprises several locking holes which are arranged in a constant grid. The locking bolts are preferably mounted on the working carriage and on the abutment carriage, in particular in the area of the guide profile of the working carriage or the abutment carriage. A lifting cylinder for moving the locking bolts is preferably assigned to each of the locking bolts.

Die Erfindung wir nachfolgend anhand bevorzugter Ausführungsbeispiele, welche in den beiliegenden Zeichnungen dargestellt sind, weiter beschrieben. In den Zeichnungen zeigt:

  • 1 eine perspektivische Ansicht einer erfindungsgemäßen Aufrichtvorrichtung;
  • 2 eine vergrößerte Ansicht eines unteren Bereichs der Aufrichtvorrichtung aus 1 ;
  • 3 eine Basis einer Aufrichtvorrichtung;
  • 4 einen Führungsholm einer Aufrichtvorrichtung;
  • 5 einen Widerlagerschlitten einer Aufrichtvorrichtung;
  • 6 einen Arbeitsschlitten einer Aufrichtvorrichtung;
  • 7 einen Anschlussadapter einer Aufrichtvorrichtung;
  • 8 unterschiedliche Ansichten einer Verriegelungseinrichtung einer Aufrichtvorrichtung;
  • 9 eine Aufrichtvorrichtung im Einsatz in einer Ausgangsposition eines Aufrichtungsvorgangs;
  • 10 eine Aufrichtvorrichtung im Einsatz in einer mittleren Position eines Aufrichtungsvorgangs; und
  • 11 eine Aufrichtvorrichtung im Einsatz in einer Endposition eines Aufrichtungsvorgangs.
The invention is described further below with reference to preferred exemplary embodiments, which are shown in the accompanying drawings. In the drawings shows:
  • 1 a perspective view of an erecting device according to the invention;
  • 2 FIG. 3 is an enlarged view of a lower region of the raising device 1 ;
  • 3 a base of an erecting device;
  • 4th a handlebar of an erecting device;
  • 5 an abutment slide of an erecting device;
  • 6th a working slide of an erecting device;
  • 7th a connection adapter of an erecting device;
  • 8th different views of a locking device of an erecting device;
  • 9 an erecting device in use in a starting position of an erecting operation;
  • 10 an erecting device in use in an intermediate position of an erecting operation; and
  • 11 an erecting device in use in an end position of an erecting operation.

Äquivalente Komponenten sind in allen Figuren mit denselben Bezugszeichen gekennzeichnet.Equivalent components are identified by the same reference symbols in all figures.

Eine erfindungsgemäße Aufrichtvorrichtung 10 und einzelne Komponenten hiervon sind in den 1 bis 8 dargestellt. Die Aufrichtvorrichtung 10 umfasst eine Basis 12 und zwei parallel zueinander angeordnete Führungsholme 14, 16, welche im Wesentlichen identisch aufgebaut und mittels eines Augenanschlusses an der Basis 12 schwenkbar gelagert sind. An den Führungsholmen sind ein Arbeitsschlitten 20 und ein Widerlagerschlitten 22 linear verschiebbar gelagert.An erecting device according to the invention 10 and individual components thereof are in the 1 to 8th shown. The lifting device 10 includes a base 12th and two guide bars arranged parallel to one another 14th , 16 , which are essentially identical in construction and have an eye connection on the base 12th are pivoted. There is a working slide on the guide rails 20th and an abutment slide 22nd linearly displaceable.

3 zeigt die Basis 12 der Aufrichtvorrichtung, welche auch als Fuß, insbesondere Schwenkfuß oder Drehachsenfuß bezeichnet werden kann. Die Basis 12 umfasst eine Grundplatte 70, an welcher mehrere Lagerplatten 72 montiert sind, welche jeweils ein Lagerauge 73 aufweisen, in welchem ein Lagerbolzen 74 angeordnet werden kann. Der Fuß beziehungsweise die Basis 12 dient als Auflagerungsschnittstelle und bietet die Möglichkeit der mittelbaren Befestigung oder Verankerung der Führungsholme 14, 16 im Gelände oder an einer Fläche. Bei einer unmittelbaren Befestigung befindet sich an dem mit Kraft zu beaufschlagenden Standort der Umgebung ein entsprechendes Gegenstück für den Augenanschluss der Führungsholme 14, 16. 3 shows the base 12th the righting device, which can also be referred to as a foot, in particular a swivel foot or a rotary axis foot. The base 12th includes a base plate 70 , on which several bearing plates 72 are mounted, which each have a bearing eye 73 have in which a bearing pin 74 can be arranged. The foot or the base 12th serves as a support interface and offers the possibility of indirect fastening or anchoring of the guide rails 14th , 16 in the field or on a surface. In the case of direct fastening, there is a corresponding counterpart for the eye connection of the guide bars at the location in the surroundings to be acted upon with force 14th , 16 .

Ein erster Führungsholm 14 ist in 4 dargestellt. Die nachfolgenden Ausführungen sind auf den zweiten Führungsholm 16 entsprechend übertragbar. Der Führungsholm 14 umfasst einen zylinderförmigen Grundkörper 60 oder Tragrohr, an dessen Außenumfang gegenüberliegend, der Längsachse folgend, zwei Führungsleisten 62 angeordnet sind. Die Führungsleisten 62 erstrecken sich im Wesentlichen entlang der gesamten Länge des Grundkörpers 60 und umfassen eine Vielzahl von Arretierungslöchern 84, die einem konstanten Raster folgend über die gesamte Länge der Führungsleiste 62 angeordnet sind. Die Führungsleisten 62 weisen eine nach außen gerichtete Führungsfläche 63 auf, in welcher die Arretierungslöcher 84 angeordnet sind. Die Flanken der Führungsleisten 62 sind reine Führungsflächen. An einem unteren, axialen Ende des Führungsholms 14 ist ein Anschlussauge oder Lagerauge 86 vorgesehen, dessen axiale Ausrichtung sich quer zu einer Längsachse des Führungsholms 14 erstreckt.A first guide rail 14th is in 4th shown. The following remarks apply to the second guide rail 16 transferable accordingly. The handlebar 14th comprises a cylindrical base body 60 or support tube, on the outer circumference opposite, following the longitudinal axis, two guide strips 62 are arranged. The guide rails 62 extend essentially along the entire length of the base body 60 and include a plurality of locking holes 84 that follow a constant grid over the entire length of the guide rail 62 are arranged. The guide rails 62 have an outwardly directed guide surface 63 in which the locking holes 84 are arranged. The flanks of the guide rails 62 are pure guide surfaces. At a lower, axial end of the guide rail 14th is a connecting eye or bearing eye 86 provided, the axial orientation of which is transverse to a longitudinal axis of the guide rail 14th extends.

Für den zweispurigen Betrieb der Aufrichtvorrichtung 10 sind die beiden Führungsholme 14, 16 durch Verbolzen der Lageraugen 86 mit dem Fuß beziehungsweise der Basis 12 der Aufrichtvorrichtung 10 verbunden. Für einen einspurigen Betrieb der Aufrichtvorrichtung 10 weist das kopfseitige Ende zumindest eines der Führungsholme 14, 16 ein Kopplungselement auf, welches ein Ankoppeln des anderen Führungsholms ermöglicht, um den Fahrweg entlang der Führungsholme zu verlängern.For two-lane operation of the lifting device 10 are the two guide rails 14th , 16 by bolting the bearing eyes 86 with the foot or the base 12th the lifting device 10 connected. For single-track operation of the lifting device 10 the head end has at least one of the guide bars 14th , 16 a coupling element which enables the other guide rail to be coupled in order to extend the travel path along the guide rails.

Die Aufrichtvorrichtung 10 umfasst des Weiteren zwei Schlitten, nämlich einen oberen Schlitten, welcher als Arbeitsschlitten 20 bezeichnet wird, und einen unteren Schlitten, welcher als Widerlagerschlitten 22 bezeichnet wird. Die Schlitten sind prinzipiell von gleichem Aufbau und haben die gleiche Tragfähigkeit. Beispiele von Schlitten sind in den 5 und 6 dargestellt.The lifting device 10 further comprises two carriages, namely an upper carriage, which is used as a working carriage 20th is referred to, and a lower slide, which is called the abutment slide 22nd referred to as. The carriages are basically of the same construction and have the same load capacity. Examples of sleds are in the 5 and 6th shown.

Die Schlitten 20, 22 sind jeweils an beiden Führungsholmen 14, 16 geführt. An ihren Seiten weisen die Schlitten jeweils eine Führungseinrichtung 64 auf, die den jeweiligen Führungsholm umschließt. Die Führungseinrichtungen 64 umfassen mindestens ein Führungsprofil 65 mit einer Gleitplatte 66, welches die Führungsleiste 62 des jeweiligen Führungsholms 14, 16 umgreift, so dass sich der Schlitten zwangsgeführt in Fahrtrichtung ausrichtet.The sleigh 20th , 22nd are on both guide bars 14th , 16 guided. The carriages each have a guide device on their sides 64 that encloses the respective guide rail. The guide institutions 64 comprise at least one guide profile 65 with a sliding plate 66 which is the guide bar 62 of the respective guide rail 14th , 16 grips around so that the slide is positively aligned in the direction of travel.

Der Arbeitsschlitten 20 und der Widerlagerschlitten 22 sind jeweils an den Führungsholmen 14, 16 arretierbar. Zum Arretieren des Arbeitsschlittens 20 beziehungsweise Widerlagerschlittens 22 befinden sich an den Führungsprofilen 65 hydraulisch betriebene Verriegelungseinrichtungen 28 mit Verriegelungsbolzen 80, die in die Arretierungslöcher 84 der an den Führungsholmen 14, 16 angebrachten Führungsleisten 62 eingreifen.The working sled 20th and the abutment slide 22nd are each on the guide rails 14th , 16 lockable. For locking the work slide 20th or abutment slide 22nd are located on the guide profiles 65 hydraulically operated locking devices 28 with locking bolt 80 that go into the locking holes 84 the one on the guide rails 14th , 16 attached guide rails 62 intervention.

Details einer Verriegelungseinrichtung 28 sind in 8 dargestellt. Die Verriegelungseinrichtungen 28 umfassen eine Montageplatte 88, welche an dem Arbeitsschlitten 20 beziehungsweise dem Widerlagerschlitten 22, insbesondere an dessen Führungsprofil 65, montierbar ist. Auf diese Weise können die Verriegelungseinrichtungen 28 lösbar an dem Arbeitsschlitten 20 beziehungsweise Widerlagerschlitten 22 befestigt werden.Details of a locking device 28 are in 8th shown. The locking devices 28 include a mounting plate 88 , which on the work slide 20th or the abutment slide 22nd , especially on its guide profile 65 , is mountable. In this way, the locking devices 28 solvable on the work slide 20th or abutment slide 22nd attached.

Zum Verfahren von Arbeitsschlitten 20 und Widerlagerschlitten 22 relativ zueinander ist eine Vorschubeinrichtung 24 mit einem oder mehreren Vorschubzylindern 52, 54 vorgesehen. Die Vorschubzylinder 52, 54 sind einerseits an dem Arbeitsschlitten 20 und andererseits an dem Widerlagerschlitten 22 angelenkt. Der Arbeitsschlitten 20 und der Widerlagerschlitten 22 umfassen jeweils eine Aufnahme 56 für zumindest einen inneren Vorschubzylinder 52 und zwei seitliche Aufnahmen 58 für jeweils zumindest einen äußeren Vorschubzylinder 54.For moving work slides 20th and abutment slide 22nd relative to one another is a feed device 24 with one or more feed cylinders 52 , 54 intended. The feed cylinder 52 , 54 are on the one hand on the work slide 20th and on the other hand on the abutment slide 22nd hinged. The working sled 20th and the abutment slide 22nd each include one recording 56 for at least one inner feed cylinder 52 and two side shots 58 for at least one outer feed cylinder 54 .

In einem mittleren Bereich des Arbeitsschlittens 20 und des Widerlagerschlittens 22 zwischen den seitlichen Führungseinrichtungen 64 ist jeweils ein Verbindungsteil 68 vorgesehen, welches eine Aufnahme 56 für einen inneren Vorschubzylinder 52 aufweist. In den seitlichen Bereichen weisen der Arbeitsschlitten 20 und der Widerlagerschlitten 22 jeweils Aufnahmen 58 für äußere Vorschubzylinder 54 auf.In a central area of the work slide 20th and the abutment slide 22nd between the lateral guide devices 64 is a connecting part 68 provided which a recording 56 for an inner feed cylinder 52 having. In the side areas of the work slide point 20th and the abutment slide 22nd each recordings 58 for outer feed cylinders 54 on.

Das Verbindungsteil 68 ist lösbar an den beiden Führungseinrichtungen 64 befestigt. Für einen einspurigen Betrieb der Aufrichtvorrichtung 10 kann das Verbindungsteil 68 durch ein Seitenteil 69 ersetzt werden. Die Führungseinrichtungen 64 besitzen hierzu Verschraubungsschnittstellen, an welche sowohl ein Verbindungsteil 68 als auch ein Seitenteil 69 anschließbar sind.The connecting part 68 is detachable on the two guide devices 64 attached. For single-track operation of the lifting device 10 can the connecting part 68 through a side part 69 be replaced. The guide institutions 64 have screw connection interfaces to which both a connecting part 68 as well as a side part 69 are connectable.

An einem oberen Ende der Aufrichtvorrichtung 10 ist eine Quertraverse 30 vorgesehen, welche die beiden Führungsholme 14, 16 miteinander verbindet und als Begrenzungsanschlag für den Arbeitsschlitten 20 dient.At an upper end of the erecting device 10 is a cross beam 30th provided which the two guide rails 14th , 16 connects with each other and as a limit stop for the work slide 20th serves.

Zum Anlenken eines aufzurichtenden Bauteils 2 umfasst der Arbeitsschlitten 20 einen Anschlussadapter 26. Der Anschlussadapter 26 ist mit einem Grundkörper 32 des Arbeitsschlittens verbunden und weist, wie der Grundkörper 32 selbst, eine Führungseinrichtung 64 mit einem Führungsprofil 65 auf. Der Anschlussadapter 26 ist oberhalb des Grundkörpers 32 des Arbeitsschlittens 20 angeordnet und bewegt sich zusammen mit diesem.For articulating a component to be erected 2 includes the work slide 20th a connection adapter 26th . The connection adapter 26th is with a basic body 32 of the work slide and has, like the base body 32 itself, a guide institution 64 with a guide profile 65 on. The connection adapter 26th is above the main body 32 of the work slide 20th arranged and moves together with this.

Der Anschlussadapter 26 umfasst einen Adapterkopf 42, welcher eine Quertraverse 44 aufweist, die von dem ersten Führungsholm 14 zum zweiten Führungsholm 16 verläuft. Ein Adapterfuß 38 ist lösbar an dem Adapterkopf 42 befestigt und verbindet den Adapterkopf 42 mit dem Verbindungsteil 68 des Grundkörpers 32 des Arbeitsschlittens 20. In einem mittleren Bereich des Anschlussadapters 26 ist eine Adaptersäule 39 ausgebildet, welche mehrere, insbesondere zwei Stege umfasst. Die Adaptersäule 39 umfasst eine Trennungsschnittstelle 46, welche die Adaptersäule 39 in einen Säulefuß 40 und einen Säulenkopf 41 unterteilt.The connection adapter 26th includes an adapter head 42 , which is a crossbar 44 having that of the first guide rail 14th to the second guide rail 16 runs. An adapter foot 38 is detachable from the adapter head 42 attaches and connects the adapter head 42 with the connecting part 68 of the main body 32 of the work slide 20th . In a central area of the connection adapter 26th is an adapter column 39 formed, which comprises several, in particular two webs. The adapter column 39 includes a disconnect interface 46 , which is the adapter column 39 in a column base 40 and a column head 41 divided.

Zwischen dem Adapterfuß 38 und dem Adapterkopf 42, welche einen Adaptergrundkörper 34 bilden, ist im Bereich der Adaptersäule 39 ein Anschlussbolzen 36 oder Auflagerungsbolzen angeordnet. Der Anschlussbolzen 36 ist insbesondere im Bereich der Trennungsschnittstelle 46 zwischen Säulenfuß 40 und Säulenkopf 41 positioniert und dient dem Anschluss des Bauteils 2 und der Ableitung der durch das Bauteil 2 erzeugten Kräfte an die Peripherie.Between the adapter foot 38 and the adapter head 42 , which have an adapter body 34 is in the area of the adapter column 39 a connecting bolt 36 or support bolts arranged. The connecting bolt 36 is particularly in the area of the separation interface 46 between the pedestal 40 and column head 41 positioned and used to connect the component 2 and the derivative of the component 2 generated forces to the periphery.

Die 9 bis 11 zeigen, jeweils in perspektivischer Ansicht und in Schnittansicht, das Aufrichten eines Bauteils 2 gegenüber einer Grundfläche 8 am Beispiel eines Tragbogens einer Stahlbrücke. Das Bauteil 2 umfasst ein Anschlusselement 4 mit einem Anschlussauge 6, das den Anschlussbolzen 36 des Anschlussadapters 26 aufnimmt. Die Trennungsschnittstelle 46 des Adaptergrundkörpers 34 dient der Montier- und Demontierbarkeit der Aufrichtvorrichtung 10 an dem Bauteil 2 und ist in Höhe einer Achse des Anschlussbolzens 36 angeordnet. Der Anschlussbolzen 36 der Aufrichtvorrichtung 10 kann in dem Anschlussauge 6 des Bauteils 2 angeordnet und anschließend bei geöffneter Trennungsschnittstelle 46 zwischen dem Adapterfuß 38 und dem Adapterkopf 42 positioniert werden. Durch Schließen der Trennungsschnittstelle 46 kann der Anschlussbolzen 36 dann am Adaptergrundkörper 34 fixiert werden, so dass das Bauteil 2 an die Aufrichtvorrichtung 10 angeschlossen ist. Die Anordnung der Auflagerung an diesem Standort der Aufrichtvorrichtung 10 minimiert das Entstehen von Abtriebskräften aus der Ebene der Führungsholme 14, 16 heraus auf eine nicht-schädliche Größe.The 9 to 11 show, in a perspective view and in a sectional view, the erection of a component 2 compared to a base area 8th using the example of a supporting arch of a steel bridge. The component 2 comprises a connection element 4th with a connecting eye 6th that is the connecting bolt 36 of the connection adapter 26th records. The separation interface 46 of the adapter body 34 is used to assemble and disassemble the erecting device 10 on the component 2 and is at the level of an axis of the connecting bolt 36 arranged. The connecting bolt 36 the lifting device 10 can in the connection eye 6th of the component 2 arranged and then with the separation interface open 46 between the adapter foot 38 and the adapter head 42 be positioned. By closing the separation interface 46 can the connecting bolt 36 then on the adapter body 34 be fixed so that the component 2 to the lifting device 10 connected. The arrangement of the support at this location of the lifting device 10 minimizes the creation of downforce from the level of the guide bars 14th , 16 out to a non-harmful size.

Die Vorschubzylinder 52, 54 können unterschiedliche Kapazitäten aufweisen und/oder unterschiedliche Typen sein. Vorzugsweise umfasst die Vorschubeinrichtung 24 zwei kräftige, einseitig arbeitende und zwei weniger kräftige beidseitig arbeitende Vorschubzylinder 52, die an die Verbindungsteile 68 von Arbeitsschlitten 20 und Widerlagerschlitten 22 angeschlossen sind. Außen befinden sich vorzugsweise Vorschubzylinder 54 der gleichen Art und Dimensionierung wie die weniger kräftigen mittleren Vorschubzylinder 52 an den Seitenteilen 69. Die vollständige Besetzung aller Pressenstandorte ist für die grundsätzliche Funktionsweise der Aufrichtvorrichtung 10 nicht erforderlich. Die konkrete Besetzung kann in Abhängigkeit der Beanspruchung vorgenommen werden.The feed cylinder 52 , 54 can have different capacities and / or be different types. The feed device preferably comprises 24 two powerful, one-sided and two less powerful, double-sided feed cylinders 52 attached to the connecting parts 68 of work slide 20th and abutment slide 22nd are connected. There are preferably feed cylinders on the outside 54 of the same type and dimensions as the less powerful middle feed cylinder 52 on the side panels 69 . The complete occupation of all press locations is essential for the basic functionality of the erecting device 10 not mandatory. The specific occupation can be made depending on the demands.

Die Aufrichtvorrichtung 10 umfasst weiterhin ein Hydraulikaggregat, welches vorzugsweise eine Einheit mit einem großen Fördervolumen und eine Einheit mit einem kleinen Fördervolumen, vorzugsweise mit gleicher Druckstufe, umfasst, um ein schnelles und präzises Fahren der Schlitten 20, 22 zu ermöglichen.The lifting device 10 furthermore comprises a hydraulic unit, which preferably comprises a unit with a large delivery volume and a unit with a small delivery volume, preferably with the same pressure level, in order to allow the carriage to be driven quickly and precisely 20th , 22nd to enable.

Der Betrieb einer erfindungsgemäßen Aufrichtvorrichtung 10 wird nachfolgend, insbesondere anhand der 9 bis 11, beschrieben. Bei dem dargestellten Ausführungsbeispiel handelt es sich um einen Hebungsvorgang oder Aufrichtvorgang eines Tragbogens einer Brücke. Die Aufrichtvorrichtung 10 kann jedoch auch für andere Zwecke, beispielsweise für das Fortbewegen von Lasten auf ebenen oder geneigten Flächen, beispielsweise zum Vorschub einer Brücke, eingesetzt werden.The operation of an erecting device according to the invention 10 is described below, in particular with the aid of 9 to 11 described. In the illustrated embodiment, a lifting process or erecting process of a supporting arch of a bridge is involved. The lifting device 10 however, it can also be used for other purposes, for example for moving loads on flat or inclined surfaces, for example for advancing a bridge.

Der Widerlagerschlitten 22 fungiert als Widerlager während einer Lastfahrt beziehungsweise eines Arbeitshubes des Arbeitsschlittens 20 beim Vorwärtsfahren und ist während des Arbeitshubes mittels der Verriegelungseinrichtungen 28 an den Führungsleisten 62 der Führungsholme 14, 16 arretiert. Die Verriegelungseinrichtungen 28 des Arbeitsschlittens 20 sind während des Arbeitshubes geöffnet und werden kurz vor dem Eintreffen am vorgesehenen Verriegelungsstandort für den Verriegelungsvorgang durch hydraulisches Vorspannen mittels der Hubzylinder 82 aktiviert. Bei Erreichen des Verriegelungsstandortes erfolgt die Verriegelung des Arbeitsschlittens 20. Eine Steuerung erkennt sensorisch diesen Zustand und tätigt einen Schaltvorgang zum hydraulischen Vorspannen der Verriegelungseinrichtungen 28 des Widerlagerschlittens 22 für das Entriegeln und zur Aktivierung der Vorschubzylinder 52, 54 zum Verfahren des Widerlagerschlittens 22. Kurz vor dem Eintreffen am vorgesehen Verriegelungsstandort werden die Verriegelungseinrichtungen 28 des Widerlagerschlittens 22 aktiviert und, entsprechend der Verriegelung des Arbeitsschlittens 20, erfolgt eine Verriegelung des Widerlagerschlittens 22. Anschließend wird der Arbeitszyklus neu gestartet.The abutment slide 22nd acts as an abutment during a load journey or a working stroke of the work carriage 20th when driving forward and is during the working stroke by means of the locking devices 28 on the guide rails 62 the guide rails 14th , 16 locked. The locking devices 28 of the work slide 20th are open during the working stroke and are opened shortly before arrival at the intended locking location for the locking process by means of hydraulic pretensioning by means of the lifting cylinder 82 activated. When the locking position is reached, the work slide is locked 20th . A control system detects this condition by means of sensors and activates a switching process to hydraulically pre-tension the locking devices 28 of the abutment slide 22nd for unlocking and activating the feed cylinder 52 , 54 for moving the abutment slide 22nd . Shortly before arrival at the intended locking location, the locking devices 28 of the abutment slide 22nd activated and, according to the locking of the work slide 20th , the abutment slide is locked 22nd . The working cycle is then restarted.

Ein Senken des Bauteils 2 erfolgt in umgekehrter Reihenfolge. Treten bei dem Verfahren der Schlitten entlang der Führungsholme 14, 16 in Abhängigkeit des konkreten Einsatzfalls unterschiedlich große Kräfte auf, so können die gegebenenfalls vorhandenen, einseitig arbeitenden kräftigeren Vorschubzylinder bei kleineren erforderlichen Antriebskräften abgeschaltet werden, so dass eine höhere Fahrgeschwindigkeit erreicht werden kann. Zum schnelleren Fahren während der Fahrten des Widerlagerschlittens können gegebenenfalls nur die weniger kräftigen, beidseitig arbeitenden Vorschubzylinder aktiviert werden. Die kräftigeren Arbeitszylinder werden während dieser Leerfahrt leergepresst.A lowering of the component 2 takes place in reverse order. Step along the guide rails when moving the slide 14th , 16 Depending on the specific application, forces of different magnitude can be used, the more powerful feed cylinders, which may be present and working on one side, can be switched off when the lower drive forces are required, so that a higher driving speed can be achieved. For faster travel while the abutment slide is moving, only the less powerful, bilateral feed cylinders can be activated if necessary. The more powerful working cylinders are pressed empty during this empty run.

Die Vorrichtung und das Verfahren können grundsätzlich auch bei sogenannten Offshore-Anwendungen, beispielsweise zum Aufrichten von Pfählen, insbesondere Tripods, von Offshore-Windenergieanlagen, eingesetzt werden.The device and the method can in principle also be used in so-called offshore applications, for example for erecting piles, in particular tripods, of offshore wind energy plants.

Claims (8)

Verfahren zum Aufrichten eines Bauteils (2) mit einer Aufrichtvorrichtung (10), bei dem - eine Basis (12) der Aufrichtvorrichtung (10) an einer Grundfläche (8) verankert wird, - das zu bewegende Bauteil (2) an einem Arbeitsschlitten (20) der Aufrichtvorrichtung (10), welcher an einem an der Basis (12) gelagerten Führungsholm (14, 16) linear verschiebbar gelagert ist, angelenkt wird, - zum Ausführen eines ersten Aufrichtschrittes der Arbeitsschlitten (20) mittels mindestens eines größer dimensionierten, einfach wirkenden Vorschubzylinders (54) relativ zu einem an dem Führungsholm (14, 16) linear verschiebbar gelagerten und verriegelten Widerlagerschlitten (22) verfahren wird, - der Arbeitsschlitten (20) an dem Führungsholm (14, 16) verriegelt wird, - der Widerlagerschlitten (22) entriegelt und dem Arbeitsschlitten (20) mittels mindestens eines kleiner dimensionierten, doppelt wirkenden Vorschubzylinders (52) nachgefahren wird und - der Widerlagerschlitten (22) an dem Führungsholm (14, 16) verriegelt und der Arbeitsschlitten (20) entriegelt wird, so dass ein weiterer Aufrichtschritt durchführbar ist.Method for erecting a component (2) with an erecting device (10), in which - A base (12) of the erecting device (10) is anchored to a base (8), - The component (2) to be moved is articulated on a working slide (20) of the erecting device (10), which is mounted so as to be linearly displaceable on a guide rail (14, 16) mounted on the base (12), - To carry out a first erecting step, the working slide (20) is moved by means of at least one larger-sized, single-acting feed cylinder (54) relative to an abutment slide (22) that is linearly displaceable on the guide rail (14, 16) and is locked, - the working slide (20) is locked on the guide rail (14, 16), - the abutment slide (22) is unlocked and the working slide (20) is followed by means of at least one smaller, double-acting feed cylinder (52) and - The abutment slide (22) is locked on the guide rail (14, 16) and the working slide (20) is unlocked, so that a further erecting step can be carried out. Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass an dem Bauteil (2) ein Anschlusselement (4) angebracht wird, welches mit einem Anschlussadapter (26) des Arbeitsschlittens (20) schwenkbar verbunden wird.Procedure according to Claim 1 , characterized in that a connection element (4) is attached to the component (2) and is pivotably connected to a connection adapter (26) of the working carriage (20). Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass ein Anschlussbolzen (36) der Aufrichtvorrichtung (10) in ein Anschlussauge (6) des Bauteils (2) eingeführt und anschließend an einem Adaptergrundkörper (34) des Arbeitsschlittens (20) montiert wird.Procedure according to Claim 1 or 2 , characterized in that a connection bolt (36) of the erecting device (10) is inserted into a connection eye (6) of the component (2) and is then mounted on an adapter base body (34) of the work carriage (20). Aufrichtvorrichtung zum Aufrichten eines Bauteils (2) mit - einem Führungsholm (14, 16), welcher schwenkbar an einer Basis (12) lagerbar ist, - einem an dem Führungsholm (14, 16) linear verschiebbar gelagerten Arbeitsschlitten (20), - einem an dem Führungsholm (14, 16) linear verschiebbar gelagerten Widerlagerschlitten (22) und - einer Vorschubeinrichtung (24) zum Verfahren des Arbeitsschlittens (20) und des Widerlagerschlittens (22) relativ zueinander, - wobei der Arbeitsschlitten (20) einen Anschlussadapter (26) aufweist, an welchen das zu bewegende Bauteil (2) anschließbar ist, dadurch gekennzeichnet, - dass der Arbeitsschlitten (20) und der Widerlagerschlitten (22) jeweils Verriegelungseinrichtungen (28) aufweisen, mit welchen der Arbeitsschlitten (20) beziehungsweise der Widerlagerschlitten (22) an dem Führungsholm (14, 16) festlegbar ist, und - dass die Vorschubeinrichtung (24) mindestens einen kleiner dimensionierten, doppelt wirkenden Vorschubzylinder (52) zum Bewegen des Widerlagerschlittens (22) und einen größer dimensionierten, einfach wirkenden Vorschubzylinder (54) zum Bewegen des Arbeitsschlittens (20) aufweist.Erecting device for erecting a component (2) with - a guide rail (14, 16) which can be pivotably mounted on a base (12), - a working slide (20) mounted linearly displaceably on the guide rail (14, 16), - an on the guide rail (14, 16) linearly displaceably mounted abutment slide (22) and - a feed device (24) for moving the work slide (20) and the abutment slide (22) relative to one another, - the work slide (20) having a connection adapter (26) , to which the component (2) to be moved can be connected, characterized in that - that the working carriage (20) and the abutment carriage (22) each have locking devices (28) with which the working carriage (20) or the abutment carriage (22) can be fixed on the guide rail (14, 16), and that the feed device (24 ) has at least one smaller-sized, double-acting feed cylinder (52) for moving the abutment slide (22) and a larger-sized, single-acting feed cylinder (54) for moving the working slide (20). Vorrichtung nach Anspruch 4, dadurch gekennzeichnet, dass der Anschlussadapter (26) einen Anschlussbolzen (36) umfasst, an welchen ein Anschlussauge (6) des zu bewegenden Bauteils (2) anschließbar ist.Device according to Claim 4 , characterized in that the connection adapter (26) comprises a connection bolt (36) to which a connection eye (6) of the component (2) to be moved can be connected. Vorrichtung nach Anspruch 5, dadurch gekennzeichnet, dass der Anschlussbolzen (36) lösbar und erneut festlegbar an einem Adaptergrundkörper (34) des Anschlussadapters (26) montiert ist.Device according to Claim 5 , characterized in that the connection bolt (36) is mounted on an adapter base body (34) of the connection adapter (26) so as to be detachable and fixable again. Vorrichtung nach einem der Ansprüche 4 bis 6, dadurch gekennzeichnet, dass mindestens zwei Führungsholme (14, 16) vorgesehen sind, entlang welchen der Arbeitsschlitten (20) und der Widerlagerschlitten (22) geführt sind, und dass mindestens ein erster Aufnahmebereich (56) für einen Vorschubzylinder (52) zwischen den Führungsholmen (14, 16) und mindestens ein zweiter Aufnahmebereich (58) für einen Vorschubzylinder (54) seitlich eines der Führungsholme (14, 16) vorgesehen ist.Device according to one of the Claims 4 to 6th , characterized in that at least two guide bars (14, 16) are provided along which the working slide (20) and the abutment slide (22) are guided, and that at least one first receiving area (56) for a feed cylinder (52) between the guide bars (14, 16) and at least one second receiving area (58) for a feed cylinder (54) is provided on the side of one of the guide bars (14, 16). Vorrichtung nach einem der Ansprüche 4 bis 7, dadurch gekennzeichnet, dass ein Anschlussbereich des Anschlussadapters (26), insbesondere ein Anschlussbolzen (36), mittig zwischen zwei Führungsholmen (14, 16) angeordnet ist.Device according to one of the Claims 4 to 7th , characterized in that a connection area of the connection adapter (26), in particular a connection bolt (36), is arranged centrally between two guide bars (14, 16).
DE102011112899.2A 2011-09-08 2011-09-08 Method for erecting a component and erecting device Expired - Fee Related DE102011112899B4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE102011112899.2A DE102011112899B4 (en) 2011-09-08 2011-09-08 Method for erecting a component and erecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102011112899.2A DE102011112899B4 (en) 2011-09-08 2011-09-08 Method for erecting a component and erecting device

Publications (2)

Publication Number Publication Date
DE102011112899A1 DE102011112899A1 (en) 2013-03-14
DE102011112899B4 true DE102011112899B4 (en) 2021-01-07

Family

ID=47740071

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102011112899.2A Expired - Fee Related DE102011112899B4 (en) 2011-09-08 2011-09-08 Method for erecting a component and erecting device

Country Status (1)

Country Link
DE (1) DE102011112899B4 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2510083B2 (en) * 1975-03-07 1979-07-19 Enor Nominees Pty. Ltd., Oakleigh, Victoria (Australien) Climbing lifting device
DE3521212A1 (en) * 1985-06-13 1986-12-18 Blohm + Voss Ag, 2000 Hamburg Process and apparatus for erecting housing panels
US5368125A (en) * 1993-04-16 1994-11-29 St-Germain; Andre Platform raising system in scaffolding
US5579865A (en) * 1994-02-23 1996-12-03 Butler; J. Frank Scaffold

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2510083B2 (en) * 1975-03-07 1979-07-19 Enor Nominees Pty. Ltd., Oakleigh, Victoria (Australien) Climbing lifting device
DE3521212A1 (en) * 1985-06-13 1986-12-18 Blohm + Voss Ag, 2000 Hamburg Process and apparatus for erecting housing panels
US5368125A (en) * 1993-04-16 1994-11-29 St-Germain; Andre Platform raising system in scaffolding
US5579865A (en) * 1994-02-23 1996-12-03 Butler; J. Frank Scaffold

Also Published As

Publication number Publication date
DE102011112899A1 (en) 2013-03-14

Similar Documents

Publication Publication Date Title
EP0794315B1 (en) Device for drilling in soil
EP2133508B1 (en) Construction device with extendable mast and method for operation of same
DE102009035277B4 (en) Drilling device
DE4334378C2 (en) Device for aligning hanging loads
EP0593803B1 (en) Positioning device for loads
DE202008007970U1 (en) Construction work tool with swiveling mast
DE2246338A1 (en) CARRYING AND HANDLING DEVICE FOR A TOOL OR THE LIKE
EP2304179B1 (en) Automated drilling and bolt setting device comprising separate carriages
DE102011102110B4 (en) Undercarriage for crawler crane, crawler crane and method of erecting and dismantling a crawler crane
DE1933573B2 (en) Device for straightening vehicle bodies or frames
DE102007058553A1 (en) Lateral bracing for a lattice boom of a crane
EP3214258B1 (en) Construction device and method for erecting a mast
WO2009118198A2 (en) Device for demolishing constructions
DE102014012661B4 (en) Method of operating a crane and crane
DE102013011180B4 (en) Collar storage for a telescopic boom as well as telescopic boom and crane
DE102013011173B4 (en) Method for assembling a crane as well as articulation, telescopic boom and crane
DE102011112899B4 (en) Method for erecting a component and erecting device
DE202015008972U1 (en) Drilling rig with a pivotable between a transport position and a working position drilling mast
DE10007773A1 (en) Crane with telescopic jib has sliding element for telescopic parts, and locking bolt to combine coupling and locking functions
EP1830006B1 (en) Construction equipment and method for preparing said equipment for transportation
DE202015008973U1 (en) Drilling rig with a pivotable between a transport position and a working position mast
EP3388200B1 (en) Chain repairing device
EP2025859A1 (en) Deep drilling device and method for mounting a deep drilling device
DE3025236A1 (en) HIKING OR TRAVELABLE SUPPORT
DE102007049673A1 (en) Damaged aircraft recovering method for use during e.g. forced landing, involves lifting construction in such manner that one of supporting elements is insertable into construction, and carrying load received by pieces over elements

Legal Events

Date Code Title Description
R012 Request for examination validly filed
R016 Response to examination communication
R082 Change of representative

Representative=s name: WUNDERLICH & HEIM PATENTANWAELTE PARTNERSCHAFT, DE

R018 Grant decision by examination section/examining division
R020 Patent grant now final
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee