DE102007014702A1 - filling system - Google Patents

filling system Download PDF

Info

Publication number
DE102007014702A1
DE102007014702A1 DE102007014702A DE102007014702A DE102007014702A1 DE 102007014702 A1 DE102007014702 A1 DE 102007014702A1 DE 102007014702 A DE102007014702 A DE 102007014702A DE 102007014702 A DE102007014702 A DE 102007014702A DE 102007014702 A1 DE102007014702 A1 DE 102007014702A1
Authority
DE
Germany
Prior art keywords
filling
channel
control valve
liquid
flow path
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE102007014702A
Other languages
German (de)
Other versions
DE102007014702B4 (en
Inventor
Ludwig Clüsserath
Dieter-Rudolf Krulitsch
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KHS GmbH
Original Assignee
KHS GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KHS GmbH filed Critical KHS GmbH
Priority to DE102007014702.5A priority Critical patent/DE102007014702B4/en
Priority to SI200831918T priority patent/SI2132130T1/en
Priority to PCT/EP2008/002013 priority patent/WO2008116564A2/en
Priority to EP08716510.6A priority patent/EP2132130B1/en
Publication of DE102007014702A1 publication Critical patent/DE102007014702A1/en
Priority to US12/564,499 priority patent/US20100071802A1/en
Application granted granted Critical
Publication of DE102007014702B4 publication Critical patent/DE102007014702B4/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B39/00Nozzles, funnels or guides for introducing articles or materials into containers or wrappers
    • B65B39/001Nozzles, funnels or guides for introducing articles or materials into containers or wrappers with flow cut-off means, e.g. valves
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B39/00Nozzles, funnels or guides for introducing articles or materials into containers or wrappers
    • B65B39/04Nozzles, funnels or guides for introducing articles or materials into containers or wrappers having air-escape, or air-withdrawal, passages
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B67OPENING, CLOSING OR CLEANING BOTTLES, JARS OR SIMILAR CONTAINERS; LIQUID HANDLING
    • B67CCLEANING, FILLING WITH LIQUIDS OR SEMILIQUIDS, OR EMPTYING, OF BOTTLES, JARS, CANS, CASKS, BARRELS, OR SIMILAR CONTAINERS, NOT OTHERWISE PROVIDED FOR; FUNNELS
    • B67C3/00Bottling liquids or semiliquids; Filling jars or cans with liquids or semiliquids using bottling or like apparatus; Filling casks or barrels with liquids or semiliquids
    • B67C3/02Bottling liquids or semiliquids; Filling jars or cans with liquids or semiliquids using bottling or like apparatus
    • B67C3/04Bottling liquids or semiliquids; Filling jars or cans with liquids or semiliquids using bottling or like apparatus without applying pressure
    • B67C3/045Apparatus specially adapted for filling bottles with hot liquids
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B67OPENING, CLOSING OR CLEANING BOTTLES, JARS OR SIMILAR CONTAINERS; LIQUID HANDLING
    • B67CCLEANING, FILLING WITH LIQUIDS OR SEMILIQUIDS, OR EMPTYING, OF BOTTLES, JARS, CANS, CASKS, BARRELS, OR SIMILAR CONTAINERS, NOT OTHERWISE PROVIDED FOR; FUNNELS
    • B67C3/00Bottling liquids or semiliquids; Filling jars or cans with liquids or semiliquids using bottling or like apparatus; Filling casks or barrels with liquids or semiliquids
    • B67C3/02Bottling liquids or semiliquids; Filling jars or cans with liquids or semiliquids using bottling or like apparatus
    • B67C3/06Bottling liquids or semiliquids; Filling jars or cans with liquids or semiliquids using bottling or like apparatus using counterpressure, i.e. filling while the container is under pressure
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B67OPENING, CLOSING OR CLEANING BOTTLES, JARS OR SIMILAR CONTAINERS; LIQUID HANDLING
    • B67CCLEANING, FILLING WITH LIQUIDS OR SEMILIQUIDS, OR EMPTYING, OF BOTTLES, JARS, CANS, CASKS, BARRELS, OR SIMILAR CONTAINERS, NOT OTHERWISE PROVIDED FOR; FUNNELS
    • B67C3/00Bottling liquids or semiliquids; Filling jars or cans with liquids or semiliquids using bottling or like apparatus; Filling casks or barrels with liquids or semiliquids
    • B67C3/02Bottling liquids or semiliquids; Filling jars or cans with liquids or semiliquids using bottling or like apparatus
    • B67C3/22Details
    • B67C3/28Flow-control devices, e.g. using valves
    • B67C3/286Flow-control devices, e.g. using valves related to flow rate control, i.e. controlling slow and fast filling phases

Abstract

Füllsystem für ein Heißabfüllen eines flüssigen Füllgutes in Flaschen oder dergleichen Behälter mit einem Füllelement mit einem in einem Füllelementgehäuse ausgebildeten Flüssigkeitskanal, der mit einem Kessel für das Füllgut in Verbindung steht und an einer Unterseite des Füllelementes eine Füllgutabgabe bildet, über die das flüssige Füllgut dem jeweils zu füllenden, an einem Behälterträger gehaltenen Behälter zufließt, mit einem im Flüssigkeitskanal angeordneten Flüssigkeitsventil.Filling system for a hot filling of a liquid filling material in bottles or the like container with a filling element with a formed in a Füllelementgehäuse liquid channel, which is in communication with a boiler for the contents and forms a Füllgutabgabe at an underside of the filling element, via which the liquid product in each case to be filled, held on a container carrier container flows, with a liquid channel disposed in the liquid valve.

Description

Die Erfindung bezieht sich auf ein Füllsystem gemäß Oberbegriff Patentanspruch 1.The The invention relates to a filling system according to the preamble Claim 1.

Füllsysteme, insbesondere auch solche zum Füllen von Flaschen oder dergleichen Behälter mit einem heißen flüssigen Füllgut, d. h. zum Heißabfüllen z. B. von stillen Getränken oder anderen Produkten sind bekannt.filling systems, especially those for filling of bottles or similar containers with a hot liquid product, d. H. for hot filling z. B. of still drinks or other products are known.

Aufgabe der Erfindung ist es, ein Füllsystem aufzuzeigen, welches wahlweise zumindest für ein Kaltabfüllen oder Heißabfüllen geeignet ist und mit welchem bei einem Heißabfüllen auch in besonders einfacher Weise ein Beheizen der Füllelemente möglich ist. Zur Lösung dieser Aufgabe ist ein Füllsystem entsprechend dem Patentanspruch 1 ausgebildet.task the invention is to show a filling system, which optionally at least for a cold filling or hot filling is and with which in a hot filling in a particularly simple Way a heating of the filling elements possible is. To the solution This task is a filling system accordingly formed according to claim 1.

Beispielsweise in Füllpausen bzw. bei Unterbrechungen des Füllprozesses erfolgt das Beheizen der Füllelemente durch das heiße Füllgut, welches die Füllelemente bei geschlossenen Flüssigkeitsventilen durchströmt, und zwar in einem in jedem Füllelement ausgebildeten ersten Strömungsweg, der bevorzugt Teil eines den Kessel oder ein anderes Reservoir für das Füllgut einschließenden Füllgutkreislaufs mit deiner Heiz- oder Erhitzungsanlage ist. Eingeleitet wird dieser Füllgutstrom oder Heißumlauf des Füllgutes durch Aktivieren wenigstens eines ersten Steuerventils, welches beispielsweise im ersten Strömungsweg jedes Füllelementes oder aber in einer Leitung oder Verbindung vorgesehen ist, die ebenfalls als Teil des Füllgutkreislaufs für sämtliche Füllelemente einer Füllmaschine oder aber für eine Gruppe von mehreren Füllelementen gemeinsam ist.For example in filling pauses or if the filling process is interrupted the heating of the filling elements takes place by the hot filling, which the filling elements with closed fluid valves flows through in one in each filling element trained first flow path, The preferred part of the boiler or another reservoir for the filling enclosing Füllgutkreislaufs with your heating or heating system. This is initiated Füllgutstrom or hot circulation of filling material by activating at least one first control valve, which for example in the first flow path each filling element or is provided in a line or connection, also as part of the product cycle for all filling elements a filling machine or for a group of several filling elements is common.

Weiterbildungen, Vorteile und Anwendungsmöglichkeiten der Erfindung ergeben sich aus der nachfolgenden Beschreibung von Ausführungsbeispielen und aus den Figuren. Dabei sind alle beschriebenen und/oder bildlich dargestellten Merkmale für sich oder in beliebiger Kombination grundsätzlich Gegenstand der Erfindung, unabhängig von ihrer Zusammenfassung in den Ansprüchen oder deren Rückbeziehung. Auch wird der Inhalt der Ansprüche zu einem Bestandteil der Beschreibung gemacht. Die Erfindung wird im Folgenden anhand der Figuren an Ausführungsbeispielen näher erläutert. Es zeigen:Further developments, Advantages and applications The invention will become apparent from the following description of embodiments and from the figures. All are described and / or illustrated illustrated features for itself or in any combination in principle the subject of the invention, independently from their summary in the claims or their dependency. Also, the content of the claims becomes a part of the description. The invention is in Explained below with reference to the figures of exemplary embodiments. It demonstrate:

1 in vereinfachter Darstellung ein Füllsystem gemäß der Erfindung, zusammen mit einer an das Füllelement dieses Systems angehobenen Flasche; 1 in a simplified representation of a filling system according to the invention, together with a raised to the filling element of this system bottle;

2 das Füllsystem der 1 in einem Betriebszustand bei unerbrochener Heißabfüllung; 2 the filling system of 1 in an operating condition with uninterrupted hot filling;

3 in einer Darstellung ähnlich 1 ein weiteres Füllsystem gemäß der Erfindung. 3 similar in a presentation 1 another filling system according to the invention.

4 Das Füllsystem der 3 in einem Betriebszustand bei unterbrochener Heißabfüllung. 4 The filling system of 3 in an operating state with interrupted hot filling.

Das in den 1 und 2 allgemein mit 1 bezeichnete Füllsystem ist Bestandteil einer Füllmaschine umlaufender Bauart zum Abfüllen eines flüssigen Füllgutes in Flaschen 2 oder dergleichen Behälter. Das Füllsystem 1 besteht hierfür im Wesentlichen aus einem Füllelement 3 und aus einem diesem Füllelement zugeordneten Flaschen- oder Behälterträger 4, der bei der dargestellten Ausführungsform zum Halten der Flaschen 2 an einem unterhalb der Flaschenmündung 2.1 gebildeten Mündungsflansch 2.2 dient und hierfür beispielsweise gabelartig ausgebildet ist. Das Füllelement 3 und der zugehörige Behälterträger 4 sind mit einer Vielzahl gleichartiger Füllelemente 3 und Behälterträger 4 am Umfang eines um eine vertikale Maschinenachse umlaufend antreibbaren Rotors 5 der Füllmaschine vorgesehen. Oberhalb der Füllelemente 3 befindet sich am Rotor 5 ein für sämtliche Füllelemente gemeinsamer Kessel 6, der beispielsweise als Ringkessel ausgebildet ist und während des Füllbetriebes bis zu einem vorgegebenen Niveau N niveaugeregelt gefüllt ist. Im Kessel 6 sind somit ein Gasraum 6.1 und ein Flüssigkeitsraum 6.2 gebildet. Das flüssige Füllgut wird dem Kessel 6 über eine nicht dargestellte Versorgungsleitung gesteuert zugeführt.That in the 1 and 2 generally with 1 designated filling system is part of a filling machine of rotating design for filling a liquid filling in bottles 2 or similar container. The filling system 1 consists essentially of a filling element 3 and from a bottle or container carrier associated with this filling element 4 in the illustrated embodiment for holding the bottles 2 at one below the mouth of the bottle 2.1 formed mouth flange 2.2 serves and this example, fork-shaped. The filling element 3 and the associated container carrier 4 are with a variety of similar filling elements 3 and container carriers 4 on the circumference of a rotatable about a vertical machine axis rotatable rotor 5 provided the filling machine. Above the filling elements 3 is located on the rotor 5 a common boiler for all filling elements 6 , For example, which is designed as a ring boiler and filled level control during the filling operation up to a predetermined level N is filled. In the kettle 6 are thus a gas space 6.1 and a fluid room 6.2 educated. The liquid product is the boiler 6 Controlled supplied via a supply line, not shown.

In einem Gehäuse 7 des Füllelementes 3 ist ein Flüssigkeitskanal 8 ausgebildet, der über eine Leitung 9 mit dem Flüssigkeitsraum 6.2 des beispielsweise als Ringkessel ausgebildeten Kessels 6 in Verbindung steht. Im Flüssigkeitskanal 8 ist das Flüssigkeitsventil 10 vorgesehen, und zwar zur gesteuerten Abgabe des flüssigen Füllgutes über eine Abgabeöffnung 11, die an der Unterseite des Füllelementes von dem dortigen offenen Ende des Flüssigkeitskanals 8 gebildet ist.In a housing 7 of the filling element 3 is a fluid channel 8th trained, over a line 9 with the liquid space 6.2 of the example designed as a ring boiler boiler 6 communicates. In the fluid channel 8th is the liquid valve 10 provided, specifically for controlled delivery of the liquid contents via a discharge opening 11 at the bottom of the filling element from the local open end of the liquid channel 8th is formed.

Das Flüssigkeitsventil 10 besteht im Wesentlichen aus einem im Flüssigkeitskanal 8 angeordneten Ventilkörper 10.1, der mit einem Ventilsitz 10.2 zusammenwirkt. Der Ventilkörper 10.1 ist an einem achsgleich mit der vertikalen Füllelementachse angeordneten, beidendig offenen Gasrohr 13 ausgebildet, welches zugleich als Ventilstößel zur Betätigung des Flüssigkeitsventils 10 dient und hierfür mit einer Betätigungseinrichtung 12 zusammenwirkt. Das untere offene Ende des Gasrohres 13 ist von der ringförmigen Abgabeöffnung 11 umschlossen. Das obere offene Ende des Gasrohres 13 mündet in einen im Gehäuse 7 ausgebildeten Gasraum 14. Das Anpressen der jeweiligen Flasche 2 mit ihrer Mündung 2.1 gegen das Füllelement 3 erfolgt bei dieser Ausführungsform zumindest unterstützend durch den im Gasraum 14 herrschenden und auf das Anpressgestänge 4.1 des jeweiligen Behälterträgers einwirkenden Druck.The liquid valve 10 consists essentially of one in the liquid channel 8th arranged valve body 10.1 that with a valve seat 10.2 interacts. The valve body 10.1 is arranged on a coaxial with the vertical Füllelementachse arranged at both ends open gas pipe 13 formed, which at the same time as a valve tappet for actuating the liquid valve 10 serves and this with an actuator 12 interacts. The lower open end of the gas pipe 13 is from the annular discharge opening 11 enclosed. The upper open end of the gas pipe 13 flows into one in the housing 7 trained gas room 14 , The pressing of the respective bottle 2 with her mouth 2.1 against the filling element 3 takes place in this embodiment, at least supportive by the gas space 14 ruling and on the Anpressgestänge 4.1 of the respective container carrier acting pressure.

Der Gasraum 14 ist u. a. mit im Gehäuse 7 ausgebildeten Kanälen 15, 16, 17 verbunden. Diese Kanäle sind jeweils Teil eines gesteuerten Strömungsweges mit Steuerventilen 18, 19 und 20. Im Detail ist der Kanal 15 Bestandteil des auch das Steuerventil 18 und einen Kanal 21 aufweisenden Strömungsweges zwischen dem Gasraum 14 und einem für sämtliche Füllelemente 3 der Füllmaschine gemeinsamen, am Rotor 5 ausgebildeten Ringkanal 22, der über eine Leitung 23 mit dem Gasraum 6.1 verbunden ist. Der gedrosselte, d. h. mit einer Drossel versehene Kanal 16 ist Bestandteil eines das Steuerventil 19 und den verzweigten Kanal 21 aufweisenden Strömungsweges zwischen dem Gasraum 14 und dem Ringkanal 22. Der Kanal 17 ist Bestandteil eines das Steuerventil 20 und den verzweigten Kanal 24 aufweisenden gesteuerten und gedrosselten Strömungsweges zwischen dem Gasraum 14 und einem für sämtliche Füllelemente der Füllmaschine gemeinsamen, am Rotor 5 ausgebildeten Ringkanal 26.The gas space 14 is among other things in the housing 7 trained channels 15 . 16 . 17 connected. These channels are each part of a controlled flow path with control valves 18 . 19 and 20 , In detail is the channel 15 Part of the control valve 18 and a channel 21 having flow path between the gas space 14 and one for all filling elements 3 the filling machine common, on the rotor 5 trained annular channel 22 who has a lead 23 with the gas space 6.1 connected is. The throttled, ie provided with a throttle channel 16 is part of a control valve 19 and the branched channel 21 having flow path between the gas space 14 and the annular channel 22 , The channel 17 is part of a control valve 20 and the branched channel 24 having controlled and throttled flow path between the gas space 14 and one common to all filling elements of the filling machine, on the rotor 5 trained annular channel 26 ,

Zusätzlich zu den drei vorgenannten Steuerventilen weist das Füllelement 3 ein viertes Steuerventil 25 auf, welches zusammen mit dem verzweigten Kanal 24 und einem weiteren Kanal 27 eine gesteuerte Verbindung zwischen dem Ringkanal 26 und dem Flüssigkeitskanal 8 bildet, und zwar in Strömungsrichtung vor dem Ventilsitz 10.2. Über eine Steuereinrichtung 28 werden die Steuerventile 18, 19, 20 und 25, aber auch die Flüssigkeitsventile 10 der Füllmaschine bzw. die Betätigungseinrichtungen 12 dem jeweiligen Füllverfahren entsprechend programmgesteuert betä tigt, und zwar die Flüssigkeitsventile 10 für ein volumetrisches Füllen auch in Abhängigkeit von dem Messsignal eines Durchflussmessers 29.In addition to the three aforementioned control valves, the filling element 3 a fourth control valve 25 on which together with the branched channel 24 and another channel 27 a controlled connection between the ring channel 26 and the fluid channel 8th forms, in the flow direction in front of the valve seat 10.2 , Via a control device 28 become the control valves 18 . 19 . 20 and 25 , but also the liquid valves 10 the filling machine or the actuators 12 the program according to the respective filling method actuated actuated, namely the liquid valves 10 for a volumetric filling also depending on the measuring signal of a flow meter 29 ,

Mit dem Füllsystem 1 sind die verschiedene Füllverfahren möglich, so beispielsweise
ein Einkammer- oder aber auch Mehrkammerdruckfüllen von CO2-haltigen Produkten bzw. Getränken, wie z. B. Softdrinks, Bier, karbonisierte Wässer,
ein druckloses Kaltabfüllen beispielsweise stiller Getränke sowie
ein druckloses Heißabfüllen stiller Getränke.
With the filling system 1 are the different filling methods possible, such as
a one-chamber or multi-chamber pressure filling of CO2-containing products or drinks, such. Soft drinks, beer, carbonated waters,
a pressureless cold filling, for example, still drinks as well
a pressureless hot filling of still drinks.

Die für die unterschiedlichen Verfahren notwendigen verfahrenstechnischen Prozess oder Steuerschritte sind vollständig oder nahezu vollständig in das jeweilige Füllelement 3 verlagert.The procedural process or control steps necessary for the different processes are completely or almost completely in the respective filling element 3 relocated.

Die Betätigungseinrichtung 12 sowie auch die Steuerventile 18, 19, 20 und 25 bzw. deren Betätigungseinrichtungen sind jeweils pneumatisch betätigt und werden über nicht dargestellte, elektrisch steuerbare Ventile (Magnetventile) gesteuert. Bei einer Füllmaschine mit mehreren Füllelementen 3 werden das Betätigungselement 12 sowie auch das Steuerventil 18 für jedes Füllelement jeweils individuell von der zentralen Steuereinheit 28 gesteuert.The actuating device 12 as well as the control valves 18 . 19 . 20 and 25 or their actuators are each pneumatically operated and are controlled by not shown, electrically controllable valves (solenoid valves). In a filling machine with several filling elements 3 become the actuator 12 as well as the control valve 18 for each filling element individually from the central control unit 28 controlled.

Die Steuerventile 19, 20 und 25 werden in Abhängigkeit von dem gewählten Füllverfahren jeweils zentral für sämtliche Füllelemente 3 der Füllmaschine gemeinsam gesteuert, und zwar beispielsweise über drei Magnetventile, von denen ein Magnetventil sämtlichen Steuerventilen 19, ein Magnetventil sämtlichen Steuerventilen 20 und ein Magnetventil sämtlichen Steuerventilen 25 der Füllmaschine zugeordnet ist.The control valves 19 . 20 and 25 become central for all filling elements depending on the chosen filling process 3 the filling machine controlled together, for example via three solenoid valves, of which one solenoid valve all the control valves 19 , a solenoid valve of all control valves 20 and a solenoid valve of all the control valves 25 associated with the filling machine.

Im Ausgangszustand, d. h. im nicht betätigten Zustand sind das Flüssigkeitsventil 10 sowie auch die Steuerventile 18, 19, 20 und 25 geschlossen. In der nachstehenden Beschreibung der verschiedenen Füllverfahren und deren Prozessschritte befinden sich die vorgenannten Ventile ebenfalls jeweils in ihrem geschlossenen Zustand, sofern der geöffnete Zustand nicht ausdrücklich angegeben ist.In the initial state, ie in the non-actuated state, the liquid valve 10 as well as the control valves 18 . 19 . 20 and 25 closed. In the following description of the various filling methods and their process steps, the aforementioned valves are also each in their closed state, unless the open state is explicitly stated.

Grundsätzlich gilt für die Ansteuerung der vorgenannten Ventile bei den verschiedenen Füllverfahren, dass bei der Druckfüllung, d. h. beim Füllen der Fla schen 2 unter Gegendruck die Steuerventile 19 und 25 ständig geschlossen sind, während das Steuerventil 20 ständig geöffnet ist. Bei der drucklosen Kalt- oder Heißabfüllung ist das Steuerventil 20 ständig geschlossen und das Steuerventil 19 ständig geöffnet.Basically, applies to the control of the aforementioned valves in the various filling method that rule in the pressure filling, ie when filling the Fla 2 under counter pressure the control valves 19 and 25 are constantly closed while the control valve 20 is constantly open. For non-pressurized cold or hot filling is the control valve 20 constantly closed and the control valve 19 constantly open.

Mit dem Steuerventil 25 erfolgt in der nachstehend noch näher beschriebenen Weise während einer Unterbrechung des Füllprozesses gesteuert eine Zirkulation des heißen flüssigen Füllgutes durch die Füllelemente 3, um diese zu beheizen bzw. auf einer für das Heißabfüllen notwendigen Temperatur zu halten.With the control valve 25 takes place in the manner described in more detail below during an interruption of the filling process controlled circulation of the hot liquid filling material through the filling elements 3 to heat them or keep them at a temperature necessary for hot filling.

Während der einzelnen Füllverfahren werden also lediglich zwei Ventile, nämlich das jeweilige Flüssigkeitsventil 10 und das Steuerventil 18 der einzelnen Füllelemente der Füllmaschine individuell gesteuert. Mit den weiteren Steuerventilen 19, 20 und 25 erfolgt durch eine zentrale für sämtliche Füllelemente 3 der Füllmaschine gemeinsamer Ansteuerung lediglich die Auswahl der jeweils gewünschten Betriebsart.During the individual filling process, therefore, only two valves, namely the respective liquid valve 10 and the control valve 18 the individual filling elements of the filling machine individually controlled. With the other control valves 19 . 20 and 25 done by a central for all filling elements 3 the filling machine common control only the selection of the respective desired mode.

Im Detail sind mit dem Füllsystem 1 u. a. folgende Verfahren möglich:In detail are with the filling system 1 the following procedures are possible:

Einkammer-DruckfüllenSingle-chamber pressure filling

Bei diesem Füllverfahren ist der Kessel bis zum Niveau N mit dem Füllgut gefällt. Der Gasraum 6.1 des Kessels 6 sowie auch der über die Leitung 23 mit dem Gasraum 6.1 verbundene Ringkanal 22 sind mit dem unter Fülldruck stehenden CO2-Gas gefüllt. Der Ringkanal 26 dient hier als ein für sämtliche Füllelemente gemeinsamer Rückgaskanal. Das Steuerventil 20 befindet sich bei diesem Füllverfahren in einem ständig geöffneten Zustand.

  • 1. Vorspannen: Nach dem Einschieben und Anheben der jeweiligen Flasche 2 in Dichtlage gegen das betreffende Füllelement 3 erfolgt ein Vorspannen der Flasche 2 mit CO2-Gas aus dem Ringkanal 22 durch Öffnen des Steuerventils 18.
  • 2. Schnellfüllen: Bei weiterhin geöffnetem Steuerventil 18 wird das Flüssigkeitsventil 12 geöffnet.
  • 3. Bremsfüllen: Aufgrund des von dem Durchflussmesser 29 gelieferten Signals wird bei weiterhin noch offenen Flüssigkeitsventil 10 das Steuerventil 18 ge schlossen, sodass der Füllprozess mit reduzierter Füllgeschwindigkeit weitergeführt wird.
  • 4. Füllende: Nach Erreichen der vorgegebenen Füllgutmenge wird das Flüssigkeitsventil 10 geschlossen.
  • 5. Vorentlasten und Beruhigen: Nach dem Schließen des Flüssigkeitsventils erfolgt über das geöffnete Steuerventil 20 bzw. über die gedrosselte Gasverbindung zwischen dem Gasrohr 13, dem Gasrohr 14 und dem als Rückgaskanal dienenden Ringkanal 26 das Vorentlasten, sodass die betreffende, gefüllte Flasche 2 dann abgesenkt und ausgeschoben werden kann.
In this filling process, the boiler is precipitated up to level N with the contents. The gas space 6.1 of the boiler 6 as well as the over the line 23 with the gas space 6.1 connected ring channel 22 are filled with the pressurized CO2 gas. The ring channel 26 serves as a common return gas channel for all filling elements. The control valve 20 is in this filling process in egg In a constantly open state.
  • 1. Preloading: After inserting and lifting the respective bottle 2 in sealing position against the relevant filling element 3 a pretensioning of the bottle takes place 2 with CO2 gas from the annular channel 22 by opening the control valve 18 ,
  • 2. Fast filling: With the control valve still open 18 becomes the liquid valve 12 open.
  • 3. Brake Filling: Due to the flow meter 29 supplied signal is at still open fluid valve 10 the control valve 18 closed, so that the filling process is continued with reduced filling speed.
  • 4. Filling: After reaching the specified amount of filling, the liquid valve 10 closed.
  • 5. Pre-relieving and calming: After closing the liquid valve, use the opened control valve 20 or via the throttled gas connection between the gas pipe 13 , the gas pipe 14 and the ring channel serving as a return gas channel 26 the pre-unloading, so that concerned, filled bottle 2 then lowered and ejected.

Drucklose Kalt- oder HeißabfüllungPressure-free cold or hot filling

Bei diesem Füllverfahren ist der Kessel 6 wiederum bis zu dem Niveau N mit dem flüssigen Füllgut gefüllt. Der Gasraum 6.1 und damit auch der Ringkanal 22 befinden sich auf Atmosphärendruck.In this filling process is the boiler 6 again filled up to the level N with the liquid contents. The gas space 6.1 and thus also the ring channel 22 are at atmospheric pressure.

Das Steuerventil 19 befindet sich bei diesem Füllverfahren in einem ständig geöffneten Zustand.

  • 1. Schnellfüllen: Nach dem Einschieben und Anheben der jeweiligen Flasche 2 in Dichtlage gegen das Füllelement 3 wird bei geöffnetem Steuerventil 18 das Flüssigkeitsventil 10 geöffnet. Die der Flasche 2 über die Abgabeöffnung 11 zufließende Füllgutmenge wird ständig mit dem Durchflussmesser 29 erfasst.
  • 2. Die von dem flüssigen Füllgut aus der Flasche 2 verdrängte Luft- oder Gasmenge strömt über das Gasrohr 13, den Gasraum 14 und die von den geöffneten Steuerventilen 18 und 19 gebildeten Strömungswege in den über die Leitung 23 mit dem Gasraum 6.1 des Kessels 6 verbundenen Ringkanal 21.
  • 3. Bremsfüllen: Bei weiterhin geöffnetem Flüssigkeitsventil 10 wird das Steuerventil 18 geschlossen, sodass die aus der Flasche 2 durch das zufließende Füllgut verdrängte Luft oder Gasmenge nur noch über die gedrosselte Verbindung bzw. den gedrosselten Strömungsweg des geöffneten Steuerventils 19 in den Ringkanal 22 strömen kann.
  • 4. Füllende: Nach Erreichen der gewünschten Füllgutmenge folgt das Schließen des Flüssigkeitsventils 10 sowie im Anschluss daran das Absenken und Ausschieben der jeweils gefüllten Flasche.
The control valve 19 is in this filling process in a constantly open state.
  • 1. Fast filling: After inserting and lifting the respective bottle 2 in sealing position against the filling element 3 is when the control valve is open 18 the liquid valve 10 open. The bottle 2 over the delivery opening 11 Inflowing product quantity is constantly with the flow meter 29 detected.
  • 2. The of the liquid contents of the bottle 2 displaced air or gas flow over the gas pipe 13 , the gas space 14 and those of the open control valves 18 and 19 formed flow paths in the over the line 23 with the gas space 6.1 of the boiler 6 connected annular channel 21 ,
  • 3. Brake filling: With the fluid valve still open 10 becomes the control valve 18 closed, leaving the bottle 2 by the inflowing medium displaced air or gas only through the throttled connection or the restricted flow path of the open control valve 19 in the ring channel 22 can flow.
  • 4. Filling: After reaching the desired volume, the liquid valve closes 10 and then lowering and pushing out the filled bottle.

Das vorstehend beschriebene drucklose Füllen kann speziell auch als Heißfüllen ausgeführt werden, und zwar insbesondere für das heißsterile Abfüllen von Produkten, wie z. B. Säften. In diesem Fall wird das flüssige Füllgut im Kessel 6 im heißen Zustand bereitgestellt, und zwar unter Verwendung einer entsprechenden Heizeinrichtung und/oder aber dadurch, dass der Kessel 6 Bestandteil eines eine Heizeinrichtung einschließenden Kreislaufs ist, in welchem das Füllgut zum Erhitzen und zur Aufrechterhaltung der erforderlichen Temperatur umläuft.The pressureless filling described above can be carried out especially as a hot filling, in particular for the hot sterile filling of products such. B. juices. In this case, the liquid product is in the boiler 6 provided in the hot state, using a corresponding heater and / or in that the boiler 6 Part of a heating device enclosing circuit in which the contents rotates to heat and maintain the required temperature.

Während des normalen Füllbetriebes werden dann auch die Füllelemente 3 durch das diese Füllelemente bzw. deren Flüssigkeitskanäle 8 durchströmende heiße Füllgut erhitzt und auf einer erforderlichen Temperatur gehalten, sodass das flüssige Füllgut mit einer ausreichend hohen, ein Verkeimen verhindernden Temperatur in die jeweilige Flasche 2 eingebracht wird.During normal filling operation then the filling elements 3 through which these filling elements or their fluid channels 8th heated hot fill material heated and maintained at a required temperature, so that the liquid product with a sufficiently high, a germ-preventing temperature in the respective bottle 2 is introduced.

Um ein Abkühlen der Füllelemente 3 bei einer Unterbrechung des Füllprozesses zu vermeiden, ist es bei der Heißabfüllung notwendig, zumindest aber zweckmäßig die Füllelemente 3 durch Wärmezufuhr auf der erforderlichen Temperatur zu halten. Dies ist mit dem Füllsystem 1 dadurch möglich, dass bei einer Unterbrechung des Füllprozesses und bei geschlossenen Flüssigkeitsventilen 10 sämtlicher Füllelemente die Steuerventile 25 der Füllelemente geöffnet werden, sodass das heiße flüssige Füllgut aus dem Kessel 6, durch die das geöffnete Steuerventil 25 enthaltene und von den Kanälen 27 und 24 gebildete Verbindung in den Ringkanal 26 strömt und von dort über eine Rückführleitung 30, in der beispielsweise auch eine Produktpumpe angeordnet ist, in den Ringkessel 6 bzw. in den dortigen Flüssigkeitsraum 6.2 zurückgeführt wird, wie dies in der 2 mit den Pfeilen A angedeutet ist.To cool the filling elements 3 to avoid an interruption of the filling process, it is necessary in the hot filling, but at least expedient the filling elements 3 to keep it at the required temperature by supplying heat. This is with the filling system 1 thereby possible that at an interruption of the filling process and with closed liquid valves 10 all filling elements the control valves 25 the filling elements are opened, so that the hot liquid product from the boiler 6 through which the open control valve 25 included and from the channels 27 and 24 formed compound in the annular channel 26 flows and from there via a return line 30 , in which, for example, a product pump is arranged in the ring bowl 6 or in the local liquid space 6.2 is attributed to, as in the 2 is indicated by the arrows A.

Die 3 zeigt als weitere Ausführungsform ein Füllsystem 1c, welches für ein druckloses Füllen, insbesondere auch für ein druckloses Heißfüllen ausgebildet ist. Das Füllsystem 1a unterscheidet sich von dem Füllsystem 1 zunächst dadurch, dass anstelle von vier Steuerventilen 18, 19, 20 und 25 und den zugehörigen steuerbaren Verbindungen lediglich ein Steuerventil 31 vorgesehen ist, welches Teil einer auch die Kanäle 15 und 21 aufweisenden steuerbaren Verbindung zwischen dem Gasraum 13 und dem Ringkanal 22 ist. Parallel zum Steuerventil 31 liegt eine gedrosselte Verbindung 32. Mit dem Steuerventil 31 werden das Schnellfüllen (bei geöffnetem Steuerventil 31) und das Langsamfüllen (bei geschlossenem Steuerventil 31) gesteuert. Im Gehäuse 7a des Füllelementes 3a ist ein Kanal 33 ausgebildet, der den Flüssigkeitskanal 8 jedes Füllelementes 3a mit dem gemeinsamen Ringkanal 26 verbindet und in den Flüssigkeitskanal 8 in Strömungsrichtung vor dem Ventilsitz 10.2 des Flüssigkeitsventils 10 mündet. Im Kanal 33 ist ein Rückschlagventil 34 vorgesehen, welches für eine Strömungsrichtung aus dem Flüssigkeitskanal 8 in den Ringkanal 26 öffnet, für eine Strömung in entgegen gesetzter Richtung aber sperrt. An den Ringkanal 26 führt eine Leitung 34 mit einem elektrisch steuerbaren Ventil bzw. Magnetventil 35.The 3 shows as a further embodiment, a filling system 1c , which is designed for a pressureless filling, in particular for a pressureless hot filling. The filling system 1a is different from the filling system 1 First, by having four control valves instead 18 . 19 . 20 and 25 and the associated controllable connections only a control valve 31 is provided, which part of one of the channels 15 and 21 having controllable connection between the gas space 13 and the annular channel 22 is. Parallel to the control valve 31 is a throttled connection 32 , With the control valve 31 Be fast filling (with open control valve 31 ) and slow filling (with the control valve closed 31 ) controlled. In the case 7a of the filling element 3a is a channel 33 formed, which the liquid channel 8th each filling element 3a With the common ring channel 26 connects and into the fluid channel 8th in the flow direction in front of the valve seat 10.2 of the liquid valve 10 empties. In the channel 33 is a check valve 34 provided, which for a flow direction from the liquid channel 8th in the ring channel 26 opens, for a flow in opposite direction but locks. To the ring channel 26 leads a line 34 with an electrically controllable valve or solenoid valve 35 ,

Das drucklose Abfüllen auch eines heißen Füllgutes in die Flaschen 2 erfolgt mit dem Füllsystem 1a bzw. Füllelement 3a in analoger Weise, wie dies vorstehend für das Füllsystem 1 beschrieben wurde, wobei der gedrosselte Kanal 32 hinsichtlich seiner Funktion der von dem geöffnetem Steuerventil 19 gebildeten gedrosselten Verbindung entspricht. Die einzelnen Verfahrensschritte sind daher:The unpressurized filling of a hot filling in the bottles 2 done with the filling system 1a or filling element 3a in an analogous manner as above for the filling system 1 was described, with the throttled channel 32 in terms of its function, that of the open control valve 19 formed throttled connection corresponds. The individual process steps are therefore:

Bei zunächst geschlossenem Steuerventil 31 und geschlossenem Flüssigkeitsventil 10 erfolgt das Einschieben und Anheben der zu füllenden Flasche 2 gegen das Füllelement 3a, sodass die Flaschenmündung 2.1 dicht gegen die Abgabeöffnung 11 bzw. gegen die dortige Dichtung anliegt.

  • 1. Schnellfüllen: Für das Füllen wird gesteuert durch die Steuereinrichtung 28 das Flüssigkeitsventil 10 über das Betätigungselement 12 geöffnet. Gleichzeitig wird auch das Steuerventil 31 geöffnet. Die der Flasche zufließende Füllgutmenge wird mit dem Durchflussmesser 29 erfasst. Die durch das flüssige Füllgut aus der Flasche 2 verdrängte Luft- oder Gasmenge strömt über den Kanal 15, das geöffnete Steuerventil 31, teilweise auch über den gedrosselten Kanal 32 und den Kanal 21 in den Ringkanal 22.
  • 2. Bremsfüllen: Gesteuert durch das von dem Durchflussmesser 29 gelieferte Messsignal wird von der Steuereinrichtung 28 das Steuerventil 31 geschlos sen, sodass die durch das flüssige Füllgut aus der Flasche 2 verdrängte Luft- oder Gasmenge nur noch über den gedrosselten Kanal 32 und den Kanal 21 in den Ringkanal 22 strömen kann und somit ein Bremsfüllen mit reduzierter Füllgeschwindigkeit (der Flasche zufließende Füllgutmenge je Zeiteinheit) erfolgt.
  • 3. Füllende: Veranlasst durch das von dem Durchflussmesser 29 gelieferte Signal wird über die Steuereinrichtung 28 das Flüssigkeitsventil 10 geschlossen, sobald die erforderliche Füllgutmenge in die Flasche 2 eingebracht ist. Im Anschluss daran erfolgt dann das Absenken der gefüllten Flasche 2 mit dem Behälterträger 4 sowie das Ausschieben dieser Flasche am Behälterauslauf der Füllmaschine.
When initially closed control valve 31 and closed liquid valve 10 the insertion and lifting of the bottle to be filled takes place 2 against the filling element 3a so the bottle mouth 2.1 close to the discharge opening 11 or abuts against the local seal.
  • 1. Fast filling: For filling is controlled by the controller 28 the liquid valve 10 over the actuator 12 open. At the same time, the control valve 31 open. The amount of product flowing into the bottle is measured using the flow meter 29 detected. The through the liquid contents of the bottle 2 displaced air or gas flow over the channel 15 , the open control valve 31 , partly also over the throttled channel 32 and the channel 21 in the ring channel 22 ,
  • 2. Brake filling: controlled by that of the flow meter 29 supplied measuring signal is from the control device 28 the control valve 31 closed, so that the liquid through the product from the bottle 2 displaced air or gas quantity only over the throttled channel 32 and the channel 21 in the ring channel 22 can flow and thus a brake filling with reduced filling speed (the bottle inflowing product quantity per unit time) is done.
  • 3. Filling: caused by that of the flow meter 29 The signal supplied is via the control device 28 the liquid valve 10 closed as soon as the required quantity of contents in the bottle 2 is introduced. This is followed by the lowering of the filled bottle 2 with the container carrier 4 and pushing out this bottle at the container outlet of the filling machine.

Das vorbeschriebene Füllverfahren ist beim drucklosen Kaltabfüllen (Abfüllen des Füllgutes im kalten Zustand bzw. bei Umgebungstemperatur) sowie auch beim drucklosen Heißabfüllen (heißes Füllgut), insbesondere auch bei einer ein Verkeimen verhindernden Temperatur grundsätzlich identisch.The above-described filling method is when pressure-free cold filling (Bottling of the contents in the cold state or at ambient temperature) as well as at pressureless hot filling (hot filling), especially at a germ-preventing temperature in principle identical.

Zur Aufrechterhaltung der Temperatur dieser Füllelemente während einer Unterbrechung des Füllprozesses wird bei geschlossenen Flüssigkeitsventilen 10 sämtlicher Füllelemente 3a einer Füllmaschine und bei geöffnetem Ventil 35 den einzelnen Füllelementen wiederum über die Leitung 9 heißes Füllgut aus dem Kessel 6 zugeführt, welches den Flüssigkeitskanal 8 sowie auch den Kanal 33 unter Öffnen des Rückschlagventils 34 durchströmt und über den Ringkanal 26 und die Leitung 34 an den Kessel 6 zurückgeführt wird. Dieser Umlauf des heißen flüssigen Füllgutes durch die Füllelemente 3a wird z. B. bei einer Unterbrechung des Füllprozesses und nach den Schließen sämtlicher Füllelemente 3a bzw. deren Flüssigkeitsventile automatisch gestartet, auf jeden Fall aber vor Wiederaufnahme des Füllprozesses durch Schließen des Ventils 36 unterbrochen. Der Ringkanal 26 bleibt mit dem Füllgut gefüllt.To maintain the temperature of these filling elements during an interruption of the filling process is closed with liquid valves 10 all filling elements 3a a filling machine and with the valve open 35 the individual filling elements in turn via the line 9 hot contents from the boiler 6 fed, which the liquid channel 8th as well as the canal 33 under opening the check valve 34 flows through and over the annular channel 26 and the line 34 to the kettle 6 is returned. This circulation of hot liquid filling material through the filling elements 3a is z. B. at an interruption of the filling process and after the closing of all filling elements 3a or their liquid valves started automatically, but in any case before resumption of the filling process by closing the valve 36 interrupted. The ring channel 26 remains filled with the contents.

Mit dem Rückschlagventil 34 ist verhindert, dass während des Füllens Füllgut aus dem Ringkanal 26 und über diesen aus anderen an den Ringkanal 26 angeschlossenen Füllelementen über das geöffnete Flüssigkeitsventil 10 in die jeweili ge Flasche 2 einfließt und dadurch das von dem Durchflussmesser 29 gesteuerte volumetrische Füllen der Flaschen 2 verfälscht.With the check valve 34 Prevents filling during filling from the annular channel 26 and over this from others to the ring channel 26 connected filling elements via the opened liquid valve 10 in the respective bottle 2 flows and thereby that of the flow meter 29 controlled volumetric filling of the bottles 2 falsified.

Für ein druckloses Kaltabfüllen wird durch geeignete Maßnahmen, beispielsweise durch eine Beaufschlagung des Ringkanals 26 mit dem Druck eines sterilen Druckmediums, beispielsweise mit steriler Druckluft oder mit dem Druck eines Inertgases oder einer sterilen Luft oder einer sterilen Flüssigkeit in der geschlossenen Stellung gehalten und sperrt damit die Verbindung zwischen dem Flüssigkeitskanal 8 und dem Ringkanal 26.For a pressureless cold filling is by suitable measures, for example by an admission of the annular channel 26 held in the closed position with the pressure of a sterile pressure medium, for example, with sterile compressed air or with the pressure of an inert gas or a sterile air or a sterile liquid and thus blocks the connection between the liquid channel 8th and the annular channel 26 ,

Die Erfindung wurde voranstehend an Ausführungsbeispielen beschrieben. Es versteht sich, dass Änderungen sowie Abwandlungen möglich sind, ohne dass dadurch der der Erfindung zugrunde liegende Erfindungsgedanke verlassen wird.The The invention has been described above with reference to exemplary embodiments. It is understood that changes as well as modifications are possible without thereby the inventive concept underlying the invention will leave.

1, 1a1, 1a
Füllsystemfilling system
22
Flaschebottle
2.12.1
Flaschenmündungbottle mouth
2.22.2
MündungsflanschMündungsflansch
3, 3a3, 3a
Füllelementfiller
44
Behälterträgercontainer carrier
55
Rotorrotor
66
Kesselboiler
7, 7a7, 7a
Gehäusecasing
88th
Flüssigkeitskanalliquid channel
99
Leitungmanagement
1010
Flüssigkeitsventilliquid valve
10.110.1
Ventilkörpervalve body
10.210.2
Ventilsitzvalve seat
1111
Abgabeöffnungdischarge opening
1212
Betätigungseinrichtungactuator
1313
Gasrohrgas pipe
1414
Gasraumheadspace
1515
verzweigter Kanalbranched channel
1616
Kanal mit Drosselchannel with throttle
1717
Kanalchannel
18, 19, 2018 19, 20
Steuerventilcontrol valve
2121
Kanalchannel
2222
Ringkanalannular channel
2323
Leitungmanagement
2424
Kanalchannel
2525
Steuerventilcontrol valve
2626
Ringkanalannular channel
2727
Kanalchannel
2828
Steuereinrichtungcontrol device
2929
DurchflussmesserFlowmeter
3030
Leitungmanagement
3131
Steuerventilcontrol valve
3232
gedrosselter Kanalthrottled channel
3333
Kanalchannel
3434
Rückschlagventilcheck valve
3535
Leitungmanagement
3636
Steuerventilcontrol valve
AA
Strömungsrichtungflow direction

Claims (22)

Füllsystem für ein Abfüllen eines flüssigen Füllgutes in Flaschen oder dergleichen Behälter (2), mit wenigstens einem Füllelement (3, 3a) mit einem in einem Füllelementgehäuse (7, 7a) ausgebildeten Produktraum oder Flüssigkeitskanal (8), der mit einem Kessel (6) für das Füllgut in Verbindung steht und an einer Unterseite des Füllelementes (3, 3a) eine Füllgutabgabe (11) bildet, über die das flüssige Füllgut dem jeweils zu füllenden, an einem Behälterträger (4) gehaltenen Behälter (2) zufließt, und mit einem im Flüssigkeitskanal (8) angeordneten Flüssigkeitsventil (10), dadurch gekennzeichnet, dass zum Beheizen oder Warmhalten des Füllelementes (3, 3a) während eines Heißabfüllens im Füllelementgehäuse (7, 7a) ein erster Strömungsweg (24, 27; 33) ausgebildet ist, der einen im Bezug auf die Strömungsrichtung des flüssigen Füllgutes im Flüssigkeitskanal (8) vor dem Flüssigkeitsventil (10) liegenden Teilabschnitt (8.1) des Flüssigkeitskanals (8) mit einem für mehrere Füllelemente (3, 3a) gemeinsamen Sammelkanal (26) verbindet, und dass wenigstens ein Steuerventil (25, 36) vorgesehen ist, und zwar zur Steuerung des Flusses eines heißen flüssigen Füllgutes aus dem Kessel (6) durch den Teilabschnitt (8.1) und den ersten Strömungsweg in den ersten Sammelkanal (26).Filling system for filling a liquid filling material into bottles or similar containers ( 2 ), with at least one filling element ( 3 . 3a ) with a in a Füllelementgehäuse ( 7 . 7a ) formed product space or liquid channel ( 8th ), with a boiler ( 6 ) is in communication with the contents and at an underside of the filling element ( 3 . 3a ) a Füllgutabgabe ( 11 ) forms over which the liquid product to be filled in each case, on a container carrier ( 4 ) ( 2 ) and with one in the liquid channel ( 8th ) arranged liquid valve ( 10 ), characterized in that for heating or keeping warm the filling element ( 3 . 3a ) during hot filling in the filler housing ( 7 . 7a ) a first flow path ( 24 . 27 ; 33 ) is formed, the one with respect to the flow direction of the liquid filling material in the liquid channel ( 8th ) in front of the liquid valve ( 10 ) subsection ( 8.1 ) of the liquid channel ( 8th ) with one for several filling elements ( 3 . 3a ) common collection channel ( 26 ) and that at least one control valve ( 25 . 36 ) is provided, namely for controlling the flow of a hot liquid filling material from the boiler ( 6 ) through the subsection ( 8.1 ) and the first flow path into the first collection channel ( 26 ). Füllsystem nach Anspruch 1, dadurch gekennzeichnet, dass das wenigstens eine erste Steuerventil (25) im ersten Strömungsweg (24, 27) vorgesehen ist.Filling system according to claim 1, characterized in that the at least one first control valve ( 25 ) in the first flow path ( 24 . 27 ) is provided. Füllsystem nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass das wenigstens eine erste Steuerventil (36) in einer an die erste Sammelkammer (26) angeschlossenen Leitung (35) zum Abführen, beispielsweise zum Rückführen des Füllgutes an den Kessel (6) vorgesehen ist.Filling system according to claim 1 or 2, characterized in that the at least one first control valve ( 36 ) in a to the first collection chamber ( 26 ) connected line ( 35 ) for discharging, for example for returning the filling material to the boiler ( 6 ) is provided. Füllsystem nach Anspruch 3, dadurch gekennzeichnet, dass bei einer Füllmaschine mit mehreren Füllelementen (3a) das erste Steuerventil (36) für sämtliche Füllelemente der Füllmaschine oder aber für eine Gruppe von mehreren Füllelementen (3a) gemeinsam vorgesehen ist.Filling system according to claim 3, characterized in that in a filling machine with a plurality of filling elements ( 3a ) the first control valve ( 36 ) for all filling elements of the filling machine or for a group of several filling elements ( 3a ) is provided jointly. Füllsystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass in dem ersten Strömungsweg (33) ein Rückschlagventil (34) vorgesehen ist, welches für eine Strömung aus dem Flüssigkeitskanal (8) des Füllelementes (3a) in den ersten Sammelkanal (26) öffnet und für eine Strömung in entgegen gesetzter Richtung sperrt.Filling system according to one of the preceding claims, characterized in that in the first flow path ( 33 ) a check valve ( 34 ), which is suitable for a flow out of the liquid channel ( 8th ) of the filling element ( 3a ) in the first collection channel ( 26 ) opens and blocks for a flow in the opposite direction. Füllsystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der erste Strömungsweg (24, 27; 33) in unmittelbarer Nähe des Flüssigkeitsventils (10) oder eines Ventilsitzes (10.2) des Flüssigkeitsventils (10) in den Flüssigkeitskanal (8) mündet.Filling system according to one of the preceding claims, characterized in that the first flow path ( 24 . 27 ; 33 ) in the immediate vicinity of the liquid valve ( 10 ) or a valve seat ( 10.2 ) of the liquid valve ( 10 ) in the liquid channel ( 8th ) opens. Füllsystem nach einem der vorhergehenden Ansprüche, gekennzeichnet durch einen Rückgaskanal (13, 14), der beim Füllen mit dem Innenraum des in Dichtlage gegen das Füllelement (3, 3a) angeordneten Behälters in Verbindung steht, durch wenigstens einen zweiten, sowie dritten, im Gehäuse (7, 7a) des Füllelementes (3, 3a) ausgebildeten Strömungsweg (15, 16, 21; 15, 21, 32), der den Rückgaskanal (13, 14) mit einer zweiten, für mehrere Füllelemente (3, 3a) gemeinsamen Sammelkammer (22) verbindet, sowie durch wenigstens ein Steuerventil (18, 19; 31) zum gesteuerten Verbinden des Rückgaskanals (13, 14) mit dem zweiten Sammelkanal (22) über den zweiten Strömungsweg (15, 21) und/oder über den dritten, gedrosselten Strömungsweg (16, 21; 32, 21).Filling system according to one of the preceding claims, characterized by a return gas channel ( 13 . 14 ), which when filling with the interior of the in sealing position against the filling element ( 3 . 3a ) arranged in connection, by at least a second, and third, in the housing ( 7 . 7a ) of the filling element ( 3 . 3a ) formed flow path ( 15 . 16 . 21 ; 15 . 21 . 32 ), which the return gas channel ( 13 . 14 ) with a second, for a plurality of filling elements ( 3 . 3a ) common collection chamber ( 22 ), and by at least one control valve ( 18 . 19 ; 31 ) for controlled connection of the return gas channel ( 13 . 14 ) with the second collection channel ( 22 ) via the second flow path ( 15 . 21 ) and / or via the third, throttled flow path ( 16 . 21 ; 32 . 21 ). Füllsystem nach Anspruch 7, dadurch gekennzeichnet, dass im zweiten Strömungsweg (15, 21) ein zweites Steuerventil (18, 31) vorgesehen ist.Filling system according to claim 7, characterized in that in the second flow path ( 15 . 21 ) a second control valve ( 18 . 31 ) is provided. Füllsystem nach Anspruch 7 oder 8, dadurch gekennzeichnet, dass im dritten Strömungsweg (16, 21) ein drittes Steuerventil (19) vorgesehen ist.Filling system according to claim 7 or 8, characterized in that in the third flow path ( 16 . 21 ) a third control valve ( 19 ) is provided. Füllsystem nach einem der Ansprüche 7–9, dadurch gekennzeichnet, dass über den dritten, gedrosselten Strömungsweg (21, 32) eine ständige Verbindung mit dem Rückgaskanal (13, 14) besteht.Filling system according to one of claims 7-9, characterized in that via the third, throttled flow path ( 21 . 32 ) a permanent connection with the return gas channel ( 13 . 14 ) consists. Füllsystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der Rückgaskanal von dem Kanal eines beidendig offenen Gasrohres (13) gebildet ist, dessen unteres Ende beim Füllen mit dem Innenraum des Behälters (2) und dessen oberes Ende mit dem zweiten und dritten Strömungsweg in Verbindung steht, beispielsweise über einen im Gehäuse (7, 7a) des Füllelementes (3, 3a) ausgebildeten Gasraum (14).Filling system according to one of the preceding claims, characterized in that the return gas channel from the channel of a gas pipe open at both ends ( 13 ) is formed, whose lower end when filling with the interior of the container ( 2 ) and whose upper end communicates with the second and third flow paths, for example via a housing (in 7 . 7a ) of the filling element ( 3 . 3a ) formed gas space ( 14 ). Füllsystem nach einem der vorhergehenden Ansprüche, gekennzeichnet durch einen vierten, im Gehäuse (7) des Füllelementes (3) ausgebildeten Strömungsweg (16, 24), zwischen dem Rückgaskanal (13, 14) und dem ersten Sammelkanal (26) sowie durch ein in diesem Strömungsweg angeordnetes viertes Steuerventil (20), über welches im geöffneten Zustand eine Verbindung zwischen dem Rückgaskanal (13, 14) und dem ersten Sammelkanal (26) besteht.Filling system according to one of the preceding claims, characterized by a fourth, in the housing ( 7 ) of the filling element ( 3 ) formed flow path ( 16 . 24 ), between the return gas channel ( 13 . 14 ) and the first collection channel ( 26 ) and by a fourth control valve arranged in this flow path ( 20 ), via which in the open state, a connection between the return gas channel ( 13 . 14 ) and the first collection channel ( 26 ) consists. Füllsystem nach Anspruch 12, dadurch gekennzeichnet, dass der vierte Strömungsweg ein gedrosselter Strömungsweg ist.filling system according to claim 12, characterized in that the fourth flow path a restricted flow path is. Füllsystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass für ein druckloses Füllen der zweite Sammelkanal (22) mit der Atmosphäre und/oder mit einem im Kessel (6) ausgebildeten Gasraum (6.1) in Verbindung steht.Filling system according to one of the preceding claims, characterized in that for a non-pressurized filling of the second collecting channel ( 22 ) with the atmosphere and / or with one in the boiler ( 6 ) formed gas space ( 6.1 ). Füllsystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass das drucklose Kalt- oder Heißfüllen bei ständig geöffnetem dritten Steuerventil (19) erfolgt.Filling system according to one of the preceding claims, characterized in that the non-pressurized cold or hot filling with constantly open third control valve ( 19 ) he follows. Füllsystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass für ein Druckfüllen das viertem Steuerventil (20) ständig geöffnet ist.Filling system according to one of the preceding claims, characterized in that for a pressure filling the fourth control valve ( 20 ) is constantly open. Füllsystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass für ein Druckfüllen das erste sowie dritte Steuerventil (25, 19) ständig geschlossen sind.Filling system according to one of the preceding claims, characterized in that for a pressure filling the first and third control valve ( 25 . 19 ) are constantly closed. Füllsystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass für ein Druckfüllen bei mit dem Füllgut teilgefülltem Kessel (6) und bei einem unter Fülldruck stehenden Inertgas, beispielsweise CO2-Gas in einem Gasraum (6.1) des Kessels (6) und in dem mit diesem Gasraum (6.1) verbundenen zweiten Sammelkanal (22) ein Vorspannen der in Dichtlage gegen das Füllelement (3) anliegenden Behälter (2) über den Rückgaska nal (13, 14) durch Öffnen des zweiten Steuerventils (18) erfolgt, und zwar bei als Rückgassammelkanal dienendem ersten Sammelkanal (26).Filling system according to one of the preceding claims, characterized in that for a pressure filling at partially filled with the medium boiler ( 6 ) and an inert gas under filling pressure, for example CO2 gas in a gas space ( 6.1 ) of the boiler ( 6 ) and in which with this gas space ( 6.1 ) second collecting channel ( 22 ) preloading the in sealing position against the filling element ( 3 ) adjacent containers ( 2 ) over the Rückgaska valley ( 13 . 14 ) by opening the second control valve ( 18 ) takes place, namely at serving as return gas collection channel first collecting channel ( 26 ). Füllsystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass beim Druckfüllen für ein Schnellfüllen das zweite Steuerventil (18) geöffnet und für ein Langsamfüllen geschlossen wird.Filling system according to one of the preceding claims, characterized in that during pressure filling for fast filling the second control valve ( 18 ) is opened and closed for slow filling. Füllsystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass bei einer Füllmaschine mit mehreren Füllelementen (3) das erste sowie das vierte Steuerventil (25, 20) sämtlicher Füllelemente oder einer Gruppe von mehreren Füllelementen gemeinsam steuerbar sind.Filling system according to one of the preceding claims, characterized in that in a filling machine with a plurality of filling elements ( 3 ) the first and the fourth control valve ( 25 . 20 ) of all filling elements or a group of several filling elements are jointly controllable. Füllsystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass bei einer Füllmaschine mit mehreren Füllelementen sämtliche Füllelemente für ein druckloses Füllen durch Öffnen des dritten Steuerventils (19) bzw. für ein Druckfüllen durch Öffnen des vierten Steuerventils (20) gemeinsam konfigurierbar sind.Filling system according to one of the preceding claims, characterized in that in a filling machine with a plurality of filling elements all filling elements for a non-pressurized filling by opening the third control valve ( 19 ) or for a pressure filling by opening the fourth control valve ( 20 ) are jointly configurable. Füllsystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der erste und zweite Sammelkanal (26, 22) an einem Rotor (5) einer Füllmaschine vorgesehen sind.Filling system according to one of the preceding claims, characterized in that the first and second collecting channel ( 26 . 22 ) on a rotor ( 5 ) are provided a filling machine.
DE102007014702.5A 2007-03-23 2007-03-23 Filling system for hot filling Expired - Fee Related DE102007014702B4 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
DE102007014702.5A DE102007014702B4 (en) 2007-03-23 2007-03-23 Filling system for hot filling
SI200831918T SI2132130T1 (en) 2007-03-23 2008-03-13 Filling system for hot-filling
PCT/EP2008/002013 WO2008116564A2 (en) 2007-03-23 2008-03-13 Filling system for hot-filling
EP08716510.6A EP2132130B1 (en) 2007-03-23 2008-03-13 Filling system for hot-filling
US12/564,499 US20100071802A1 (en) 2007-03-23 2009-09-22 Filling system for hot filling of beverage bottles or containers in a bottle or container filling plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102007014702.5A DE102007014702B4 (en) 2007-03-23 2007-03-23 Filling system for hot filling

Publications (2)

Publication Number Publication Date
DE102007014702A1 true DE102007014702A1 (en) 2008-09-25
DE102007014702B4 DE102007014702B4 (en) 2017-03-30

Family

ID=39713214

Family Applications (1)

Application Number Title Priority Date Filing Date
DE102007014702.5A Expired - Fee Related DE102007014702B4 (en) 2007-03-23 2007-03-23 Filling system for hot filling

Country Status (5)

Country Link
US (1) US20100071802A1 (en)
EP (1) EP2132130B1 (en)
DE (1) DE102007014702B4 (en)
SI (1) SI2132130T1 (en)
WO (1) WO2008116564A2 (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102317197A (en) * 2009-02-13 2012-01-11 S.I.P.A.工业设计自动化合伙股份有限公司 Hot filling system for bottles
WO2012013255A1 (en) * 2010-07-28 2012-02-02 Khs Gmbh Filling machine
FR2977249A1 (en) * 2011-07-01 2013-01-04 Serac Group PACKAGING INSTALLATION COMPRISING FILLING BITS EQUIPPED WITH CONNECTING DUCTING PIPES
ITTO20111234A1 (en) * 2011-12-29 2013-06-30 Sidel Spa Con Socio Unico FILLING DEVICE AND ITS CONTROL METHOD
EP2386518B1 (en) * 2010-05-12 2014-05-21 Krones AG Filling device
CN107226445A (en) * 2017-06-27 2017-10-03 江苏新美星包装机械股份有限公司 A kind of packaging process
WO2018046149A1 (en) * 2016-09-12 2018-03-15 Krones Ag Bottling plant for heat-treating and bottling a liquid
EP3663255A1 (en) * 2018-12-05 2020-06-10 Krones Ag Device and method for filling a filling product into a container to be filled in a beverage filling system
FR3104550A1 (en) * 2019-12-16 2021-06-18 Serac Group Filling station for packaging installation including a filling spout with integrated suction channel
FR3104549A1 (en) * 2019-12-16 2021-06-18 Serac Group Packaging installation comprising filling spouts connected to return pipes

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2893605B1 (en) * 2005-11-23 2007-12-28 Serac Group Soc Par Actions Si PACKAGING INSTALLATION COMPRISING FILLING BITS EQUIPPED WITH CONNECTING DUCTING PIPES
DE102007009435A1 (en) * 2007-02-23 2008-08-28 Khs Ag Method for filling bottles or the like container with a liquid product under counter pressure and filling machine for performing this method
DE102009016084A1 (en) * 2009-04-03 2011-05-12 Khs Gmbh Filling element for filling containers with a liquid product, filling machine and method for filling containers
DE102010024522A1 (en) * 2010-06-21 2011-12-22 Khs Gmbh Method and filling element for pressure filling of containers with a liquid product
DE102010027512A1 (en) * 2010-07-16 2012-01-19 Khs Gmbh Filling element, method and filling system for filling containers
DE102011114690A1 (en) * 2011-10-04 2013-04-04 Khs Gmbh Method for controlling a filling system and filling system
DE102011120372A1 (en) * 2011-12-07 2013-06-13 Khs Gmbh Filling element and filling system
ITTO20120240A1 (en) * 2012-03-19 2013-09-20 Sidel Spa Con Socio Unico FILLING DEVICE
US11014696B2 (en) * 2017-07-12 2021-05-25 Vanrx Pharmasystems Inc. Purgeable pharmaceutical fill needle
US10479536B2 (en) * 2012-09-17 2019-11-19 Portland Outdoors, Llc System, methods and apparatus for urine collection and storage
US10846975B2 (en) 2015-03-23 2020-11-24 Fountain Master, Llc Fluid filling station
DE102018126303B4 (en) * 2018-10-23 2021-03-11 Khs Gmbh Filling system for filling containers with a liquid product as well as filling machine
IT202000013456A1 (en) * 2020-06-05 2021-12-05 Kosme Srl Unipersonale FILLING UNIT FOR FILLING TWO DIFFERENT TYPES OF CONTAINERS WITH A LIQUID SUBSTANCE, IN PARTICULAR WITH A BEVERAGE
IT202000013465A1 (en) 2020-06-05 2021-12-05 Kosme Srl Unipersonale MACHINE FOR FILLING CONTAINERS OF TWO DIFFERENT TYPES WITH A LIQUID SUBSTANCE, IN PARTICULAR WITH A DRINK
IT202000013447A1 (en) * 2020-06-05 2021-12-05 Kosme Srl Unipersonale FILLING UNIT FOR FILLING CONTAINERS OF TWO DIFFERENT TYPES WITH A LIQUID SUBSTANCE, IN PARTICULAR WITH A BEVERAGE
IT202000013450A1 (en) * 2020-06-05 2021-12-05 Kosme Srl Unipersonale FILLING UNIT FOR FILLING TWO DIFFERENT TYPES OF CONTAINERS WITH A LIQUID SUBSTANCE, IN PARTICULAR WITH A BEVERAGE

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19836500A1 (en) 1998-08-12 2000-02-17 Khs Masch & Anlagenbau Ag Filling system
DE10061401A1 (en) * 2000-12-09 2002-06-13 Khs Masch & Anlagenbau Ag Method and appliance for filling containers comprise filler elements, liquid path, and control valves
DE20105716U1 (en) 2001-03-30 2002-05-29 Krones Ag Container filling machine
DE102004004331B3 (en) * 2004-01-29 2005-09-15 Khs Maschinen- Und Anlagenbau Ag Process for hot filling of a liquid filling material into bottles or the like container and filling machine for carrying out the method
DE102007014701A1 (en) * 2007-03-23 2008-09-25 Khs Ag Filling system for pressureless hot filling
DE102007022259A1 (en) * 2007-05-09 2009-01-15 Khs Ag Filling system and method for controlling a filling system
DE102007024106B4 (en) * 2007-05-22 2009-12-03 Khs Ag filling system
DE102007058047A1 (en) * 2007-11-30 2009-06-10 Khs Ag Method and device for filling liquids
DE102008057752A1 (en) * 2008-11-17 2010-05-20 Khs Ag Filling element and filling system with such a filling element

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102317197A (en) * 2009-02-13 2012-01-11 S.I.P.A.工业设计自动化合伙股份有限公司 Hot filling system for bottles
CN102317197B (en) * 2009-02-13 2014-06-04 S.I.P.A.工业设计自动化合伙股份有限公司 Hot filling system for bottles
EP2386518B1 (en) * 2010-05-12 2014-05-21 Krones AG Filling device
WO2012013255A1 (en) * 2010-07-28 2012-02-02 Khs Gmbh Filling machine
CN103025642A (en) * 2010-07-28 2013-04-03 Khs有限责任公司 Filling machine
CN103025642B (en) * 2010-07-28 2014-09-24 Khs有限责任公司 Filling machine
US9302895B2 (en) 2010-07-28 2016-04-05 Khs Gmbh Filling machine
FR2977249A1 (en) * 2011-07-01 2013-01-04 Serac Group PACKAGING INSTALLATION COMPRISING FILLING BITS EQUIPPED WITH CONNECTING DUCTING PIPES
WO2013004524A1 (en) * 2011-07-01 2013-01-10 Serac Group Packaging equipment including filling nozzles provided with pipes for placing the nozzle body in a loop
US9561945B2 (en) 2011-07-01 2017-02-07 Serac Group Bottling installation including filler spouts fitted with feed-back ducts from the spout bodies
ITTO20111234A1 (en) * 2011-12-29 2013-06-30 Sidel Spa Con Socio Unico FILLING DEVICE AND ITS CONTROL METHOD
EP2610210A1 (en) * 2011-12-29 2013-07-03 Sidel S.p.a. Con Socio Unico Contactless filling device and control method thereof
US11000052B2 (en) 2016-09-12 2021-05-11 Krones Ag Filling line for heat-treating and filling a liquid into containers
WO2018046149A1 (en) * 2016-09-12 2018-03-15 Krones Ag Bottling plant for heat-treating and bottling a liquid
CN107226445B (en) * 2017-06-27 2019-04-19 江苏新美星包装机械股份有限公司 A kind of packaging process
CN107226445A (en) * 2017-06-27 2017-10-03 江苏新美星包装机械股份有限公司 A kind of packaging process
US11370646B2 (en) 2018-12-05 2022-06-28 Krones Ag Device and method for filling a fill product into a container to be filled in a beverage bottling plant
EP3663255A1 (en) * 2018-12-05 2020-06-10 Krones Ag Device and method for filling a filling product into a container to be filled in a beverage filling system
DE102018131077A1 (en) * 2018-12-05 2020-06-10 Krones Ag Device and method for filling a filling product into a container to be filled in a beverage filling system
CN111268615A (en) * 2018-12-05 2020-06-12 克朗斯公司 Device and method for filling a filling product into a container to be filled
FR3104550A1 (en) * 2019-12-16 2021-06-18 Serac Group Filling station for packaging installation including a filling spout with integrated suction channel
WO2021122433A1 (en) * 2019-12-16 2021-06-24 Serac Group Filling spout having a return line
WO2021122435A1 (en) * 2019-12-16 2021-06-24 Serac Group Filling nozzle comprising a suction channel
FR3104549A1 (en) * 2019-12-16 2021-06-18 Serac Group Packaging installation comprising filling spouts connected to return pipes
US11891291B2 (en) 2019-12-16 2024-02-06 Serac Group Filling spout having a return line
US11897746B2 (en) 2019-12-16 2024-02-13 Serac Group Filling nozzle comprising a suction channel

Also Published As

Publication number Publication date
DE102007014702B4 (en) 2017-03-30
SI2132130T1 (en) 2018-03-30
US20100071802A1 (en) 2010-03-25
EP2132130B1 (en) 2018-01-24
WO2008116564A3 (en) 2009-01-15
WO2008116564A2 (en) 2008-10-02
EP2132130A2 (en) 2009-12-16

Similar Documents

Publication Publication Date Title
DE102007014702B4 (en) Filling system for hot filling
EP2129613B1 (en) Filling system for unpressurized hot filling
EP2162382B1 (en) Filling system
EP1692071B1 (en) Filling element for a filling machine and filling machine provided with filling elements of this type
EP1584601B1 (en) Filling machine of the rotary type
EP1580160B1 (en) Filling head for counter pressure filling and free jet filling
EP2146922B1 (en) Filling system and method for controlling a filling system
EP2162383B1 (en) Method for filling bottles or similar containers, and filling system
EP2125600B1 (en) Method for filling bottles or similar containers with a liquid product under counterpressure and filling machine for carrying out this method
EP2279149B1 (en) Method and filling system for filling bottles or similar containers with a liquid product
DE102004004331B3 (en) Process for hot filling of a liquid filling material into bottles or the like container and filling machine for carrying out the method
EP2598429B1 (en) Filling machine
DE19818762A1 (en) Filling system and filling element
DE102008030948A1 (en) Filling system for filling bottles or similar containers and filling machine
EP2882678A1 (en) Multiple filling element for a filling system or a filling machine and filling machine
DE102007014639A1 (en) Free-jet filling system with weighing unit
DE102019135257A1 (en) Device for filling a container with a filling product
DE102016112369A1 (en) Method for filling containers
EP2314538B1 (en) Device and method for loss-free filling of continuously mixed products in containers
EP3838838A1 (en) Device and method for filling a container with a filling product
EP2958850A1 (en) Filling system
DE202012007517U1 (en) Multiple filling element for a filling system or a filling machine and filling machine
DE102012015962A1 (en) Filling machine for filling containers with liquid product, has fillers that are intended to be mounted on underside of rotor for supplying liquid filling in ring boiler
DE102013101813A1 (en) Filling system for filling e.g. bottles with beverage, has gas path control valve comprising outer gas path and attached at respective non-controlled gas path of filling elements of respective pairs of filling locations

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
8127 New person/name/address of the applicant

Owner name: KHS GMBH, 44143 DORTMUND, DE

R016 Response to examination communication
R018 Grant decision by examination section/examining division
R020 Patent grant now final
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee