DE102006044790B4 - Bridge with two trussed discs and kit for their production - Google Patents

Bridge with two trussed discs and kit for their production Download PDF

Info

Publication number
DE102006044790B4
DE102006044790B4 DE200610044790 DE102006044790A DE102006044790B4 DE 102006044790 B4 DE102006044790 B4 DE 102006044790B4 DE 200610044790 DE200610044790 DE 200610044790 DE 102006044790 A DE102006044790 A DE 102006044790A DE 102006044790 B4 DE102006044790 B4 DE 102006044790B4
Authority
DE
Germany
Prior art keywords
sheets
bridge according
bridge
diagonals
straps
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE200610044790
Other languages
German (de)
Other versions
DE102006044790A1 (en
Inventor
Thomas Stihl
Johann Matuschek
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEH Engineering GmbH
Original Assignee
Eiffel Deutschland Stahltechnologie GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Eiffel Deutschland Stahltechnologie GmbH filed Critical Eiffel Deutschland Stahltechnologie GmbH
Priority to DE200610044790 priority Critical patent/DE102006044790B4/en
Priority to EP07017648A priority patent/EP1905900A3/en
Publication of DE102006044790A1 publication Critical patent/DE102006044790A1/en
Application granted granted Critical
Publication of DE102006044790B4 publication Critical patent/DE102006044790B4/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D6/00Truss-type bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D15/00Movable or portable bridges; Floating bridges
    • E01D15/12Portable or sectional bridges
    • E01D15/133Portable or sectional bridges built-up from readily separable standardised sections or elements, e.g. Bailey bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Brücke mit wenigstens zwei fachwerkartig ausgebildeten Scheiben, die aus profilierten Untergurten (7), Obergurten (17) und diese verbindenden Diagonalen (10) zusammengesetzt sind, und mit die Scheiben verbindenden profilierten Querträgern (14, 14a), die der Auflage von begehbaren oder befahrbaren Planken (22) dienen, dadurch gekennzeichnet, dass die Unter- und Obergurte (7, 17) je zwei einander gegenüber stehende Bleche (1) mit in deren Längsrichtung (x-Richtung) verlaufenden Aufnahmen (4) enthalten, die Diagonalen (10) mit ihren Enden jeweils zwischen den beiden Blechen (1) eines Unter- oder Obergurts (7, 17) angeordnet sind und die Verbindung der Diagonalen (10) mit den Unter- und Obergurten (7, 17) mit Hilfe von in die Aufnahmen (4) eingelegten, der Versteifung der Bleche (1) dienenden Formstücken (5) erfolgt.Bridge with at least two truss-like discs that profiled from Lower straps (7), upper straps (17) and these connecting diagonals (10) are assembled, and profiled with the discs connecting crossbeams (14, 14a), the edition of walkable or passable planks (22) serve, characterized in that the lower and upper straps (7, 17) two opposite each other standing sheets (1) with in the longitudinal direction (x-direction) extending Recordings (4) contain the diagonals (10) with their ends each between the two sheets (1) of a lower or upper belt (7, 17) are arranged and the connection of the diagonal (10) with the Lower and upper straps (7, 17) with the help of in the shots (4) inserted, the stiffening of the sheets (1) serving fittings (5) takes place.

Figure 00000001
Figure 00000001

Description

Die Erfindung betrifft eine Brücke der im Oberbegriff des Anspruchs 1 angegebenen Gattung und einen Bausatz zu deren Herstellung.The The invention relates to a bridge the type specified in the preamble of claim 1 and a Kit for their production.

Brücken mit fachwerkartig ausgebildeten Wänden oder Scheiben sind in vielfältiger Form bekannt und werden auch kurz als "Fachwerkbrücken" bezeichnet (z. B. "Lueger Lexikon der Technik", Bd. 10, S. 409 und 410, Deutsche Verlags-Anstalt GmbH, Stuttgart, 1966). Die einzelnen Scheiben bestehen im Fall von einfachen Strebenfachwerken aus Stäben in Form von Untergurten, Obergurten und diese verbindenden Diagonalen (Streben), deren Enden mit sog. Binde- oder Knotenblechen miteinander verbunden sind. Zusätzlich können derartige Scheiben zur Bildung von Pfostenfachwerken mit vertikalen Pfosten versehen werden. Weiterhin weisen derartige Brücken Querträger auf, die einerseits zur Verbindung von zwei parallelen Scheiben und andererseits zur Anbringung von begehbaren oder befahrbaren Planken od. dgl. dienen. Schließlich sind Brücken der beschriebenen Art meistens noch mit sog. Verbänden, insbesondere Windverbänden versehen, die zur Aufnahme von Seitenkräften dienen.Bridges with Truss-like walls or slices are in more diverse Form known and are also referred to as "truss bridge" (eg, "Lueger Lexicon of Technology", Vol 10, p 409 and 410, Deutsche Verlagsanstalt GmbH, Stuttgart, 1966). The single ones In the case of simple strut trusses, slices consist of bars in the form of lower girths, upper girths and these connecting diagonals (struts), whose ends are connected with so-called binding or gusset plates are. additionally can such discs to form post trusses with vertical posts be provided. Furthermore, such bridges have cross members on the one hand to Connection of two parallel discs and on the other hand for attachment of walkable or drivable planks od. Like. Serve. Finally are bridges Of the type described mostly with so-called. Associations, in particular wind associations provided, which serve to receive lateral forces.

Brücken dieser Art eignen sich insbesondere im militärischen Bereich oder bei Naturkatastrophen (Erdbeben, Überschwemmungen od. dgl.) zur schnellen Überspannung von Hindernissen in Form von Bombentrichtern oder anderen Bodenöffnungen, Schluchten, Flüssen od. dgl. im Zuge von Straßen oder Wegen, d. h. zur Überwindung von vergleichsweise kurzen Hindernissen mit Längen bis zu z. B. 20 m. Bisherige Brückenbauwerke für diese Zwecke sind vergleichsweise schwer, sofern ihre Einzelteile aus üblichen Bauteilen und nicht unter Aufwendung hoher Kosten aus mit Kohlefasern od. dgl. verstärkten Leichtbaukunststoffen, Leichtmetallen wie Titan od. dgl. hergestellt werden. Einer bloßen Reduzierung der Materialstärken sind wegen der dann bestehenden Knick-, Beul- und Kippneigung Grenzen gesetzt. Es ist daher in der Regel erforderlich, die einzelnen Brückenbauteile oder auch die komplett vorgefertigten Brücken mittels Tiefladern od. dgl. an den jeweiligen Einbauort zu transportieren und dort mit Hilfe von Kränen zusammenzusetzen oder zu errichten. Das ist umständlich und in unzugänglichen Gegenden wegen fehlender oder schlechter Transportwege häufig unmöglich.Bridges of this Species are particularly suitable in the military field or in natural disasters (earthquakes, floods od. Like.) For fast overvoltage obstacles in the form of bomb craters or other floor openings, canyons, rivers od. Like. In the course of roads or Because, d. H. to overcome from relatively short obstacles with lengths up to z. B. 20 m. Previous bridges for this Purposes are comparatively difficult, provided their items from usual Components and not at high cost with carbon fibers od. Like. Reinforced Lightweight plastics, light metals such as titanium od. Like. Made become. A mere one Reduction of material thicknesses are limits because of the then existing buckling, buckling and tilting tendency set. It is therefore usually required, the individual bridge components or the completely prefabricated bridges by means of low loaders od. Like. To transport to the respective installation site and there with the help of cranes to assemble or to build. That's awkward and inaccessible Areas often impossible because of missing or bad transport routes.

Ausgehend davon liegt der Erfindung das technische Problem zugrunde, eine Brücke der eingangs bezeichneten Gattung in Leichtbauweise so herzustellen, dass sie zumindest bis zu einer Länge von z. B. 20 m und im komplett vormontierten Zustand bei Bedarf auch mit Luftfahrzeugen, insbesondere Transporthubschraubern, an den Einbauort gebracht und dort in der erforderlichen, das jeweilige Hindernis überspannenden Weise platziert werden kann. Außerdem bezweckt die Erfindung die Schaffung eines zur Herstellung einer solchen Brücke geeigneten Bausatzes. Dabei sollen außerdem Standardmaterialien aus Stahl und keine speziellen Leichtbaumaterialien zur Anwendung kommen.outgoing thereof, the invention is based on the technical problem, a bridge the type described in lightweight construction so to produce that they at least up to a length of z. B. 20 m and in complete preassembled state, if necessary, even with aircraft, in particular Transport helicopters, brought to the installation site and there in the necessary, placed the respective obstacle way can be. Furthermore The purpose of the invention is to provide a device for producing a such bridge suitable kit. It should also standard materials made of steel and no special lightweight materials for use come.

Zur Lösung dieses Problems dienen die kennzeichnenden Merkmale der Ansprüche 1 und 22.to solution This problem is served by the characterizing features of claims 1 and 22.

Durch die erfindungsgemäße Anwendung von Blechen mit in Längsrichtung verlaufenden Aufnahmen bzw. Sicken und in diese eingelegten, übliche Binde- oder Knotenbleche ersetzenden Formstücken wird es trotz Anwendung extrem dünner Bleche möglich, Brücken mit hoher Tragfähigkeit herzustellen. Werden z. B. die Unter- und Obergurte sowie die Querträger aus Blechen mit Sigma- oder U-förmigen Querschnitten verwendet, kann bereits mit einer Blechdicke von ca. 3 mm eine hohe Steifigkeit mit ausreichender Knick-, Beul- und Kippfestigkeit erzielt werden. Außerdem ist die Herstellung der Brücke preisgünstig, da nur einfache, kalt umgeformte Profile aus Stahl verwendet werden können. Eine zur Überbrückung von z. B. 20 m breiten Öffnungen geeignete Fachwerkbrücke lässt sich auf diese Weise mit einem Gesamtgewicht von nur ca. 5800 kg herstellen.By the application of Sheet metal in the longitudinal direction extending seats or beads and in this inserted, usual binding or gusset replacing fittings it is despite application extremely thin sheets possible, bridges with high load capacity manufacture. Are z. B. the lower and upper straps and the cross member Sheets with sigma or U-shaped cross sections used, can already with a sheet thickness of about 3 mm a high Stiffness can be achieved with sufficient buckling, buckling and Kippfestigkeit. Furthermore the production of the bridge is cheap, since only simple, cold formed steel profiles are used can. One for bridging z. B. 20 m wide openings suitable truss bridge let yourself produce in this way with a total weight of only about 5800 kg.

Weitere vorteilhafte Merkmale der Erfindung ergeben sich aus den Unteransprüchen.Further advantageous features of the invention will become apparent from the dependent claims.

Die Erfindung wird nachfolgend in Verbindung mit den beiliegenden, in unterschiedlichen Maßstäben dargestellten Zeichnungen an Ausführungsbeispielen näher erläutert.The The invention will be described below in conjunction with the appended, in represented by different scales Drawings on exemplary embodiments explained in more detail.

Es zeigen:It demonstrate:

1 ein bevorzugtes Blechprofil zur Herstellung von Unter- und Obergurten sowie Querträgern einer erfindungsgemäßen Brücke in einer Vorderansicht; 1 a preferred sheet metal profile for the production of lower and upper straps and cross members of a bridge according to the invention in a front view;

2 und 3 Seitenansichten des Blechprofils nach 1; 2 and 3 Side views of the sheet profile after 1 ;

4 bis 6 je eine Vorderansicht und zwei Seitenansichten eines erfindungsgemäßen Formstücks; 4 to 6 depending on a front view and two side views of a molded piece according to the invention;

7 und 8 je eine Stirnansicht und eine Seitenansicht eines als Diagonale und Pfosten verwendbaren Stabs der erfindungsgemäßen Brücke; 7 and 8th each an end view and a side view of a usable as a diagonal and post rod of the bridge according to the invention;

9 und 10 in je einer Vorderansicht und Seitenansicht schematisch die Verbindung eines Pfostens nach 7 und 8 mit zwei Blechen nach 1 bis 3 zur Bildung eines Unter- oder Obergurts; 9 and 10 in each case a front view and side view schematically the connection of a post to 7 and 8th with two sheets to 1 to 3 to form a lower or upper girth;

11 und 12 in je einer Vorderansicht und Seitenansicht schematisch die Ver bindung von zwei entsprechend 7 und 8 ausgebildeten Diagonalen mit zwei Blechen nach 1 bis 3 zur Bildung eines Untergurts unter zusätzlicher Anwendung eines Formstücks nach 4 bis 6; 11 and 12 in each case a front view and side view schematically the Ver binding of two accordingly 7 and 8th trained diagonals with two sheets after 1 to 3 for forming a lower chord with additional application of a fitting 4 to 6 ;

13 und 14 in je einer Vorder- und Seitenansicht schematisch die Verbindung eines Pfostens mit zwei Blechen nach 1 bis 3 zur Bildung eines Querträgers; 13 and 14 in a front and side view schematically the connection of a post with two sheets after 1 to 3 for forming a cross member;

15 und 16 in perspektivischer Darstellung und schematisch je einen Pfosten mit zwei am unteren bzw. oberen Ende angebrachten Formstücken nach 4 bis 6; 15 and 16 in perspective and schematically each post with two attached to the lower and upper end fittings after 4 to 6 ;

17 schematisch die Verbindung der entsprechend 1 bis 3 ausgebildeten Bleche eines Untergurts mit zwei Diagonalen und einem Pfosten im Bereich einer Stoßstelle; 17 schematically the connection of the corresponding 1 to 3 trained sheets of a bottom strap with two diagonals and a post in the region of a joint;

18 eine erfindungsgemäße, aus den Bauteilen und mit den Verbindungen nach 1 bis 17 zusammengesetzte Leichtbau-Brücke in einer perspektivischen Ansicht; 18 an inventive, from the components and with the compounds according to 1 to 17 composite lightweight bridge in a perspective view;

19 die Befestigung von Windverbandstäben der Brücke nach 18 mit den beiden Blechen eines Querträgers nach 13 und 14; 19 the attachment of Windverbandstäben the bridge after 18 with the two sheets of a cross member after 13 and 14 ;

20 schematisch die Verbindung eines Untergurts, einer Diagonale und eines Querträgers an einem Ende der Brücke nach 18 durch eine spezielle Konsole; 20 schematically the connection of a lower chord, a diagonal and a cross member at one end of the bridge 18 through a special console;

21 eine Vorderansicht der Brücke nach 18 mit auf die Querträger aufgelegten Fahrbahn-Planken und zwischen diesen angeordneten Gitterrosten; 21 a front view of the bridge behind 18 with laid on the cross member roadway planks and between these arranged gratings;

22 eine perspektivische Ansicht der Brücke entsprechend 18, jedoch mit einer aufgelegten Fahrbahn mit Planken gemäß 21; und 22 a perspective view of the bridge accordingly 18 , but with an attached carriageway with planks according to 21 ; and

23 einen Endabschnitt der Brücke nach 22 mit zusätzlich aufgelegten Auffahr-Rampen. 23 an end portion of the bridge after 22 with additional ramps.

Nachfolgend werden zunächst die Einzelteile einer erfindungsgemäßen, in 18 dargestellten Brücke und deren Verbindungen untereinander näher erläutert. Ein in 1 bis 3 dargestelltes Blech 1 besitzt, wie insbesondere 1 zeigt, einen im wesentlichen sigma- bzw. Σ-förmigen Querschnitt. Parallel zu einer Längsachse 2 kann das Blech 1 z. B. eine Länge l von ca. 4000 mm, quer dazu eine Breite b von z. B. 170 mm und quer zur Länge l und Breite b eine Höhe h von ca. 60 mm aufweisen. Das Blech 1 enthält außerdem zwei in derselben Ebene liegende Seitenstege 1a, einen dazu parallelen, jedoch in einer zurückgesetzten zweiten Ebene liegenden Mittelsteg 1b und zwei schräg verlaufende, den Mittelsteg 1b mit den beiden Seitenstegen 1a verbindende Übergangsabschnitte 1c. An den seitlichen Enden ist das Blech 1 vorzugsweise um ca. 90° in Richtung des Mittelstegs 1b abgekantet, um je einen die Steifigkeit erhöhenden Flansch 1d auszubilden, der am freien Ende nochmals um 90° nach innen abgekantet sein kann, um Endabschnitte 1e auszubilden, die die Steifigkeit noch weiter vergrößern. Die Dicke des Blechs 1 beträgt vorzugsweise 0,5 mm bis 10 mm mit besonderem Vorzug 1 mm bis 5 mm. Das Blech 1 ist im übrigen ein z. B. durch kalte Umformung erhaltenes Stahlblech.Subsequently, the individual parts of an inventive, in 18 illustrated bridge and their connections with each other explained in more detail. An in 1 to 3 illustrated sheet metal 1 owns, in particular 1 shows a substantially sigma or Σ-shaped cross-section. Parallel to a longitudinal axis 2 can the sheet 1 z. B. a length l of about 4000 mm, across a width b of z. B. 170 mm and across the length l and width b have a height h of about 60 mm. The sheet 1 also contains two sidebars in the same plane 1a , a middle web lying parallel thereto but lying in a recessed second plane 1b and two sloping, the Mittelsteg 1b with the two side bars 1a connecting transitional sections 1c , At the side ends is the sheet metal 1 preferably by about 90 ° in the direction of the center bar 1b folded to one each increasing the rigidity flange 1d form, which can be bent at the free end again by 90 ° inwards to end sections 1e form, which increase the rigidity even further. The thickness of the sheet 1 is preferably 0.5 mm to 10 mm, with particular preference 1 mm to 5 mm. The sheet 1 is otherwise a z. B. obtained by cold forming steel sheet.

Der zurückgesetzte Mittelsteg 1b und die beiden Übergangsabschnitte 1c begrenzen eine rückseitige Aufnahme bzw. Sicke 4 (1), die parallel zur Längsachse 2 über das ganze Blech 1 durchgehend ausgebildet ist.The recessed center bar 1b and the two transitional sections 1c limit a back shot or bead 4 ( 1 ) parallel to the longitudinal axis 2 over the whole sheet metal 1 is formed throughout.

Die Bleche 1 können mit identischen Abmessungen zur Herstellung von Unter- und Obergurten einer erfindungsgemäßen Brücke verwendet werden, wie weiter unten näher erläutert ist. Außerdem können sie zur Herstellung von Querträgern der Brücke dienen, in welchem Fall sie z. B. eine Länge von 3700 mm und eine Breite von z. B. 300 mm bei sonst im wesentlichen gleichen Abmessungen aufweisen.The sheets 1 can be used with identical dimensions for the production of lower and upper straps of a bridge according to the invention, as explained in more detail below. In addition, they can serve for the production of cross members of the bridge, in which case they z. B. a length of 3700 mm and a width of z. B. 300 mm with otherwise substantially the same dimensions.

Nach 4 bis 6 enthält ein erfindungsgemäßes Formstück 5 einen vorzugsweise trapezförmigen Querschnitt. Mit besonderem Vorteil erhält das im Vergleich zu 1 bis 4 geringfügig vergrößert dargestellte Formstück 5 eine solche Form und Größe, dass es genau in die Aufnahme 4 passt. Es enthält daher eine ebene Oberseite 5a, deren Breite der Breite der Innenfläche des Mittelstegs 1b entspricht, eine ebene Unterseite 5b, deren Breite im wesentlichen dem Abstand der beiden Seitenstege 1a voneinander entspricht, und eine im wesentlichen der Höhe der Ausnehmung 4 entsprechende Dicke von z. B. 26 mm. Allerdings kann die Dicke des Formstücks 5 auch etwas größer sein, als der Höhe der Aufnahme 4 entspricht. Die Oberseite 5a ist außerdem durch Schrägflächen 5c mit der Unterseite 5b verbunden, die vorzugsweise unter denselben Winkeln zu den Seiten 5a, 5b angeordnet sind, wie dies auch für die Übergangsabschnitte 1c des Blechs 1 relativ zu deren Seiten- und Mittelstegen 1a, 1b gilt. Die Länge der Formstücke 5 ist so gewählt, dass diese die weiter unten beschriebenen Befestigungen ermöglichen.To 4 to 6 contains a molded piece according to the invention 5 a preferably trapezoidal cross-section. This is particularly advantageous when compared to 1 to 4 slightly enlarged illustrated fitting 5 Such a shape and size that it is exactly in the picture 4 fits. It therefore contains a flat top 5a whose width is the width of the inner surface of the central web 1b corresponds, a level base 5b whose width is substantially the distance between the two side bars 1a corresponds to each other, and a substantially the height of the recess 4 corresponding thickness of z. B. 26 mm. However, the thickness of the fitting can be 5 also be slightly larger than the height of the shot 4 equivalent. The top 5a is also by inclined surfaces 5c with the bottom 5b connected, preferably at the same angles to the sides 5a . 5b are arranged, as well as for the transition sections 1c of the sheet 1 relative to their side and middle bars 1a . 1b applies. The length of the fittings 5 is chosen so that they allow the fixings described below.

7 und 8 zeigen ein Rohr 6 mit rechteckigem Querschnitt, das mit einer Länge von z. B. 2200 mm als Pfosten und mit einer Länge von z. B. ca. 2900 mm als Diagonale für die noch zu beschreibende Brücke verwendet werden kann. Die Rechteckseiten können z. B. 140 mm·80 mm (Pfosten) oder 80 mm·90 mm (Diagonale) betragen. Die Wandstärke der Rohre 6 beträgt z. B. ca. 4 mm. 7 and 8th show a pipe 6 with a rectangular cross-section, with a length of z. B. 2200 mm as a post and with a length of z. B. 2900 mm can be used as a diagonal for the bridge to be described. The rectangle sides can z. 140 mm x 80 mm (post) or 80 mm x 90 mm (diagonal). The wall thickness of the pipes 6 is z. B. about 4 mm.

9 und 10 zeigen eine bevorzugte Ausgestaltung eines Untergurts 7. Dieser besteht aus zwei parallel zueinander angeordneten Blechen 1, die von wenigstens einem zwischen diesen angeordneten, aus einem Rohr 6 bestehenden Pfosten 8 voneinander beabstandet sind. Im fertigen Zustand der Brücke ist vorzugsweise der Untergurt 7 horizontal und der Pfosten 8 vertikal angeordnet, obwohl die Brücke insgesamt auch schräg angeordnet werden könnte. Die feste Verbindung der beiden Bleche 1 des Untergurts 7 wird mit Hilfe der Pfosten 8 und mit Hilfe von nur schematisch angedeuteten, den Pfosten 8 und die Seitenstege 1a der Bleche 1 durchsetzenden Schrauben 9 und auf diese aufgedrehten Mutter erhalten. 9 and 10 show a preferred embodiment of a lower belt 7 , This consists of two mutually parallel sheets 1 arranged by at least one between them, from a tube 6 existing posts 8th spaced apart from each other. In the finished state of the bridge is preferably the lower flange 7 horizontal and the post 8th arranged vertically, although the bridge could also be arranged obliquely. The firm connection of the two sheets 1 of the lower leg 7 is using the posts 8th and with the help of only schematically indicated, the post 8th and the side bars 1a the sheets 1 passing through screws 9 and get on this mother turned up.

Die Befestigung von aus den Rohren 6 bestehenden Diagonalen 10 an den Untergurten 7 erfolgt entsprechend 11 und 12 dadurch, dass die Diagonalen 10 wie die Pfosten 8 (9) zwischen den beiden Blechen 1 des Untergurts 7 angeordnet werden. An der Befestigungsstelle wird allerdings vorher je ein Füllstück 5 nach 4 bis 6 in die Aufnahmen 4 (1) eingelegt, die zu diesem Zweck vorzugsweise nach innen hin offen, d. h. mit ihren Öffnungen einander zugewandt sind. Das untere Ende der in 12 linken Diagonale 10 wird dann mit Hilfe von Schrauben 11, die die Diagonale 10, die Formstücke 5 und die Mittelstege 1b der Bleche 1 durchragen, und auf diese aufgedrehten Mutter mit den linken Teilen der Formstücke 5 verbunden. In entsprechender Weise wird die in 10 rechte Diagonale 10 mit Hilfe der rechten Teile der Formstücke 5 am Untergurt 7 befestigt.The attachment of from the pipes 6 existing diagonals 10 at the lower girths 7 takes place accordingly 11 and 12 in that the diagonals 10 like the posts 8th ( 9 ) between the two sheets 1 of the lower leg 7 to be ordered. At the attachment point, however, before ever a filler 5 to 4 to 6 in the recordings 4 ( 1 ), which are for this purpose preferably inwardly open, ie with their openings facing each other. The lower end of the in 12 left diagonal 10 is then done with the help of screws 11 that the diagonal 10 , the fittings 5 and the Mittelstege 1b the sheets 1 protrude, and on this nut turned up with the left parts of the fittings 5 connected. In a similar way, the in 10 right diagonal 10 with the help of the right parts of the fittings 5 at the bottom strap 7 attached.

13 und 14 zeigen eine bevorzugte Ausbildung und Befestigung eines Querträgers 14 an einem Untergurt 7. Der Querträger 14 wird analog zum Untergurt 7 aus zwei Blechen 1 zusammengesetzt, wobei die Öffnungen der Aufnahmen 4 einander zugewandt sind (14). Die Montage der Querträger 14 erfolgt mit Hilfe von Pfosten 8, die zwischen den beiden Blechen 1 angeordnet und mit deren Seitenstegen 1a durch weitere Schrauben 15 verbunden sind, die die Rohre 8 und die Seitenstege 1a der Bleche 1 durchragen und mit nicht dargestellten Muttern gesichert sind. 13 and 14 show a preferred embodiment and attachment of a cross member 14 on a lower chord 7 , The crossbeam 14 becomes analogous to the lower chord 7 from two sheets 1 assembled, with the openings of the shots 4 facing each other ( 14 ). The assembly of the cross members 14 done with the help of posts 8th between the two sheets 1 arranged and with their side bars 1a through additional screws 15 connected to the pipes 8th and the side bars 1a the sheets 1 protrude and secured with nuts, not shown.

In den anhand der 9 bis 14 beschriebenen Fällen stellen die Pfosten 8 und die Diagonalen 10 gleichzeitig Abstandhalter für die beiden einen Untergurt 7 bildenden Bleche 1 dar.In the basis of the 9 to 14 cases described make the posts 8th and the diagonals 10 at the same time spacer for the two a lower flange 7 forming sheets 1 represents.

Die Obergurte einer noch zu beschreibenden Brücke werden wie die Untergurte 7 aus den Blechen 1 hergestellt und wie die Untergurte 7 mit den Diagonalen 10 und/oder den Pfosten 8 verbunden, so dass eine erneute Beschreibung dieser Verbindungen nicht erforderlich ist.The upper straps of a bridge to be described become like the lower girths 7 from the sheets 1 made and like the lower straps 7 with the diagonals 10 and / or the post 8th connected, so that a re-description of these compounds is not required.

Grundsätzlich ist es möglich, eine Brücke bereits mit den anhand der 1 bis 8 und 11 bis 14 beschriebenen Teilen, d. h. ohne die Pfosten 8 zu errichten. Eine aus den Untergurten 7, entsprechenden Obergurten und den Diagonalen 10 gebildete Scheibe ist dann nach Art eines sog. Strebenfachwerks ausgebildet, bei dem die Diagonalen 10 zickzackförmig zwischen den Unter- und Obergurten verlaufen. Bevorzugt werden jedoch zusätzlich die Pfosten 8 verwendet, um ein Pfostenfachwerk zu schaffen, bei dem zwischen je zwei Diagonalen 10 ein Pfosten 8 eingebaut ist.Basically it is possible to use a bridge already with the basis of 1 to 8th and 11 to 14 parts described, ie without the posts 8th to build. One from the lower chords 7 , corresponding upper straps and diagonals 10 formed disc is then formed in the manner of a so-called. Strut framework, in which the diagonals 10 zigzag between the lower and upper straps. However, in addition, the posts are preferred 8th used to create a mullion with two diagonals each 10 a post 8th is installed.

Für den Fall, dass die Pfosten 8 gewünscht sind, wird jeder Pfosten 8 vorzugsweise bereits vor dem Zusammenbau einer Brücke fest mit zwei Formstücken 5 versehen, die quer zu seiner Achse angeordnet sind. Die Formstücke 5 werden dabei abwechselnd an den unteren und oberen Enden der Pfosten 8 befestigt, wie in 15 und 16 angedeutet ist. Außerdem wird jeder Pfosten 8 jeweils an zwei diametral gegenüber liegenden Rechteckseiten und derart mit je einem Formstück 5 versehen, dass rechts und links von den Pfosten 8 ausreichend lange Abschnitte 5d und 5e der Formstücke 5 vorhanden sind, um die Diagonalen 10 in der aus 11 ersichtlichen Weise anschließen zu können. Es ist dann lediglich erforderlich, die Bleche 1 von beiden Seiten her mit ihren Aufnahmen 4 auf die Formstücke 5 aufzusetzen, wodurch sich einerseits automatisch die richtige Lage der Bleche 1 relativ zu den Pfosten 8 ergibt, andererseits dadurch aber auch die Lage der Diagonalen 10 relativ zu den Pfosten 8 und dem Unter- bzw. Obergurt festgelegt wird.In the event that the posts 8th each post is desired 8th preferably already before the assembly of a bridge fixed with two fittings 5 provided, which are arranged transversely to its axis. The fittings 5 are alternately at the lower and upper ends of the posts 8th attached, as in 15 and 16 is indicated. In addition, every post will 8th in each case on two diametrically opposite sides of the rectangle and thus each with a shaped piece 5 provided that right and left of the posts 8th Sufficiently long sections 5d and 5e the fittings 5 are present to the diagonals 10 in the out 11 be able to connect apparent manner. It is then only necessary, the sheets 1 from both sides with their recordings 4 on the fittings 5 put on, on the one hand automatically the correct position of the sheets 1 relative to the posts 8th but also the position of the diagonals 10 relative to the posts 8th and the lower or upper chord is determined.

Die Verbindungen von zwei Diagonalen 10 am Untergurt 7 und zwei Formstücken 5, die an einem unteren Ende eines Pfostens 8 befestigt ist, ist schematisch in 17 dargestellt. Der einzige Unterschied im Vergleich zu 11 und 12 besteht darin, dass zwischen den beiden einander benachbarten Enden von zwei Diagonalen 10 noch je einer der Pfosten 8 zu liegen kommt. Dieser wird ungeachtet der Tatsache, dass im Gegensatz zu 9 und 10 zwei Formstücke 5 an dem Pfosten 8 befestigt sind, mittels der Schrauben 9 befestigt, die nur den Pfosten 8 und die Seitenstege 1a der Bleche 1 durchragen.The connections of two diagonals 10 at the bottom strap 7 and two fittings 5 at a lower end of a post 8th attached is schematically in 17 shown. The only difference compared to 11 and 12 is that between the two adjacent ends of two diagonals 10 one more post each 8th to come to rest. This is despite the fact that unlike 9 and 10 two fittings 5 at the post 8th are fastened, by means of screws 9 attached, only the post 8th and the side bars 1a the sheets 1 project through.

In entsprechender Weise kann die Befestigung der Diagonalen 10 mit Hilfe eines Formstücks 5 erfolgen, das entsprechend 16 am oberen Ende eines Pfostens 8 befestigt ist.Similarly, the attachment of the diagonal 10 with the help of a fitting 5 done accordingly 16 at the top of a post 8th is attached.

17 zeigt außerdem die Verbindung von zwei in der Längsrichtung 2 aufeinander folgenden Untergurten 7a und 7b. Hierzu werden die beiden einander zugewandten Enden der Untergurte 7a und 7b jeweils längs einer Mittelebene 16 der Pfosten 8 gegeneinander gelegt und dann in der anhand der 9 und 10 beschriebenen Weise mit Schrauben 9a bzw. 9b mit dem Pfosten 8 verbunden. Die Befestigung kann daher im Stoßbereich zumindest teilweise auch durch die Formstücke 5 hindurch erfolgen 17 also shows the connection of two in the longitudinal direction 2 successive lower chords 7a and 7b , For this purpose, the two mutually facing ends of the lower chords 7a and 7b each along a median plane 16 the post 8th placed against each other and then in the basis of the 9 and 10 described manner with screws 9a respectively. 9b with the post 8th connected. The attachment can therefore in the joint area at least partially by the fittings 5 through

18 zeigt eine aus den beschriebenen Teilen hergestellte Leichtbau-Brücke. Sie enthält zwei im Abstand der Querträger 14 parallel angeordnete Scheiben, die einerseits eine Mehrzahl von in Längsrichtung 2 hintereinander angeordneten, entsprechend 17 mittels Pfosten 8 miteinander verbundenen Untergurten 7 und andererseits eine Mehrzahl von entsprechend ausgebildeten und angeordneten Obergurten 17 enthält, die mit einem der Länge der Pfosten 8 entsprechenden Abstand parallel oberhalb der Untergurte 7 angeordnet sind. Im Ausführungsbeispiel enthält jede Scheibe fünf Untergurte 7 und vier Obergurte 17, neun Pfosten 8 und zehn Diagonalen 10, und beide Scheiben sind durch elf Querträger 14 miteinander verbunden, von denen zwei als Endträger 14a ausgebildet sind. Die Unter- und Obergurte 7 bzw. 17 und die Querträger 14, 14a sind aus je zwei einander gegenüberstehenden Blechen 1 gemäß 1 bis 3 gebildet (vgl. auch 9 bis 14), die mit Hilfe der Formstücke 5 nach 4 bis 6 überall dort versteift sind, wo die Diagonalen 10 oder die mit den Formstücken 5 versehenen Pfosten 8 angeschlossen werden. 18 shows a lightweight bridge made from the described parts. It contains two at a distance from the cross member 14 parallel discs, on the one hand a plurality of longitudinally 2 arranged one behind the other, accordingly 17 by means of posts 8th interconnected lower straps 7 and on the other hand, a plurality of correspondingly formed and arranged upper chords 17 Contains that with one of the length of the posts 8th corresponding distance parallel above the lower chords 7 are arranged. In the embodiment, each disc contains five lower straps 7 and four upper straps 17 , nine posts 8th and ten diagonals 10 , and both discs are through eleven crossbeams 14 interconnected, two of which as the end carrier 14a are formed. The lower and upper straps 7 respectively. 17 and the crossbeams 14 . 14a are each made of two opposing sheets 1 according to 1 to 3 formed (see also 9 to 14 ), with the help of the fittings 5 to 4 to 6 are everywhere stiffened where the diagonals 10 or with the fittings 5 provided posts 8th be connected.

Sind die Formstücke 5, wie dies bei dem bisher für am besten gehaltenen Ausführungsbeispiel der Fall ist, in Richtung der Hauptkrafteinleitung formschlüssig in den Aufnahmen 4 angeordnet, dann ergibt sich außerdem der wesentliche Vorteil, dass zumindest die von den Diagonalen 10 übertragenen Kräfte überwiegend über diesen Formschluss und nicht allein über die Lochleibungen der Schraublöcher auf die Unter- und Obergurte übertragen werden, was die Standzeit der Brücke wesentlich vergrößert. Außerdem sind keine üblichen Binde- und Knotenbleche erforderlich. Dabei wird als Richtung der Hauptkrafteinleitung die z-Achse eines gedachten Koordinatensystems (18) verstanden, dessen x-Achse parallel zur Längsrichtung 2 der Brücke bzw. der Unter- und Obergurte 7, 17 und dessen y-Achse parallel zu den Querträgern 14, 14a verläuft. Schließlich erfolgt die Krafteinleitung bei der erfindungsgemäßen Brücke so, dass sich die Achsen der verschiedenen Stäbe (Ober- und Untergurte, Pfosten und Diagonalen) nicht wie bei üblichen Fachwerken in einem Punkt der Formstücke 5 treffen, sondern auf unterschiedliche Punkte verteilt sind, wie 12 und 17 zeigen.Are the fittings 5 , as is the case in the hitherto considered best embodiment, in the direction of the main force introduction form fit in the recordings 4 arranged, then there is also the significant advantage that at least that of the diagonals 10 transmitted forces are transmitted predominantly on this positive engagement and not only on the bearing holes of the screw holes on the lower and upper straps, which significantly increases the service life of the bridge. In addition, no usual binding and gusset plates are required. The direction of the main force introduction is the z-axis of an imaginary coordinate system ( 18 ), whose x-axis is parallel to the longitudinal direction 2 the bridge or the lower and upper straps 7 . 17 and its y-axis parallel to the cross members 14 . 14a runs. Finally, the introduction of force in the bridge according to the invention takes place so that the axes of the various bars (upper and lower chords, posts and diagonals) not at a point of the fittings as in conventional trusses 5 but are distributed on different points, like 12 and 17 demonstrate.

Die Verbindung der Bleche 1, der Formstücke 5, der Pfosten 8 und der Diagonalen 10 erfolgt bei der Brücke nach 18 auf die anhand der 9 bis 17 beschriebene Weise. Dabei wird der Zusammenbau der verschiedenen Teile vorzugsweise fortschreitend vom einen bis zum anderen Ende der Brücke vorgenommen.The connection of the sheets 1 , the mold pieces 5 , the post 8th and the diagonal 10 takes place at the bridge 18 on the basis of the 9 to 17 described way. The assembly of the various parts is preferably carried out progressively from one to the other end of the bridge.

Zur Aufnahme von Seitenkräften, insbesondere Windlasten, kann die Brücke nach 18 zusätzlich mit üblichen Verbandsstäben 18 versehen werden, die z. B. aus Flachstahlelementen bestehen, die mit Spannschlössern versehen sind. Die einen Enden dieser Verbandsstäbe 18 werden z. B. gemäß 19 an Platten 19 befestigt, die ihrerseits auf mittleren Abschnitten der Querträger 14, 14a aufliegen und mit den unteren Flanschen 1d (1 und 14) von deren Blechen 1 verbunden sind. Die anderen Enden der Verbandsstäbe 18 sind dagegen z. B. mit denselben Schrauben 11 (11 und 12) an den Untergurten 7 befestigt, die auch zur Befestigung der Formstücke 5 an diesen dienen.To absorb side forces, especially wind loads, the bridge can 18 in addition with usual bandages 18 be provided, the z. B. consist of flat steel elements, which are provided with turnbuckles. The one ends of these bandages 18 be z. B. according to 19 on plates 19 attached, in turn, on middle sections of the cross member 14 . 14a rest and with the lower flanges 1d ( 1 and 14 ) of their sheets 1 are connected. The other ends of the bandages 18 are z. B. with the same screws 11 ( 11 and 12 ) on the lower straps 7 attached, which is also used to attach the fittings 5 serve on these.

An den beiden Enden der Brücke können die Untergurte 7 an speziellen Auflagerkonsolen 20 (20) befestigt werden. Diese dienen auch zur Befestigung der endseitigen Querträger 14a (18).At the two ends of the bridge can the lower straps 7 on special support consoles 20 ( 20 ) are attached. These also serve to attach the end cross member 14a ( 18 ).

21 zeigt schematisch eine in Richtung der gedachten x-Achse (18) auf einen Querträger 14. Dieser ist mit zwei Paaren von Klemmwinkeln 21 versehen, die auf den oberen Flanschen 1d der zugehörigen Bleche 1 befestigt sind und zum Einlegen von Planken 22 dienen, die als Fuß- oder Fahrweg benutzt werden können. Zwischen den Planken 22 frei bleibende, in x-Richtung verlaufende Spalte können mit Gitterrosten 23 abgedeckt sein. 21 schematically shows a in the direction of the imaginary x-axis ( 18 ) on a cross member 14 , This one is with two pairs of clamp angles 21 provided on the upper flanges 1d the associated sheets 1 are attached and to insert planks 22 serve, which can be used as a foot or track. Between the planks 22 free-standing, running in the x-direction column can with gratings 23 be covered.

Eine fertige und einsatzbereite, insgesamt als Trogbrücke gestaltete Brücke gemäß der Erfindung ist in 22 dargestellt, aus der auch ersichtlich ist, dass beidseitig der Gitterroste 23 je zwei nebeneinander liegende Planken 22 an der Bildung des Fuß- oder Fahrwegs beteiligt sein können.A finished and ready to use, designed as a trough bridge overall bridge according to the invention is in 22 shown, from which it is also apparent that both sides of the gratings 23 two adjacent planks each 22 be involved in the formation of the footpath or driveway.

23 zeigt zusätzliche, an den Enden der Brücke angebrachte Auffahr-Rampen 24. Diese Auffahr-Rampen 24 können wie die Planken 22 aus Leichtbaumaterialien wie Aluminium, Holz, GFK, CFK od. dgl. hergestellt sein und beispielsweise in dem die Brücke transportierenden Hubschrauber mitgeführt oder separat an den Einbauort gebracht werden. 23 shows additional ramps attached to the ends of the bridge 24 , These ramps 24 can like the planks 22 be made of lightweight materials such as aluminum, wood, fiberglass, CFK od. Like. And be carried for example in the transporting the bridge helicopter or brought separately to the installation.

Die Erfindung ist nicht auf das beschriebene Ausführungsbeispiel beschränkt, das auf vielfache Weise abgewandelt werden kann. Das gilt zunächst für die aus 1 bis 3 ersichtliche Profilierung der Bleche 1. Alternativ können auch z. B. Bleche vorgesehen sein, die zumindest im Bereich der Aufnahmen 4 U-förmige Querschnitte haben, in welchem Fall die Formstücke 5 zweckmäßig rechteckige statt, wie in 4 gezeigt ist, trapezförmige Querschnitte aufweisen. Weiter ist klar, dass die beschriebenen Teile mit vorgefertigten Bohrungen für die verschiedenen Schrauben 9, 11 und 15 versehen werden könnten, wobei die jeweiligen Lochmuster weitgehend frei wählbar sind. Anstelle der beschriebenen Schraubverbindungen können für den Fall, dass eine nachträgliche Demontage der Brücke nicht erforderlich ist, auch Schweiß-, Klebe- oder Nietverbindungen vorgesehen werden. Weiter kann es zweckmäßig sein, die Enden der Formstücke 5 und die mit ihnen verbundenen Enden der Diagonalen 10 abzuschrägen, um überflüssiges Material zu vermeiden. Weiterhin lässt sich die Erfindung in analoger Weise auf Brücken mit mehr als zwei Scheiben ausdehnen, falls dies aus Gewichtsgründen vertretbar ist. Möglich wäre es bei Bedarf ferner, die beiden Bleche eines Unter- oder Obergurts zusätzlich mit eingefügten Abstandhaltern zu versehen, insbesondere wenn es sich um Strebenfachwerke handelt und die einzelnen Bleche 1 relativ lang sind. Weiter kann es vorteilhaft sein, die Endquerträger 14a auf ihren Oberseiten mit nicht dargestellten Auflagen für die zusätzlichen Auffahr-Rampen 24 zu versehen und diese Auflagen so zu gestalten, dass die zusätzli chen Auffahr-Rampen 24 unabhängig davon an den endseitigen Querträgern 14a montiert werden können, ob die an die Brücke anschließende Fahrbahn ansteigend oder abfallend verläuft. Schließlich versteht sich, dass die verschiedenen Merkmale auch in anderen als den beschriebenen und dargestellten Kombinationen angewendet werden können.The invention is not limited to the described embodiment, which can be modified in many ways. That applies first of all to the 1 to 3 apparent profiling of the sheets 1 , Alternatively, z. B. sheets be provided, at least in the field of shots 4 U-shaped cross-sections have, in which case the fittings 5 expedient rectangular instead, as in 4 is shown to have trapezoidal cross sections. Next, it is clear that the parts described with prefabricated holes for the various screws 9 . 11 and 15 could be provided, the respective hole pattern are largely freely selectable. Instead of the described screw connections, welding, adhesive or riveted connections can be provided in the event that a subsequent disassembly of the bridge is not required. Further, it may be appropriate, the ends of the fittings 5 and the ends of the diagonals connected to them 10 beveled to avoid unnecessary material. Furthermore, the invention can be extended in an analogous manner to bridges with more than two panes, if this is justifiable for weight reasons. It would also be possible, if necessary, in addition to provide the two sheets of a lower or upper belt with inserted spacers, especially when it comes to strut trusses and the individual sheets 1 are relatively long. Further, it may be advantageous, the end cross member 14a on their tops with not shown pads for the additional ramps 24 To provide and these conditions so that the addi tional ramps 24 regardless of the end-side cross members 14a can be mounted, whether the road adjacent to the bridge rising or falling runs. Finally, it is understood that the various features may be applied in combinations other than those described and illustrated.

Claims (25)

Brücke mit wenigstens zwei fachwerkartig ausgebildeten Scheiben, die aus profilierten Untergurten (7), Obergurten (17) und diese verbindenden Diagonalen (10) zusammengesetzt sind, und mit die Scheiben verbindenden profilierten Querträgern (14, 14a), die der Auflage von begehbaren oder befahrbaren Planken (22) dienen, dadurch gekennzeichnet, dass die Unter- und Obergurte (7, 17) je zwei einander gegenüber stehende Bleche (1) mit in deren Längsrichtung (x-Richtung) verlaufenden Aufnahmen (4) enthalten, die Diagonalen (10) mit ihren Enden jeweils zwischen den beiden Blechen (1) eines Unter- oder Obergurts (7, 17) angeordnet sind und die Verbindung der Diagonalen (10) mit den Unter- und Obergurten (7, 17) mit Hilfe von in die Aufnahmen (4) eingelegten, der Versteifung der Bleche (1) dienenden Formstücken (5) erfolgt.Bridge with at least two truss-like discs consisting of profiled lower straps ( 7 ), Upper girths ( 17 ) and these connecting diagonals ( 10 ) and profiled cross beams connecting the disks ( 14 . 14a ), the circulation of walk-in or drive-on planks ( 22 ), characterized in that the lower and upper straps ( 7 . 17 ) each two opposing plates ( 1 ) with in the longitudinal direction (x-direction) extending images ( 4 ), the diagonals ( 10 ) with their ends between the two sheets ( 1 ) of a lower or upper girth ( 7 . 17 ) and the connection of the diagonals ( 10 ) with the lower and upper straps ( 7 . 17 ) with the help of in the recordings ( 4 ) inserted, the stiffening of the sheets ( 1 ) serving fittings ( 5 ) he follows. Brücke nach Anspruch 1, dadurch gekennzeichnet, dass die Aufnahmen (4) durch Mittelstege (1b) und an diese angrenzende Übergangsabschnitte (1c) der Bleche (1) gebildet sind.Bridge according to claim 1, characterized in that the recordings ( 4 ) by Mittelstege ( 1b ) and adjoining transition sections ( 1c ) of the sheets ( 1 ) are formed. Brücke nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass die Bleche (1) der Unter- und Obergurte (7, 17) zumindest im Bereich der Aufnahmen (4) einen im wesentlichen sigma- oder U-förmigen Querschnitt aufweisen.Bridge according to claim 1 or 2, characterized in that the sheets ( 1 ) of the lower and upper straps ( 7 . 17 ) at least in the area of recordings ( 4 ) have a substantially sigma or U-shaped cross-section. Brücke nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass die Diagonalen (10) aus Vierkantrohren (6) bestehen.Bridge according to one of claims 1 to 3, characterized in that the diagonals ( 10 ) made of square tubes ( 6 ) consist. Brücke nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass die Formstücke (5) in Belastungsrichtung (z-Richtung) formschlüssig in den Aufnahmen (4) angeordnet sind.Bridge according to one of claims 1 to 4, characterized in that the shaped pieces ( 5 ) in the loading direction (z-direction) positively in the recordings ( 4 ) are arranged. Brücke nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass die Aufnahmen (4) der beiden Bleche (1) eines Unter- oder Obergurts (7, 17) aufeinander zugewandten Seiten offen sind.Bridge according to one of claims 1 to 5, characterized in that the recordings ( 4 ) of the two sheets ( 1 ) of a lower or upper girth ( 7 . 17 ) are open to each other facing sides. Brücke nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass die Formstücke (5) wenigstens eine Dicke aufweisen, die einer sowohl senkrecht zur x-Richtung als auch senkrecht zur z-Richtung gemessenen Höhe (y-Richtung) der Aufnahmen (4) entspricht.Bridge according to one of claims 1 to 6, characterized in that the shaped pieces ( 5 ) have at least one thickness which corresponds to a height (y direction) of the recordings measured perpendicular to the x-direction as well as perpendicular to the z-direction ( 4 ) corresponds. Brücke nach Anspruch 7, dadurch gekennzeichnet, dass die Querträger (14, 14a) aus je zwei einander gegenüber stehenden, profilierten Blechen (1) bestehen.Bridge according to claim 7, characterized in that the transverse beams ( 14 . 14a ) of two opposing, profiled sheets ( 1 ) consist. Brücke nach Anspruch 8, dadurch gekennzeichnet, dass die Bleche (1) im wesentlichen sigma- oder U-förmige Querschnitte aufweisen.Bridge according to claim 8, characterized in that the sheets ( 1 ) have substantially sigma or U-shaped cross-sections. Brücke nach Anspruch 8 oder 9, dadurch gekennzeichnet, dass zumindest die Bleche (1) der Untergurte (7) und der Querträger (14, 14a) mit seitlichen Flanschen (1d) versehen sind.Bridge according to claim 8 or 9, characterized in that at least the sheets ( 1 ) of the lower straps ( 7 ) and the cross member ( 14 . 14a ) with side flanges ( 1d ) are provided. Brücke nach Anspruch 10, dadurch gekennzeichnet, dass die Querträger (14, 14a) auf den Untergurten (7) aufliegen und mittels der Flansche (1d) mit diesen verbunden sind.Bridge according to claim 10, characterized in that the transverse beams ( 14 . 14a ) on the lower chords ( 7 ) and by means of the flanges ( 1d ) are connected to these. Brücke nach einem der Ansprüche 1 bis 11, dadurch gekennzeichnet, dass sie zusätzlich mit Pfosten (8) versehen ist.Bridge according to one of claims 1 to 11, characterized in that it additionally comprises posts ( 8th ) is provided. Brücke nach Anspruch 12, dadurch gekennzeichnet, dass die Pfosten (8) an zwischen den Enden von zwei benachbarten Diagonalen (10) befindlichen Stellen und wie die Diagonalen (10) jeweils zwischen den beiden Blechen (1) eines Unter- oder Obergurts (7, 17) angeordnet sind.Bridge according to claim 12, characterized in that the posts ( 8th ) between the ends of two adjacent diagonals ( 10 ) and like the diagonals ( 10 ) between the two sheets ( 1 ) of a lower or upper girth ( 7 . 17 ) are arranged. Brücke nach Anspruch 12 oder 13, dadurch gekennzeichnet, dass die Pfosten (8) aus Vierkantrohren (6) bestehen.Bridge according to claim 12 or 13, characterized in that the posts ( 8th ) made of square tubes ( 6 ) consist. Brücke nach einem der Ansprüche 1 bis 14, dadurch gekennzeichnet, dass die Querträger (14, 14a) auf den Untergurten (7) aufliegen und den Pfosten (8) befestigt sind.Bridge according to one of claims 1 to 14, characterized in that the cross members ( 14 . 14a ) on the lower chords ( 7 ) and the post ( 8th ) are attached. Brücke nach einem der Ansprüche 12 bis 15, dadurch gekennzeichnet, dass die Formstücke (5) in x-Richtung abwechselnd an oberen und unteren Enden der Pfosten (8) befestigt sind.Bridge according to one of claims 12 to 15, characterized in that the shaped pieces ( 5 ) in the x-direction alternately at upper and lower ends of the posts ( 8th ) are attached. Brücke nach einem der Ansprüche 1 bis 16, dadurch gekennzeichnet, dass sie zusätzlich mit Verbandsstäben (18) versehen ist.Bridge according to any one of Claims 1 to 16, characterized in that it is additionally provided with bandages ( 18 ) is provided. Brücke nach Anspruch 17, dadurch gekennzeichnet, dass die Verbandsstäbe (18) mit einen Enden mittels Platten (19) an mittleren Abschnitten der Querträger (14, 14a) und mit entgegengesetzten Enden an den Untergurten (7) befestigt sind.Bridge according to claim 17, characterized in that the bandage bars ( 18 ) with one end by means of plates ( 19 ) at middle portions of the cross members ( 14 . 14a ) and with opposite ends on the lower straps ( 7 ) are attached. Brücke nach einem der Ansprüche 1 bis 18, dadurch gekennzeichnet, dass die Bleche (1) der Unter- und Obergurte (7, 17) sowie der Querträger (14, 14a) Dicken von 0,5 mm bis 10 mm aufweisen.Bridge according to one of claims 1 to 18, characterized in that the sheets ( 1 ) of the lower and upper straps ( 7 . 17 ) and the cross member ( 14 . 14a ) Have thicknesses of 0.5 mm to 10 mm. Brücke nach einem der Ansprüche 1 bis 19, dadurch gekennzeichnet, dass die Bleche (1) aus kalt umgeformten Stahlblechen bestehen.Bridge according to one of claims 1 to 19, characterized in that the sheets ( 1 ) consist of cold formed steel sheets. Brücke nach einem der Ansprüche 1 bis 20, dadurch gekennzeichnet, dass die Unter- und Obergurte (7, 17), Diagonalen (10), Pfosten (8) und Querträger (14, 14a) durch Schraubverbindungen (9, 11, 15) miteinander verbunden sind.Bridge according to one of claims 1 to 20, characterized in that the lower and upper straps ( 7 . 17 ), Diagonals ( 10 ), Posts ( 8th ) and cross beams ( 14 . 14a ) by screw connections ( 9 . 11 . 15 ) are interconnected. Bausatz zur Herstellung einer Brücke mit fachwerkartig ausgebildeten Scheiben, dadurch gekennzeichnet, dass er Bleche (1) für Unter- und Obergurte (7, 17) sowie Querträger (14, 14a), Rohre (6) für Diagonalen (10) und Formstücke (5) nach einem der Ansprüche 1 bis 10 und 19, 20 enthält.Kit for producing a bridge with truss-like discs, characterized in that it sheets ( 1 ) for lower and upper straps ( 7 . 17 ) and crossmembers ( 14 . 14a ), Pipes ( 6 ) for diagonals ( 10 ) and fittings ( 5 ) according to any one of claims 1 to 10 and 19, 20. Bausatz nach Anspruch 22, dadurch gekennzeichnet, dass er zusätzlich Rohre (6) für Pfosten (8) enthält.Kit according to claim 22, characterized in that it additionally pipes ( 6 ) for posts ( 8th ) contains. Bausatz nach Anspruch 23, dadurch gekennzeichnet, dass die Rohre (6) an ihren oberen oder unteren Enden mit je einem formschlüssig in die Aufnahmen (4) der Bleche (1) der Unter- und Obergurte (7, 17) passenden Formstück (5) fest verbunden sind.Kit according to claim 23, characterized in that the tubes ( 6 ) at their upper or lower ends, each with a form-fitting in the recordings ( 4 ) of the sheets ( 1 ) of the lower and upper straps ( 7 . 17 ) matching fitting ( 5 ) are firmly connected. Bausatz nach einem der Ansprüche 22 bis 24, dadurch gekennzeichnet, dass er 1 zusätzlich Verbandsstäbe (18) enthält.Kit according to one of claims 22 to 24, characterized in that it 1 additional bandage rods ( 18 ) contains.
DE200610044790 2006-09-20 2006-09-20 Bridge with two trussed discs and kit for their production Expired - Fee Related DE102006044790B4 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE200610044790 DE102006044790B4 (en) 2006-09-20 2006-09-20 Bridge with two trussed discs and kit for their production
EP07017648A EP1905900A3 (en) 2006-09-20 2007-09-10 Bridge with two framework-type plates and set for its manufacture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE200610044790 DE102006044790B4 (en) 2006-09-20 2006-09-20 Bridge with two trussed discs and kit for their production

Publications (2)

Publication Number Publication Date
DE102006044790A1 DE102006044790A1 (en) 2008-04-03
DE102006044790B4 true DE102006044790B4 (en) 2008-07-10

Family

ID=38863135

Family Applications (1)

Application Number Title Priority Date Filing Date
DE200610044790 Expired - Fee Related DE102006044790B4 (en) 2006-09-20 2006-09-20 Bridge with two trussed discs and kit for their production

Country Status (2)

Country Link
EP (1) EP1905900A3 (en)
DE (1) DE102006044790B4 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425100A (en) * 2011-09-20 2012-04-25 广州市设计院 Wide-bodied pedestrian overpass erected among buildings
CN102535327B (en) * 2012-02-03 2014-06-04 西安中交土木科技有限公司 Through prestress steel truss and concrete combined continuous steel structure bridge and construction method thereof
CN103590318B (en) * 2013-11-22 2015-09-02 龙口丛林中德车体系统工程有限公司 A kind of reinforcement structure of the unsettled lift-launch position of aluminium alloys overline bridge elevator
CN105862564A (en) * 2016-03-24 2016-08-17 中铁二院工程集团有限责任公司 Variable-truss high-steel-truss continuous beam with varying lower chord curve
PL126544U1 (en) * 2017-08-23 2019-02-25 Bogdan Kula Cable-stayed bridge suspension tower
FR3072978B1 (en) * 2017-10-30 2021-04-16 Baudin Chateauneuf ENGINEERING STRUCTURES, IN PARTICULAR BRIDGE, OF THE LATTICE TYPE WITH AT LEAST ONE LATERAL LATTICE ELEMENT AND LATERAL LATERAL ELEMENT
CN108301308B (en) * 2018-03-29 2023-12-19 中铁上海设计院集团有限公司 Connection structure for arch bridge round steel pipe hanging rod and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE977193C (en) * 1953-05-12 1965-06-10 Maschf Augsburg Nuernberg Ag Dismountable bridge with screwable main girders designed as a network
CH473948A (en) * 1967-09-14 1969-06-15 Krupp Gmbh Dismountable bridge
WO2006085185A1 (en) * 2005-02-09 2006-08-17 Robert James Waller Hamlin Rolled metal section; posts and frame members made from same; and assembly fittings

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2219023B (en) * 1988-04-14 1991-12-11 Thos Storey Improvements in and relating to pre-fabricated panels
GB2351750B (en) * 1999-07-07 2003-07-30 Johnson Limited Mabey Lattice panel bridges

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE977193C (en) * 1953-05-12 1965-06-10 Maschf Augsburg Nuernberg Ag Dismountable bridge with screwable main girders designed as a network
CH473948A (en) * 1967-09-14 1969-06-15 Krupp Gmbh Dismountable bridge
WO2006085185A1 (en) * 2005-02-09 2006-08-17 Robert James Waller Hamlin Rolled metal section; posts and frame members made from same; and assembly fittings

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
DE M 0025863 AZ

Also Published As

Publication number Publication date
DE102006044790A1 (en) 2008-04-03
EP1905900A3 (en) 2009-07-29
EP1905900A2 (en) 2008-04-02

Similar Documents

Publication Publication Date Title
EP2090744B1 (en) Conveyor trolley
DE102006044790B4 (en) Bridge with two trussed discs and kit for their production
EP2900585B1 (en) Trackway for an escalator or moving pathway
DE1903129B2 (en) Device for connecting a beam to a concrete column
EP3052210A1 (en) Track system for an amusement ride, in particular for a roller coaster or suspension rail
EP1931832A2 (en) Composite pillar for junction connections on constructions and building frames
DE202007003206U1 (en) Modular carrier for roofs of large areas
DE10242860B3 (en) Removable bridge
EP1650376A2 (en) Aluminium scaffold beam
DE2109088B2 (en) Spatial building element for the formation of all kinds of supporting structures
DE102007047919A1 (en) Supporting structure for supporting formwork to construct bridge, has roller fixed at head piece of structure for moving structure away from building or from fabricated section of building in connection to construction of building
EP3049316B1 (en) Overhead conveying apparatus for mounting on the ceiling of an assembly plant
DE3508437C2 (en) Truss bridge that can be dismantled from individual segments
DE10242794B4 (en) Demountable bridge
DE868442C (en) Dismountable bridge
DE202008012407U1 (en) Self-supporting steel hall
DE2801945A1 (en) STANDARD STEEL BRIDGES AND THEIR COMPONENTS
DE202005006228U1 (en) Roof construction for buildings, especially industrial buildings with large widths, comprises bottom and top booms in the form of I-shaped supports with two boom flanges, and node elements with two flat node flange plates
EP3259419B1 (en) Parking deck module and demountable parking deck
EP3427851A1 (en) Construction profile and combination profile consisting of at least two construction profiles and guard rail bracket
WO2019192794A1 (en) Overhead conveying device having an adhesive connection
EP4194613A1 (en) Structural unit for manufacturing a concrete foundation, use and method
DE1900572A1 (en) Components for viaducts, methods of building viaducts from such parts and here after-built viaducts
DE202017106469U1 (en) Operating platform for systems
EP0524576A1 (en) Assembly of a column and a beam in a steel-concrete floor structure

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
8364 No opposition during term of opposition
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee

Effective date: 20120403