DE10145977B4 - Manual laying device for laying concrete and stone elements - Google Patents

Manual laying device for laying concrete and stone elements Download PDF

Info

Publication number
DE10145977B4
DE10145977B4 DE2001145977 DE10145977A DE10145977B4 DE 10145977 B4 DE10145977 B4 DE 10145977B4 DE 2001145977 DE2001145977 DE 2001145977 DE 10145977 A DE10145977 A DE 10145977A DE 10145977 B4 DE10145977 B4 DE 10145977B4
Authority
DE
Germany
Prior art keywords
laying
handle parts
hand
lowered position
gas spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE2001145977
Other languages
German (de)
Other versions
DE10145977A1 (en
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Probst GmbH
Original Assignee
Probst Greiftechnik Verlegesysteme GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Probst Greiftechnik Verlegesysteme GmbH filed Critical Probst Greiftechnik Verlegesysteme GmbH
Priority to DE2001145977 priority Critical patent/DE10145977B4/en
Publication of DE10145977A1 publication Critical patent/DE10145977A1/en
Application granted granted Critical
Publication of DE10145977B4 publication Critical patent/DE10145977B4/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/52Apparatus for laying individual preformed surfacing elements, e.g. kerbstones
    • E01C19/526Apparatus for laying individual preformed surfacing elements, e.g. kerbstones hand operated

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Road Paving Machines (AREA)

Abstract

Handverlegevorrichtung zum Verlegen eines Verlegegutes (11), insbesondere von Beton- und Steinelementen, mit einer Greifvorrichtung (7; 30) zum Ergreifen des zu verlegenden Verlegegutes (11) und mit zwei sich an einem Körper (2) gegenüberliegenden Handgriffteilen (5, 6), dadurch gekennzeichnet, daß die Handgriffteile (5, 6) in Bezug auf den Körper (2) zwischen einer angehobenen Position beim Transport des Verlegegutes (11) zum Verlegeort und einer abgesenkten Position zum Abnehmen des Verlegegutes (11) von einer erhöhten Position verstellbar sind, derart, daß die Verstellung von der abgesenkten Position in die angehobene Position nach dem Abnehmen des Verlegegutes (11) durch eine Steuereinrichtung (16) ausgelöst, während des Transportes erfolgt.Hand laying device for laying a laying material (11), in particular of concrete and stone elements, with a gripping device (7; 30) for gripping the laying material to be laid (11) and with two handle parts (5, 6) opposite to a body (2) , characterized in that the handle parts (5, 6) with respect to the body (2) between a raised position during transport of the installation material (11) to the installation site and a lowered position for removing the installation material (11) are adjustable from an elevated position , Such that the adjustment of the lowered position in the raised position after the removal of the Verlegegutes (11) by a control device (16) triggered during transport takes place.

Figure 00000001
Figure 00000001

Description

Die Erfindung betrifft eine Handverlegevorrichtung zum Verlegen eines Verlegegutes, insbesondere von Beton- und Steinelementen, wie zum Beispiel Bordsteinen, Platten und dergleichen, nach dem Oberbegriff des Patentanspruches 1.The The invention relates to a hand-laying device for laying a Laying good, especially of concrete and stone elements, such as Curbs, plates and the like, according to the preamble of claim 1.

Während früher das Verlegepersonal Bordsteine, Platten oder dergleichen manuell direkt von einer Palette abgenommen und von Hand zur entsprechenden Verlegestelle getragen und dann dort verlegt hat, werden im Zuge von Rückenschutzmaßnahmen neben maschinellen Verlegeeinrichtungen mit Hebezeugen vermehrt auch Handverlegevorrichtungen zum Verlegen von Bordsteinen, Platten oder dergleichen eingesetzt. Mit solchen Handverlegevorrichtungen können Beton- oder Steinelemente sicher ergriffen und zur Verlegestelle getragen werden. Bei der Verlegung, die zumeist in Bodennahe erfolgt, wird mit diesen Handverlegevorrichtungen eine ergonomisch positive Körperhaltung erreicht. Bei solchen Handverlegevorrichtungen sind zumeist mechanische Greifer vorgesehen, die die Beton- oder Steinelemente mit einer entsprechenden Klammerkraft aufnehmen können. Es sind jedoch auch Handverlegevorrichtungen bekannt, bei denen Vakuum-Saugplatten vorgesehen sind, die nach dem Last-/Haft-Prinzip arbeiten.While earlier that Laying staff curbs, plates or the like manually directly removed from a pallet and manually to the appropriate installation point worn and then relocated there are in the course of back protection measures multiplied by mechanical laying equipment with hoists also hand laying devices for laying curbs, plates or the like used. With such hand-laying devices can Concrete or stone elements seized securely and to the laying place be worn. In the laying, which takes place mostly near the ground, becomes ergonomically positive with these hand-laying devices posture reached. In such hand-laying devices are usually mechanical Grippers provided the concrete or stone elements with a corresponding Can absorb clamping force. However, hand laying devices are known in which Vacuum suction plates are provided, which operate on the load / detention principle.

Ein grundlegendes Problem solcher Handverlegevorrichtungen besteht darin, daß zwar beim eigentlichen Verlegevorgang die oben erwähnte ergonomisch positive Körperhaltung ermöglicht wird. Da die Anlieferung von Baustoffen jedoch meistens auf Paletten oder in Paketform erfolgt, wobei die zu verlegenden Produkte übereinandergestapelt sind, sind die bekannten Handverlegevorrichtungen beim Abgreifen der Produkte aus der oberen Hälfte der Paletten, d. h. also bei etwa 50% der Anwendungen sehr unvorteilhaft, da sich die Handgriffe der Verlegevorrichtungen dann normalerweise in Brusthöhe oder gar höher befinden. Die Benutzer solcher Handverlegevorrichtungen müssen daher bei der Abnahme von Produkten aus der oberen Hälfte von Paletten und der Absenkung der bestückten Handverlegevorrichtung auf die Trageposition enorme körperliche Anstrengungen aufbringen.One basic problem of such hand laying devices is that though during the actual laying process, the above-mentioned ergonomically positive posture allows becomes. As the delivery of building materials, however, mostly on pallets or in package form, with the products to be laid stacked on top of each other are the known hand-laying devices when tapping the products from the top half the pallets, d. H. So in about 50% of applications very unfavorable, since the handles of the laying devices then usually at chest height or even higher are located. The users of such hand-laying devices must therefore when taking products from the top half of pallets and lowering the stocked Hand laying device on the carrying position enormous physical Make an effort.

Aus der DE 103 15 457 A1 geht eine manuell betätigbare Zange zum Ergreifen von in einer Reihe angeordneten Pflastersteinen hervor, die eine Greifvorrichtung zum Ergreifen der Reihe der Pflastersteine und zwei Handgreifteile aufweist, die sich an einem Körper gegenüberliegen.From the DE 103 15 457 A1 For example, a manually operated tong for gripping paving stones arranged in a row has a gripping device for gripping the row of paving stones and two hand gripping parts facing one another on a body.

Ausgehend von dieser DE 103 15 457 A1 besteht die Aufgabe der vorliegenden Erfindung darin, eine Handverlegevorrichtung so auszugestalten, daß sowohl der eigentliche Verlegevorgang am Verlegeort, wie auch das Ergreifen des Verlegegutes von relativ hohen Positionen eines Verlegegutstapels jeweils in einer ergonomisch optimalen Weise erfolgen kann.Starting from this DE 103 15 457 A1 The object of the present invention is to design a hand-laying device so that both the actual laying process at the installation site, as well as the gripping of the installation material from relatively high positions of a Verlegegutstapels can each be done in an ergonomically optimal manner.

Diese Aufgabe wird durch eine Handverlegevorrichtung mit den Merkmalen des Patentanspruches 1 gelöst.These Task is by a hand-laying device with the features of claim 1.

Der wesentliche Vorteil der erfindungsgemäßen Handverlegevorrichtung besteht darin, daß ihre Handgriffe höhenverstellbar angeordnet sind, so daß eine optimale Anpassung an unterschiedliche Arbeitspositionen, bei denen das Verlegegut in unterschiedlich hohen Positionen ergriffen bzw. gehalten werden muß, erfolgt.Of the substantial advantage of the hand-laying device according to the invention is that their handles height adjustable are arranged so that a optimal adaptation to different working positions in which the laying material in different high positions taken or must be kept he follows.

Bei einer bevorzugten Ausgestaltung der vorliegenden Erfindung ist eine sogenannte blockierbare Gasfeder als Energiespeicher vorgesehen, mit deren Hilfe die Handgriffe bei den verschiedenen Arbeitsschritten in die ergonomisch jeweils optimalen Positionen betätigbar sind.at A preferred embodiment of the present invention is a so-called blockable gas spring provided as energy storage, with their help, the handles in the various steps in the ergonomically optimal positions are actuated.

Weitere vorteilhafte Ausgestaltungen der Erfindung gehen aus den Unteransprüchen hervor.Further advantageous embodiments of the invention will become apparent from the dependent claims.

Im folgenden werden die Erfindung und deren Ausgestaltungen im Zusammenhang mit den Figuren näher erläutert. Es zeigen:in the The following are the invention and its embodiments related closer with the figures explained. Show it:

1 Eine Darstellung einer vorliegenden Handverlegevorrichtung; 1 An illustration of an existing hand laying apparatus;

2 die Position der Handgriffe der erfindungsgemäßen Handverlegevorrichtung beim Transport des Verlegegutes zum Verlegeort und beim Verlegen des Verlegegutes am Verlegeort (hohe Position der Handgriffteile); 2 the position of the handles of the hand-laying device according to the invention during transport of the installation material to the installation site and when laying the installation material at the installation site (high position of the handle parts);

3 die Position der Handgriffe der erfindungsgemäßen Handverlegevorrichtung beim Abnehmen des Verlegegutes von einem Stapel (niedrige Position der Handgriffteile) und 3 the position of the handles of the hand-laying device according to the invention when removing the installation material from a stack (low position of the handle parts) and

4, 5 Weiterbildungen der Erfindung. 4 . 5 Further developments of the invention.

Gemäß 1 weist die vorliegende Handverlegevorrichtung 1 im wesentlichen einen Körper 2 auf, an dem Handgriffteile 5, 6 verschwenkbar angeordnet sind. An dem Körper 2 ist ferner eine Greifvorrichtung 7 befestigt, die gemäß 1 vorzugsweise aus zwei Greifarmen 8, 9 besteht, die an ihren Enden Greifbacken 10 besitzen, zwischen denen das Verlegegut 11, beispielsweise eine Steinplatte beim Anheben der Handverlegevorrichtung 1 infolge der Schwerkraft der Greifarme 8, 9 festgeklemmt wird. Die genannten Greifbacken 10 sind an den einen Enden der Greifarme 8, 9 angeordnet, wohingegen die anderen Enden der Greifarme 8, 9 in einem Drehpunkt 12 des Körpers 2 drehbar gelagert sind.According to 1 shows the present hand laying device 1 essentially a body 2 on, on the handle parts 5 . 6 are arranged pivotably. On the body 2 is also a gripping device 7 attached, according to 1 preferably from two gripping arms 8th . 9 consists of gripping jaws at their ends 10 own, between which the Verlegegut 11 For example, a stone slab when lifting the hand-laying device 1 due to the gravity of the gripping arms 8th . 9 is clamped. The aforementioned gripping jaws 10 are at one end of the gripping arms 8th . 9 whereas the other ends of the gripper arms are arranged 8th . 9 in a spin Point 12 of the body 2 are rotatably mounted.

Der Kern der Erfindung besteht darin, daß die Handgriffteile 5, 6 nicht, wie beim Stand der Technik üblich, am Körper 2 der Handverlegevorrichtung 1 starr befestigt sind, sondern daß diese Handgriffteile 5, 6 am Körper 2 höhenverstellbar angeordnet sind, und zwar derart, daß sie, wie dies später erläutert werden wird, nach dem Abgreifen eines Verlegegutes 11 vom Stapel 13 während des Tragevorganges höhenverstellbar sind. Insbesondere kann dabei die Höhenverstellung von einer Steuereinrichtung aus ferngesteuert (z. B. über einen Bowdenzug) erfolgen.The essence of the invention is that the handle parts 5 . 6 not, as usual in the prior art, on the body 2 the hand-laying device 1 are rigidly fixed, but that these handle parts 5 . 6 on the body 2 are arranged adjustable in height, in such a way that, as will be explained later, after the tapping of a Verlegegutes 11 from the pile 13 are height adjustable during the wearing process. In particular, the height adjustment can be carried out remotely by a control device (eg via a Bowden cable).

Vorzugsweise sind die Handgriffteile 5, 6 um voneinander beabstandete Drehpunkte 3, 4 verschwenkbar am Körper 2 angeordnet. Dadurch wird es ermöglicht, daß die Handgriffteile 5, 6 beim Transport des Verlegegutes 11 zum Verlegeort gemäß 2 in eine angehobene Position verstellt werden können, so daß die Benutzer B beim genannten Transport zum Verlegeort und auch beim eigentlichen Verlegen des Verlegegutes 11 am Verlegeort in einer ergonomisch optimalen Haltung arbeiten können. Dadurch wird der Rücken der Benutzer B geschont.Preferably, the handle parts 5 . 6 around spaced pivot points 3 . 4 swiveling on the body 2 arranged. This will allow the handle parts 5 . 6 during transport of the installation material 11 according to the place of installation 2 can be adjusted in a raised position, so that the user B in the mentioned transport to the installation site and also during the actual laying of the installation material 11 can work at the place of installation in an ergonomically optimal attitude. As a result, the back of the user B is spared.

Zum Abnehmen des Verlegegutes 11 von einem Verlegegutstapel 13 werden die Handgriffe gemäß 3 in eine abgesenkte Position verschwenkt, so daß die Benutzer B auch beim Abnehmen des Verlegegutes in einer ergonomisch optimalen Position, d. h. also ebenfalls rückenschonend arbeiten können.For removing the installation material 11 from a laying pile 13 the handles are adjusted according to 3 pivoted in a lowered position, so that the user B can also work when removing the bedding in an ergonomically optimal position, ie also back-friendly.

Bei einer besonders einfachen Ausführungsform der Erfindung sind die beiden Handgriffteile 5, 6 in den genannten abgesenkten Positionen (1 unterbrochene Linien) und den genannten angehoben Positionen (1 durchgehende Linien) durch an sich bekannte Einrastelemente (nicht dargestellt) arretierbar.In a particularly simple embodiment of the invention, the two handle parts 5 . 6 in said lowered positions ( 1 broken lines) and said raised positions ( 1 solid lines) by known latching elements (not shown) can be locked.

Bei einer besonders bevorzugten Ausgestaltung der Erfindung ist zwischen den Handgriffteilen 5, 6 eine sogenannte blockierbare Gasfeder 14 angeordnet, die durch Betätigen der Steuereinrichtung, vorzugsweise in der Form eines mit der Gasfeder 14 über eine mechanische Verbindungsleitung 15 verbundenen Handhebels 16, der an einem der beiden Handgriffteile 5, 6 angeordnet ist, durch einen Benutzer B bedienbar ist. Die Handgriffteile 5, 6 weisen zu diesem Zweck vorteilhafterweise an ihnen befestigte Haltearme 17, 18 auf, die oberhalb der Drehpunkte 3, 4 vorzugsweise senkrecht zu den Handgriffteilen 5, 6 aufeinander zu verlaufen, wobei an ihren Enden verschwenkbar der Zylinder 19 bzw. der Kolben 20 der Gasfeder 14 angelenkt sind. Die entsprechenden Anlenkpunkte sind mit 21 bzw. 22 bezeichnet.In a particularly preferred embodiment of the invention is between the handle parts 5 . 6 a so-called blockable gas spring 14 arranged by operating the control device, preferably in the form of one with the gas spring 14 via a mechanical connecting line 15 connected hand levers 16 , on one of the two handle parts 5 . 6 is arranged by a user B is operable. The handle parts 5 . 6 have for this purpose advantageously attached to them holding arms 17 . 18 on, above the pivot points 3 . 4 preferably perpendicular to the handle parts 5 . 6 to run towards each other, wherein at its ends pivotally the cylinder 19 or the piston 20 the gas spring 14 are articulated. The corresponding articulation points are with 21 respectively. 22 designated.

Mit der zuletzt beschriebenen Ausführungsform wird in der folgenden Weise gearbeitet. Zum Transport bzw. zum Verlegen ist der Kolben 20 in den Zylinder 19 der Gasfeder 14 eingeschoben, so daß die Handgriffteile 5, 6 sich in der angehobenen Position befinden und die Anlenkpunkte 21, 22 einander am weitesten angenähert sind (2). In dieser angehoben Position ist die Gasfeder 14 blockiert. Wenn nun nach dem Transport zum Verlegeort gemäß 2 und dem Verlegen des Verlegegutes 11 weiteres Verlegegut gemäß 3 vom Verlegegutstapel abgenommen werden soll, wird beim Weg vom Verlegeort zum Verlegegutstapel 13 der Handhebel 16 durch einen Benutzer B betätigt, so daß die Gasfeder 14 auf Grund der in ihr gespeicherten Energie bzw. Druckkraft den Kolben 22 aus dem Zylinder 19 herausdrückt, wobei der Abstand zwischen den Anlenkpunkten 21, 22 vergrößert und die Handgriffteile 5, 6 in die abgesenkte Position verschwenkt werden. Wenn dies erfolgt ist, wird der Handhebel 16 losgelassen, so daß die Gasfeder 14 in dieser Position wieder blockiert wird und die abgesenkte Position beibehalten wird. Nach dem Anordnen der Klemmbacken 9, 10 am Verlegegut 11 und dem Abnehmen desselben vom Verlegegutstapel 13, wird der Handhebel 16 erneut betätigt, wobei die Blockade der Gasfeder 14 aufgehoben wird und der Kolben 20 wegen des Gewichts des Verlegegutes 11 und des Körpers 2 sowie der Greifarme 8, 9 in den Zylinder 19 hineingedrückt wird. Dabei wird die Energie bzw. Druckkraft wieder in die Gasfeder eingebracht und es wird erreicht, daß nach dem Abnehmen des Verlegegutes 11 vom Verlegegutstapel 13 bei abgesenkten Handgriffteilen 5, 6 die Handgriffteile 5, 6 zum Transport und Verlegen des Verlegegutes 11 in die ergonomisch günstige angehobene, Position verschwenkt werden.The last-described embodiment operates in the following manner. For transport or laying the piston 20 in the cylinder 19 the gas spring 14 pushed in, so that the handle parts 5 . 6 are in the raised position and the pivot points 21 . 22 closest to each other ( 2 ). In this raised position is the gas spring 14 blocked. If now after transport to the place of installation according to 2 and laying the installation material 11 further laying material according to 3 is to be removed from the Verlegegutstapel, is the path from the installation to the Verlegegutstapel 13 the hand lever 16 operated by a user B, so that the gas spring 14 due to the stored energy or pressure force the piston 22 out of the cylinder 19 pushes out, with the distance between the articulation points 21 . 22 enlarged and the handle parts 5 . 6 be pivoted in the lowered position. When this is done, the hand lever becomes 16 let go, so that the gas spring 14 in this position is blocked again and the lowered position is maintained. After arranging the jaws 9 . 10 at the laying material 11 and removing it from the laying stock pile 13 , becomes the hand lever 16 pressed again, the blockage of the gas spring 14 is lifted and the piston 20 because of the weight of the installation material 11 and the body 2 and the gripper arms 8th . 9 in the cylinder 19 is pressed into it. The energy or pressure force is again introduced into the gas spring and it is achieved that after removing the installation material 11 from the Verlegegutstapel 13 with lowered handle parts 5 . 6 the handle parts 5 . 6 for transporting and laying the installation material 11 be pivoted into the ergonomically raised position.

Es wird also jeweils nach dem Abnehmen des Verlegegutes vom Stapel gezielt das Gewicht des Verlegegutes zur Einbringung der Energie in die Gasfeder genutzt. Diese Energie wird dann jeweils nach dem Verlegen des Verlegegutes zum Verstellen des Greifers in die angehobene Position benutzt und verbraucht.It So each time after removing the installation material from the stack targeted the weight of the installation material for the introduction of energy used in the gas spring. This energy will then be after each Laying the material to be laid to move the gripper into the raised position Position used and consumed.

Gemäß 4 kann an der Stelle der mechanischen Greifereinrichtung der 1 auch eine durch eine Vakuumeinrichtung betätigbare Saugplatte 30 oder dergleichen zum Ansaugen des Verlegegutes 11 an der Handverlegevorrichtung angeordnet sein. Es wird darauf hingewiesen, daß auch andere Greifereinrichtungen im Rahmen der vorliegenden Erfindung denkbar sind.According to 4 can at the location of the mechanical gripper device of 1 also a suction plate actuated by a vacuum device 30 or the like for sucking the installation material 11 be arranged on the hand-laying device. It should be noted that other gripping devices in the context of the present invention are conceivable.

Gemäß 5 sind die Handgriffteile 5, 6 nicht um Drehpunkte am Körpers 2 verschwenkbar, sondern in Bezug auf diesen parallel verschieblich angeordnet, so daß auch hier die gewünschte Höhenverstellung zwischen der angehobenen Position (unterbrochene Linien) und der abgesenkten Position (durchgehende Linien) möglich ist. Insbesondere ist am Körper 2 wenigstens eine Kolben-/Zylinderanordnung 40 angeordnet, die auf die Handgriffteile 5, 6 einwirkt, die in diesem Fall starr miteinander verbunden sind. Am Körper 2 ist ein Greifer 7 gemäß 1 oder 30 gemäß 4 angeordnet.According to 5 are the handle parts 5 . 6 not about turning points on the body 2 pivotable, but with respect to this arranged to be displaceable in parallel, so that here, too, the desired height adjustment between the raised position (broken lines) and the lowered position (solid lines) is possible. In particular, it is on the body 2 at least one piston / cylinder arrangement 40 arranged on the handle parts 5 . 6 acts, which are rigidly connected in this case. On the body 2 is a gripper 7 according to 1 or 30 according to 4 arranged.

Durch Betätigen der Kolben-/Zylinderanordnung 40 kann der Abstand zwischen dem Körper 2 und den Handgriffteilen 5, 6 in der oben beschriebenen Weise verändert werden. Um eine Führung bzw. Festlegung des Körpers 2 in Bezug auf die starr miteinander verbundenen Handgriffteile 5, 6 zu erreichen, ist zwischen dem Körper 2 und den Handgriffteilen 5, 6 wenigstens eine, vorzugsweise jedoch zwei sich in Bezug auf die Kolben-/Zylinderanordnung 40 symmetrisch gegenüberliegende teleskopierbare Führung mit einem am Körper 2 (oder an den Handgriffteilen) befestigten Außenrohr 43 und einem an den Handgriffteilen 5, 6 (oder am Körper) befestigten Innenrohr 42 vorgesehen.By actuating the piston / cylinder arrangement 40 can the distance between the body 2 and the handle parts 5 . 6 be changed in the manner described above. To take a lead or fix the body 2 in relation to the rigidly connected handle parts 5 . 6 to reach is between the body 2 and the handle parts 5 . 6 at least one, but preferably two with respect to the piston / cylinder assembly 40 symmetrically opposed telescopic guide with one on the body 2 (or on the handle parts) attached outer tube 43 and one on the handle parts 5 . 6 (or on the body) attached inner tube 42 intended.

Als Kolben-/Zylinderanordnung 40 kann die oben bereits beschriebene, fernsteuerbare Gasfeder vorgesehen werden.As a piston / cylinder arrangement 40 For example, the remotely controllable gas spring described above may be provided.

Es wird darauf hingewiesen, daß beim Arbeiten mit der vorliegenden Handverlegevorrichtung durch gezielte Betätigung der Gasfeder im Hinblick auf die zeitliche Länge der Betätigung des Handhebels 16 und/oder die Bemessung der Ventilöffnung des Ventiles der Gasfeder der Grad des Anhebens bzw. Absenkens der Handgriffteile steuerbar ist. Dadurch werden beim Abnehmen eines Verlegegutes von einem Stapel eine Anpassung an die sich ändernde Stapelhöhe und beim Absetzen des Verlegegutes eine Anpassung an Geländegegebenheiten erreicht.It should be noted that when working with the present hand-laying device by targeted actuation of the gas spring with respect to the length of time the operation of the hand lever 16 and / or the design of the valve opening of the valve of the gas spring, the degree of raising or lowering of the handle parts is controllable. As a result, an adaptation to the changing stacking height and the settling of the installation material an adaptation to terrain conditions are achieved when removing a laying material from a stack.

Claims (10)

Handverlegevorrichtung zum Verlegen eines Verlegegutes (11), insbesondere von Beton- und Steinelementen, mit einer Greifvorrichtung (7; 30) zum Ergreifen des zu verlegenden Verlegegutes (11) und mit zwei sich an einem Körper (2) gegenüberliegenden Handgriffteilen (5, 6), dadurch gekennzeichnet, daß die Handgriffteile (5, 6) in Bezug auf den Körper (2) zwischen einer angehobenen Position beim Transport des Verlegegutes (11) zum Verlegeort und einer abgesenkten Position zum Abnehmen des Verlegegutes (11) von einer erhöhten Position verstellbar sind, derart, daß die Verstellung von der abgesenkten Position in die angehobene Position nach dem Abnehmen des Verlegegutes (11) durch eine Steuereinrichtung (16) ausgelöst, während des Transportes erfolgt.Manual laying device for laying a laying material ( 11 ), in particular of concrete and stone elements, with a gripping device ( 7 ; 30 ) for gripping the laying material to be laid ( 11 ) and two on one body ( 2 ) opposite handle parts ( 5 . 6 ), characterized in that the handle parts ( 5 . 6 ) in relation to the body ( 2 ) between a raised position during transport of the material to be laid ( 11 ) to the installation site and a lowered position for removing the installation material ( 11 ) are adjustable from an elevated position, such that the adjustment of the lowered position in the raised position after removal of the installation material ( 11 ) by a control device ( 16 ) is triggered during transport. Handverlegevorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die Handgriffteile (5, 6) an einem Körper (2) jeweils um einen Drehpunkt (3, 4) zwischen der angehobenen Position und der abgesenkten Position verschwenkbar angeordnet sind, daß die Greifvorrichtung (7; 30) am Körper (2) unterhalb der Drehpunkte (3, 4) befestigt ist und daß eine Kolben-/Zylindereinrichtung (14) zum Verstellen der Handgriffteile (5, 6) zwischen der angehobenen Position und der abgesenkten Position und umgekehrt vorgesehen ist.Hand laying device according to claim 1, characterized in that the handle parts ( 5 . 6 ) on a body ( 2 ) each about a pivot point ( 3 . 4 ) are arranged pivotably between the raised position and the lowered position that the gripping device ( 7 ; 30 ) on the body ( 2 ) below the pivot points ( 3 . 4 ) and that a piston / cylinder device ( 14 ) for adjusting the handle parts ( 5 . 6 ) is provided between the raised position and the lowered position and vice versa. Handverlegevorrichtung nach Anspruch 2, dadurch gekennzeichnet, daß die Kolben-/Zylindereinrichtung (14) die Form einer blockierbaren Gasfeder aufweist, die sich zwischen den Handgriffteilen (5, 6) abstützt, um diese zwischen der angehobenen Position und der abgesenkten Position und umgekehrt zu bewegen, wobei die Bewegung von der angehobenen Position in die abgesenkte Position durch eine in der Gasfeder gespeicherte Energie und die Bewegung von der abgesenkten Position in die angehobene Position durch das Gewicht des Verlegegutes, das auch die Energie in die Gasfeder einbringt, erfolgt, und daß die blockierbare Gasfeder (14) über eine mechanische Verbindungsleitung (15) mit einem an einem der beiden Handgriffteile (5, 6) angeordneten Handhebel als Steuereinrichtung (16) verbunden und bei dessen Betätigung zur Festlegung der angehobenen bzw. abgesenkten Position fernsteuerbar ist.Hand laying device according to claim 2, characterized in that the piston / cylinder device ( 14 ) has the form of a lockable gas spring which extends between the handle parts ( 5 . 6 ) to move it between the raised position and the lowered position and vice versa, the movement from the raised position to the lowered position by energy stored in the gas spring and the movement from the lowered position to the raised position by the weight of the material to be laid, which also introduces the energy into the gas spring, takes place, and that the blockable gas spring ( 14 ) via a mechanical connecting line ( 15 ) with one on one of the two handle parts ( 5 . 6 ) arranged hand lever as a control device ( 16 ) is connected and in the operation thereof for fixing the raised or lowered position can be controlled remotely. Handverlegevorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die Handgriffteile (5, 6) starr miteinander verbunden sind und in Bezug auf den Körper (2) durch eine Kolben-/Zylinderanordnung (40) zwischen der angehobenen Position und der abgesenkten Position bewegbar sind.Hand laying device according to claim 1, characterized in that the handle parts ( 5 . 6 ) are rigidly connected with each other and in relation to the body ( 2 ) by a piston / cylinder arrangement ( 40 ) are movable between the raised position and the lowered position. Handverlegevorrichtung nach Anspruch 4, dadurch gekennzeichnet, daß die Kolben-/Zylinderanordnung (40) eine blockierbare Gasfeder ist, die sich zwischen dem Körper (2) und den Handgriffteilen (5, 6) abstützt und mit einem Handhebel ferngesteuert betätigbar ist, der an einem Handgriffteil (5, 6) angeordnet ist und mit der Gasfeder über eine mechanische Verbindungsleitung verbunden ist, wobei in die Gasfeder nach dem Abnehmen des Verlegegutes beim. Verstellen in die angehobene Position durch das Gewicht des Verlegegutes jeweils Energie eingebracht wird und nach dem Verlegen des Verleggutes die Verstellung in die abgesenkte Position durch die in der Gasfeder enthaltene Energie erfolgt.Hand laying device according to claim 4, characterized in that the piston / cylinder arrangement ( 40 ) is a blockable gas spring that extends between the body ( 2 ) and the handle parts ( 5 . 6 ) is supported and remotely operable with a hand lever on a handle part ( 5 . 6 Is arranged) and is connected to the gas spring via a mechanical connecting line, wherein in the gas spring after removing the installation material at. Adjusting to the raised position by the weight of the installation material each energy is introduced and after the laying of the laying material, the adjustment is carried out in the lowered position by the energy contained in the gas spring. Handverlegevorrichtung nach Anspruch 4 oder 5, dadurch gekennzeichnet, daß der Körper (2) in Bezug auf die Handgriffteile (5, 6) zur Bewegung zwischen der angehobenen Position und der abgesenkten Position in wenigstens einer teleskopierbaren Führung (42, 43) bewegbar ist.Hand laying device according to claim 4 or 5, characterized in that the body ( 2 ) with respect to the handle parts ( 5 . 6 ) for movement between the raised position and the lowered position in at least one telescopic guide ( 42 . 43 ) is movable. Handverlegevorrichtung nach Anspruch 6, dadurch gekennzeichnet, daß in Bezug auf die Kolben-/Zylinderanordnung (40) sich gegenüberliegend zwei teleskopierbare Führungen (42, 43) zwischen dem Körper (2) und den Handgriffteilen (5, 6) angeordnet sind.Hand laying device according to claim 6, since characterized in that in relation to the piston / cylinder arrangement ( 40 ) Opposite two telescopic guides ( 42 . 43 ) between the body ( 2 ) and the handle parts ( 5 . 6 ) are arranged. Handverlegevorrichtung nach Anspruch 7, dadurch gekennzeichnet, daß die Führung ein am Körper (2) oder an den Handgriffteilen (5, 6) angeordnetes Außenrohr (43) aufweist, in das ein an den Handgriffteilen (5, 6) oder am Körper (2) angeordnetes Innenrohr (42) eingreift.Hand laying device according to claim 7, characterized in that the guide a on the body ( 2 ) or on the handle parts ( 5 . 6 ) arranged outer tube ( 43 ), in which a on the handle parts ( 5 . 6 ) or on the body ( 2 ) arranged inner tube ( 42 ) intervenes. Handverlegevorrichtung nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, daß die Greifvorrichtung (7) zwei Greifarme (8, 9) aufweist, an deren Enden Greifbacken (10, 10) angeordnet sind, zwischen denen das Verlegegut (11) festklemmbar ist.Hand laying device according to one of claims 1 to 8, characterized in that the gripping device ( 7 ) two gripping arms ( 8th . 9 ), at whose ends jaws ( 10 . 10 ) are arranged, between which the Verlegegut ( 11 ) is clamped. Handverlegevorrichtung nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, daß die Greifvorrichtung (30) eine durch eine Vakuumeinrichtung betätigbare Saugplatte zum Ansaugen des Verlegegutes (11) aufweist.Hand laying device according to one of claims 1 to 8, characterized in that the gripping device ( 30 ) actuatable by a vacuum device suction plate for sucking the installation material ( 11 ) having.
DE2001145977 2001-09-18 2001-09-18 Manual laying device for laying concrete and stone elements Expired - Fee Related DE10145977B4 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE2001145977 DE10145977B4 (en) 2001-09-18 2001-09-18 Manual laying device for laying concrete and stone elements

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE2001145977 DE10145977B4 (en) 2001-09-18 2001-09-18 Manual laying device for laying concrete and stone elements

Publications (2)

Publication Number Publication Date
DE10145977A1 DE10145977A1 (en) 2003-04-03
DE10145977B4 true DE10145977B4 (en) 2010-07-15

Family

ID=7699426

Family Applications (1)

Application Number Title Priority Date Filing Date
DE2001145977 Expired - Fee Related DE10145977B4 (en) 2001-09-18 2001-09-18 Manual laying device for laying concrete and stone elements

Country Status (1)

Country Link
DE (1) DE10145977B4 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023279103A1 (en) * 2021-07-01 2023-01-05 Michael Oliphant Stone paver and heavy object lifting apparatus

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DK176964B1 (en) * 2009-02-12 2010-08-02 Kewen Paick Lifting device for lifting an edge
SE544486C2 (en) * 2019-08-29 2022-06-14 Pritec Vaculyft Ab A vacuum lifting device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2279030A (en) * 1993-06-18 1994-12-21 Stephen John Knight Lifting device
DE10315457A1 (en) * 2002-11-16 2004-06-09 Kombilith Gmbh Entwicklung Und Verwertung Tongs for handling rows of construction elements has scissor mechanism with short and long lever arms and connecting rod between free ends of long arms to act as stop for line of elements

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2279030A (en) * 1993-06-18 1994-12-21 Stephen John Knight Lifting device
DE10315457A1 (en) * 2002-11-16 2004-06-09 Kombilith Gmbh Entwicklung Und Verwertung Tongs for handling rows of construction elements has scissor mechanism with short and long lever arms and connecting rod between free ends of long arms to act as stop for line of elements

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023279103A1 (en) * 2021-07-01 2023-01-05 Michael Oliphant Stone paver and heavy object lifting apparatus

Also Published As

Publication number Publication date
DE10145977A1 (en) 2003-04-03

Similar Documents

Publication Publication Date Title
DE3527022A1 (en) TILT OR LIFT-TIP DEVICE FOR EMPTYING CONTAINERS IN COLLECTOR, PREFERABLY WASTE CONTAINER IN THE COLLECTOR OF A WASTE VEHICLE
DE2756370A1 (en) COMBINED GRIPPER IN A NUCLEAR REACTOR
EP3539916B1 (en) Control device for a hose lifter
DE202012005409U1 (en) lifting fork
DE10145977B4 (en) Manual laying device for laying concrete and stone elements
DE20318858U1 (en) Lifting jaw system for stone slabs used as headstones for graves has curved jaws pivoted together with spread adjustment rod and pull cords moving spring-loaded clamping elements at ends
DE2540644C3 (en) Length-adjustable rod, in particular earthing rod or operating rod for electrotechnical equipment
DE4017287A1 (en) GRipper unit for paving stones etc. - has swivel connected arms with grip elements at lower operating ends and gripping rod with end holders
EP0061047A1 (en) Process and device for piling agricultural products, such as roughage and silage in agricultural buildings up to the framework of the roof
EP0035159B1 (en) Gripper for slab-shaped concrete elements
DE202005007892U1 (en) Rail gripper, in particular, for handling rails for rail track vehicles comprises at least two gripper elements, two or more pivot levers, and at least two side elements
DE10311605A1 (en) Lifting device has rocker lever mounted rotatable on movable support and having load pick-up at one end and handle at other
DE3930222A1 (en) LAYING TROLLEY FOR COMPOSITION BLOCKS
DE4113254A1 (en) Trolley for handling paving slabs - has jaws controlled by lever to hold and release slabs
DE102015107900A1 (en) Versetzzange
DE19601222C2 (en) Vacuum lifting device for suctioning objects, in particular paving slabs
DE19912448C2 (en) Transport device for heavy loads
DE2744413C3 (en)
DE3928516A1 (en) Lifting and moving paving slabs in batches - involves movable jaws controlled by compressed air operated by lever in grip handle
DE202005008248U1 (en) Device for receiving, transporting and setting down of load has lifting sleeve connected to vacuum producer and connected to suction plate and guide arm, and connected by flow to control unit and to suction plate
DE29515524U1 (en) Device for transporting and handling palletized base plates, shaped stones and the like. Components
DE3512431C1 (en) Hay crane
DE8700573U1 (en) Gripping pliers for moving bricks in rows
DE4137399A1 (en) Tongs for safe lifting of inclined pipe - has lifting linkage pivoted about jaws in direction of pipe axis to avoid bending moments
DE10039330A1 (en) Device for manual control and manual guidance of a handling device

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
8364 No opposition during term of opposition
R081 Change of applicant/patentee

Owner name: PROBST GMBH, DE

Free format text: FORMER OWNER: PROBST GREIFTECHNIK-VERLEGESYSTEME GMBH, 71729 ERDMANNHAUSEN, DE

R082 Change of representative

Representative=s name: LS-MP VON PUTTKAMER BERNGRUBER LOTH SPUHLER MU, DE

R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee