CN86203954U - Wall bearing self-lifting scaffold - Google Patents

Wall bearing self-lifting scaffold Download PDF

Info

Publication number
CN86203954U
CN86203954U CN 86203954 CN86203954U CN86203954U CN 86203954 U CN86203954 U CN 86203954U CN 86203954 CN86203954 CN 86203954 CN 86203954 U CN86203954 U CN 86203954U CN 86203954 U CN86203954 U CN 86203954U
Authority
CN
China
Prior art keywords
scaffold
framework
inner sleeve
outer tube
hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 86203954
Other languages
Chinese (zh)
Inventor
沈定公
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 86203954 priority Critical patent/CN86203954U/en
Publication of CN86203954U publication Critical patent/CN86203954U/en
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold for the construction, in particular to a self-elevating scaffold attached to wall for replacing a prior multi-vertical member steel tube scaffold, which overcomes the defects that prior suspended scaffolds can not be self-elevating. The utility model comprises a plurality of sleeve framework racks which are arranged along the wall surface of the building in the horizontal direction; the sleeve framework racks are placed with scaffold boards. The scaffold attached to the wall can be self-elevating via lifting apparatuses, such as a jack, etc. Thus the overlapping of the scaffold has the advantages of simple operation, investment saving, safe use, and good utility.

Description

Wall bearing self-lifting scaffold
The utility model relates to building operations and architectural decoration operation scaffold.
In building operations, especially in high-building construction, need set up scaffold, in order to satisfy the needs of building operations and architectural decoration operation.Continuous development along with design of building structures and architectural construction technology, especially construction technologies such as more employing sliding formwork, large form and gang form in highrise building, above-mentioned scaffold mostly is many pole steel tubes scaffold greatly, and this scaffold desired structure material is more, and sets up troublesome poeration and set up and remove the required cycle of scaffold long etc.In addition, usually also use a kind of suspended scaffold, but because this suspended scaffold self can not lifting, and to make its lifting by the jacking equipment that is located at this suspended scaffold outside, complicated because of its elevating method, thereby in building operations, seldom adopt this suspended scaffold.
The utility model scaffold is exactly in order to adapt to the needs of architectural construction technology development, with in order to replace above-mentioned suspended scaffold, and attempt replacing or partly replacing above-mentioned many pole steel tubes scaffold, and simple but practical attached wall self the Liftable type scaffold device of a kind of structure is proposed.
The utility model scaffold has a plurality of hangers that are made of an inner sleeve framework and an outer tube framework, described hanger is arranged along the horizontal direction of building wall, and make described outer tube framework slip big envelope on described inner sleeve framework, have being connected partly of some energy and described fabric structure spare phase mount on described inner sleeve framework and the outer tube framework respectively, can make respectively to produce between described inside and outside cover tube frame and relatively move by being installed in manual crane gear in the described scaffold.
The major advantage of the utility model scaffold is that its energy self carry out lifting, can not self lifting thereby overcome original suspended scaffold, and the shortcoming that can not extensively be promoted the use of, simultaneously, the utility model scaffolding structure is simple, and set up and remove easily, and small investment, be hopeful to be used for replacing or partly replace many pole steel tubes scaffold that extensive at present custom adopts, this helps improving building operations efficient and reduces investment outlay.The utility model scaffold is suitable for the high-building construction occasion especially, and adopts the occasion of architectural construction technologies such as large form and climbing forms.
Structural representation when Fig. 1 is connected for the sleeve pipe framing component of the described sleeve pipe shaped as frame hanger of expression formation and with fabric structure spare mount.
Fig. 2 uses the utility model scaffold when a certain actual high-building construction for expression, and described sleeve pipe shaped as frame hanger is along the skin configuration schematic diagram.
Fig. 3 connects partly structural representation for the part of the described sleeve pipe framing component of expression.
Now referring to (a) among Fig. 1,1 is described sleeve pipe framing component, it by outer tube framework (3) big envelope on inner sleeve framework (2), and can in inner sleeve framework (2), move freely and form, inner sleeve framework (2) is fixedly connected by welding by two steel tube poles 2 and some web members 6 and forms rectangular frame, outer tube framework (3) is by two steel tube poles 3 and some web members 6 ' form rectangular frame by welding, the structure length of outer tube framework (3) is about about one meter (distances of the two adjacent screws through walls that stay along the building structural member vertical direction when being equivalent to construction approximately), be provided with by welding on one side at it and all right one way or the otherly be mounted with the hook 7 that is connected with fabric structure spare, at its web member 6 ' be mounted with scaffold board support 5 that connection can be shelved scaffold board 4. On one side of inner sleeve framework (2) by welding be provided with all right one way or the other and fabric structure spare be mounted with the hook 7 that is connected ', has scaffold board support 5 with the scaffold board shelved 4 of above-mentioned same configuration form at its web member 6, the structure height of inner sleeve framework (2) is about (the structure height sum that is equivalent to approximately two common scaffold operation element layer heights and a jacketing frame (3)) about four meter five, two vertical rods 2 at inner sleeve framework (2) are respectively equipped with the pin hole that a row can insert the insurance pin, are used for addition rod 11 being installed and being inserted the insurance pin when making 1 lifting of cover tube frame.
Be positioned at the jack type hydraulic lifting on the web member seat board of outer tube framework (3) among Fig. 1 (a) Equipment 9 schematically illustrates the state when preparing lifting or decline inner sleeve framework (2), when wanting inner sleeve framework (2) is promoted, the adjacent two inner sleeve frameworks (2) of arranging along the same level direction are promoted simultaneously, therefore need there be two described jack type hydraulic lifting equipments 9 to work simultaneously, by install and fix addition rod 11 temporarily, when outer tube framework (3) and fabric structure spare being mounted be connected, unclamp the connecting bolt of inner sleeve framework (2) and fabric structure spare, can allow jack start working, inner sleeve framework (2) is promoted step by step, inner sleeve framework (2) is always promoted about one meter, generally need to change the position about three of addition rod 11 on inner sleeve framework (2), four times, just can finish once always promoting of inner sleeve framework (2). When wanting inner sleeve framework (2) is descended, for inner sleeve framework (2) is descended, must make earlier inner sleeve framework (2) a bit of distance that rises, can withdraw from from the fastening bolt that is connected with fabric structure spare, and then make its decline, in addition, the operation sequence of its rising and decline is all identical with main points, generally also need change about three, four times of the position of addition rod 11 on inner sleeve framework (2), just can finish once always descending of inner sleeve framework (2).
State when Fig. 1 (b) expression prepares outer tube framework (3) is risen, when wanting outer tube framework (3) is promoted, the two adjacent outer tube frameworks (3) of arranging along the same level direction are promoted simultaneously, when inner sleeve framework (2) and fabric structure spare being mounted be connected, unclamp the connecting bolt of outer tube framework (3) and fabric structure spare, can allow jack start working, the outer tube framework is promoted step by step, outer tube framework (3) is always promoted about one meter, by interim installing addition rod, generally also need change the position about three of addition rod on inner sleeve framework (2), four times, just can finish once always promoting of outer tube framework (3). When wanting to make outer tube framework (3) to descend, its operation sequence is substantially identical with the operation sequence when making inner sleeve framework (2) decline.
In addition, the gap of 5~10mm is arranged approximately between vertical rod 2 and vertical rod 3 tube walls, be beneficial to overlap the mount of tube frame 1 and fabric structure spare.
The utility model scaffold also has two-layer scaffold operation element layer, and described scaffold floor support 5 can connect by bolt makes it be connected with vertical rod 2 or 3 phase mounts, also can itself and mobile jib 2 or 3 is fixedly connected by welding.
Fig. 2 schematically illustrates the sleeve pipe shaped as frame hanger of described the utility model scaffold and the scaffold floor member put is thereon arranged along a certain high-building construction is on-the-spot, (1) is relatively independent described hanger, or title unit hanger, the horizontal span of described unit hanger can decide according to the adjacent two screw distances through walls that stay along fabric structure spare horizontal direction in the building operations, generally in 1.2~3.5 meters left and right sides scopes, choose, has arc form architecture construction occasion when running into, the desirable less value of described horizontal span.
Fig. 3 (a) is presentation graphs 1(a) in the local structure for amplifying schematic diagram at F place, by pin the both sides that the west of addition rod 11 is inserted in vertical rod 2 are respectively fixed.Fig. 3 (b) is presentation graphs 1(a) in the local structure for amplifying schematic diagram at K place, on hook 7 or 7 ' be fixedly connected by welding vertical rod 3 or 2, link up with 7 or 7 ' on have the hanging groove that can be suspended on the buckle connecting bolt that passes described screw through walls.
The member of the identical or same type of identical symbolic representation among above-mentioned each figure.

Claims (4)

1, a kind of building operations scaffold, relate in particular to building operations with self liftable suspended scaffold, it comprise a plurality of have with fabric structure spare assemble partly the hanger of being connected that is connected and fixed mutually, and be shelved on scaffold floor member on the described hanger, it is characterized in that described hanger is the sleeve pipe shaped as frame hanger that is formed by a plurality of cover tube frames of arranging along the building horizontal direction 1, described cover tube frame 1 by have a plurality of described connect partly 7 outer tube framework (3) big envelope have a plurality ofly describedly connect partly 7 ' inner sleeve framework (2) on, with the manual crane gear that is arranged on described scaffold inside can make respectively outer tube framework (3) and inner sleeve framework (2) each other generation relatively move.
2, scaffold according to claim 1, it is characterized in that described inner sleeve framework (2) is the rectangular frame that is fixedly connected by welding and is formed by two steel pipe vertical rods 2 and Duo Gen web member 6, outer tube framework (3) is the rectangular frame by two steel pipe vertical rods 3 and Duo Gen web member 6 ' be fixedly connected by welding and form.
3, scaffold according to claim 1 and 2 is characterized in that described manual crane gear is jack one a class crane gear 9, by interim installing addition rod 11 inner sleeve framework (2) and outer tube framework (3) is promoted or decline.
4, scaffold according to claim 1, it is characterized in that described connection partly 7 and 7 ' be coupling hook.
CN 86203954 1986-06-05 1986-06-05 Wall bearing self-lifting scaffold Expired - Lifetime CN86203954U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 86203954 CN86203954U (en) 1986-06-05 1986-06-05 Wall bearing self-lifting scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 86203954 CN86203954U (en) 1986-06-05 1986-06-05 Wall bearing self-lifting scaffold

Publications (1)

Publication Number Publication Date
CN86203954U true CN86203954U (en) 1987-09-30

Family

ID=4807133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 86203954 Expired - Lifetime CN86203954U (en) 1986-06-05 1986-06-05 Wall bearing self-lifting scaffold

Country Status (1)

Country Link
CN (1) CN86203954U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100365236C (en) * 2004-07-19 2008-01-30 深圳市特辰升降架工程有限公司 Circulating mechanical arm type lifting scaffold
CN100376760C (en) * 2004-08-13 2008-03-26 深圳市特辰科技有限公司 Circulating automatic up-down scaffold
CN103723600A (en) * 2014-01-17 2014-04-16 上海建工集团股份有限公司 Wall attaching device of construction elevator steel charging platform as well as operation method of wall attaching device
CN103993729A (en) * 2014-05-05 2014-08-20 泰兴市第一建筑安装工程有限公司 High rise elevator shaft formwork erecting platform
CN109457932A (en) * 2018-02-10 2019-03-12 彭绍华 Safe and convenient lifting scaffold device
CN109594759A (en) * 2017-09-30 2019-04-09 中国二十冶集团有限公司 The double-deck outer protection rack device of height-adjustable pin-connected panel and its application method
CN111576840A (en) * 2020-04-21 2020-08-25 中国建筑第八工程局有限公司 Wall attaching device for climbing equipment and climbing method thereof
CN113216595A (en) * 2021-05-20 2021-08-06 黎明职业大学 Adjustable external hanging rack for folding and unfolding of assembled concrete structure
CN113323368A (en) * 2021-04-21 2021-08-31 成都嘉泽正达科技有限公司 Lifting construction method for external protection hanging frame of assembled building

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100365236C (en) * 2004-07-19 2008-01-30 深圳市特辰升降架工程有限公司 Circulating mechanical arm type lifting scaffold
CN100376760C (en) * 2004-08-13 2008-03-26 深圳市特辰科技有限公司 Circulating automatic up-down scaffold
CN103723600A (en) * 2014-01-17 2014-04-16 上海建工集团股份有限公司 Wall attaching device of construction elevator steel charging platform as well as operation method of wall attaching device
CN103993729A (en) * 2014-05-05 2014-08-20 泰兴市第一建筑安装工程有限公司 High rise elevator shaft formwork erecting platform
CN109594759A (en) * 2017-09-30 2019-04-09 中国二十冶集团有限公司 The double-deck outer protection rack device of height-adjustable pin-connected panel and its application method
CN109594759B (en) * 2017-09-30 2021-03-26 中国二十冶集团有限公司 Height-adjustable assembled double-layer outer protection frame device and using method thereof
CN109457932A (en) * 2018-02-10 2019-03-12 彭绍华 Safe and convenient lifting scaffold device
CN111576840A (en) * 2020-04-21 2020-08-25 中国建筑第八工程局有限公司 Wall attaching device for climbing equipment and climbing method thereof
CN111576840B (en) * 2020-04-21 2021-08-13 中国建筑第八工程局有限公司 Wall attaching device for climbing equipment and climbing method thereof
CN113323368A (en) * 2021-04-21 2021-08-31 成都嘉泽正达科技有限公司 Lifting construction method for external protection hanging frame of assembled building
CN113216595A (en) * 2021-05-20 2021-08-06 黎明职业大学 Adjustable external hanging rack for folding and unfolding of assembled concrete structure

Similar Documents

Publication Publication Date Title
CN86203954U (en) Wall bearing self-lifting scaffold
CN213014697U (en) Corner structure of encorbelmenting and building structure
CN209780229U (en) Jacking platform system of integrated tower crane
CN213115437U (en) Wall-attached type operation platform module under overhanging roof
CN2263161Y (en) Self-lifting scaffold
CN217027984U (en) Movable overhanging construction platform
CN215803090U (en) Hanging basket support frame
CN210622277U (en) Hanging flower basket high support fixing device
CN220414810U (en) Double-hanging-point hanging basket
CN212984714U (en) Supporting tool for assembled cantilever component
CN218564566U (en) double-C-shaped purline lower hanging pipeline mounting support and hanger device for steel structure roof
CN210316465U (en) Guide rail and combined guide rail
CN217782825U (en) Steel pipe frame platform extension instrument
CN220725748U (en) Ultra-high-rise atrium roof refuge layer formwork system
CN216476314U (en) Assembly type formwork system of cast-in-place plate of steel structure building
CN215594829U (en) Combined adjustable diagonal type outer frame auxiliary supporting frame
CN212336763U (en) Curtain wall installation guide rail device fixed on roof flower frame beam
CN217581192U (en) Supporting device for steel-clad room template
CN219753963U (en) Horizontal supporting structure for concrete laminated slab construction
CN215564317U (en) Novel stores pylon for assembly type structure
CN216007787U (en) Template system is pour to double-deck shear force wall unilateral
CN220395120U (en) Overhanging type operation platform
CN219100689U (en) Attachment structure suitable for super high floor attached lifting scaffold
CN216341070U (en) Auxiliary positioning device for installation of steel structure net rack
CN216740618U (en) Steel construction protection scaffold puts up system suitable for light rail station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CX01 Expiry of patent term