CN109594759A - The double-deck outer protection rack device of height-adjustable pin-connected panel and its application method - Google Patents

The double-deck outer protection rack device of height-adjustable pin-connected panel and its application method Download PDF

Info

Publication number
CN109594759A
CN109594759A CN201710937252.0A CN201710937252A CN109594759A CN 109594759 A CN109594759 A CN 109594759A CN 201710937252 A CN201710937252 A CN 201710937252A CN 109594759 A CN109594759 A CN 109594759A
Authority
CN
China
Prior art keywords
bar
bracket
support frame
longitudinal movement
longitudinally fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710937252.0A
Other languages
Chinese (zh)
Other versions
CN109594759B (en
Inventor
李明轩
白世烨
孙颖
陈斌
李鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201710937252.0A priority Critical patent/CN109594759B/en
Publication of CN109594759A publication Critical patent/CN109594759A/en
Application granted granted Critical
Publication of CN109594759B publication Critical patent/CN109594759B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to the field of stents of main branch on the ground, specially a kind of height-adjustable pin-connected panel bilayer is outer to protect rack device and its application method.A kind of double-deck outer protection rack device of height-adjustable pin-connected panel, including bracket A (1) and bracket B (2), it is characterized in that: bracket A (1) includes support frame (11), skirting board (12), support plate (13) and split bolt (14);Bracket B (2) includes longitudinally fixed bar (21), longitudinal movement bar (22), positioning bolt (23), cushion block (24), horizontal cross bar (25) and purse seine (26).A kind of application method of the double-deck outer protection rack device of height-adjustable pin-connected panel, it is characterized in that: successively implementing as described below: a. positioning;B. it constructs;C. it dismantles;D. it repeats.The present invention is built conveniently, and disassembly is easy, and construction speed is fast, and construction cost is low.

Description

The double-deck outer protection rack device of height-adjustable pin-connected panel and its application method
Technical field
The present invention relates to the field of stents of main branch on the ground, specially a kind of double-deck outer protection of height-adjustable pin-connected panel Rack device and its application method.
Background technique
Currently, when prefabricated concrete structure bracing engineering is constructed, generally use method by setting up external scaffolding into The construction of row prefabricated concrete structure bracing engineering, construction speed is slower, and construction cost is high.
Summary of the invention
In order to overcome the drawbacks of the prior art, provide one kind build conveniently, disassembly is easy, construction speed is fast, construction cost Low building support unit, the invention discloses a kind of double-deck outer protection rack device of height-adjustable pin-connected panel and its users Method.
The present invention reaches goal of the invention by following technical solution:
A kind of double-deck outer protection rack device of height-adjustable pin-connected panel, including bracket A and bracket B, it is characterized in that:
Bracket A includes support frame, skirting board, support plate and split bolt,
Support frame is right angled triangle, and two right-angle sides of support frame are in horizontal and vertical setting respectively, and each support frame is horizontal On the skirting board that the tie point of right-angle side and bevel edge is sequentially fixed at and level right angle side of the skirting board perpendicular to support frame, support Plate is fixed on the level right angle side of support frame and is bonded behind skirting board before support plate to play support to skirting board and make With the vertical right-angle side of support frame is fitted on precast concrete exterior wall and is fixed on precast concrete exterior wall by split bolt On;
Bracket B includes longitudinally fixed bar, vertically moves bar, positioning bolt, cushion block, horizontal cross bar and purse seine,
Each longitudinally fixed bar is all vertically arranged and is all located on the same vertical plane, and one is arranged in every longitudinally fixed bar and is indulged To mobile bar and the fixed link movement along longitudinal direction of longitudinal movement bar, both longitudinally fixed bar and longitudinal movement bar are along respective axis Direction is all provided at least two location holes, and longitudinally fixed bar positions when fixed link is moved to the location hole alignment of the two along longitudinal direction Bolt penetrates location hole and fixes, and each horizontal cross bar is horizontally disposed, and every horizontal cross bar is all sequentially connected each longitudinally fixed bar Or each longitudinal movement bar, in the gap between longitudinally fixed bar and longitudinal movement bar, between horizontal cross bar and longitudinally fixed bar Gap in, be all embedded with cushion block in the gap between horizontal cross bar and longitudinal movement bar, purse seine is laid on by longitudinally fixed bar, vertical On the grid constituted to mobile bar and horizontal cross bar;
The upper and lower part of each bracket B is separately connected a bracket A, it may be assumed that the upper and lower part difference of every longitudinally fixed bar The vertical right-angle side an of support frame is connected, the gap between longitudinally fixed bar and the vertical right-angle side of support frame is embedded with pad Block.
The double-deck outer protection rack device of the height-adjustable pin-connected panel, it is characterized in that: support frame is formed by welding by channel steel, Longitudinally fixed bar and longitudinal movement bar all use channel steel, and the distance between longitudinal movement bar notch lateral wall is less than longitudinally fixed bar The width of notch, skirting board and support plate all use steel plate.
The application method of the double-deck outer protection rack device of the height-adjustable pin-connected panel, it is characterized in that: as described below Successively implement:
A. position: adjusting longitudinal movement bar, fixed link is moved to setting position and makes longitudinally fixed bar and longitudinal movement along longitudinal direction The location hole of both bars is aligned, and is then fixed with positioning bolt;
B. it constructs: two bracket A of the upper and lower part position support B being passed through into split bolt and are fixed on outside precast concrete On wall, then precast concrete exterior wall is lifted to corresponding construction point, pedal is laid on the level right angle side of support frame and is made For workbench;
C. it dismantles: after construction, unscrewing split bolt, bracket A and bracket B are unloaded and dropped from precast concrete exterior wall To ground, and unscrew positioning bolt
D. it repeats: according to new story height, repeating step a~c, until completing the construction of all precast concrete exterior walls.
The present invention is constructing operation face using the outer protective frame for being fixed on exterior wall, solves prefabricated concrete structure and goes along with sb. to guard him Engineering construction problem;Outer protection rack device is fixed on precast facade, the horizontal channel steel top of triangular support bracket by triangular support bracket It is laid with the steel plate with skirting board and forms construction operation platform, the vertical channel steel of outer protective frame being connected with skirting board is adjustable Length, by adjusting vertical channel steel length, to adjust second layer protective platform height.The invention has the following beneficial effects: 1. It can be used in turn, save scaffold purchase cost, advantageously reduce construction cost;2. outer protective platform is prefabricated accessory, only The scene splicing of need can be completed, and saves the scaffold building time, is conducive to accelerate construction progress;3. outer protective frame podium level Adjustable, flexibility is big, applied widely.
Detailed description of the invention
Fig. 1 is the main view of bracket A in the present invention;
Fig. 2 is the left view of bracket A in the present invention;
Fig. 3 is the main view of bracket B in the present invention;
Fig. 4 is the left view of bracket B in the present invention;
Fig. 5 is main view of the invention;
Fig. 6 is left view of the invention.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
Embodiment 1
A kind of double-deck outer protection rack device of height-adjustable pin-connected panel, including bracket A1 and bracket B2, as shown in Fig. 1~Fig. 6, tool Body structure is:
Bracket A1 is as depicted in figs. 1 and 2: including support frame 11, skirting board 12, support plate 13 and split bolt 14,
Support frame 11 is right angled triangle, and two right-angle sides of support frame 11 are in horizontal and vertical setting, each support frame respectively On the skirting board 12 that the tie point of 11 level right angle sides and bevel edge is sequentially fixed at and skirting board 11 perpendicular to support frame 11 water The straight arm of angle, after support plate 13 is fixed on the level right angle side of support frame 11 and is bonded skirting board 12 before support plate 13 Face to play a supportive role to skirting board 12, the vertical right-angle side of support frame 11 be fitted on precast concrete exterior wall 10 and by pair Bolt 14 is drawn to be fixed on precast concrete exterior wall 10;
Bracket B2 is as shown in Figure 3 and Figure 4: including longitudinally fixed bar 21, longitudinal movement bar 22, positioning bolt 23, cushion block 24, level Cross bar 25 and purse seine 26,
Each longitudinally fixed bar 21 is all vertically arranged and is all located on the same vertical plane, is arranged one in every longitudinally fixed bar 21 Root vertically moves bar 22 and longitudinal movement bar 22, and fixed link 21 is mobile along longitudinal direction, longitudinally fixed bar 21 and longitudinal movement bar 22 this two Person is provided at least two location holes along respective axis direction, and fixed link 21 is moved to the two to longitudinally fixed bar 22 along longitudinal direction Location hole penetrates location hole with positioning bolt 23 when being aligned and fixes, and each horizontal cross bar 25 is horizontally disposed, every horizontal cross bar 25 All be sequentially connected each longitudinally fixed bar 21 or each longitudinal movement bar 22, with reinforce longitudinal stability and improve peripheral intensity and Rigidity, in the gap between longitudinally fixed bar 21 and longitudinal movement bar 22, between horizontal cross bar 25 and longitudinally fixed bar 21 between It is all embedded with cushion block 24 in gap in gap, between horizontal cross bar 25 and longitudinal movement bar 22, is required and power transmission road with meeting size Diameter requirement, purse seine 26 are laid on the grid being made of longitudinally fixed bar 21, longitudinal movement bar 22 and horizontal cross bar 25, to improve Platform operates the safety of surface construction, while preventing material equipment falling from high altitude of constructing on operating platform, eliminates hidden danger;
The upper and lower part of each bracket B2 is separately connected a bracket A1, it may be assumed that the upper and lower part of every longitudinally fixed bar 21 It is separately connected the vertical right-angle side an of support frame 11, the gap between longitudinally fixed bar 21 and the vertical right-angle side of support frame 11 Being embedded with cushion block 24, size requires and Path of Force Transfer requires to meet.
In the present embodiment: support frame 11 is formed by welding by three 8# channel steels, and longitudinally fixed bar 21 selects 10# channel steel, longitudinal Mobile bar 22 selects 8# channel steel, and skirting board 12 and support plate 13 all use steel plate, longitudinally fixed bar 21 and longitudinal movement bar 22 this The two is equipped with the location hole of a diameter 20mm, split bolt 14 and positioning bolt 23 along respective axis direction every 500mm All select M20 bolt.
Be the construction of assembly of shear wall structure with Mr. Yu's project subject structure, main structure is that 15 floors are high, the 1st layer and 2nd layer to be cast-in-place, since the 3rd layer use prefabricated member, the 3rd high 4m layer by layer, the 4th layer to 15 high 3m layer by layer, using height Spend the double-deck outer protection rack device construction of adjustable pin-connected panel, specific steps are as follows:
A. prepare: according to construction loads and regional wind load of constructing, being calculated and determined by outer protective frame mechanical model:
The quantity, spacing and the selection of material of support frame 11 in bracket A1, longitudinally fixed bar 21, longitudinal movement 22 and of bar in bracket B2 The respective quantity of horizontal cross bar 25, spacing and the selection of material, split bolt 14 and the respective quantity of positioning bolt 23, spacing and The selection of material;
By outer protective frame mechanical model calculated result, drafts the erection scheme of the double-deck outer protection rack device of each pin-connected panel and tear open Unload scheme;
According to outer protective frame erection scheme, component detail drawing is drawn, gives manufacturer's production in advance;
B. position: as shown in Figure 5 and Figure 6: adjusting longitudinal movement bar 22, fixed link 21 is moved to setting position and makes to indulge along longitudinal direction Location hole alignment to 22 the two of fixed link 21 and longitudinal movement bar, it is then fixed with positioning bolt 23;
C. it constructs: two bracket A1 of the upper and lower part position support B2 being passed through into split bolt 14 and are fixed on concrete On native exterior wall 10, then precast concrete exterior wall 10 is lifted to corresponding construction point, on the level right angle side of support frame 11 Pedal is laid with as workbench, content of constructing generally includes outer wall water proof structure construction, heat insulating material for external stickup etc.;
D. it dismantles: after construction, unscrewing split bolt 14, bracket A1 and bracket B2 are unloaded from precast concrete exterior wall 10 Ground is descended and be down to, and unscrews positioning bolt 23
E. it repeats: according to new story height, repeating step b~d, construction is had enough to meet the need with this, until completing all concretes The construction of native exterior wall 10.

Claims (3)

1. a kind of double-deck outer protection rack device of height-adjustable pin-connected panel, including bracket A (1) and bracket B (2), it is characterized in that:
Bracket A (1) includes support frame (11), skirting board (12), support plate (13) and split bolt (14), and support frame (11) is straight Angle triangle,
Two right-angle sides of support frame (11) are in horizontal and vertical setting respectively, each support frame (11) level right angle side and bevel edge The skirting board (12) that is sequentially fixed at of tie point on and level right angle side of the skirting board (11) perpendicular to support frame (11), support Plate (13) be fixed on the level right angle side of support frame (11) and before support plate (13) be bonded skirting board (12) behind with It plays a supportive role to skirting board (12), the vertical right-angle side of support frame (11) is fitted on precast concrete exterior wall (10) and passes through Split bolt (14) is fixed on precast concrete exterior wall (10);
Bracket B (2) includes longitudinally fixed bar (21), longitudinal movement bar (22), positioning bolt (23), cushion block (24), horizontal cross bar (25) and purse seine (26),
Each longitudinally fixed bar (21) is all vertically arranged and is all located on the same vertical plane, every longitudinally fixed bar (21) inner sleeve If a longitudinal movement bar (22) and longitudinal movement bar (22) fixed link (21) movement along longitudinal direction, longitudinally fixed bar (21) and longitudinal direction Both mobile bars (22) are all provided at least two location holes along respective axis direction, and longitudinally fixed bar (22) is fixed along longitudinal direction Bar (21) penetrates location hole with positioning bolt (23) when being moved to the location hole alignment of the two and fixes, each horizontal cross bar (25) water Flat setting, every horizontal cross bar (25) are all sequentially connected each longitudinally fixed bar (21) or each longitudinal movement bar (22), longitudinal Gap in gap between fixed link (21) and longitudinal movement bar (22), between horizontal cross bar (25) and longitudinally fixed bar (21) Cushion block (24) all are embedded in gap between interior, horizontal cross bar (25) and longitudinal movement bar (22), purse seine (26) is laid on by indulging On the grid constituted to fixed link (21), longitudinal movement bar (22) and horizontal cross bar (25);
The upper and lower part of each bracket B (2) is separately connected a bracket A (1), it may be assumed that the top of every longitudinally fixed bar (21) The vertical right-angle side of a support frame (11), the vertical right angle of longitudinally fixed bar (21) and support frame (11) are separately connected with lower part Gap between side is embedded with cushion block (24).
2. as described in claim 1 height-adjustable pin-connected panel it is double-deck it is outer protect rack device, it is characterized in that: support frame (11) by Channel steel is formed by welding, and longitudinally fixed bar (21) and longitudinal movement bar (22) all use channel steel, longitudinal movement bar (22) notch outside The distance between wall is less than the width of longitudinally fixed bar (21) notch, and skirting board (12) and support plate (13) all use steel plate.
3. the application method of the double-deck outer protection rack device of height-adjustable pin-connected panel as claimed in claim 1 or 2, feature It is: successively implements as described below:
A. position: adjusting longitudinal movement bar (22), fixed link (21) is moved to setting position and makes longitudinally fixed bar along longitudinal direction (21) it is aligned with the location hole of longitudinal movement bar (22) the two, it is then fixed with positioning bolt (23);
B. it constructs: two bracket A (1) of position support B (2) upper and lower part being all fixed on by split bolt (14) pre- On concrete exterior wall (10) processed, then precast concrete exterior wall (10) are lifted to corresponding construction point, in support frame (11) Pedal is laid on level right angle side as workbench;
C. it dismantles: after construction, unscrewing split bolt (14), by bracket A (1) and bracket B (2) from precast concrete exterior wall (10) ground is unloaded and be down on, and unscrews positioning bolt (23)
D. it repeats: according to new story height, repeating step a~c, until completing all precast concrete exterior walls (10) Construction.
CN201710937252.0A 2017-09-30 2017-09-30 Height-adjustable assembled double-layer outer protection frame device and using method thereof Active CN109594759B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710937252.0A CN109594759B (en) 2017-09-30 2017-09-30 Height-adjustable assembled double-layer outer protection frame device and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710937252.0A CN109594759B (en) 2017-09-30 2017-09-30 Height-adjustable assembled double-layer outer protection frame device and using method thereof

Publications (2)

Publication Number Publication Date
CN109594759A true CN109594759A (en) 2019-04-09
CN109594759B CN109594759B (en) 2021-03-26

Family

ID=65956145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710937252.0A Active CN109594759B (en) 2017-09-30 2017-09-30 Height-adjustable assembled double-layer outer protection frame device and using method thereof

Country Status (1)

Country Link
CN (1) CN109594759B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067207A (en) * 2019-05-29 2019-07-30 中交一公局集团有限公司 High pier over-form construction reinforced bar binds protective frame
CN112282042A (en) * 2020-09-18 2021-01-29 上海二十冶建设有限公司 Detachable supporting tool for prefabricated air conditioner plate and using method thereof
CN113175203A (en) * 2021-05-07 2021-07-27 苏茂兵 Method for setting lifting power equipment in attached lifting scaffold

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3341031A1 (en) * 1983-11-12 1984-06-14 Anton 7971 Aitrach Schad Framework bracket for producing a bracket framework which can be adjusted in height and width and is fastened onto the rafters, purlins, cross members etc. forming part of a roof construction
CN86203954U (en) * 1986-06-05 1987-09-30 沈定公 Wall bearing self-lifting scaffold
AU2004205156B2 (en) * 2003-08-20 2006-04-13 Frank Suvajdich Concreter's scaffodling brackets
FR2984384B1 (en) * 2011-12-15 2014-03-07 Hussor WORK PLATFORM ENCORBELLEMENT ADJUSTABLE IN LENGTH
CN204311719U (en) * 2014-11-21 2015-05-06 安徽万升架业有限公司 External hanging type scaffold
CN204899274U (en) * 2015-09-10 2015-12-23 安徽宇辉新型建筑材料有限公司 Prefabricated concrete structure goes along with sb. to guard him frame outward
CN105781090A (en) * 2016-04-29 2016-07-20 武汉工程大学 Tool-type elevator shaft operating platform with adjustable size and height
CN106677509A (en) * 2017-02-14 2017-05-17 中天建设集团有限公司 Design finalization external protective frame system used for assembly type building construction

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3341031A1 (en) * 1983-11-12 1984-06-14 Anton 7971 Aitrach Schad Framework bracket for producing a bracket framework which can be adjusted in height and width and is fastened onto the rafters, purlins, cross members etc. forming part of a roof construction
CN86203954U (en) * 1986-06-05 1987-09-30 沈定公 Wall bearing self-lifting scaffold
AU2004205156B2 (en) * 2003-08-20 2006-04-13 Frank Suvajdich Concreter's scaffodling brackets
FR2984384B1 (en) * 2011-12-15 2014-03-07 Hussor WORK PLATFORM ENCORBELLEMENT ADJUSTABLE IN LENGTH
CN204311719U (en) * 2014-11-21 2015-05-06 安徽万升架业有限公司 External hanging type scaffold
CN204899274U (en) * 2015-09-10 2015-12-23 安徽宇辉新型建筑材料有限公司 Prefabricated concrete structure goes along with sb. to guard him frame outward
CN105781090A (en) * 2016-04-29 2016-07-20 武汉工程大学 Tool-type elevator shaft operating platform with adjustable size and height
CN106677509A (en) * 2017-02-14 2017-05-17 中天建设集团有限公司 Design finalization external protective frame system used for assembly type building construction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067207A (en) * 2019-05-29 2019-07-30 中交一公局集团有限公司 High pier over-form construction reinforced bar binds protective frame
CN110067207B (en) * 2019-05-29 2024-05-17 中交一公局集团有限公司 Reinforcing steel bar binding protection frame for high pier turnover formwork construction
CN112282042A (en) * 2020-09-18 2021-01-29 上海二十冶建设有限公司 Detachable supporting tool for prefabricated air conditioner plate and using method thereof
CN113175203A (en) * 2021-05-07 2021-07-27 苏茂兵 Method for setting lifting power equipment in attached lifting scaffold

Also Published As

Publication number Publication date
CN109594759B (en) 2021-03-26

Similar Documents

Publication Publication Date Title
CN106677070B (en) A kind of high-altitude long-span heavy duty construction of beam bracket and construction method
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN203891443U (en) Shear wall elevator shaftway assembly type operation platform
CN203188589U (en) Rigid-frame continuous beam zero block construction bracket supporting system
CN109594759A (en) The double-deck outer protection rack device of height-adjustable pin-connected panel and its application method
CN203021923U (en) Big cantilever bent cap steel truss construction platform
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN108049666B (en) A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction
CN107724540A (en) Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates
CN108951426A (en) It is a kind of for setting up the support device and construction system of eminence steel girder segment
CN209040348U (en) A kind of assembled double steel plate combined shear wall construction with ribbing
CN109024685B (en) Large-volume concrete bottom plate steel bar supporting system and construction method thereof
CN207686147U (en) Floor and double steel bar protective layer thickness control device
CN203684102U (en) Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge
CN207244633U (en) Brick retaining wall steel bar girder hardened system on foundation pit enclosure top beam
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN204754150U (en) Dish -type node formula scaffold
CN205421330U (en) A formwork support system for construction of vault underground structure engineering
CN209854576U (en) Trolley for construction of cover plate culvert or channel
CN103882882B (en) Integral jacking formula tower crane platform structure
CN207905333U (en) Saddle combines Construction of Supporting hoistable platform
CN203257080U (en) Adjustable overhang supporting device for building construction
CN206599994U (en) One kind is exempted to pierce formula form bracing system branch head part
CN205100242U (en) Three laminar cantilever operation platform systems
CN206256683U (en) For the tool of concave character type architecture storey shaping

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant