CN109457932A - Safe and convenient lifting scaffold device - Google Patents
Safe and convenient lifting scaffold device Download PDFInfo
- Publication number
- CN109457932A CN109457932A CN201810169774.5A CN201810169774A CN109457932A CN 109457932 A CN109457932 A CN 109457932A CN 201810169774 A CN201810169774 A CN 201810169774A CN 109457932 A CN109457932 A CN 109457932A
- Authority
- CN
- China
- Prior art keywords
- embedded iron
- safe
- ladder frame
- latch hook
- convenient lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
Abstract
The present invention discloses a kind of safe and convenient elevating scaffold, including is arranged in wall pre-embedded iron.The construction that N layers of high building can be only constructed with the tube material of first floor is able to achieve when ladder frame and embedded iron couple.Convenient elevating scaffold is safe and reliable.It is used suitable for low layer, middle layer, high-rise floor, speed of application can be significantly improved.
Description
The convenient lifting scaffold device of [field] design safety of the present invention, by its be on tall building wall, design it is a kind of with
The safe and convenient device that wall rises together.A large amount of scaffolding steel pipe can be not only saved, can also be saved a large amount of manually installed
Cost.Securely and reliably.
[background] current known scaffold has traditional pin-connected panel, integrated hydraulic ascending manner, module combined type.Traditional type
It is to be built from Stall to roof by N root steel pipe and fastener assembly.Integrated hydraulic ascending manner is to design a same external walls of building
The framework platform of size starts entire framework with oil pressure and rises.As the construction of the first in the world high building is exactly to be put down with whole in recent years
The platform scaffold of desk-top rising.Modular is to combine scaffolding steel pipe on N number of compartment frame, these compartment framves and outer Wall bolt connect
It connects, or there is the bolt rail to lead combination with exterior wall.Such as the modularization external hanging type scaffold of application number 2017102126027.It leads
Rail is bolted to outside wall.Scaffold pulls by tower crane rope on guide rail and slides and rise, because of tower crane and scaffold phase
Away from it is too far when, manipulation fault it is more.
[purpose] the invention is realized in this way, the latch hook on existing floor wall inclination ladder frame, ladder frame is straight
Connect the embedded iron safe self-locking with floor wall.It saves manually to climb up and climb down, fastening bolt trouble.When ladder frame is self-locking in wall
After embedded iron, then riding boogie board frame is placed on ladder frame.Load onto guardrail and screen cloth.This design scheme not only solves traditional steel
When pipe assembly, time-consuming feed consumption problem at high cost and unsafe also solves the problems, such as that improving work efficiency and special-shaped residential building uses
Limited problem, moreover it is possible to solve the modularization external hanging type scaffold bolt and wall connecting of application 2017102126027
Recession dress problem.Numerous bolt and mobile module are filled because climbing up in scaffold and climbing down to remove repeatedly, there are serious
Insecurity factor and troublesome time-consuming process.
[scheme] because using safe and convenient lifting device technology in invention, the implementation innovation effect of scheme is very bright
It is aobvious.Now by the combination of above-mentioned safe and convenient lifting scaffold device (hereinafter referred to as are as follows: scaffold) and floor wall and go up and down into
Multiple equidistant latch hooks should be arranged in the connection of row design structure, scaffold and wall on scaffold, and energy quick and safe lock is in wall
In the embedded iron of body.The operating procedure on concrete plate of standing is the latch hook position of the ladder frame on scaffold, and embedded iron and mould are housed
Box, diaphragm capsule is arranged on wall, and to concrete casting complete, embedded iron and diaphragm capsule are just embedded among concrete material.It is solid to concrete material, just
Ladder frame is drawn high to one layer upwards, latch hook is allowed to be detached from first layer embedded iron, latch hook is then injected second layer embedded iron.Like this
Floor increases rear ladder frame and latch hook also constantly converts raised position.It is to use ladder frame that every layer of embedded iron positions in pour concrete
On equidistant latch hook on homalocephalus bolt realize, when concrete is solid after in embedded iron be oriented to just can control ladder frame pulled straight
And accurately enter position.In order to safe and simple, the hole drawstring on ladder frame is in conjunction with small machine.When ladder frame will rise, start small
Motor drives hinge rope sheave rotation, and ladder frame can rise to predetermined position.Dual ladder frame order only use two small machines and
Hinge rope, which achieves that, moves up scaffold.
[effect] with reference to the accompanying drawings and examples: being described in further detail to invention effect
Fig. 1 is main view of the present invention;
Fig. 2 is side view of the present invention;
Fig. 3 is top view of the invention;
Fig. 4 is partial enlarged view of the invention;
Fig. 5 is embedded iron and ladder frame figure;
Fig. 6 is embedded iron top view.
[drawing explanation] in figure one, equidistant latch hook (2) on ladder frame (8), hinge rope (5), small machine (3), embedded iron
(1), diaphragm capsule (11), homalocephalus pin (10), wall (12), pin (6), riding boogie board frame (9), notch (7), guardrail pipe (13), hinge wheel (4).
There is equidistant latch hook (2) that the embedded iron (1) in wall (12) can be hooked on [implementation] ladder frame (8).Due to lock
Hook (2) is inside and outside be all provided with it is gradient, latch hook (2) will not walk about misplace latch hook (2) enter in embedded iron (1) after hook obtain it is very secured,
It loosens to prevent latch hook (2) and embedded iron (1) from breaking off relations, therefore is consolidated in latch hook (2) and setting homalocephalus bolt (10) in embedded iron
It is fixed.With the stability for ensureing diaphragm capsule (11), such ladder frame (8), embedded iron (1), diaphragm capsule (11), homalocephalus pin (10) formation
Positioning can also be from the secured single unit system that can be closed.When concrete casting be it is stable will not be squeezed and lose shape by concrete, effective guarantee ladder
Shape frame (8) can shift vertically upward.Latch hook (2) can be injected accurately in one layer of embedded iron (1).Hole on ladder frame (8) is used for
Installation hinge rope (4) and small machine (3), after the concrete of wall (12) is solid and ladder frame (8) is with regard to upward displacement, hinge rope (5) one end
Small machine (3) one end connection ladder frame (8) is connected, starting small machine (3) drives hinge wheel (4), and ladder frame (8) just moves up.
And first floor embedded iron (1) is left, because embedded iron (1) is equipped with guide position limiter, just make ladder frame (8) will not when rising in this way
It wanders off.After ladder frame (8) all rises in place, make that embedded iron (1) and diaphragm capsule (11) homalocephalus pin (10) is installed, with regard to upper guardrail pipe
(13) riding boogie board (9).Dress steel bar template and casting can be carried out later.For the ease of transporting more dresses ladder frame (9), ladder frame (8)
Unilateral settable notch (7) set pin (6) in ladder frame (8) pipe convenient for being sleeved on notch (7) position.
Claims (3)
1. construction and installation speed and safety can be improved in the safe and convenient lifting scaffold device according to claim, the device
And cost declining.It is characterized in that:
Have on ladder frame (9) latch hook (2), latch hook (2) can hook wall (12) and have equidistant embedded iron (1), in embedded iron (1)
Equipped with diaphragm capsule (11), embedded iron (1) can be consolidated with homalocephalus pin (10) and diaphragm capsule (11) will not lose shape dislocation in pour concrete, is improved
Accuracy.
2. the 1 safe and convenient lifting scaffold device according to claim, it is characterized in that: latch hook (2) is inside and outside to be all provided with taper.
Can enhance the stability of ladder frame (8), and with after embedded iron (1) locking.
3. safe and convenient lifting scaffold device according to claim 2, it is characterized in that: ladder frame (8) unilateral pipe have it is scarce
Mouthful (7) have pin (6) in the pipe of notch (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810169774.5A CN109457932A (en) | 2018-02-10 | 2018-02-10 | Safe and convenient lifting scaffold device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810169774.5A CN109457932A (en) | 2018-02-10 | 2018-02-10 | Safe and convenient lifting scaffold device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109457932A true CN109457932A (en) | 2019-03-12 |
Family
ID=65606212
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810169774.5A Pending CN109457932A (en) | 2018-02-10 | 2018-02-10 | Safe and convenient lifting scaffold device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109457932A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113356561A (en) * | 2021-07-21 | 2021-09-07 | 中国十七冶集团有限公司 | Wall-attached support of attached lifting scaffold and wall-attached rod mounting method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2850279A1 (en) * | 1978-11-20 | 1980-05-29 | Heinrich Haenzel | House wall fixture for scaffolding ladder - has stem hung on hooks and hinged to ladder |
CN86203954U (en) * | 1986-06-05 | 1987-09-30 | 沈定公 | Wall bearing self-lifting scaffold |
CN204691201U (en) * | 2015-05-21 | 2015-10-07 | 中铁建设集团有限公司 | A kind of Liftable hanging formula scaffold system |
CN206034875U (en) * | 2016-06-23 | 2017-03-22 | 中国建筑第二工程局有限公司 | Supplementary installation swing arm formula tower crane instrument roof beam hanging flower basket device |
CN107143128A (en) * | 2017-07-11 | 2017-09-08 | 安徽卓良新材料有限公司 | A kind of connecting structure of wall of dual-raw external scaffold |
-
2018
- 2018-02-10 CN CN201810169774.5A patent/CN109457932A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2850279A1 (en) * | 1978-11-20 | 1980-05-29 | Heinrich Haenzel | House wall fixture for scaffolding ladder - has stem hung on hooks and hinged to ladder |
CN86203954U (en) * | 1986-06-05 | 1987-09-30 | 沈定公 | Wall bearing self-lifting scaffold |
CN204691201U (en) * | 2015-05-21 | 2015-10-07 | 中铁建设集团有限公司 | A kind of Liftable hanging formula scaffold system |
CN206034875U (en) * | 2016-06-23 | 2017-03-22 | 中国建筑第二工程局有限公司 | Supplementary installation swing arm formula tower crane instrument roof beam hanging flower basket device |
CN107143128A (en) * | 2017-07-11 | 2017-09-08 | 安徽卓良新材料有限公司 | A kind of connecting structure of wall of dual-raw external scaffold |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113356561A (en) * | 2021-07-21 | 2021-09-07 | 中国十七冶集团有限公司 | Wall-attached support of attached lifting scaffold and wall-attached rod mounting method |
CN113356561B (en) * | 2021-07-21 | 2022-05-10 | 中国十七冶集团有限公司 | Wall-attached support of attached lifting scaffold and wall-attached rod mounting method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105971271B (en) | Unilateral cantilever form and its construction method of climbing certainly | |
WO2022252633A1 (en) | Method for arranging upside-down hoisting power device in attached lifting scaffold | |
CN211229441U (en) | Concrete pouring platform is built in room | |
CN106869475A (en) | Height-adjustable individual layer scaffold | |
CN110259079A (en) | One kind being used for building machinery and construction synchronization lifting structure | |
CN201729566U (en) | Multifunctional semi-circular structure lifting appliance | |
CN109457932A (en) | Safe and convenient lifting scaffold device | |
CN102979297A (en) | Hanging type stairwell operating platform mechanism and construction method thereof | |
CN2703832Y (en) | Elevator well creeping formwork hoisting frame | |
CN207647168U (en) | A kind of construction hydraulic formwork climbing device | |
CN202441045U (en) | Rail-type electric attached lifting scaffold | |
CN107642241A (en) | The stress supporting construction and construction method of a kind of prefabricated balcony | |
CN105926918B (en) | A kind of collapsible hoistway operation steel platform device and erection method | |
CN107587710A (en) | The treadle of false work of safe footmuff is installed | |
CN111648583B (en) | Walkway platform of tower crane connected with all-steel attached lifting scaffold | |
CN209855192U (en) | Automatic lifting frame for shaped elevator shaft way | |
CN207986446U (en) | Top supernumerary segment extends downwardly formula transport device | |
CN209482687U (en) | A kind of Super High exterior frame column construction operation platform | |
CN206737397U (en) | Type multi-layer scaffold can be climbed | |
CN207245131U (en) | A kind of packaged type automatic lifting operating platform | |
CN205713036U (en) | High pier over-form construction platform | |
CN206511894U (en) | A kind of working hoistable platform of bridge construction | |
CN2256418Y (en) | Creeping formwork lifting frame for lift shaft | |
CN106760464B (en) | Elevator shaft operating platform and its construction method | |
CN206157890U (en) | Prefabricated assembly building structure of building cavity formula |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190312 |
|
WD01 | Invention patent application deemed withdrawn after publication |