CN206034875U - Supplementary installation swing arm formula tower crane instrument roof beam hanging flower basket device - Google Patents

Supplementary installation swing arm formula tower crane instrument roof beam hanging flower basket device Download PDF

Info

Publication number
CN206034875U
CN206034875U CN201620634521.7U CN201620634521U CN206034875U CN 206034875 U CN206034875 U CN 206034875U CN 201620634521 U CN201620634521 U CN 201620634521U CN 206034875 U CN206034875 U CN 206034875U
Authority
CN
China
Prior art keywords
suspension bracket
section steel
tower crane
channel
gallows
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620634521.7U
Other languages
Chinese (zh)
Inventor
郭蛟
张凯毅
向俊宇
李炎
李冉
钟智贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201620634521.7U priority Critical patent/CN206034875U/en
Application granted granted Critical
Publication of CN206034875U publication Critical patent/CN206034875U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a supplementary installation swing arm formula tower crane instrument roof beam hanging flower basket device, include gallows, gallows built -in fitting and set up the guardrail bar that prevents on the gallows, the tripod structure that the gallows welded for the channel -section steel, gallows lin qiang side and gallows built -in fitting are passed through the otic placode and are connected and fix otic placode and gallows built -in fitting welded fastening. The supplementary installation swing arm formula tower crane instrument roof beam hanging flower basket device application of optimization that is under construction, the problem of non -operation face when having solved the installation of instrument roof beam well, installation procedure is simple for this device, the workman's operation of being convenient for.

Description

Auxiliary installs boom-type tower crane instrument beam nacelle device
Technical field
The utility model belongs to CONSTRUCTION OPERATIONS device field, and in particular to a kind of auxiliary installs boom-type tower crane instrument Beam nacelle device.
Background technology
With developing rapidly for city size, the skyscraper for representing characteristic of city is rised sheer from level ground such as spring bamboo, it is large-scale from Lift-type movable arm tower crane has more and more closely been contacted with Chinese city landmark building together, the type selecting of swing arm tower crane, Arrangement, planning of climbing, support be Super High project construction core, rational tower crane type selecting, arrangement engineering can be made to exist Under relatively low cost, effectively raising Steel Structure Installation efficiency, the planning of correct tower crane climbing, support ensure that engineering is being applied During work, civil engineering realizes efficient cooperation, so as to the construction period for reaching owner becomes most important, tower crane working with steel construction Tool beam installs the important step for also becoming tower crane climbing.As core wall structure construction is leading in existing tower crane instrument beam installation Housing floor slab construction, causes tower crane instrument beam to affect efficiency of construction without operating platform when installing.
Utility model content
The utility model provides a kind of auxiliary and installs boom-type tower crane instrument beam nacelle device, solves tower crane instrument beam peace Problem without operating surface during dress.
The utility model is adopted the following technical scheme that:
A kind of auxiliary installs boom-type tower crane instrument beam nacelle device, hangs including suspension bracket, suspension bracket built-in fitting and being arranged on Guard rail on frame, the tripod structure that the suspension bracket is welded into for channel-section steel, suspension bracket Lin Qiang sides pass through ear with suspension bracket built-in fitting Plate is connected, and otic placode is welded and fixed with suspension bracket built-in fitting.
The guard rail is steel-pipe welding into frame structure, and base of frame is equipped with steel springboard, forms operating surface.
The suspension bracket at least includes horizontal channel-section steel, a vertical channel-section steel and is arranged on horizontal channel-section steel, vertical channel-section steel Between a diagonal brace.
The otic placode is welded into hollow for channel-section steel.
The vertical channel-section steel Lin Qiang sides two ends arrange hook, and hook is fixedly connected with otic placode.
Face.
Face the skirting board that is welded on the inside of the guard rail lower end section of avris.
Brace is provided with the framework that the guard rail is formed, it is ensured that the stability of railing.
Beneficial effect:Auxiliary installs the application of boom-type tower crane instrument beam nacelle device construction technology, solves well Problem without operating surface when instrument beam is installed, this device installation procedure are simple, are easy to operative.
Description of the drawings
Structural representations of the Fig. 1 for the present embodiment.
In figure, suspension bracket -1, suspension bracket built-in fitting -2, guard rail -3, otic placode -4, hook -5, steel springboard -6, front rail - 7th, safety net -8, skirting board -9, brace -10.
Specific embodiment
A kind of auxiliary installs boom-type tower crane instrument beam nacelle device, including using horizontal channel-section steel and being arranged on level Suspension bracket 1, suspension bracket built-in fitting 2 and the guard rail being arranged on suspension bracket that diagonal brace between channel-section steel, vertical channel-section steel is welded 3, using steel-pipe welding into frame structure, the vertical channel-section steel of suspension bracket 1 faces metope two ends and is respectively welded two hooks 5 guard rail 3 Tangle with otic placode 4, the otic placode 4 is welded and fixed with suspension bracket built-in fitting 2, the otic placode 4 of the present embodiment is welded into a mouthful word using channel-section steel Type and suspension bracket built-in fitting 2 carry out full weld, and the hook 5 on suspension bracket must be firmly linked with otic placode 5, and arrange latch (non-table in figure Illustrate), prevent suspension bracket from coming off.
Steel springboard 6 is equipped with the framework that guard rail is formed, and forms operating surface.Connect two with fastener on guard rail The horizontal insertion bar in road, while in operating surface width to twice front rail 7 is arranged, it is vertical with guard rail framework with right-angle coupler Bar connects.
The present embodiment faces, and hanging basket framework faces avris lower end section Inner side is welded skirting board 9, is provided with brace 10, it is ensured that the stability of railing in the framework that guard rail is formed, during construction, workman Entered by hole under high building Core Walls Structure coupling beam, if floor face facilitates workman to enter operating platform away from the too high cat ladder of should setting up of operating surface Construction, cat ladder can be set up using steel pipe.
It is due to the leading housing floor slab construction of core wall structure construction, without operating platform when causing tower crane instrument beam to be installed, auxiliary The application for installing boom-type tower crane instrument beam nacelle device construction technology is helped, is solved when instrument beam is installed very well without operating surface Problem, this device installation procedure are simple, are easy to operative.

Claims (4)

1. a kind of auxiliary installs boom-type tower crane instrument beam nacelle device, including suspension bracket, suspension bracket built-in fitting and is arranged on suspension bracket On guard rail, the suspension bracket at least includes horizontal channel-section steel, a vertical channel-section steel and is arranged on horizontal channel-section steel, vertically A diagonal brace between channel-section steel, the guard rail are steel-pipe welding into frame structure, and base of frame is equipped with steel springboard, are formed Operating surface, the tripod structure that the suspension bracket is welded into for channel-section steel, it is characterised in that suspension bracket Lin Qiang sides are passed through with suspension bracket built-in fitting Otic placode is connected, and otic placode is welded and fixed with suspension bracket built-in fitting, and the vertical channel-section steel Lin Qiang sides two ends arrange hook, hook and ear Plate is fixedly connected, and the otic placode is welded into hollow for channel-section steel.
2. nacelle device according to claim 1, it is characterised in that face The whole network.
3. nacelle device according to claim 2, it is characterised in that face and be welded on the inside of the guard rail lower end section of avris Skirting board.
4. nacelle device according to claim 3, it is characterised in that be provided with the framework that the guard rail is formed tiltedly Bar.
CN201620634521.7U 2016-06-23 2016-06-23 Supplementary installation swing arm formula tower crane instrument roof beam hanging flower basket device Expired - Fee Related CN206034875U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620634521.7U CN206034875U (en) 2016-06-23 2016-06-23 Supplementary installation swing arm formula tower crane instrument roof beam hanging flower basket device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620634521.7U CN206034875U (en) 2016-06-23 2016-06-23 Supplementary installation swing arm formula tower crane instrument roof beam hanging flower basket device

Publications (1)

Publication Number Publication Date
CN206034875U true CN206034875U (en) 2017-03-22

Family

ID=58312926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620634521.7U Expired - Fee Related CN206034875U (en) 2016-06-23 2016-06-23 Supplementary installation swing arm formula tower crane instrument roof beam hanging flower basket device

Country Status (1)

Country Link
CN (1) CN206034875U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457932A (en) * 2018-02-10 2019-03-12 彭绍华 Safe and convenient lifting scaffold device
CN110359692A (en) * 2019-06-24 2019-10-22 中国五冶集团有限公司 A kind of rod-pulling type scaffolding structure
CN114436179A (en) * 2022-01-23 2022-05-06 中铁隧道局集团有限公司 Special type limb operation platform vehicle with mechanical self-locking function and use method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457932A (en) * 2018-02-10 2019-03-12 彭绍华 Safe and convenient lifting scaffold device
CN110359692A (en) * 2019-06-24 2019-10-22 中国五冶集团有限公司 A kind of rod-pulling type scaffolding structure
CN114436179A (en) * 2022-01-23 2022-05-06 中铁隧道局集团有限公司 Special type limb operation platform vehicle with mechanical self-locking function and use method
CN114436179B (en) * 2022-01-23 2023-12-08 中铁隧道局集团有限公司 Special edge operation platform car with mechanical self-locking function and use method

Similar Documents

Publication Publication Date Title
CN204040435U (en) High-altitude steel structure welding Hanging Basket
CN206034875U (en) Supplementary installation swing arm formula tower crane instrument roof beam hanging flower basket device
CN203808484U (en) Integrated cantilevered and attached external scaffolding
CN204299145U (en) For the operating platform that external climbing tower crane support frame is installed
CN205116768U (en) Superelevation layer instrument formula protection platform of encorbelmenting
CN103628692B (en) A kind of floor beam mounting bracket and use it to install the method for floor beam
CN204126238U (en) Steel plate shear force wall operation platform and bracing frame thereof
CN214786179U (en) Instrument formula level safety net of encorbelmenting
CN203271096U (en) Operating platform
CN206220649U (en) Construction guard fender
CN201943350U (en) Supporting steel frame for die holder of high-altitude large span overhanging structure
CN215212255U (en) Suspension type frame combined high-altitude operation platform
CN204038917U (en) Dismountable external hanging service platform
CN206971735U (en) Basic platform for cantilevered structure formwork
CN204876519U (en) Building interior decoration frame of ascending a height
CN210239201U (en) Cart type elevator wellhead and hoistway protection device
CN210947661U (en) Installation device of socket type overhanging scaffold
CN214302798U (en) Prevent hot wall inserted scaffold frame
CN203308109U (en) External carrying net device
CN206110643U (en) Scaffold frame perpendicular fixed knot construct
CN106760464B (en) Elevator shaft operating platform and its construction method
CN217924705U (en) Attached type section steel overhanging fastener type steel pipe scaffold
CN214462389U (en) Scaffold for building engineering
CN103758334A (en) Scaffold structure for constructing exterior wall of building
CN220058763U (en) Climbing frame pocket net protection device and climbing frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170322

Termination date: 20170623