CN220840726U - Precast beam template with recovery unit - Google Patents

Precast beam template with recovery unit Download PDF

Info

Publication number
CN220840726U
CN220840726U CN202322576047.XU CN202322576047U CN220840726U CN 220840726 U CN220840726 U CN 220840726U CN 202322576047 U CN202322576047 U CN 202322576047U CN 220840726 U CN220840726 U CN 220840726U
Authority
CN
China
Prior art keywords
precast beam
recovery
bag
beam form
recovery bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322576047.XU
Other languages
Chinese (zh)
Inventor
周亮
曹英鑫
曾超
许春珲
湛增光
李君玮
龙威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
CCCC First Highway Xiamen Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Co Ltd
CCCC First Highway Xiamen Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, CCCC First Highway Xiamen Engineering Co Ltd filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN202322576047.XU priority Critical patent/CN220840726U/en
Application granted granted Critical
Publication of CN220840726U publication Critical patent/CN220840726U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a precast beam template with recovery unit, includes the template body, and template body both sides are equipped with the clearance platform of outside extension, and two clearance platforms are equipped with a plurality of collecting holes, and the upper end of collecting hole is equipped with the apron that is used for closing and opening the collecting hole, and the lower extreme of collecting hole is connected with the recovery bag, and the bottom of recovery bag is equipped with the discharge gate that can open and shut. After the precast beam is poured, sundries such as concrete and the like on the surface of the precast beam are scanned into the collecting holes and fall into the recovery bag, so that the cleanliness of the construction platform is kept; after the recycling bag is fully collected, the discharge hole is opened, the construction waste in the bag is discharged, and the cleaning and transportation of the recycling bag waste are completed.

Description

Precast beam template with recovery unit
Technical Field
The utility model relates to the field of precast beam pouring garbage recycling devices, in particular to a precast beam template with a recycling device.
Background
The prefabricated components refer to building components which are poured in advance by taking concrete as a basic material, and comprise beams, plates, columns, building decoration accessories and the like. Common examples of the construction method include precast concrete floor slabs, concrete box girders for bridges, precast concrete roof truss girders for industrial plants, and precast concrete piles for treating culvert frames and foundations. At present, after precast beams are poured, the beam surface construction waste is cleaned to an operation platform through manpower, then the waste is gradually collected, the cleaning process is low in efficiency, and the construction platform cannot keep clean.
Disclosure of utility model
Aiming at the defects existing in the background technology, the utility model aims to provide the precast beam template with the recovery device.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
The utility model provides a precast beam template with recovery unit, includes the template body, the template body outside is equipped with the clearance platform, the clearance platform is equipped with a plurality of collecting holes, the upper end of collecting hole is equipped with and is used for closing and opening the apron of collecting hole, the lower extreme of collecting hole is connected with the recovery bag, the bottom of recovery bag is equipped with the discharge gate that can open and shut.
Further, the lower end of the collecting hole is provided with a connecting part, and the recovery bag is connected to the connecting part.
Further, the connecting part is a conical part with a small upper part and a large lower part, and at least one annular groove for connecting the recovery bag is arranged on the outer side surface of the connecting part.
Further, the annular groove is adapted with a clip by which the recovery bag is fixedly connected in the annular groove.
Further, the clamp includes first clamp and the second clamp of mutual pin joint, one of them link pin joint of first clamp or second clamp has the body of rod, is equipped with clamping part on the other link, the body of rod is located the one end of clamping part is connected with lock nut, just clamping part butt in lock nut.
Further, the clamping part comprises a U-shaped opening for the rod body to enter and exit, the tail end of the U-shaped opening is provided with an anti-loosening convex part, and the distance between the two anti-loosening convex parts is smaller than the minimum peripheral width of the lock nut.
Further, a pre-tightening belt is arranged on one side, close to the feeding port, of the recovery bag, and is matched with the annular groove, so that the recovery bag is preloaded on the connecting portion; a plurality of pull ropes are arranged at the position of the recovery bag close to the discharge hole, the discharge hole is closed and opened by tightening and releasing the pull ropes,
Further, the distance between the discharge hole and the ground is 80-100cm, so that the cleaning and transporting trolley can conveniently enter and exit.
Further, the recycling bag is characterized in that the inner wall surface of the recycling bag is coated with a wear-resistant plastic layer.
Further, the outside of the platform is also connected with an operation platform.
The beneficial effects of the utility model are as follows:
1. The precast beam template assembly comprises a template body, wherein platforms extending outwards are arranged on two sides of the template body, a plurality of collecting holes are formed in the two platforms, a cover plate for closing and opening the collecting holes is arranged at the upper end of each collecting hole, a recovery bag is connected to the lower end of each collecting hole, and an openable discharge hole is formed in the bottom of each recovery bag. After the precast beam is poured, sundries such as concrete and the like on the surface of the precast beam are scanned into the collecting holes and fall into the recovery bag, so that the cleanliness of the construction platform is kept; after the recycling bag is fully collected, the discharge hole is opened, the construction waste in the bag is discharged, and the cleaning and transportation of the recycling bag waste are completed.
2. The lower end of the collecting hole of the precast beam template assembly is provided with the connecting part, the recovery bag is connected to the connecting part, the connecting part is a conical part with a small upper part and a large lower part, the outer side surface of the connecting part is provided with at least one annular groove for connecting the recovery bag, and a clamp is adapted in the annular groove, and the recovery bag is fixedly connected to the connecting part through the clamp, so that the connection strength of the recovery bag and the connecting part is improved.
3. According to the precast beam template assembly provided by the utility model, the side, close to the feed inlet, of the recovery bag is provided with the pre-tightening belt, and the pre-tightening belt is matched with the annular groove, so that the recovery bag can be conveniently pre-assembled on the connecting part.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings that are used in the description of the embodiments or the prior art will be briefly described, it being obvious that the drawings in the description below are only some embodiments of the utility model, and that other drawings can be obtained from these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic illustration of a precast beam form having a recycling apparatus according to the present utility model;
FIG. 2 is an exploded view of a precast beam form having a recycling apparatus according to the present utility model;
FIG. 3 is a top view of a precast beam form having a recycling apparatus of the present utility model;
FIG. 4 is a side view of a precast beam form having a recycling apparatus of the present utility model;
FIG. 5 is a cross-sectional view taken along line 3 A-A;
FIG. 6 is an enlarged view of a portion of FIG. 5B;
FIG. 7 is a schematic view of a recycling bag of a precast beam form having a recycling apparatus according to the present utility model;
FIG. 8 is a schematic view of a clamp of a precast beam form with a recovery device according to the present utility model;
In the figure, 10, a template body; 20. cleaning a platform; 201. a collection hole; 202. a connection part; 2021. an annular groove; 30. a cover plate; 40. a recovery bag; 401. a pre-tightening belt; 402. a pull rope; 403. a discharge port; 50. a clamp; 501. a first clip; 502. a second clip; 503. a rod body; 504. a lock nut; 5051. u-shaped open pores; 5052. an anti-loosening convex part; 60. and a working platform.
Detailed Description
The utility model is described in detail below with reference to fig. 1-8.
The utility model provides a precast beam template with recovery unit, includes template body 10, and template body 10 outside is equipped with clearance platform 20, and clearance platform 20 outside is connected with operation platform 60, and two clearance platforms 20 are equipped with a plurality of collecting holes 201, and the distance between the adjacent collecting hole 201 is 5m, and its aperture is 40cm, and collecting hole 201's upper end is equipped with and is used for closing and opening collecting hole 201's apron 30, and apron 30 diameter is 50cm, and apron 30 passes through the bolt or closes the mode soon and connects in collecting hole 201. The lower end of the collecting hole 201 is connected with a recovery bag 40, and the bottom of the recovery bag 40 is provided with a openable and closable discharging hole 403. Therefore, after the precast beam is poured, sundries such as concrete on the surface of the precast beam are scanned into the collecting holes 201 and fall into the recovery bag 40, so that the cleanliness of the construction platform is maintained; after the recovery bag 40 is fully collected, the discharge port 403 is opened, and the construction waste in the bag is discharged, so that the garbage collection of the recovery bag 40 is completed.
In this embodiment, a connection portion 202 is disposed at the lower end of the collecting hole 201, the recovery bag 40 is connected to the connection portion 202, the connection portion 202 is a conical portion with a smaller top and a larger bottom, and specifically, an included angle between the surface of the conical portion and the vertical direction is 20-30 degrees. The outer side surface of the connection portion 202 is provided with at least one annular groove 2021 for connecting the recovery bag 40, specifically, the number of annular grooves 2021 is two, and each annular groove 2021 is adapted with a clip 50, and the recovery bag 40 is fixedly connected in the annular groove 2021 by the clip 50.
In this embodiment, the clip 50 includes a first clip 501 and a second clip 502 that are pivoted to each other, one of the connection ends of the first clip 501 or the second clip 502 is pivoted to a rod body 503, the other connection end is provided with a clamping portion, one end of the rod body 503 located at the clamping portion is connected with a lock nut 504, and the clamping portion is abutted to the lock nut 504. Further, the clamping portion includes a U-shaped opening 5051 for the entry and exit of the rod body 503, and a locking protrusion 5052 is provided at the end of the U-shaped opening, and the distance between the locking protrusions 5052 is smaller than the minimum peripheral width of the lock nut 504. When the recovery bag is installed, the first clamp 50150 and the second clamp 502 are opened, the rod body 503 is rotated to be embedded into the U-shaped opening, and then the locking nut 504 is screwed, so that the first clamp 501 and the second clamp 502 are slowly tightened and fixed in the annular groove 2021, and the recovery bag 40 is fixed in the annular groove 2021. When the recovery bag is disassembled, the locking nut 504 is loosened, the rod body 503 can be taken out from the U-shaped opening without completely separating the locking nut 504 from the rod body 503, and the first clamp 501 and the second clamp 502 are opened, so that the recovery bag 40 is convenient to replace. Meanwhile, in order to prevent the rod body 503 and the clamp 50 from falling off from each other after assembly, the end of the U-shaped opening is provided with a locking protrusion 5052 for limiting the movement of the lock nut 504 along the direction of the U-shaped opening, so as to achieve the purpose of falling off prevention.
In this embodiment, a pre-tightening belt 401 is disposed on one side of the recovery bag 40 close to the feeding hole, the pre-tightening belt 401 is adapted to the annular groove 2021, so that the recovery bag 40 is preloaded in the connecting portion 202, a plurality of pull ropes 402 are disposed on the recovery bag 40 close to the discharging hole 403, and the closing and opening of the discharging hole 403 are achieved by tightening and releasing the pull ropes 402. Further, the distance between the discharging hole 403 and the ground is 80-100cm, so that the cleaning cart can conveniently go in and out.
In this embodiment, the inner wall surface of the recovery bag 40 is coated with a wear-resistant plastic layer, which enhances the performance of the recovery bag 40 against damage by sharp portions of the concrete block surface, and prolongs the service life of the recovery bag 40.
The above embodiments are only for illustrating the technical concept and features of the present utility model, and are intended to enable those skilled in the art to understand the present utility model and implement it, and not to limit the scope of the present utility model. All equivalent changes or modifications made in accordance with the spirit of the present utility model should be construed to be included in the scope of the present utility model.

Claims (10)

1. The utility model provides a precast beam template with recovery unit, includes the template body, its characterized in that, the template body outside is equipped with the clearance platform, the clearance platform is equipped with a plurality of collecting holes, the upper end of collecting hole is equipped with and is used for closing and opening the apron of collecting hole, the lower extreme of collecting hole is connected with the recovery bag, the bottom of recovery bag is equipped with the discharge gate that can open and shut.
2. A precast beam form with a recovery device as claimed in claim 1, wherein a connection part is provided at a lower end of the collecting hole, and the recovery bag is connected to the connection part.
3. A precast beam form with a recovery device as claimed in claim 2, wherein the connecting portion is a conical portion with a small upper part and a large lower part, and the outer side surface of the connecting portion is provided with at least one annular groove for connecting the recovery bag.
4. A precast beam form having a recycling apparatus according to claim 3, wherein the annular groove is adapted with a clip by which the recycling bag is fixedly connected in the annular groove.
5. The precast beam form with a recovery device of claim 4, wherein the clamp comprises a first clamp and a second clamp pivoted to each other, one connecting end of the first clamp or the second clamp is pivoted with a rod body, the other connecting end is provided with a clamping part, one end of the rod body, which is positioned at the clamping part, is connected with a locking nut, and the clamping part is abutted against the locking nut.
6. The precast beam form with a recycling device according to claim 5, wherein the clamping part comprises a U-shaped opening for the rod body to enter and exit, the tail end of the U-shaped opening is provided with a locking convex part, and the distance between the locking convex parts is smaller than the minimum peripheral width of the locking nut.
7. A precast beam form with a recovery device according to claim 3, wherein a pretension belt is arranged on one side of the recovery bag close to the feed inlet, and the pretension belt is matched with the annular groove, so that the recovery bag is preloaded on the connecting part; the recovery bag is close to the discharge hole and is provided with a plurality of pull ropes, and the discharge hole is closed and opened by tightening and releasing the pull ropes.
8. A precast beam form with a recovery device as in claim 1, wherein the distance of the discharge port from the ground is 80-100cm, facilitating the entry and exit of the purge cart.
9. A precast beam form with a recycling apparatus according to any one of claims 1 to 8, wherein an inner wall surface of the recycling pocket is coated with a wear-resistant plastic layer.
10. A precast beam form with a recovery device as claimed in claim 9, wherein the outside of the platform is further connected with an operation platform.
CN202322576047.XU 2023-09-21 2023-09-21 Precast beam template with recovery unit Active CN220840726U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322576047.XU CN220840726U (en) 2023-09-21 2023-09-21 Precast beam template with recovery unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322576047.XU CN220840726U (en) 2023-09-21 2023-09-21 Precast beam template with recovery unit

Publications (1)

Publication Number Publication Date
CN220840726U true CN220840726U (en) 2024-04-26

Family

ID=90780461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322576047.XU Active CN220840726U (en) 2023-09-21 2023-09-21 Precast beam template with recovery unit

Country Status (1)

Country Link
CN (1) CN220840726U (en)

Similar Documents

Publication Publication Date Title
CN206794339U (en) A kind of building waste recovery system
CN220840726U (en) Precast beam template with recovery unit
CN107116086A (en) A kind of building waste recovery system
CN103302741B (en) Chassis is built in the rainproof movement of precast bridge concrete
CN206087977U (en) Muck haulage device
CN210459879U (en) In-floor garbage transportation system
CN202490664U (en) Environment-friendly material collection bin for kitchen waste
CN203331220U (en) Rainproof moving pouring trolley for prefabricated bridge concrete
CN216340665U (en) Novel floor garbage collection channel
CN209277537U (en) A kind of assembled support construction
CN208361038U (en) A kind of building site building waste recyclable device
CN211110637U (en) Tower crane ash cylinder capable of discharging materials simply
CN206561857U (en) A kind of construction site cement transporter of quickly discharging material
CN217998968U (en) A pipeline transportation device for building site construction waste
CN212710995U (en) Transport vehicle box capable of preprocessing building garbage
CN208668874U (en) A kind of novel building vertical garbage transportation system
CN208560499U (en) Building waste transport vehicle
CN214691418U (en) Environment-friendly building rubbish pond convenient to shift
CN218374950U (en) Floor garbage channel for newly-built building structure
CN219824784U (en) Foundation pit cover plate system
CN114148651B (en) Construction waste classification and recovery method
CN215925815U (en) Dustbin for road sweeper
CN209467623U (en) A kind of scrap collecting tank convenient for handling
CN106223619A (en) Building pours uses dump skip
CN113152843B (en) Flue combined type garbage channel and process flow thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant