CN208560499U CN201820875219.XU CN201820875219U CN208560499U CN 208560499 U CN208560499 U CN 208560499U CN 201820875219 U CN201820875219 U CN 201820875219U CN 208560499 U CN208560499 U CN 208560499U
Authority
CN
China
Prior art keywords
rubbish
partition
air
storage part
carrier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820875219.XU
Other languages
Chinese (zh)
Inventor
马伟
吴静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority to CN201820875219.XU priority Critical patent/CN208560499U/en
Application granted granted Critical
Publication of CN208560499U publication Critical patent/CN208560499U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of building waste transport vehicle, it includes carrier, walking wheel assembly, at least two rubbish store part and at least one set of air-dried component, walking wheel assembly is mounted on the bottom of carrier, at least two rubbish storage part is disposed side by side on carrier, rubbish storage part is provided with storage chamber and opening, partition is installed in rubbish storage part, at least one drainage hole is provided on partition, the side of partition is hinged on the side that rubbish storage part is provided with opening, rubbish storage part is provided with retention bead far from the side of opening, the other side of partition is overlapped in retention bead, storage zones are formd between partition and the bottom of rubbish storage part, rubbish storage part is provided with discharge outlet close to the side of opening, air-dried component includes air blower and air hose, one end of air hose is mounted at the air outlet of air blower.The building waste transport vehicle is able to carry out classifying for rubbish, be not easy convenient for the centralized processing of subsequent rubbish, and during garbage transporting it is mouldy rot, be not easy to influence environment.

Description

Building waste transport vehicle
Technical field
The utility model relates to construction equipment fields, in particular to a kind of building waste transport vehicle.
Background technique
Building waste refers to the slag that people generate in the production activity for being engaged in the construction industries such as removal, construction, finishing, repairerment The general designation of soil, waste and old concrete, waste and old masonry and other wastes.Classify by generating source, building waste can be divided into engineering dregs, Decoration garbage, removal rubbish, engineering slurry etc.;Classify by constituent, dregs, concrete block, broken can be divided into building waste Stone, brick and tile fragment, waste mortar, mud, asphalt blocks, waste plastics, old metal, useless bamboo wood etc..In engineering due to artificial or The construction waste, including waste residue soil, spoir, mud and rejected material etc. that the reasons such as natural generate.These materials are for building itself For be no any help, but the substance generated during building needs to perform corresponding processing, so Ideal Engineering Project Construction can be reached, just because of being the process of an entirety, so the considerations of its link is prior.
Currently, a large amount of building waste can be generated in building construction process, when handling these rubbish, need First rubbish to be put together, then, after rubbish is delivered to suitable position, rubbish is subjected to the processing such as cremate.
Inventor has found under study for action, at least has the following disadvantages: in traditional building waste treatment process
Traditional building waste is transported after being directly packaged using sack or chest to a building heap when being handled Place is put, building waste mixing is put together, and is not easy to subsequent processing, and inconvenient in transportational process.
Utility model content
The purpose of this utility model is to provide a kind of building waste transport vehicles, are not easy to the building waste for improving traditional The problem of cleaning.
The embodiments of the present invention are achieved in that
Based on above-mentioned purpose, the utility model provides a kind of building waste transport vehicle comprising has:
Carrier,
Walking wheel assembly, the walking wheel assembly are mounted on the bottom of the carrier,
At least two rubbish store part, and at least two rubbish storage parts are disposed side by side on the carrier, each The opening that rubbish storage part is provided with storage chamber and be connected to the storage chamber, the rubbish store be equipped in part every Plate, at least one drainage hole is provided on the partition, and the side of the partition is hinged on the rubbish storage part and is provided with out The side of mouth, the rubbish storage part are provided with retention bead, the other side overlap joint of the partition far from the side of the opening In the retention bead, the retention bead is used to limit the partition towards the lower rotation of rubbish storage part, and Storage zones are formd between the partition and the bottom of rubbish storage part, the rubbish storage part is close to the opening Side is provided with discharge outlet, and the discharge outlet is connected to the storage zones,
And at least one set of air-dried component, the air-dried component include air blower and air hose, one end peace of the air hose At the air outlet of the air blower, the air hose is mounted on the carrier, is provided at least two on the air hose Exhaust vent, at least two exhaust vent are connected to at least two storage zones.
In the utility model preferred embodiment, rubbish storage part include bottom wall, antetheca, rear wall, left wall and Right wall, the antetheca, left wall, rear wall and right wall, which are sequentially connected, surrounds tool there are two the column structure of port, and the bottom wall is pacified Mounted in the bottom of the antetheca, rear wall, left wall and right wall to block the port, the antetheca and the rear wall are along institute The moving direction for stating carrier is intervally arranged, and the antetheca is obliquely installed with the rear wall, enables the opening in open-like shape.
In the utility model preferred embodiment, the partition is rectangular slab, and the side of the partition is hinged on described Side of the antetheca far from the rear wall;The retention bead is strip, and the length direction of the retention bead is perpendicular to the left side Wall extends.
In the utility model preferred embodiment, the rubbish storage part further includes limit assembly, the limit assembly It is rotated for limiting the partition far from the direction of the bottom wall.
In the utility model preferred embodiment, the limit assembly includes bolt, and the bolt is slidably mounted on institute State on rear wall, can be protruded into the bolt sliding process in the storage chamber so that the partition be located at the retention bead with Between the bolt.
In the utility model preferred embodiment, the limit assembly further includes elastic component and cam, the bolt End far from the storage chamber is provided with annular stop convex block, and one end of the elastic component is mounted on the rear wall, described The other end of elastic component is mounted on the annular stop convex block, and the elastic component enables the bolt have along perpendicular to after described The movement tendency in the storage chamber is protruded into the direction of wall, and the cam is rotatably installed on the rear wall, and the cam is located at Between the rear wall and the annular stop convex block, the glide direction of the pivot center of the cam perpendicular to the bolt.
In the utility model preferred embodiment, rotational handle is provided on the cam.
In the utility model preferred embodiment, the air hose is closed at one end far from the air blower, the air hose Tube wall on be provided at least two exhaust vents, a bend pipe is communicated at each exhaust vent, on the rubbish storage part It is provided with air inlet hole, the bend pipe is mounted at the air inlet hole far from the end of the air hose, and the height of the bend pipe is higher than The height of air inlet hole on the rubbish storage part.
In the utility model preferred embodiment, equal wind net is installed at the air inlet hole.
Based on above-mentioned purpose, the utility model additionally provides a kind of building waste transport vehicle comprising has:
Carrier is provided with the suspension part for placing pliers on the carrier,
Walking wheel assembly, the walking wheel assembly are mounted on the bottom of the carrier,
At least two rubbish store part, and at least two rubbish storage parts are disposed side by side on the carrier, each The opening that rubbish storage part is provided with storage chamber and be connected to the storage chamber, the rubbish store be equipped in part every Plate, at least one drainage hole is provided on the partition, and the side of the partition is hinged on the rubbish storage part and is provided with out The side of mouth, the rubbish storage part are provided with retention bead, the other side overlap joint of the partition far from the side of the opening In the retention bead, the retention bead is used to limit the partition towards the lower rotation of rubbish storage part, and Storage zones are formd between the partition and the bottom of rubbish storage part, the rubbish storage part is close to the opening Side is provided with discharge outlet, and the discharge outlet is connected to the storage zones,
And at least one set of air-dried component, the air-dried component include air blower and air hose, one end peace of the air hose At the air outlet of the air blower, the air hose is mounted on the carrier, is provided at least two on the air hose Exhaust vent, at least two exhaust vent are connected to at least two storage zones.
The beneficial effect of the utility model embodiment is:
In conclusion the utility model embodiment provides a kind of building waste transport vehicle, and it is simple and reasonable, it is convenient for Manufacture processing, installation with it is easy to use, meanwhile, which is able to carry out classifying for rubbish, be convenient for it is subsequent The centralized processing of rubbish, and garbage transporting during be not easy it is mouldy rot, be not easy to influence environment.It is specific as follows:
Building waste transport vehicle provided in this embodiment includes carrier, walking wheel assembly, the storage of at least two rubbish Part and at least one set of air-dried component.Walking wheel assembly is mounted on the bottom of carrier, convenient for whole building cram packer Walking.At least two rubbish storage part is installed on carrier, rubbish can be placed in each rubbish storage part, by being arranged extremely Few two rubbish store part, and rubbish can be classified on demand during placing rubbish, such as dry rubbish is placed on In one cabinet, the rubbish with moisture is placed in same cabinet, in this way, rubbish is classified processing, subsequent rubbish It handles more convenient.When rubbish is placed in rubbish storage part, rubbish is located on partition, at least one draining is provided on partition Hole, and storage zones are formd between partition and the bottom of rubbish storage part, the water in rubbish is under the effect of gravity by partition Drainage hole at enter storage zones, the rubbish in rubbish storage part is separated from water, and is not easy to be corroded rotten, be not easy it is smelly, It is not easy to influence environment, it is more environmentally-friendly.And after rubbish is toppled over, the water in storage zones is discharged from discharge outlet, opens and air-dries component, Rubbish storage part is air-dried, is not easy to remain peculiar smell, does not tend to have ponding, rubbish storage part is not easy the damage that is corroded.
Detailed description of the invention
It, below will be to use required in embodiment in order to illustrate more clearly of the technical solution of the utility model embodiment Attached drawing be briefly described, it should be understood that the following drawings illustrates only some embodiments of the utility model, therefore should not be by Regard the restriction to range as, for those of ordinary skill in the art, without creative efforts, may be used also To obtain other relevant attached drawings according to these attached drawings.
Fig. 1 is the schematic diagram of the building waste transport vehicle of the utility model embodiment;
Fig. 2 is the schematic cross-sectional view of the building waste transport vehicle of the utility model embodiment;
Fig. 3 is the partial enlargement diagram in Fig. 2;
Fig. 4 is the local overlooking schematic diagram of the building waste transport vehicle of the utility model embodiment.
Icon: 100- carrier;110- supporting leg;120- handrail;200- walking wheel assembly;The storage of 300- rubbish Part;310- partition;311- drainage hole;320- retention bead;The storage zones 330-;340- discharge outlet;350- bolt; 351- annular stop convex block;360- elastic component;370- cam;400- air-dries component;410- air blower;420- air hose.
Specific embodiment
Traditional building waste is transported after being directly packaged using sack or chest to a building heap when being handled Place is put, building waste mixing is put together, and is not easy to subsequent processing, and inconvenient in transportational process.
In consideration of it, inventor devises a kind of building waste transport vehicle, which is able to carry out rubbish Classify, be not easy convenient for the centralized processing of subsequent rubbish, and during garbage transporting it is mouldy rot, be not easy to influence environment.
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is the utility model a part of the embodiment, instead of all the embodiments.Usually here in attached drawing description and The component of the utility model embodiment shown can be arranged and be designed with a variety of different configurations.
Therefore, requirement is not intended to limit to the detailed description of the embodiments of the present invention provided in the accompanying drawings below The scope of the utility model of protection, but it is merely representative of the selected embodiment of the utility model.Based in the utility model Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all Belong to the range of the utility model protection.
It should also be noted that similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined in a attached drawing, does not then need that it is further defined and explained in subsequent attached drawing.
In the description of the present invention, it should be noted that the orientation or positional relationship of the instructions such as term "inner", "outside" For be based on the orientation or positional relationship shown in the drawings or the utility model product using when the orientation or position usually put Relationship is merely for convenience of describing the present invention and simplifying the description, rather than the device or element of indication or suggestion meaning must There must be specific orientation, be constructed and operated in a specific orientation, therefore should not be understood as limiting the present invention.This Outside, term " first ", " second ", " third " etc. are only used for distinguishing description, are not understood to indicate or imply relative importance.
In the description of the present invention, it should also be noted that, unless otherwise clearly defined and limited, term " is set Set ", " installation ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally Connection;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition The concrete meaning of language in the present invention.
It should be noted that in the absence of conflict, the feature in the embodiments of the present invention and embodiment can To be combined with each other.
Embodiment
Fig. 1-Fig. 4 is please referred to, a kind of building waste transport vehicle is present embodiments provided comprising has carrier 100, row Wheel assembly 200, at least two rubbish storage part 300 and at least one set of air-dried component 400, walking wheel assembly 200 is walked to be mounted on The bottom of carrier 100, at least two rubbish storage part 300 are disposed side by side on carrier 100, and each rubbish stores part 300 The opening for being provided with storage chamber and being connected to storage chamber, rubbish, which stores in part 300, is equipped with partition 310, is arranged on partition 310 There is at least one drainage hole 311, the side of partition 310 is hinged on the side that rubbish storage part 300 is provided with opening, rubbish storage Part 300 is provided with retention bead 320 far from the side of opening, and the other side of partition 310 is overlapped in retention bead 320, limit Lower rotation of the protrusion 320 for limiting partition 310 towards rubbish storage part 300, and partition 310 and rubbish store part 300 Storage zones 330 are formd between bottom, rubbish storage part 300 is provided with discharge outlet 340, discharge outlet close to the side of opening 340 are connected to storage zones 330, and air-drying component 400 includes air blower 410 and air hose 420, and one end of air hose 420 is mounted on At the air outlet of air blower 410, air hose 420 is mounted on carrier 100, and at least two exhaust vents are provided on air hose 420, until Few two exhaust vents are connected to at least two storage zones 330.
Building waste transport vehicle provided in this embodiment includes carrier 100, walking wheel assembly 200, at least two rubbish Rubbish stores part 300 and at least one set of air-dried component 400.Walking wheel assembly 200 is mounted on the bottom of carrier 100, convenient for whole The walking of a building waste transport vehicle.At least two rubbish storage part 300 is installed, each rubbish stores part on carrier 100 Rubbish can be placed in 300, store part 300 by least two rubbish of setting, it can be on demand by rubbish during placing rubbish Rubbish is classified, such as dry rubbish is placed in a cabinet, and the rubbish with moisture is placed in same cabinet, this Sample, rubbish are classified processing, and the processing of subsequent rubbish is more convenient.When rubbish is placed in rubbish storage part 300, rubbish On partition 310, at least one drainage hole 311, and the bottom of partition 310 and rubbish storage part 300 are provided on partition 310 Between form storage zones 330, the water in rubbish enters storage by the drainage hole 311 on partition 310 under the effect of gravity Water area 330, the rubbish in rubbish storage part 300 are separated from water, are not easy to be corroded rotten, are not easy smelly, be not easy to influence environment, It is more environmentally-friendly.And after rubbish is toppled over, the water in storage zones 330 is discharged from discharge outlet 340, opens and air-dry component 400, by rubbish Rubbish stores part 300 and air-dries, and is not easy to remain peculiar smell, does not tend to have ponding, and rubbish storage part 300 is not easy the damage that is corroded.
In the present embodiment, carrier 100 is built using mental section and is made, the generally rectangular shaped frame structure of carrier 100, Mental section can also be bolted by being welded and fixed.The side of carrier 100 is equipped with handrail 120, passes through Operation handrail 120 can push or pull carrier 100.In carrier 100 there is the side of handrail 120 to be equipped with two branch Support leg 110, every supporting leg 110 are substantially in inverted T-shaped, are supported more stable.Walk wheel assembly 200 include two groups of traveling wheels, two Group traveling wheel is mounted on carrier 100, is intervally arranged along the width direction of carrier 100, and carrier 100 relies on two groups of rows It walks wheel and two supporting legs 110 realizes support.When needing to dump rubbish, 120 side of handrail applies upward power, with traveling wheel with The position of ground face contact be fulcrum, rotate carrier 100, make 120 side of handrail increase, carrier 100 far from handrail 120 one Side reduces, and rubbish is poured.
In the present embodiment, rubbish store part 300 include bottom wall, antetheca, rear wall, left wall and right wall, antetheca, left wall, after Wall and right wall, which are sequentially connected, surrounds tool there are two the column structure of port, and bottom wall is mounted on antetheca, rear wall, left wall and right wall Bottom be intervally arranged with blocking a port, antetheca and rear wall along the moving direction of carrier 100, the inclination of antetheca and rear wall is set It sets, enabling opening is in open-like shape.Partition 310 is rectangular slab, and the side of partition 310 is hinged on side of the antetheca far from rear wall, partition At least two drainage holes 311, the arrangement of at least two drainage holes, 311 rectangular array are provided on 310.Retention bead 320 is item The length direction of shape, retention bead 320 extends perpendicular to left wall.Rubbish storage part 300 further includes limit assembly, and limit assembly is used It is rotated in limitation partition 310 far from the direction of bottom wall.Optionally, limit assembly includes bolt 350, and bolt 350 is slidably mounted on On rear wall, can be protruded into 350 sliding process of bolt in storage chamber so that partition 310 be located at retention bead 320 and bolt 350 it Between.Limit assembly further includes elastic component 360 and cam 370, and it is convex that the end of the separate storage chamber of bolt 350 is provided with annular stop One end of block 351, elastic component 360 is mounted on rear wall, and the other end of elastic component 360 is mounted on annular stop convex block 351, bullet Property part 360 enable bolt 350 have along perpendicular to rear wall direction protrude into storage chamber in movement tendency, cam 370 be rotatablely installed On rear wall, cam 370 is between rear wall and annular stop convex block 351, and the pivot center of cam 370 is perpendicular to bolt 350 Glide direction.
The structure of limit assembly designs, and during transport of refuse, partition 310 is connected to limit convex by bolt 350 It rises between 320 and bolt 350, partition 310 will not rotate automatically, and rubbish is not easy to store in part 300 from rubbish and drop out, transportational process It is safer.When needing to pour in rubbish, bolt 350 is pulled, extracts bolt 350 from storage zones 330, then, Rotation cam 370 is connected to cam 370 between annular stop convex block 351 and rear wall, and elastic component 360 is in compressive state, is used for The restriction effect of cam 370, bolt 350 will not be inserted into storage zones 330 under the effect of the elastic force of elastic component 360, at this point, Partition 310 can rotate, and then rubbish is poured.After toppling over, partition 310, which rotates back to, is overlapped on retention bead 320 On position at, under the action of elastic component 360, bolt 350 is inserted into storage zones 330, limit partition 310 rotation.
Optionally, elastic component 360 is spring.It is provided with rotational handle on cam 370, is convenient for rotation cam 370.
In the present embodiment, air hose 420 is closed at one end far from air blower 410, and at least two are provided on the tube wall of air hose 420 A exhaust vent is communicated with a bend pipe at each exhaust vent, is provided with air inlet hole on rubbish storage part 300, bend pipe is far from air hose 420 end is mounted at air inlet hole, and the height of bend pipe is higher than the height of the air inlet hole on rubbish storage part 300.At air inlet hole Equal wind net is installed.Water in storage zones 330 is not easily accessible in bend pipe, and use is safer.Meanwhile equal wind net is set, The wind of blowout is softer, and the area of covering is wider.
In other embodiments, it is provided with the suspension part for placing pliers on carrier 100, such as hanging hole, outstanding Extension box etc. convenient for the storage of pliers, and can timely use tool in garbage processing procedure, and it is more flexible convenient to operate.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (10)

1. a kind of building waste transport vehicle, which is characterized in that it includes:
Carrier,
Walking wheel assembly, the walking wheel assembly are mounted on the bottom of the carrier,
At least two rubbish store part, and at least two rubbish storage parts are disposed side by side on the carrier, each described The opening that rubbish storage part is provided with storage chamber and is connected to the storage chamber, the rubbish, which stores in part, is equipped with partition, At least one drainage hole is provided on the partition, the side of the partition is hinged on the rubbish storage part and is provided with opening Side, the rubbish storage part are provided with retention bead far from the side of the opening, and the other side of the partition is overlapped on institute It states in retention bead, the retention bead is used to limit the lower rotation that the partition stores part towards the rubbish, and described Storage zones are formd between partition and the bottom of rubbish storage part, the rubbish storage part is close to the side of the opening It is provided with discharge outlet, the discharge outlet is connected to the storage zones,
And at least one set of air-dried component, the air-dried component includes air blower and air hose, and one end of the air hose is mounted on At the air outlet of the air blower, the air hose is mounted on the carrier, and at least two outlet air are provided on the air hose Hole, at least two exhaust vent are connected to at least two storage zones.
2. building waste transport vehicle according to claim 1, which is characterized in that rubbish storage part includes bottom wall, preceding Wall, rear wall, left wall and right wall, the antetheca, left wall, rear wall and right wall are sequentially connected the column for surrounding and having there are two port Structure, the bottom wall are mounted on the bottom of the antetheca, rear wall, left wall and right wall to block the port, before described Moving direction of the wall with the rear wall along the carrier is intervally arranged, and the antetheca is obliquely installed with the rear wall, described in order Opening is in open-like shape.
3. building waste transport vehicle according to claim 2, which is characterized in that the partition is rectangular slab, the partition Side be hinged on side of the antetheca far from the rear wall;The retention bead is strip, the length of the retention bead Direction extends perpendicular to the left wall.
4. building waste transport vehicle according to claim 3, which is characterized in that the rubbish storage part further includes limit group Part, the limit assembly are used to limit the partition and rotate far from the direction of the bottom wall.
5. building waste transport vehicle according to claim 4, which is characterized in that the limit assembly includes bolt, described Bolt is slidably mounted on the rear wall, can be protruded into the storage chamber in the bolt sliding process so that the partition position Between the retention bead and the bolt.
6. building waste transport vehicle according to claim 5, which is characterized in that the limit assembly further include elastic component with And cam, the bolt are provided with annular stop convex block far from the end of the storage chamber, one end of the elastic component is mounted on On the rear wall, the other end of the elastic component is mounted on the annular stop convex block, and the elastic component enables the bolt have There is the movement tendency protruded into the storage chamber along the direction perpendicular to the rear wall, the cam is rotatably installed in the rear wall On, the cam between the rear wall and the annular stop convex block, insert perpendicular to described by the pivot center of the cam The glide direction of pin.
7. building waste transport vehicle according to claim 6, which is characterized in that be provided with rotational handle on the cam.
8. building waste transport vehicle according to claim 1, which is characterized in that the air hose far from the air blower one End seal is closed, and at least two exhaust vents are provided on the tube wall of the air hose, a bend pipe, institute are communicated at each exhaust vent It states and is provided with air inlet hole on rubbish storage part, the bend pipe is mounted at the air inlet hole far from the end of the air hose, described The height of bend pipe is higher than the height of the air inlet hole on rubbish storage part.
9. building waste transport vehicle according to claim 8, which is characterized in that be equipped with equal wind net at the air inlet hole.
10. a kind of building waste transport vehicle, which is characterized in that it includes:
Carrier is provided with the suspension part for placing pliers on the carrier,
Walking wheel assembly, the walking wheel assembly are mounted on the bottom of the carrier,
At least two rubbish store part, and at least two rubbish storage parts are disposed side by side on the carrier, each described The opening that rubbish storage part is provided with storage chamber and is connected to the storage chamber, the rubbish, which stores in part, is equipped with partition, At least one drainage hole is provided on the partition, the side of the partition is hinged on the rubbish storage part and is provided with opening Side, the rubbish storage part are provided with retention bead far from the side of the opening, and the other side of the partition is overlapped on institute It states in retention bead, the retention bead is used to limit the lower rotation that the partition stores part towards the rubbish, and described Storage zones are formd between partition and the bottom of rubbish storage part, the rubbish storage part is close to the side of the opening It is provided with discharge outlet, the discharge outlet is connected to the storage zones,
And at least one set of air-dried component, the air-dried component includes air blower and air hose, and one end of the air hose is mounted on At the air outlet of the air blower, the air hose is mounted on the carrier, and at least two outlet air are provided on the air hose Hole, at least two exhaust vent are connected to at least two storage zones.
CN201820875219.XU 2018-06-06 2018-06-06 Building waste transport vehicle Expired - Fee Related CN208560499U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820875219.XU CN208560499U (en) 2018-06-06 2018-06-06 Building waste transport vehicle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820875219.XU CN208560499U (en) 2018-06-06 2018-06-06 Building waste transport vehicle

Publications (1)

Publication Number Publication Date
CN208560499U true CN208560499U (en) 2019-03-01

Family

ID=65485666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820875219.XU Expired - Fee Related CN208560499U (en) 2018-06-06 2018-06-06 Building waste transport vehicle

Country Status (1)

Country Link
CN (1) CN208560499U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113428533A (en) * 2021-05-17 2021-09-24 中国建筑股份有限公司 Small-size building rubbish classification transfer car (buggy)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113428533A (en) * 2021-05-17 2021-09-24 中国建筑股份有限公司 Small-size building rubbish classification transfer car (buggy)

Similar Documents

Publication Publication Date Title
KR101068582B1 (en) A sorting separation device of construction waste
CN208560499U (en) Building waste transport vehicle
CN103600950A (en) Compression system of garbage transfer station
CN101831945A (en) Toilet bowl
CN206088028U (en) Indoor perpendicular compression station
CN204225260U (en) A kind of sewer and Accrete clearing device thereof
US20120017390A1 (en) Vacuum Debris Collection Box Having Sloped Debris Chute
KR100919848B1 (en) Waste storage facility
CN207827071U (en) Building waste collects transporting equipment
CN206986045U (en) A kind of consumer garbage compost Zymolysis Equipment
CN105292857A (en) Trash can with convenient trash dumping function
CN105819126A (en) Novel deep buried type dustbin
CN209351440U (en) Building waste transport pushing cart in a kind of high-building construction floor
CN205830698U (en) A kind of flushing free does clear excrement pig house
CN207827108U (en) Building waste slag waggon
KR101203878B1 (en) A system and a method for dewatering of waste
CN207827109U (en) Building waste transloading equipment
CN208152486U (en) Multi-rise building refuse collection pipe-line system
CN204199414U (en) A kind of is the water closet of organic fertilizer by organic garbage treatment
CN205738998U (en) A kind of locker of ground embedded type garbage can
CN105507191A (en) Garbage collection device for sweeping and suction type sweeper
CN204197756U (en) Totally enclosed discharge door mechanism for opening/closing
CN207174942U (en) A kind of collection bucket
CN110478243A (en) The anti-hydrops dregs of a decoction move away from structure
CN204281614U (en) A kind of is the device of organic fertilizer by family's organic garbage treatment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190301

Termination date: 20190606