CN218860194U - Concrete overhanging parapet lifting device - Google Patents

Concrete overhanging parapet lifting device Download PDF

Info

Publication number
CN218860194U
CN218860194U CN202222508554.5U CN202222508554U CN218860194U CN 218860194 U CN218860194 U CN 218860194U CN 202222508554 U CN202222508554 U CN 202222508554U CN 218860194 U CN218860194 U CN 218860194U
Authority
CN
China
Prior art keywords
parapet
connecting piece
hoisting
steel cable
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202222508554.5U
Other languages
Chinese (zh)
Inventor
李玉晨
李流铝
袁磊
廖吉秋
罗欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202222508554.5U priority Critical patent/CN218860194U/en
Application granted granted Critical
Publication of CN218860194U publication Critical patent/CN218860194U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the technical field of hoisting, and discloses a concrete cantilever parapet hoisting tool, which comprises a bracket component, a hoisting rod and a hoisting rod, wherein the bracket component is erected on a parapet body; the hoisting assembly is arranged on the bracket assembly, and a steel cable is arranged on the hoisting assembly; and the clamping assembly is arranged at one end of the steel cable close to the outer side of the outer wall and is used for assembling the wallboard. The utility model provides a current lifting device's cable wire can cause the problem of interference and existence potential safety hazard to the construction workman, be applicable to hoist and mount.

Description

Concrete overhanging parapet lifting device
Technical Field
The utility model relates to a hoist and mount technical field, more specifically say, it relates to a parapet lifting device is encorbelmented to concrete.
Background
The wallboard installation conventional construction machinery matching modes comprise a tower crane and hanging basket combination, a hoisting machinery crane and hanging basket combination, a tower crane and overhead working truck, a hoisting machinery crane and overhead working truck and the like. It can be seen that the vertical transportation of the existing wallboard material usually adopts a tower crane or a crane of a hoisting machine, and a larger construction vehicle parking place must be required on the ground, but most construction sites are difficult to meet the above conditions, and the problems that the crane cannot stand due to insufficient construction space, and the tower crane cannot meet the requirements of simultaneous construction of a plurality of groups of construction teams exist.
In order to solve the problems, chinese patent (No. CN 216275912U) discloses a support for fixing hoisting equipment on a parapet, which comprises a parapet body positioned at the top of a building body and a rolling component arranged on the ground, wherein the top of the parapet body is provided with a support component, a fastening component is arranged between the support component and the parapet body, and one side of the support component is provided with a positioning pulley component.
Although above-mentioned technical scheme is through setting up fastening components with bracket component and positioning pulley subassembly fixed mounting on parapet body, install the rolling subassembly in ground after that to make the cable wire wear on positioning pulley subassembly, install the wallboard on clamping component, the hoist and mount work of wallboard can be realized in rolling subassembly work, install the wallboard to the outer wall by the workman again. However, in the actual use process, because the winding assembly is installed on the ground, the steel cable needs to be obliquely arranged between the parapet wall and the ground, and when workers use an overhead working truck and the like to install a higher-layer wallboard, the workers are interfered by the steel cable, so that potential safety hazards exist.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a parapet lifting device is chosen to concrete has solved current lifting device's cable wire can lead to the fact the problem of interference and existence potential safety hazard to the construction workman.
The above technical object of the present invention can be achieved by the following technical solutions: a concrete cantilever parapet hoisting tool comprises a bracket assembly, a hoisting rod and a hoisting rod, wherein the bracket assembly is erected on a parapet body; the hoisting assembly is arranged on the bracket assembly, and a steel cable is arranged on the hoisting assembly; and the clamping component is arranged at one end of the steel cable close to the outer side of the outer wall and is used for assembling the wallboard.
The working principle of the technical scheme is as follows: use the utility model discloses during the hoist and mount wallboard, at first erect the bracket component on parapet body, after that with hoist and mount subassembly fixed connection on the bracket component, then accomplish the installation of cable wire, fix the free end at the cable wire with the centre gripping subassembly again, during the construction, pass through bolt fixed connection on the centre gripping subassembly with the wallboard earlier, restart hoist and mount subassembly can be with wallboard hoist, until the wallboard rise to suitable high back, close hoist and mount subassembly can.
To sum up, the utility model discloses following beneficial effect has:
compared with the prior art, the utility model relates to a concrete parapet lifting device that encorbelments mutually supports through setting up bracket component and hoisting assembly, under the prerequisite that does not influence the effect of lifting by crane, causes building body top surface one side with cable wire and hoisting assembly, make full use of the space at building body top, avoid when the higher floor board of installation, the cable wire can occupy the partial space of outer wall one side, disturbs worker's high altitude construction, and has eliminated the potential safety hazard.
Further, the bracket assembly includes: the connecting piece is hung upside down on the parapet wall body, one end of the connecting piece is provided with two square holes, the other end of the connecting piece is opened, and a cavity is reserved in the connecting piece; the two connecting rods are matched with the square holes and respectively extend into the two square holes and are fixed through bolts; the two fixed rods are respectively and fixedly arranged at the bottoms of the two connecting rods; the bottom plate is fixedly arranged at the top of the building body, and one end of the bottom plate extends into the cavity and is fixedly connected with the connecting piece through a bolt; wherein, dead lever and connecting piece are hugged closely with parapet body both sides respectively.
Furthermore, the hoisting assembly comprises a first fixed pulley fixedly arranged between the two connecting rods, a second fixed pulley fixedly arranged on the connecting piece and a base connected to the bottom plate, a third fixed pulley and a winch are fixedly connected to the base, one end of the steel cable is fixedly connected with the winch, the middle of the steel cable is overlapped on the second fixed pulley and the first fixed pulley, and the other end of the steel cable is connected with the clamping assembly.
Furthermore, the clamping assembly comprises a fixing block connected to the free end of the steel cable and a channel steel arranged at the bottom of the fixing block, and the wallboard is fixed to the inner side of the channel steel through a bolt.
Furthermore, a first reinforcing rod is obliquely arranged between the free end of the connecting rod and the free end of the fixing rod, and a second reinforcing rod is obliquely arranged between one side of the connecting piece and the bottom plate.
Furthermore, a plurality of limiting holes matched with the bolts are formed in the connecting rod, the connecting piece and the bottom plate.
Drawings
FIG. 1 is a schematic view of the structure of the utility model for preparing branded soles;
FIG. 2 is an enlarged view taken at A in FIG. 1;
FIG. 3 is a top view of the present invention with the second reinforcement bar removed;
fig. 4 is a side view of the connecting member of the present invention;
in the figure: 1. a building body; 2. a base plate; 3. a base; 4. a hoist; 5. a third fixed pulley; 6. a steel cord; 7. a limiting hole; 8. a second fixed pulley; 9. a connecting member; 10. a first fixed pulley; 11. a connecting rod; 12. a first reinforcement bar; 13. fixing the rod; 14. a parapet body; 15. a wallboard; 16. an outer wall; 17. a fixed block; 18. a square hole; 19. a second reinforcement bar; 20. channel steel.
Detailed Description
The present invention will be described in further detail with reference to fig. 1 to 4.
As shown in fig. 1, an embodiment of the present invention provides a concrete suspended parapet hoisting tool, which includes a bracket assembly, which is mounted on a parapet body 14; the hoisting component is fixedly arranged on the bracket component, and a steel cable 6 is arranged on the hoisting component; and the clamping component is fixedly connected to one end of the steel cable 6 close to the outer side of the outer wall 16 and is used for assembling the wall board 16.
The specific working process is as follows: use the utility model discloses during hoist and mount wallboard 15, at first erect the bracket component on parapet body 14, after that with hoist and mount subassembly fixed connection on the bracket component, then accomplish the installation of cable wire 6, fix the free end at cable wire 6 with the centre gripping subassembly again, during the construction, earlier pass through bolt fixed connection on the centre gripping subassembly with wallboard 15, restart hoist and mount subassembly can hoist wallboard 15, rise to suitable high back until wallboard 15, close hoist and mount subassembly can.
In this embodiment, mutually support through setting up bracket component and hoisting assembly, under the prerequisite that does not influence the effect of lifting by crane, lead cable 6 and hoisting assembly to building body 1's top surface one side, make full use of the space at building body 1 top, avoid when installing higher floor's wallboard 15, cable 6 can occupy the partial space of outer wall 16 one side, disturb worker's high altitude construction, and eliminated the potential safety hazard.
As shown in fig. 1 and 4, according to another embodiment of the present invention, a concrete cantilever parapet lifting tool, wherein the bracket assembly includes: the connecting piece 9 with the L-shaped longitudinal section is hung upside down on the parapet wall body 14, as shown in figure 1, the left end of the connecting piece 9 is provided with two square holes 18, the other end is arranged with an opening, and a cavity is reserved in the connecting piece; the two connecting rods 11 are matched with the square holes 18, and the two connecting rods 11 respectively extend into the two square holes 18 and are fixed through bolts; two fixed rods 13 respectively fixedly arranged at the bottoms of the two connecting rods 11; the bottom plate 2 is fixedly arranged at the top of the building body 1, and one end of the bottom plate 2 extends into the cavity and is fixedly connected with the connecting piece 9 through a bolt; wherein, the fixed rod 13 and the connecting piece 9 are respectively clung to two sides of the parapet wall body 14.
This scheme is mutually supported through setting up connecting piece 9, connecting rod 11 and dead lever 13 and is blocked jointly and establish on parapet body 14, again with bottom plate 2 fixed mounting in 1 top of building body to make 2 one end of bottom plate stretch into connecting piece 9, through bolt and its fixed connection.
In the actual use process, a first reinforcing rod 12 can be obliquely and fixedly arranged between the free end of the connecting rod 11 and the free end of the fixing rod 13 to reinforce the connecting rod 11 and the fixing rod 13; a second reinforcing rod 19 is obliquely and fixedly arranged between one side of the connecting piece 9 and the bottom plate 2 and used for reinforcing the connecting piece 9 and the bottom plate 2; a plurality of limiting holes 7 matched with the bolts are formed in the connecting rod 11, the connecting piece 9 and the bottom plate 2 and are used for being matched with parapet bodies 14 with different thicknesses.
As shown in fig. 1 and 3, according to the utility model discloses a concrete cantilevered parapet lifting device, wherein lifting unit is including fixed first fixed pulley 10 that sets up between two connecting rods 11, fixed second fixed pulley 8 that sets up on connecting piece 9 and the base 3 of connection on bottom plate 2, fixedly connected with third fixed pulley 5 and hoist engine 4 on the base 3, the one end and the hoist engine 4 fixed connection of cable wire 6, the middle part overlap joint of cable wire 6 is on second fixed pulley 8 and first fixed pulley 10, the other end of cable wire with clamping unit connects.
The scheme is that a winch 4, a first fixed pulley 10, a second fixed pulley 8 and a third fixed pulley 5 are arranged to pull a steel cable 6.
As shown in fig. 2, according to another embodiment of the present invention, a parapet hoisting tool for concrete cantilever, wherein the clamping component comprises a fixed block 17 connected to the free end of the steel cable 6 and a channel steel 20 fixedly arranged at the bottom of the fixed block 17, and the wall plate 15 is fixed inside the channel steel 20 by bolts.
In the scheme, the wall plate 15 is fixed by arranging the fixing block 17 and the channel steel 20, so that the subsequent hoisting of the wall plate 15 is realized.
The present embodiment is only for explaining the present invention, and it is not limited to the present invention, and those skilled in the art can make modifications to the present embodiment without inventive contribution as required after reading the present specification, but all of them are protected by patent laws within the scope of the claims of the present invention.

Claims (6)

1. The utility model provides a concrete parapet lifting device that encorbelments which characterized in that includes:
a bracket assembly, which is erected on the parapet wall body (14);
the hoisting component is arranged on the bracket component, and a steel cable (6) is arranged on the hoisting component;
and the clamping component is arranged at one end of the steel cable (6) close to the outer side of the outer wall (16), and is used for assembling the wallboard (15).
2. A concrete cantilever parapet lifting tool as claimed in claim 1, wherein the bracket assembly includes:
the connecting piece (9) is hung upside down on the parapet body (14), one end of the connecting piece is provided with two square holes (18), the other end of the connecting piece is provided with an opening, and a cavity is reserved in the connecting piece;
the two connecting rods (11) are matched with the square holes (18), and the two connecting rods (11) respectively extend into the two square holes (18) and are fixed through bolts;
two fixed rods (13) which are respectively fixedly arranged at the bottoms of the two connecting rods (11);
the bottom plate (2) is fixedly arranged at the top of the building body (1), and one end of the bottom plate (2) extends into the cavity and is fixedly connected with the connecting piece (9) through a bolt;
wherein, the fixed rod (13) and the connecting piece (9) are respectively clung to two sides of the parapet wall body (14).
3. A concrete cantilever parapet lifting tool as claimed in claim 2, characterized in that: the hoisting assembly comprises a first fixed pulley (10) fixedly arranged between two connecting rods (11), a second fixed pulley (8) fixedly arranged on a connecting piece (9) and a base (3) connected onto the bottom plate (2), a third fixed pulley (5) and a winch (4) are fixedly connected onto the base (3), one end of a steel cable (6) is fixedly connected with the winch (4), the middle of the steel cable (6) is lapped on the second fixed pulley (8) and the first fixed pulley (10), and the other end of the steel cable is connected with the clamping assembly.
4. A concrete cantilever parapet lifting tool as claimed in claim 3, wherein: the clamping assembly comprises a fixing block (17) connected to the free end of the steel cable (6) and a channel steel (20) arranged at the bottom of the fixing block (17), and the wallboard (15) is fixed to the inner side of the channel steel (20) through a bolt.
5. A concrete cantilever parapet lifting tool as claimed in claim 4, characterized in that: a first reinforcing rod (12) is obliquely arranged between the free end of the connecting rod (11) and the free end of the fixing rod (13), and a second reinforcing rod (19) is obliquely arranged between the side wall of the connecting piece (9) and the bottom plate (2).
6. A concrete cantilever parapet lifting device of claim 5, characterized in that: a plurality of limiting holes (7) matched with the bolts are formed in the connecting rod (11), the connecting piece (9) and the bottom plate (2).
CN202222508554.5U 2022-09-21 2022-09-21 Concrete overhanging parapet lifting device Withdrawn - After Issue CN218860194U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222508554.5U CN218860194U (en) 2022-09-21 2022-09-21 Concrete overhanging parapet lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222508554.5U CN218860194U (en) 2022-09-21 2022-09-21 Concrete overhanging parapet lifting device

Publications (1)

Publication Number Publication Date
CN218860194U true CN218860194U (en) 2023-04-14

Family

ID=87355956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222508554.5U Withdrawn - After Issue CN218860194U (en) 2022-09-21 2022-09-21 Concrete overhanging parapet lifting device

Country Status (1)

Country Link
CN (1) CN218860194U (en)

Similar Documents

Publication Publication Date Title
CN109110616B (en) Overhead telescopic construction elevator roof beam for elevator shaft traction and installation and use method thereof
CN101177959A (en) Curtain wall unit hanging equipment and construction method thereof
CN111021749A (en) Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof
CN108678752A (en) Shaft equipment rapid installation process
CN111764629A (en) Method for mounting and dismounting inclined roof hanging basket without counterweight
CN210460016U (en) Integrated form single power lift material platform
CN218860194U (en) Concrete overhanging parapet lifting device
CN106245984B (en) Jack up Multifunctional creeping gin pole
CN210316214U (en) Assembled steel construction building dysmorphism post
CN213085125U (en) Elevator shaft traction rotary telescopic construction elevator
CN112227378B (en) Auxiliary device for hoisting reinforcement cage
CN206769526U (en) Jack up Multifunctional creeping gin pole
CN214899827U (en) High-altitude outdoor cable terminal operation platform
CN211691536U (en) Simple lifting mechanism for bare concrete exterior wall cladding
CN211034877U (en) Pitched roof hoisting device
CN218176115U (en) Novel accurate assembly of panel building wall device
CN205772813U (en) For 40 tons of door machines built-in decelerator remove and install one suspender
CN216413741U (en) Overhead ground wire lifter
CN211873783U (en) Fixing part for replacing front bracket of high-altitude operation hanging basket
CN213231328U (en) Portable portable high altitude construction accessory hoisting machine constructs
CN114920157B (en) Hoisting device and hoisting method for curtain wall glass ribs
CN215716656U (en) Simple overhanging gutter aluminum plate mounting bracket
CN211775639U (en) Embedded plate type hanging basket mounting structure
CN218405379U (en) System for underground continuous wall construction
CN220449559U (en) Hanging basket overhanging system for being installed in building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20230414

Effective date of abandoning: 20230630

AV01 Patent right actively abandoned

Granted publication date: 20230414

Effective date of abandoning: 20230630