CN220449559U - Hanging basket overhanging system for being installed in building - Google Patents
Hanging basket overhanging system for being installed in building Download PDFInfo
- Publication number
- CN220449559U CN220449559U CN202321419623.3U CN202321419623U CN220449559U CN 220449559 U CN220449559 U CN 220449559U CN 202321419623 U CN202321419623 U CN 202321419623U CN 220449559 U CN220449559 U CN 220449559U
- Authority
- CN
- China
- Prior art keywords
- steel
- channel steel
- rear leg
- channel
- wire rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 101
- 239000010959 steel Substances 0.000 claims abstract description 101
- 210000001364 upper extremity Anatomy 0.000 claims description 9
- 238000009434 installation Methods 0.000 abstract description 12
- 239000000463 material Substances 0.000 abstract description 9
- 230000007246 mechanism Effects 0.000 description 8
- 238000000034 method Methods 0.000 description 6
- 238000010276 construction Methods 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 229910000975 Carbon steel Inorganic materials 0.000 description 2
- 239000010962 carbon steel Substances 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 241000277275 Oncorhynchus mykiss Species 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000011344 liquid material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
Abstract
The utility model discloses a hanging basket cantilever system for being installed in a building, and relates to the technical field of lifting. This a hanging flower basket system of encorbelmenting for installing in the floor, including leg support behind 2.5m10# channel-section steel, two 1.5m8# channel-section steel preceding leg supports and purpose-made wire rope couple, be provided with 1m8# back leg height adjustment channel-section steel and back leg height adjustment node on the leg support behind the 2.5m10# channel-section steel, the notch has been seted up on the leg support behind the 2.5m10# channel-section steel. The hanging basket cantilever system for being installed in the floor is made of common materials in the market, has a simple structure, is put into operation once, and can be repeatedly recycled; the device is arranged indoors, prevents the damage of the severe environment to the structure, is unfavorable in structural safety, is overhauled and dismantled, and greatly improves the safety of installation personnel during operation; the problem that the overhanging frame body structure cannot be installed or the installation stability is poor due to overhigh roof eave or parapet is avoided.
Description
Technical Field
The utility model relates to the technical field of lifting, in particular to a hanging basket overhanging system for being installed in a building.
Background
Lifting operations are an industrial process in which mechanical equipment or other items are transported from one location to another by hydraulic lifts. Most lifting machines start a vertical or vertical and horizontal working stroke after the lifting appliance takes materials, unload the materials after reaching a destination, and then perform idle stroke to a material taking place to complete a working cycle, and then perform second lifting. Generally, when the hoisting machinery works, the material taking, the moving and the unloading are sequentially carried out, and the work of each corresponding mechanism is intermittent. The hoisting machinery is mainly used for carrying finished articles, carrying bulk materials such as coal, ore and grain after being provided with a grab bucket, and carrying liquid materials such as molten steel after being provided with a bucket. Some hoisting machines, such as elevators, may also be used for people. In some applications, hoisting equipment is also the primary work machine, for example cranes for loading and unloading materials at ports and stations.
In the prior art, the hanging basket hanging mechanism needs to be installed on a building roof, the frame body is extremely easy to damage under the external severe environment of the roof, a large number of balancing weights are needed, the installation efficiency is low, certain safety problems exist, the requirements on installation personnel are high, and a series of safety and quality problems are caused by manual errors easily during installation.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the utility model provides a hanging basket overhanging system for being installed in a building, which solves the problems that in the prior art, a hanging basket hanging mechanism is required to be installed on a building roof, a frame body is extremely easy to damage under the severe environment outside the roof, a large number of balancing weights are required, the installation efficiency is low, certain safety problems exist, the requirement on installation personnel is high, and a series of safety and poor quality problems are easy to occur due to manual errors during installation.
(II) technical scheme
In order to achieve the above purpose, the utility model is realized by the following technical scheme: the hanging basket overhanging system comprises a 2.5m10# channel steel rear leg support, two 1.5m8# channel steel front leg supports and a special steel wire rope hook, wherein the 2.5m10# channel steel rear leg support is provided with a 1m8# rear leg height adjusting channel steel and a rear leg height adjusting node, the 2.5m10# channel steel rear leg support is provided with a notch, the 1m8# channel steel is inserted into the notch and can move up and down relative to the 2.5m10# channel steel rear leg support, the 1m8# channel steel rear leg height adjusting channel steel is provided with a bolt hole, the 2.5m10# channel steel rear leg support is provided with a rectangular groove matched with the bolt hole, and when the hanging basket is used, the bolt penetrates through the bolt hole and the rectangular groove to fix the relative position between the 1m8# channel steel and the 2.5m10# channel steel rear leg support;
one side of the 2.5m10# channel steel rear leg support is provided with a 4m10# I-steel cantilever beam, and the 4m10# I-steel cantilever beam is provided with a specially-made adjustable steel wire rope hook node;
a 1.5m8# I-steel beam is arranged between the two 1.5m8# channel steel front leg brackets;
the bottom of the special steel wire rope hook is provided with a 45# steel arc hook.
(III) beneficial effects
The utility model provides a hanging basket cantilever system for being installed in a building. The beneficial effects are as follows:
the hanging basket cantilever system for being installed in the floor is made of general materials in the market, has a simple structure, greatly reduces construction cost, is convenient to manufacture and install, can be repeatedly recycled, and is simple to operate and high in practicability; the device is arranged indoors, prevents the damage of the severe environment to the structure, is unfavorable in structural safety, is overhauled and dismantled, and greatly improves the safety of installation personnel during operation; the problem that the overhanging frame body structure cannot be installed or the installation stability is poor due to overhigh roof eave or parapet is avoided; the hanging basket steel wire rope hook position is adjustable, and the overhanging length can reach 2m, so that the hanging basket steel wire rope hook is suitable for being used for installing overhanging components (overhanging balcony and overhanging modeling) of an outer wall; the method is suitable for hanging basket operation of high-rise and super high-rise, outer wall hanging basket operation is not required to be carried out after the main body structure is capped, and sectional construction in the vertical direction can be realized.
Drawings
FIG. 1 is an overall view of a basket suspension mechanism for use in a floor according to the present utility model;
FIG. 2 is a schematic representation of a hook joint of an adjustable wire rope tailored for a basket suspension mechanism in a building according to the present utility model;
FIG. 3 is a detail view of a node for adjusting the height of the rear leg brackets of the channel steel (the rear channel steel is propped against the upper layer structure plate bottom, which is beneficial to better stress);
in the figure: 1. 4m10# I-steel cantilever beam; 2. 1.5m8# channel steel front leg support; 3. 2.5m10# channel steel rear leg support; 4. 1.5m8# I-steel beam, 5, specially-made adjustable steel wire rope hook joint; 6. a rear leg height adjustment node; 7. 1m8# rear leg height adjusting channel steel, 8# and 45# steel arc hooks; 9. a special steel wire rope hook.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-3, the present utility model provides a technical solution: the hanging basket overhanging system comprises a 2.5m10# channel steel rear leg support 3, two 1.5m8# channel steel front leg supports 2 and special steel wire rope hooks 9, wherein the 2.5m10# channel steel rear leg support 3 is provided with a 1m8# rear leg height adjustment channel steel 7 and a rear leg height adjustment node 6, the 2.5m10# channel steel rear leg support 3 is provided with a notch, the 1m8# rear leg height adjustment channel steel 7 is inserted into the notch and can move up and down relative to the 2.5m10# channel steel rear leg support 3, the 1m8# channel steel rear leg support 3 is provided with a bolt hole, the 2.5m10# channel steel rear leg support 3 is provided with a rectangular groove matched with the bolt hole, and when the hanging basket overhanging system is used, the relative position between the 1m8# rear leg height adjustment channel steel 7 and the 2.5m10# channel steel support 3 is fixed through the bolt penetrating through the bolt hole and the rectangular groove;
one side of the rear leg bracket 3 of the 5m10# channel steel is provided with a 4m10# I-steel cantilever beam 1, and the 4m10# I-steel cantilever beam 1 is provided with a specially-made adjustable steel wire rope hook joint 5;
a 1.5m8# I-steel beam 4 is arranged between the two 1.5m8# channel steel front leg brackets 2;
the bottom of the special steel wire rope hook 9 is provided with a 45# steel arc hook 8.
During operation, firstly, an I-steel channel steel head steel plate is welded with I-steel and channel steel, then the I-steel cantilever beam, an I-steel beam, a channel steel front leg support, a channel steel rear leg support, a rear leg height adjusting channel steel and a special adjustable steel wire rope hook are conveyed to a proper position in a proper floor, the I-steel cantilever beam and the I-steel beam, the I-steel beam and the channel steel front leg support, the I-steel cantilever beam and the channel steel rear leg support are mechanically connected through a hexagonal nut screw (8.8-grade carbon steel M14) respectively, stability of the hanging mechanism is checked, if the rear leg support is not fastened tightly, a wooden wedge can be adopted for fastening, finally, a hanging basket steel wire rope is penetrated into the special adjustable steel wire rope hook, and the hanging basket cantilever length is fixed through the hexagonal nut screw (8.8-grade carbon steel M14), so that the hanging mechanism for hanging a hanging basket in a floor is manufactured and installed, and the hanging mechanism can bear a maximum load of 0.5 ton.
In summary, the hanging basket overhanging system for being installed in the building is made of general materials in the market, has a simple structure, greatly reduces construction cost, is convenient to manufacture and install, can be repeatedly recycled after being put into use, and is simple to operate and high in practicability; the device is arranged indoors, prevents the damage of the severe environment to the structure, is unfavorable in structural safety, is overhauled and dismantled, and greatly improves the safety of installation personnel during operation; the problem that the overhanging frame body structure cannot be installed or the installation stability is poor due to overhigh roof eave or parapet is avoided; the hanging basket steel wire rope hook position is adjustable, and the overhanging length can reach 2m, so that the hanging basket steel wire rope hook is suitable for being used for installing overhanging components (overhanging balcony and overhanging modeling) of an outer wall; the method is suitable for hanging basket operation of high-rise and super high-rise, outer wall hanging basket operation is not required to be carried out after the main body structure is capped, and sectional construction in the vertical direction can be realized.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.
Claims (1)
1. A hanging flower basket system of encorbelmenting for installing in building layer, its characterized in that: the novel steel wire rope support comprises a 2.5m10# channel steel rear leg support (3), two 1.5m8# channel steel front leg supports (2) and a special steel wire rope hook (9), wherein 1m8# rear leg height adjusting channel steel (7) and rear leg height adjusting nodes (6) are arranged on the 2.5m10# channel steel rear leg support (3), a notch is formed in the 2.5m10# channel steel rear leg support (3), the 1m8# rear leg height adjusting channel steel (7) is inserted into the notch and can move up and down relative to the 2.5m10# channel steel rear leg support (3), bolt holes are formed in the 1m8# rear leg height adjusting channel steel (7), rectangular grooves matched with the bolt holes are formed in the 2.5m10# channel steel rear leg support (3), and when the novel steel wire rope support is used, the relative positions of the 1m8# rear leg height adjusting channel steel (7) and the 2.5m10# channel steel wire rope support (3) are fixed through the bolts through the bolt holes and the rectangular grooves;
one side of the 2.5m10# channel steel rear leg support (3) is provided with a 4m10# I-steel cantilever beam (1), and the 4m10# I-steel cantilever beam (1) is provided with a specially-made adjustable steel wire rope hook node (5);
a 1.5m8# I-steel cross beam (4) is arranged between the two 1.5m8# channel steel front leg brackets (2);
the bottom of the special steel wire rope hook (9) is provided with a 45# steel arc hook (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321419623.3U CN220449559U (en) | 2023-06-06 | 2023-06-06 | Hanging basket overhanging system for being installed in building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202321419623.3U CN220449559U (en) | 2023-06-06 | 2023-06-06 | Hanging basket overhanging system for being installed in building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220449559U true CN220449559U (en) | 2024-02-06 |
Family
ID=89737841
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202321419623.3U Active CN220449559U (en) | 2023-06-06 | 2023-06-06 | Hanging basket overhanging system for being installed in building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220449559U (en) |
-
2023
- 2023-06-06 CN CN202321419623.3U patent/CN220449559U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110748139B (en) | Hanging basket support system | |
CN210460016U (en) | Integrated form single power lift material platform | |
CN220449559U (en) | Hanging basket overhanging system for being installed in building | |
CN101450766B (en) | Lifting installation method for ultralong workpiece and used fixture cross beam | |
CN211341686U (en) | Hanging basket support system | |
CN210340141U (en) | House building engineering lifting device | |
CN206720680U (en) | A kind of roofing color corrugated sheet steel lifting device | |
CN203486787U (en) | Integral lifting device for cabinet top of Wiggins coal gas cabinet | |
CN114412192B (en) | Interlayer complex special-shaped aluminum veneer curtain wall and construction method thereof | |
CN2212621Y (en) | Guide rail upright column type external wall scaffold for high building | |
CN109516390B (en) | Flat-head tower crane convenient for manual carrying and installation and field installation method | |
CN209957241U (en) | Steel hanger | |
CN2839223Y (en) | The construction lifting appliance in floor type steel structure circle storehouse | |
CN208604911U (en) | A kind of novel suspention beam bracket | |
CN214942253U (en) | Hanging basket hanging mechanism for special-shaped building structure | |
CN111706060A (en) | Steel wire rope inclined-pulling type hanging basket device | |
CN115370096B (en) | Large-sized clear water concrete slab-based ultra-large space dry-hanging wall surface mounting construction method | |
CN220580489U (en) | Sliding hanging basket for construction in umbrella column | |
CN221027329U (en) | Auxiliary support for installing transformer substation engineering modularized construction wallboard | |
CN216787879U (en) | Interlayer complex special-shaped aluminum veneer curtain wall construction structure | |
CN219118717U (en) | Non-counterweight type steel truss inclined-pulling special-shaped hanging basket device | |
CN219060112U (en) | Construction elevator chassis device | |
CN221216935U (en) | Assembled curtain wall unit body lifting device for super high-rise building reconstruction | |
CN218860194U (en) | Concrete overhanging parapet lifting device | |
CN211873783U (en) | Fixing part for replacing front bracket of high-altitude operation hanging basket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |