CN218541448U - Attached lifting scaffold for high-rise building construction - Google Patents

Attached lifting scaffold for high-rise building construction Download PDF

Info

Publication number
CN218541448U
CN218541448U CN202222126423.0U CN202222126423U CN218541448U CN 218541448 U CN218541448 U CN 218541448U CN 202222126423 U CN202222126423 U CN 202222126423U CN 218541448 U CN218541448 U CN 218541448U
Authority
CN
China
Prior art keywords
lifting
wall
connecting rod
frame
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222126423.0U
Other languages
Chinese (zh)
Inventor
郭德豪
郭庆伟
崔小红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222126423.0U priority Critical patent/CN218541448U/en
Application granted granted Critical
Publication of CN218541448U publication Critical patent/CN218541448U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses an attached lifting scaffold for high-rise building construction, including attachment device, lifting frame and synchronous hoisting device, lifting frame passes through synchronous hoisting device and is preset at the attachment device sliding connection of building outer wall to realize that lifting frame moves at the building outer wall along attachment device under synchronous hoisting device's effect, lifting frame includes braced frame, main frame, horizontal pole and lifting beam, the main frame is at least two, and be vertical state setting parallel to each other on braced frame, and connect through horizontal pole and lifting beam each other; the utility model discloses lifting frame in ground pre-assembling passes through synchronous hoisting device and predetermines the attachment device sliding connection at the building outer wall to realize that lifting frame moves at the building outer wall along the attachment device under synchronous hoisting device's effect, the work efficiency is high, low in labor strength, and the wholeness is good, and safe and reliable saves a large amount of turnover materials.

Description

Attached lifting scaffold for high-rise building construction
The technical field is as follows:
the utility model relates to a building construction field especially relates to an attached lifting scaffold for high-rise building construction.
Background art:
in the building construction process, in order to facilitate construction, a construction platform outer protection frame is often required to be erected outside a building, and the existing common construction platforms are floor type scaffolds, scaffold arms, hangers and hanging baskets.
The utility model has the following contents:
the utility model discloses the technical problem that will solve is: the attached lifting scaffold for the high-rise building construction overcomes the defects of the prior art, the lifting frame preassembled on the ground is in sliding connection with the attachment device preset on the outer wall of the building through the synchronous lifting device, the lifting frame is moved on the outer wall of the building along the attachment device under the action of the synchronous lifting device, the work efficiency is high, the labor intensity is low, the integrity is good, the attached lifting scaffold is safe and reliable, and a large amount of turnover materials are saved.
The technical scheme of the utility model is that: the utility model provides a high-rise building construction is with inserted lift scaffold, includes attachment means, lifting frame and synchronous hoisting device, characterized by: the lifting frame is in sliding connection with the attachment device preset on the building outer wall through the synchronous lifting device, and the lifting frame moves on the building outer wall along the attachment device under the action of the synchronous lifting device;
the lifting frame comprises at least two supporting frames, main frames, cross rods and lifting cross beams, wherein the main frames are vertically arranged on the supporting frames in parallel and connected with one another through the cross rods and the lifting cross beams;
the attachment device comprises a wall connecting rod, an attachment support and a pull rod, one end of the attachment support and the wall connecting rod is fixed on the outer wall of the building, the other end of the attachment support and the wall connecting rod is in sliding connection with a guide rail arranged on the main frame through a guide seat, one end of the pull rod is fixed on the inner wall of the building, and the other end of the pull rod is hung on the wall connecting rod;
synchronous hoisting device includes electric block and switch board, and electric block hangs through the connecting rod to be established on even the wall pole, electric block's couple with the lifting beam is connected, the switch board is connected with electric block and sets up on the main frame.
Furthermore, the number of the main frames is at least two, and the main frames are connected up and down through connecting flanges.
Further, the main frame include with the pole setting that the guide rail is parallel, and the pole setting with the guide rail passes through the horizon bar and the down tube is connected, forms a body structure.
Furthermore, a construction platform is erected on the horizontal rod in the main frame, and the construction platform is hinged with a folding turnover plate through a hinge.
Furthermore, the end part of the wall connecting rod is provided with a through hole for the connecting rod to penetrate through, and the connecting rod penetrating through the through hole is fixed and limited through a movable limiting rod.
Furthermore, the number of the pull rods is two, one end of each pull rod is hung on a pull ring on the wall connecting rod, the other end of each pull rod is hinged with a pull block, the pull block is hinged with one end of a screw buckle, and the other end of the screw buckle is fixed on the inner wall of the building.
Furthermore, the wall connecting rod and the attachment support are provided with a fixing through hole and an anti-falling device which are used for being fixed on a building.
Furthermore, the anti-falling device comprises a limiting support and a limiting transverse plate, one end of the limiting support is hinged to the wall connecting rod and the attaching support, the other end of the limiting support is provided with a groove used for embedding the limiting transverse plate, the limiting transverse plates are at least two, and the limiting transverse plates are horizontally arranged on the guide rail.
Furthermore, a protective net is arranged on the outer side of the lifting frame.
The beneficial effects of the utility model are that:
1. the utility model discloses lifting frame in ground pre-assembling passes through synchronous hoisting device and predetermines the attachment device sliding connection at the building outer wall to realize that lifting frame moves at the building outer wall along the attachment device under synchronous hoisting device's effect, the work efficiency is high, low in labor strength, and the wholeness is good, and safe and reliable saves a large amount of turnover materials.
2. The utility model discloses needn't carry out the operation of turning over the frame among the prior art, avoided the dismouting process of scaffold frame simultaneously (once assemble the back and use the construction always and finish), and do not receive the restriction of building height, can cancel the steel pipe scaffold frame of encorbelmenting that uses in the conventional building as working face and outer protection frame, can confirm the equipment number of piles according to actual conditions, very big manpower and material of having saved to also have great change at safe angle to traditional scaffold frame.
3. The utility model provides an interconnect between guide rail, pole setting, horizon bar and the down tube, form the main frame of a body structure, and the main frame is at least two, and is the setting that vertical state is parallel to each other and is in on the braced frame, and pass through each other the horizontal pole with the lifting beam connects, forms lifting frame, simultaneously, can realize the mode of being connected from top to bottom of main frame and main frame through flange according to actual conditions, confirms the equipment number of piles.
4. The utility model discloses adhere to and support and link wall pole one end and fix at the building outer wall, the other end passes through guide holder and the guide rail sliding connection of setting on the main frame, pull rod one end is fixed at the building interior wall, the other end is hung and is established on linking the wall pole, and adhere to and support and link the wall pole and be two at least, and be vertical state setting on the building outer wall, the realization is to the direction of guide rail, adhere to simultaneously and support and be provided with anti-falling device on linking the wall pole, at the guide rail removal in-process, spacing diaphragm can imbed in the groove of spacing support, support spacingly to the guide rail in real time, when preventing that synchronous lifting device from appearing unexpected, the problem that the guide rail falls.
5. The utility model discloses set up construction platform on the horizon bar in the adjacent main frame, and articulated on the construction platform have folding board that turns over through the hinge, fold at the promotion in-process and turn over board upwards rotatory folding, fold in the work progress and turn over board downward rotation and open to with the contact of building outer wall, and use with the protection network cooperation that the lifting frame outside set up, guarantee constructor's safety.
6. The utility model discloses electric block hangs through the connecting rod and establishes on linking the wall pole, and electric block's couple is connected with lifting beam, and the switch board is connected and sets up on the main frame with electric block, through synchronous at the uniform velocity rotation of switch board control electric block, realizes promoting at the uniform velocity, because lifting frame's weight is all on linking the wall pole, draws to linking the wall pole to one side through the pull rod.
7. The utility model discloses the pull rod is two, and its one end is hung on the pull ring on linking the wall pole, and the other end with draw the piece articulated, draw the one end of piece and turnbuckle articulated, the other end of turnbuckle is fixed at the building interior wall, increases the holding power of linking the wall pole, forms the triangle structure through turnbuckle and two pull rods, increases the stability of linking the wall pole to can adjust the tautness through the turnbuckle.
Description of the drawings:
fig. 1 is a using state diagram of an attached lifting scaffold for high-rise building construction.
Fig. 2 is a schematic structural diagram of the lifting frame.
Fig. 3 is another structural schematic diagram of the lifting frame.
Fig. 4 is a schematic structural diagram of the main frame.
Fig. 5 is a schematic structural view of the attaching support.
Fig. 6 is a schematic view of the structure of the wall connecting rod.
Fig. 7 is a schematic structural view of the wall connecting rod and the electric hoist.
Fig. 8 is a schematic structural view of the tie bar.
The specific implementation mode is as follows:
example (b): referring to fig. 1, 2, 3, 4, 5, 6, 7 and 8, in the drawings, 1-a supporting frame, 2-a main frame, 3-a cross bar, 4-a lifting cross beam, 5-a protective net, 6-a wall connecting bar, 7-an attaching support, 8-a pull bar, 9-a guide seat, 10-a connecting bar, 11-a through hole, 12-an electric hoist, 13-a limiting support, 14-a limiting cross plate, 15-a groove, 16-a fixing through hole, 17-a lifting lug and 18-a movable limiting rod;
21-connecting flange, 22-guide rail, 23-vertical rod, 24-horizontal rod, 25-diagonal rod, 26-construction platform and 27-folding turnover plate;
81-pull ring, 82-pull block and 83-turnbuckle.
An attached lifting scaffold for high-rise building construction comprises an attaching device, a lifting frame and a synchronous lifting device, wherein the lifting frame is in sliding connection with the attaching device preset on the outer wall of a building through the synchronous lifting device, and the lifting frame is moved on the outer wall of the building along the attaching device under the action of the synchronous lifting device; the lifting frame preassembled on the ground is in sliding connection with the attachment device preset on the building outer wall through the synchronous lifting device, and the lifting frame is moved on the building outer wall along the attachment device under the action of the synchronous lifting device, so that the working efficiency is high, the labor intensity is low, the integrity is good, the lifting frame is safe and reliable, and a large amount of turnover materials are saved.
The present application will be described in detail below with reference to the drawings and examples.
The first embodiment is as follows:
the lifting frame is connected with an attachment device preset on the outer wall of the building in a sliding mode through the synchronous lifting device, and the lifting frame moves on the outer wall of the building along the attachment device under the action of the synchronous lifting device.
The lifting frame preassembled on the ground is in sliding connection with the attachment device preset on the outer wall of the building through the synchronous lifting device, and the lifting frame is moved on the outer wall of the building along the attachment device under the action of the synchronous lifting device, so that the working efficiency is high, the labor intensity is low, the integrity is good, the lifting frame is safe and reliable, and a large amount of turnover materials are saved.
Lifting frame includes braced frame 1, main frame 2, horizontal pole 3 and lifting beam 4, and main frame 2 is at least two, and is vertical state setting parallel to each other on braced frame 1, and connects through horizontal pole 3 and lifting beam 4 each other.
The number of the main frames 2 is at least two, and the main frames are connected up and down through connecting flanges 21; the main frame 2 comprises a vertical rod 23 parallel to the guide rail 22, and the vertical rod 23 and the guide rail 22 are connected through a horizontal rod 24 and an inclined rod 25 to form an integral structure; a construction platform 26 is erected on the horizontal rod 24 in the adjacent main frame 2, and a folding turnover plate 27 is hinged on the construction platform 26 through a hinge. A protective net 5 is arranged outside the lifting frame.
The guide rail 22, the upright rod 23, the horizontal rod 24 and the inclined rod 25 are connected with each other to form the main frame 2 of an integral structure, the main frame 2 is at least two, the vertical state is parallel to each other and is arranged on the supporting frame 1, the main frame is connected with the lifting cross beam 4 through the cross rod 3, the lifting frame is formed, and meanwhile, the assembling layer number can be determined according to the actual situation by the mode that the main frame 2 and the main frame 2 are connected up and down through the connecting flange 21.
The construction platform 26 is set up on the horizontal pole 24 in the adjacent main frame 2, and has folding board 27 that turns over through the hinge articulated on the construction platform 26, and folding board 27 that turns over is upwards rotatory folding at the promotion in-process, and folding board 27 that turns over in the work progress is rotatory down and is turned over and open to with the building outer wall contact, and use with the protection network 5 cooperation that the lifting frame outside set up, guarantee constructor's safety.
The attachment device comprises a wall connecting rod 6, an attachment support 7 and a pull rod 8, one end of the attachment support 7 and one end of the wall connecting rod 6 are fixed on the outer wall of the building, the other end of the attachment support 7 and the other end of the wall connecting rod 6 are in sliding connection with a guide rail 22 arranged on the main frame 2 through a guide seat 9, one end of the pull rod 8 is fixed on the inner wall of the building, and the other end of the pull rod 8 is hung on the wall connecting rod 6; the wall connecting rod 6 and the attachment support 7 are provided with fixing through holes 16 for fixing on a building.
The end of the wall connecting rod 6 is provided with a through hole 11 for the connecting rod 10 to pass through, and the connecting rod 10 passing through the through hole 11 is fixed and limited by a movable limiting rod 18.
The number of the pull rods 8 is two, one end of each pull rod is hung on a pull ring 81 on the wall connecting rod 6, the other end of each pull rod is hinged with a pull block 82, the pull block 82 is hinged with one end of a screw buckle 83, and the other end of the screw buckle 83 is fixed on the inner wall of the building.
Adhere to and support 7 and link 6 one end of wall pole and fix at the building outer wall, the other end through guide seat 9 with set up guide rail 22 sliding connection on main frame 2, 8 one ends of pull rod are fixed at the building inner wall, the other end is hung and is established on linking wall pole 6, and adhere to and support 7 and link wall pole 6 and be two at least, and be vertical state setting on the building outer wall, realize the direction to guide rail 22.
The pull rod 8 is two, and its one end is hung on the pull ring 81 on linking the wall pole 6, and the other end with draw the piece 82 articulated, draw the one end of piece 82 and turnbuckle 83 articulated, the other end of turnbuckle 83 is fixed at the building interior wall, increases linking the holding power of wall pole 6, forms the triangle-shaped structure through turnbuckle 83 and two pull rods 8, increases linking the stability of wall pole 6 to can adjust the tautness through turnbuckle 83.
Synchronous hoisting device includes electric block 12 and switch board, and electric block 12 is hung through connecting rod 10 and is established on even wall pole 6, and electric block's 12 couple is connected with lifting beam 4, and the switch board is connected and sets up on main frame 2 with electric block 12.
Electric block 12 is hung through connecting rod 10 and is established on linking wall pole 6, and electric block 12's couple is connected with lifting beam 4, and the switch board is connected and sets up on main frame 2 with electric block 12, through synchronous at the uniform velocity rotation of switch board control electric block 12, realizes promoting at the uniform velocity, because lifting frame's weight all is on linking wall pole 6, draws to one side through pull rod 8 to linking wall pole 6.
Example two:
in this embodiment, the anti-falling device is added on the basis of the first embodiment, other technical features are the same, and the description of the same parts is omitted here, where the specific description of the anti-falling device is as follows: all be provided with anti-falling device on even wall pole 6 and the adhesion support 7, anti-falling device includes spacing support 13 and spacing diaphragm 14, and spacing support 13 one end articulates on even wall pole 6 and adhesion support 7, and the other end is provided with the groove 15 that is used for spacing diaphragm 14 embedding, and spacing diaphragm 14 is at least two, and the level sets up on guide rail 22.
The anti-falling device is arranged on the attaching support 7 and the wall connecting rod 6, and in the moving process of the guide rail 22, the limiting transverse plate 14 can be embedded into the groove 15 of the limiting support 13 to support and limit the guide rail 22 in real time, so that the problem that the lifting frame falls when the synchronous lifting device is unexpected is solved.
When the lifting frame is used, the attached support 7 and the wall connecting rod 6 are pre-fixed on the building outer wall through the fixing through hole 16, one ends of the two pull rods 8 are hung on a pull ring 81 on the wall connecting rod 6, the other ends of the two pull rods are hinged with a pull block 82, the pull block 82 is hinged with one end of a screw buckle 83, the other end of the screw buckle 83 is fixed on the building inner wall, after the lifting frame is assembled, the guide rail 22 extends into the guide seat 9, one end of a connecting rod 10 penetrates through a through hole 11 in the end part of the wall connecting rod 6 and fixedly limits the connecting rod 10 penetrating through the through hole 11 through a movable limiting rod 12, the other end of the connecting rod is connected with an electric hoist 12, a hook of the electric hoist 12 is connected with a lifting lug 17 on the lifting beam 4, the control cabinet is connected with the electric hoist 12 and arranged on the main frame 2, the lifting operation of the lifting frame is realized through the rotation of the electric hoist 12, at the moment, in the moving process of the guide rail 22, the limiting transverse plate 14 can be embedded into a groove 15 of the limiting support 13, and limit the guide rail 22 is supported and limited in real time; when the lifting frame moves in place, the lifting frame continuously rises through the alternate and cyclic use of the plurality of synchronous lifting devices.
Wherein, can be according to the construction conditions, realize the mode that main frame 2 and main frame 2 are connected from top to bottom through flange 21, confirm the equipment number of piles, construction platform 26 has been set up on the horizontal bar 24 in the adjacent main frame 2, and it has folding board 27 that turns over to articulate through the hinge on the construction platform 26, it is folding to turn over board 27 upwards rotatory folding to turn over at the promotion in-process, it turns over board 27 downwards rotatory and opens to fold in the work progress, and contact with the building outer wall, and use with the protection network 5 cooperation that the lifting frame outside set up, guarantee constructor's safety.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the present invention in any way, and all simple modifications, equivalent changes and modifications made by the technical spirit of the present invention to the above embodiments still fall within the scope of the technical solution of the present invention.

Claims (9)

1. The utility model provides a high-rise building construction is with inserted lift scaffold, includes anchorage device, lifting frame and synchronous hoisting device, characterized by: the lifting frame is in sliding connection with the attachment device preset on the building outer wall through the synchronous lifting device, and the lifting frame moves on the building outer wall along the attachment device under the action of the synchronous lifting device;
the lifting frame comprises at least two supporting frames, a main frame, a cross rod and a lifting cross beam, wherein the main frames are vertically arranged on the supporting frames in parallel and are connected with each other through the cross rod and the lifting cross beam;
the attachment device comprises a wall connecting rod, an attachment support and a pull rod, one end of the attachment support and the wall connecting rod is fixed on the outer wall of the building, the other end of the attachment support and the wall connecting rod is in sliding connection with a guide rail arranged on the main framework through a guide seat, one end of the pull rod is fixed on the inner wall of the building, and the other end of the pull rod is hung on the wall connecting rod;
synchronous hoisting device includes electric block and switch board, and electric block hangs through the connecting rod to be established on even the wall pole, electric block's couple with the lifting beam is connected, the switch board is connected with electric block and sets up on the main frame.
2. The attached lifting scaffold for high-rise building construction according to claim 1, wherein: the number of the main frames is at least two, and the main frames are connected up and down through connecting flanges.
3. The attached lifting scaffold for high-rise building construction according to claim 2, wherein: the main frame includes with the pole setting that the guide rail is parallel, and the pole setting with the guide rail passes through the horizon bar and is connected with the down tube, forms a body structure.
4. The attached lifting scaffold for high-rise building construction according to claim 3, wherein: and adjacent construction platforms are erected on the horizontal rods in the main frames and are hinged with folding turning plates through hinges.
5. The attached lifting scaffold for high-rise building construction according to claim 1, wherein: the end part of the wall connecting rod is provided with a through hole for the connecting rod to penetrate through, and the connecting rod penetrating through the through hole is fixed and limited through a movable limiting rod.
6. The attached lifting scaffold for high-rise building construction according to claim 1, wherein: the wall connecting rod is characterized in that the number of the pull rods is two, one end of each pull rod is hung on a pull ring on the wall connecting rod, the other end of each pull rod is hinged with a pull block, the pull block is hinged with one end of a screw buckle, and the other end of the screw buckle is fixed on the inner wall of a building.
7. The attached lifting scaffold for high-rise building construction according to claim 1, wherein: and the wall connecting rod and the attached support are provided with a fixing through hole and an anti-falling device which are used for being fixed on a building.
8. The attached lifting scaffold for high-rise building construction according to claim 1, wherein: the anti-falling device comprises a limiting support and a limiting transverse plate, one end of the limiting support is hinged to the wall connecting rod and the attaching support, the other end of the limiting support is provided with a groove used for embedding the limiting transverse plate, the limiting transverse plate is at least two, and the level of the limiting transverse plate is arranged on the guide rail.
9. The attached lifting scaffold for high-rise building construction according to any one of claims 1 to 8, wherein: and a protective net is arranged outside the lifting frame.
CN202222126423.0U 2022-08-12 2022-08-12 Attached lifting scaffold for high-rise building construction Active CN218541448U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222126423.0U CN218541448U (en) 2022-08-12 2022-08-12 Attached lifting scaffold for high-rise building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222126423.0U CN218541448U (en) 2022-08-12 2022-08-12 Attached lifting scaffold for high-rise building construction

Publications (1)

Publication Number Publication Date
CN218541448U true CN218541448U (en) 2023-02-28

Family

ID=85268293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222126423.0U Active CN218541448U (en) 2022-08-12 2022-08-12 Attached lifting scaffold for high-rise building construction

Country Status (1)

Country Link
CN (1) CN218541448U (en)

Similar Documents

Publication Publication Date Title
CN109826411A (en) A kind of climbing frame and its operation method for building
CN101696598A (en) Wholly lifted construction external frame
CN110748139B (en) Hanging basket support system
CN218541448U (en) Attached lifting scaffold for high-rise building construction
CN206844431U (en) A kind of curtain wall construction support
CN211341686U (en) Hanging basket support system
CN210767927U (en) Safety protection platform of attached lifting operation
CN208024056U (en) A kind of double flat arm ground type pole
CN211850682U (en) Scaffold for building construction
CN214785847U (en) Be applied to hanging flower basket device of single structure concrete beam
CN205955156U (en) Elevartor shaft steel platform
CN210798251U (en) But scaffold of automatically regulated height
CN213329975U (en) Steel pull rod hanging and pulling overhanging bearing steel beam structure
CN210316599U (en) A curtain ring rail for roofing truss beam position
CN211037760U (en) Novel instrument formula elevartor shaft construction operation platform
CN209040527U (en) A kind of scaffold cradle structure
CN210342619U (en) Connecting piece of integral lifting scaffold
CN209837623U (en) Wall construction and composite platform for people to go up and down
CN215631516U (en) Hanging flower basket device is used in construction of roof slope roofing platform curtain
CN216787787U (en) Manual operation platform for tower crane dismantling
CN115095163B (en) Inverted steel structure hanging frame construction method and steel column positioning tool
CN215291333U (en) Safe and economical combined hanging basket
CN211286560U (en) Spherical node suspension adjustable operation platform
CN215925721U (en) Cantilever hanging rack for steel box girder
CN109516390A (en) A kind of flat-top tower crane and field installation process convenient for manpower transport's installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant