CN216787787U - Manual operation platform for tower crane dismantling - Google Patents

Manual operation platform for tower crane dismantling Download PDF

Info

Publication number
CN216787787U
CN216787787U CN202120362061.8U CN202120362061U CN216787787U CN 216787787 U CN216787787 U CN 216787787U CN 202120362061 U CN202120362061 U CN 202120362061U CN 216787787 U CN216787787 U CN 216787787U
Authority
CN
China
Prior art keywords
supporting
girder
vertical
tower crane
main beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120362061.8U
Other languages
Chinese (zh)
Inventor
徐敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Pangyuan Machinery Engineering Co ltd
Original Assignee
Shandong Pangyuan Machinery Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Pangyuan Machinery Engineering Co ltd filed Critical Shandong Pangyuan Machinery Engineering Co ltd
Priority to CN202120362061.8U priority Critical patent/CN216787787U/en
Application granted granted Critical
Publication of CN216787787U publication Critical patent/CN216787787U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a manual operation platform for tower crane dismantling, which comprises a cement wall surface, wherein an anchor bar is fixedly arranged on the right side of the cement wall surface, a fixing piece is fixedly arranged on the right side of the anchor bar, a first connecting lug seat is fixedly arranged on the right side of the fixing piece, a first supporting main beam I is fixedly arranged on the outer side of the cement wall surface, a first seal head is fixedly arranged on the left side of the first supporting main beam I, a second connecting lug seat is fixedly arranged on the right side of the front end surface of the first supporting main beam I, a third connecting lug seat is fixedly arranged on the right side of the upper end of the first supporting main beam I, a vertical support rod is arranged on the upper side of the first supporting main beam I, a second seal head is fixedly arranged on the outer side of the vertical support rod, and a horizontal support rod is arranged on the front end surface of the first supporting main beam I. This manual operation platform is convenient for the staff climbing through the cat ladder mechanism that sets up, provides a supporting platform through the hanging flower basket mechanism that sets up, and the staff of being convenient for stands to be convenient for dismantle the tower crane.

Description

Manual operation platform for tower crane dismantling
Technical Field
The utility model relates to the technical field of building equipment, in particular to a manual operation platform for tower crane dismantling.
Background
The tower crane is the most common hoisting equipment in the construction site, also known as tower crane, and is lengthened section by section for hoisting construction raw materials such as reinforcing steel bars, wood ridges, concrete, steel pipes and the like. The tower crane is indispensable equipment on a construction site.
But current most of tower cranes often need dismantle on the artifical climbing wall, and the design is unreasonable, leads to the dismantlement degree of difficulty to the tower crane big, is not convenient for use.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a manual operation platform for tower crane dismantling, and aims to solve the problems that most of existing tower cranes are often dismantled by manually climbing on a wall surface, and the tower cranes are difficult to dismantle and inconvenient to use due to unreasonable design.
In order to achieve the purpose, the utility model provides the following technical scheme: a manual operation platform for tower crane dismantling comprises a cement wall surface, wherein an anchor bar is fixedly arranged on the right side of the cement wall surface, a fixing plate is fixedly arranged on the right side of the anchor bar, a first connecting lug seat is fixedly arranged on the right side of the fixing plate, a first supporting main beam is fixedly arranged on the outer side of the cement wall surface, a first seal head is fixedly arranged on the left side of the first supporting main beam, a second connecting lug seat is fixedly arranged on the right side of the front end surface of the first supporting main beam, a third connecting lug seat is fixedly arranged on the right side of the upper end of the first supporting main beam, a vertical support rod is arranged on the upper side of the first supporting main beam, a second seal head is fixedly arranged on the outer side of the vertical support rod, a horizontal support rod is arranged on the front end surface of the first supporting main beam, a third seal head is fixedly arranged on the outer side of the horizontal support rod, a third supporting main beam and a second supporting main beam are arranged on the upper end of the first supporting main beam, the tower crane support frame is fixedly mounted inside the first supporting girder, the second supporting girder and the third supporting girder, the ladder climbing mechanism is fixedly mounted on the outer side of the vertical supporting rod, and the hanging basket mechanism is arranged below the first supporting girder.
Preferably, hanging flower basket mechanism is including vertical fixed plate, hanging flower basket body, first locking bolt, bracing piece, second locking bolt, vertical fixed plate fixed mounting is in the outside of cement wall, the right side fixed mounting of vertical fixed plate lower extreme has the hanging flower basket body, vertical fixed plate passes through first locking bolt and cement wall fixed connection, fixedly connected with bracing piece between vertical fixed plate and the hanging flower basket body, through second locking bolt fixed connection between bracing piece and vertical fixed plate and the hanging flower basket body.
Preferably, the ladder climbing mechanism comprises a first fixing block, a second fixing block, a third locking bolt and a ladder climbing body, the first fixing block and the second fixing block are fixedly installed on the outer side of the ladder climbing body, and the first fixing block and the second fixing block are fixedly installed on the outer side of the vertical supporting rod through the third locking bolt.
Preferably, the third head that the horizontal stay bar is close to the cement wall is fixed connection with first connection ear seat, the third head and the second connection ear seat of the horizontal stay bar other end are fixed connection.
Preferably, the third supporting main beam and the second supporting main beam are fixedly connected with the first supporting main beam, and the first supporting main beam is provided with a plurality of same supporting main beams.
Preferably, the vertical stay bar and the second seal head are welded by adopting a forty-five degree groove, and the horizontal stay bar and the third seal head are welded by adopting a forty-five degree groove.
Compared with the prior art, the utility model has the beneficial effects that:
this a manual operation platform for tower crane is demolishd, the staff climbing of being convenient for through the cat ladder mechanism that sets up provides a supporting platform through the hanging flower basket mechanism that sets up, and the staff of being convenient for stands to be convenient for dismantle the tower crane.
Drawings
FIG. 1 is a schematic side view of the whole body of the present invention;
FIG. 2 is a schematic top view of the present invention;
FIG. 3 is a schematic structural diagram of the basket mechanism of the present invention;
FIG. 4 is a schematic view of the mounting structure of the ladder climbing mechanism and the vertical stay bar of the present invention;
FIG. 5 is a schematic side view of the horizontal stay bar of the present invention;
FIG. 6 is a schematic top view of the horizontal stay bar of the present invention;
FIG. 7 is a schematic side view of the vertical stay of the present invention;
FIG. 8 is a schematic top view of the vertical stay of the present invention;
FIG. 9 is a first schematic view of the fixing plate and anchor bar mounting structure of the present invention;
FIG. 10 is a schematic view of the structure of the anchor sheet and anchor bar of the present invention.
In the figure: 1. a cement wall surface; 2. anchoring ribs; 3. a fixing sheet; 4. a first connecting lug seat; 5. supporting a first main beam; 6. a first end enclosure; 7. a vertical fixing plate; 8. a second connecting lug seat; 9. a vertical stay bar; 10. a second end enclosure; 11. a horizontal stay bar; 12. a third end enclosure; 13. supporting a second main beam; 14. supporting a main beam III; 15. a tower crane supporting frame; 16. a ladder climbing mechanism; 17. a third connecting lug seat; 18. a basket body; 19. a first locking bolt; 20. a support bar; 21. a second locking bolt; 22. a hanging basket mechanism; 23. a first fixed block; 24. a second fixed block; 25. a third locking bolt; 26. the cat ladder body.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-10, the present invention provides a technical solution: a manual operation platform for tower crane dismantling comprises a cement wall surface 1, an anchor bar 2 is fixedly installed on the right side of the cement wall surface 1, a fixing piece 3 is fixedly installed on the right side of the anchor bar 2, a first connecting lug seat 4 is fixedly installed on the right side of the fixing piece 3, a first supporting main beam 5 is fixedly arranged on the outer side of the cement wall surface 1, a first seal head 6 is fixedly installed on the left side of the first supporting main beam 5, a second connecting lug seat 8 is fixedly installed on the right side of the front end surface of the first supporting main beam 5, a third connecting lug seat 17 is fixedly installed on the right side of the upper end of the first supporting main beam 5, a vertical support rod 9 is arranged on the upper side of the first supporting main beam 5, a second seal head 10 is fixedly installed on the outer side of the vertical support rod 9, a horizontal support rod 11 is arranged on the front end surface of the first supporting main beam 5, a third seal head 12 is fixedly installed on the outer side of the horizontal support rod 11, a third supporting main beam 14 and a second supporting main beam 13 are arranged on the upper end of the first supporting main beam 5, a tower crane support frame 15 is fixedly arranged inside the first supporting main beam 5, the second supporting main beam 13 and the third supporting main beam 14, a ladder climbing mechanism 16 is fixedly arranged outside the vertical support rod 9, a hanging basket mechanism 22 is arranged below the first supporting main beam 5, the anchor bar 2, the fixing piece 3, the first connecting lug seat 4, the first supporting main beam 5, the first seal head 6, the second connecting lug seat 8, the vertical support rod 9, the second seal head 10, the horizontal support rod 11, the third seal head 12, the second supporting main beam 13, the third supporting main beam 14, the tower crane support frame 15 and the third connecting lug seat 17 are all made of Q3405B material, two red lead paints are sprayed on the outer sides of the anchor bar 2, the fixing piece 3, the first connecting lug seat 4, the first supporting main beam 5, the first seal head 6, the second connecting lug seat 8, the vertical support rod 9, the second seal head 10, the horizontal support rod 11, the third seal head 12, the second supporting main beam 13, the third supporting main beam 14, the tower crane support frame 15 and the third connecting lug seat 17, and the thickness of the red lead paint is 100 mu m, and in the using process of the device, a worker can stand on the vertical fixing plate 7 to detach the tower crane support frame 15 and can climb up and down by using the ladder climbing mechanism 16 to detach.
Further, hanging flower basket mechanism 22 is including vertical fixed plate 7, hanging flower basket body 18, first locking bolt 19, the bracing piece 20, second locking bolt 21, vertical fixed plate 7 fixed mounting is in the outside of cement wall 1, the right side fixed mounting of vertical fixed plate 7 lower extreme has hanging flower basket body 18, vertical fixed plate 7 is through first locking bolt 19 and cement wall 1 fixed connection, fixedly connected with bracing piece 20 between vertical fixed plate 7 and the hanging flower basket body 18, through second locking bolt 21 fixed connection between bracing piece 20 and vertical fixed plate 7 and the hanging flower basket body 18, hanging flower basket mechanism 22 through setting up provides a supporting platform, the staff of being convenient for stands, dismantle the tower crane.
Further, cat ladder mechanism 16 is including first fixed block 23 and second fixed block 24, third locking bolt 25 and cat ladder body 26, and first fixed block 23 and 24 fixed mounting of second fixed block are in the outside of cat ladder body 26, and first fixed block 23 passes through third locking bolt 25 fixed mounting in the outside of vertical stay 9 with second fixed block 24, through the cat ladder mechanism 16 that sets up the staff climbing of being convenient for.
Further, the third head 12 that horizontal vaulting pole 11 is close to cement wall 1 is fixed connection with first connection ear seat 4, and the third head 12 and the second connection ear seat 8 of the horizontal vaulting pole 11 other end are fixed connection, and at the in-process of using the device, second connection ear seat 8 and first connection ear seat 4 can be with horizontal vaulting pole 11 fixed mounting in the outside that supports girder 5.
Further, the supporting girder three 14 and the supporting girder two 13 are fixedly connected with the supporting girder one 5, the supporting girder one 5 is provided with a plurality of same supporting girders, the supporting girder one 5 can fix and limit the supporting girder three 14 and the supporting girder two 13, and the stability of the device is greatly enhanced.
Further, vertical vaulting pole 9 and second head 10 adopt forty-five degree groove weld, and horizontal vaulting pole 11 and third head 12 adopt forty-five degree groove weld, and at the in-process of operative installations, vertical vaulting pole 9 and second head 10 of forty-five degree groove weld can strengthen vertical vaulting pole 9 and the stability of second head 10, and horizontal vaulting pole 11 and third head 12 of forty-five degree groove weld simultaneously also can increase horizontal vaulting pole 11 and the stability of third head 12.
The working principle is as follows: firstly, the fixing plate 3 can be stably installed at the upper end of the cement wall surface 1 by the hook outside the anchor bar 2, the fixing plate 3 can fix the first supporting main beam 5 on the fixing plate 3, the first supporting main beam 5 can fix and limit the tower crane supporting frame 15, the safety is high, the vertical support rod 9 can be fixedly installed at the lower side of the first supporting main beam 5 by the first connecting ear seat 4 and the third connecting ear seat 17, the horizontal support rod 11 can be fixedly installed at the outer side of the first supporting main beam 5 by the second connecting ear seat 8 and the first connecting ear seat 4, the vertical support rod 9 and the second end enclosure 10 which are welded by a forty-five degree groove can enhance the stability of the vertical support rod 9 and the second end enclosure 10, meanwhile, the horizontal support rod 11 and the third end enclosure 12 which are welded by a forty-five degree groove can also increase the stability of the horizontal support rod 11 and the third end enclosure 12, and the tower crane can be conveniently detached by a worker through the vertical fixing plate 7 and the ladder climbing mechanism 16, the bracing piece 20 can be fixed and support vertical fixed plate 7 and hanging flower basket body 18, effectively avoids vertical fixed plate 7 and hanging flower basket body 18 separation, has improved the stability of device greatly, and first fixed block 23, second fixed block 24 and third locking bolt 25 can be with cat ladder mechanism 16 fixed mounting in the outside of vertical bracing piece 9, have improved the stability of device greatly.
Finally, it should be noted that the above-mentioned contents are only used for illustrating the technical solutions of the present invention, and not for limiting the protection scope of the present invention, and that the simple modifications or equivalent substitutions of the technical solutions of the present invention by those of ordinary skill in the art can be made without departing from the spirit and scope of the technical solutions of the present invention.

Claims (6)

1. A manual operation platform for tower crane is demolishd, including cement wall (1), its characterized in that: the concrete wall is characterized in that an anchor bar (2) is fixedly mounted on the right side of the cement wall (1), a fixing piece (3) is fixedly mounted on the right side of the anchor bar (2), a first connecting lug seat (4) is fixedly mounted on the right side of the fixing piece (3), a first supporting girder (5) is fixedly arranged on the outer side of the cement wall (1), a first seal head (6) is fixedly mounted on the left side of the first supporting girder (5), a second connecting lug seat (8) is fixedly mounted on the right side of the front end face of the first supporting girder (5), a third connecting lug seat (17) is fixedly mounted on the right side of the upper end of the first supporting girder (5), a vertical support rod (9) is arranged on the upper side of the first supporting girder (5), a second seal head (10) is fixedly mounted on the outer side of the vertical support rod (9), and a horizontal support rod (11) is arranged on the front end face of the first supporting girder (5), the outside fixed mounting of horizontal vaulting pole (11) has third head (12), the upper end of supporting girder (5) is provided with supports girder three (14) and supports girder two (13), the inside fixed mounting who supports girder (5), supports girder two (13) and supports girder three (14) has tower crane support frame (15), the outside fixed mounting of vertical vaulting pole (9) has cat ladder mechanism (16), the below of supporting girder (5) is provided with hanging flower basket mechanism (22).
2. The manual operation platform for tower crane dismantling according to claim 1, wherein: hanging flower basket mechanism (22) is including vertical fixed plate (7), hanging flower basket body (18), first locking bolt (19), bracing piece (20), second locking bolt (21), vertical fixed plate (7) fixed mounting is in the outside of cement wall (1), the right side fixed mounting of vertical fixed plate (7) lower extreme has hanging flower basket body (18), vertical fixed plate (7) are through first locking bolt (19) and cement wall (1) fixed connection, fixedly connected with bracing piece (20) between vertical fixed plate (7) and hanging flower basket body (18), through second locking bolt (21) fixed connection between bracing piece (20) and vertical fixed plate (7) and hanging flower basket body (18).
3. The manual operation platform for tower crane dismantling according to claim 1, wherein: the ladder climbing mechanism (16) comprises a first fixing block (23), a second fixing block (24), a third locking bolt (25) and a ladder climbing body (26), wherein the first fixing block (23) and the second fixing block (24) are fixedly installed on the outer side of the ladder climbing body (26), and the first fixing block (23) and the second fixing block (24) are fixedly installed on the outer side of the vertical supporting rod (9) through the third locking bolt (25).
4. The manual operation platform for tower crane dismantling according to claim 1, wherein: the third head (12) that horizontal stay bar (11) is close to cement wall (1) is fixed connection with first connection ear seat (4), third head (12) and second connection ear seat (8) of the horizontal stay bar (11) other end are fixed connection.
5. The manual operation platform for tower crane dismantling according to claim 1, wherein: the supporting girder III (14) and the supporting girder II (13) are fixedly connected with the supporting girder I (5), and the supporting girder I (5) is provided with a plurality of same supporting girders.
6. The manual operation platform for tower crane dismantling according to claim 1, wherein: the vertical supporting rod (9) and the second seal head (10) are welded by adopting a forty-five degree groove, and the horizontal supporting rod (11) and the third seal head (12) are welded by adopting a forty-five degree groove.
CN202120362061.8U 2021-02-09 2021-02-09 Manual operation platform for tower crane dismantling Active CN216787787U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120362061.8U CN216787787U (en) 2021-02-09 2021-02-09 Manual operation platform for tower crane dismantling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120362061.8U CN216787787U (en) 2021-02-09 2021-02-09 Manual operation platform for tower crane dismantling

Publications (1)

Publication Number Publication Date
CN216787787U true CN216787787U (en) 2022-06-21

Family

ID=81999404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120362061.8U Active CN216787787U (en) 2021-02-09 2021-02-09 Manual operation platform for tower crane dismantling

Country Status (1)

Country Link
CN (1) CN216787787U (en)

Similar Documents

Publication Publication Date Title
CN203441073U (en) Hoop-type high-altitude guard platform suitable for super high-rise building outline boarder structural column
CN209942196U (en) Cantilever support system for large-volume concrete structure
CN108532968A (en) A kind of assembled support device of steel bar truss floor support plate composite floor system
CN211173007U (en) Novel tripod of encorbelmenting
CN216787787U (en) Manual operation platform for tower crane dismantling
CN210316599U (en) A curtain ring rail for roofing truss beam position
CN107587711A (en) A kind of regularization assembled overhanging protection canopy and its assembly method
CN208294079U (en) Can dismantle design steel form concrete operation platform
CN110552495A (en) assembled building combined tool type outer protective frame system and construction method thereof
CN216476335U (en) Inclined frame concrete cylindrical formwork reinforcing system
CN201502170U (en) Horizontal supporting device of building external frame
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN210597325U (en) Anti-falling conversion device for steel enclosing purlin
CN113958120A (en) Inclined frame concrete cylindrical formwork reinforcing system
CN210918167U (en) Triangular section steel construction device for overhanging scaffold
CN107461029B (en) Lower hanging beam pouring forming device based on hydraulic climbing formwork system setting
CN211622697U (en) Anti-falling device for building construction
CN215291333U (en) Safe and economical combined hanging basket
CN111962850A (en) Construction method of overhanging scaffold
CN206220547U (en) A kind of operating platform for steel structure column installation
CN218406382U (en) A operation platform that encorbelments for construction of roofing overlength structure of encorbelmenting
CN210685313U (en) Safe convenient house steel connection structure
CN211714573U (en) Be applied to aerial large-span hang mould strutting arrangement
CN219118715U (en) Elevator well safety protection and operation platform integrated device
CN214785736U (en) Overhanging outer frame and floor outer frame combined scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant