CN206220547U - A kind of operating platform for steel structure column installation - Google Patents
A kind of operating platform for steel structure column installation Download PDFInfo
- Publication number
- CN206220547U CN206220547U CN201621303061.6U CN201621303061U CN206220547U CN 206220547 U CN206220547 U CN 206220547U CN 201621303061 U CN201621303061 U CN 201621303061U CN 206220547 U CN206220547 U CN 206220547U
- Authority
- CN
- China
- Prior art keywords
- fence
- steel structure
- platform
- structure column
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 69
- 239000010959 steel Substances 0.000 title claims abstract description 69
- 238000009434 installation Methods 0.000 title claims abstract description 19
- 239000000725 suspension Substances 0.000 claims description 4
- 239000000463 material Substances 0.000 abstract description 7
- 238000006073 displacement reaction Methods 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 7
- 238000000034 method Methods 0.000 description 3
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 241000282326 Felis catus Species 0.000 description 2
- 239000011324 bead Substances 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model is related to a kind of operating platform for steel structure column installation, including main platform body, the main platform body includes platform floor, the first fence and the second fence, fluting corresponding with steel structure column is provided with front side of the platform floor, the leading flank of the main platform body sets the second fence, and remaining side of the main platform body sets the first fence, the bottom of the main platform body is fixedly connected on steel structure column by support beam.The beneficial effects of the utility model are:Efficiently solve the problems, such as that steel column is installed without operating surface, using the platform of live clout processing and fabricating, cannot make simple, flexibility, safe, easy to use, the security of the work high above the ground personnel for greatly improving in the case of use in routine operation platform;Can Reusability, utilization rate is high, and it is convenient and swift to install displacement, saves materials'use and engineering time.
Description
Technical field
The utility model is related to construction equipment technical field, it particularly relates to one kind is installed for steel structure column
The operating platform of construction.
Background technology
Current most of skyscrapers are steel reinforced concrete structure, and Core Walls Structure shear wall is by girder steel and housing steel structure column
3 connections.When housing steel structure column 3 is installed, Normal practice is the firm space formed using steel column, girder steel, shear wall, in girder steel
On add operating platform.
But when Core Walls Structure shear wall is connected with housing steel structure column 3 without girder steel in skyscraper, it is impossible in work progress
When forming firm spatial relationship, the way of conventional utilization steel girder erection steel column installation operating platform cannot just be realized, nothing
Method provides the execution conditions of safety to work high above the ground personnel, there is very big security risk.
Therefore, develop one kind and may be disposed at steel column top, make simple, easy to use, flexibility, safe behaviour
Make platform, it is the problem of professional's urgent need to resolve to become.
Utility model content
The utility model proposes a kind of operating platform for steel structure column installation, overcome in existing product
State the deficiency of aspect.
The purpose of this utility model is achieved through the following technical solutions:
A kind of operating platform for steel structure column installation, including main platform body, the main platform body include platform
Base plate, is provided with fluting corresponding with steel structure column on front side of the platform floor, the leading flank of the main platform body is provided with
Second fence, and the trailing flank and left surface of the main platform body, right flank are respectively provided with the first fence, the bottom of the main platform body
Portion is fixedly connected on steel structure column by support beam.
Further, some suspension ring are fixedly connected with the top of first fence and the second fence.
Further, first fence and the second fence include column, crossbeam and facade diagonal brace, the column and horizontal stroke
Beam is arranged in a mutually vertical manner, and the facade diagonal brace is set along the diagonal of the first fence and the second fence.
Further, it is fixedly connected with horizontal diagonal brace between first fence and the second fence.
Further, the platform floor includes framework and the checkered steel plate being arranged on framework.
Further, the framework includes longitudinal keel and lateral keel.
Further, the column, crossbeam, facade diagonal brace, horizontal diagonal brace, longitudinal keel and lateral keel are square steel.
Further, the support beam is I-steel.
The beneficial effects of the utility model are:Efficiently solve the problems, such as that steel column is installed without operating surface, it is flat in routine operation
Platform cannot make simple, flexibility, safe, user in the case of use, using the platform of live clout processing and fabricating
Just, the security of the work high above the ground personnel for greatly improving;Can Reusability, utilization rate is high, and it is convenient and swift to install displacement, saves
Materials'use and engineering time.
Brief description of the drawings
In order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art, below will be to embodiment
Needed for the accompanying drawing to be used be briefly described, it should be apparent that, drawings in the following description are only of the present utility model
Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this
A little accompanying drawings obtain other accompanying drawings.
Fig. 1 is the structural representation of the platform floor for steel structure column installation described in the utility model embodiment
Figure;
Fig. 2 is the top view of the operating platform for steel structure column installation according to Fig. 1;
Fig. 3 is the side view of the operating platform for steel structure column installation according to Fig. 1.
In figure:
1st, platform floor;2nd, the first fence;3rd, steel structure column;4th, slot;5th, column;6th, crossbeam;7th, facade diagonal brace;8th,
Two fences;9th, horizontal diagonal brace;10th, checkered steel plate;11st, longitudinal keel;12nd, lateral keel.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out
Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole
Embodiment.Based on the embodiment in the utility model, the every other embodiment that those of ordinary skill in the art are obtained all belongs to
In the scope of the utility model protection.
As Figure 1-3, a kind of operation for steel structure column installation according to the utility model embodiment
Platform, including main platform body, the main platform body include platform floor 1, and the front side of the platform floor 1 is provided with and steel construction
The corresponding fluting 4 of post 3, the leading flank of the main platform body is provided with the second fence 8, and the main platform body trailing flank and left side
Face, right flank are respectively provided with the first fence 2, and the bottom of the main platform body is fixedly connected on steel structure column 3 by support beam.
In a specific embodiment of the present utility model, first fence 2 is fixedly connected with the top of the second fence 8
There are some suspension ring.
In a specific embodiment of the present utility model, the fence 8 of first fence 2 and second includes column 5, horizontal stroke
Beam 6 and facade diagonal brace 7, the column 5 are arranged in a mutually vertical manner with crossbeam 6, and the facade diagonal brace 7 encloses along the first fence 2 and second
The diagonal on column 8 is set.
In a specific embodiment of the present utility model, it is fixedly connected between the fence 8 of first fence 2 and second
Horizontal diagonal brace 9.
In a specific embodiment of the present utility model, the platform floor 1 includes framework and is arranged on framework
Checkered steel plate 10.
In a specific embodiment of the present utility model, the framework includes longitudinal keel 11 and lateral keel 12.
It is the column 5, crossbeam 6, facade diagonal brace 7, horizontal diagonal brace 9, vertical in a specific embodiment of the present utility model
Square steel is to keel 11 and lateral keel 12.
In a specific embodiment of the present utility model, the support beam is I-steel.
Above-mentioned technical proposal of the present utility model is understood for convenience, below by way of new to this practicality in specifically used mode
The above-mentioned technical proposal of type is described in detail.
The mode that is fixedly connected described in the utility model can be replaced using conventional technical means such as welding, bolt connections.
After steel structure column 3 is marched into the arena, it is the 250 × 200 of 200mm that the surrounding in steel structure column 3 welds two spacing in advance
× 8 × 12 I-steel(Support beam)As the main support primary structure member of main platform body, platform deadweight and construction loads are born, its
Weld bead height has to comply with《Code for acceptance of construction quality of steel structures》It is required that.Main platform body surrounding is protected(That is the first fence
2)Height 1.8m, length and width are 2m(The maximum gauge 1m of steel structure column 3, respectively stays 0.5m construction operation spaces around steel structure column 3),
1.8 meters of the height of second fence 8, width 0.4m.Platform floor 1, the first fence 2, the second fence 8, horizontal diagonal brace 9 using 40 ×
3mm thin-walled square steel tubes, the top of platform floor 1 laying 3mm thickness checkered steel plates 10, the first fence 2 and the second fence 8 are thick using 5mm
Color steel is used as going along with sb. to guard him, and connected mode uses welding manner, local to be fixed using M20*80 plain bolts, embrace grid beam use 40 ×
3mm thin-walleds square steel tube is fastened with connector.The crossbeam 6 at the top of the first fence 2 and the second fence 8 is provided with multiple suspension ring, uses
In the installation and dismounting of main platform body.After the completion of the concreting in steel structure column 3, you can utilize tower crane by main platform body
Lifting is added on the I-steel being welded in advance to the top of steel structure column 3, and stable connection.The length of horizontal diagonal brace 9 is not less than
500mm。
Main platform body from top to bottom pass through steel structure column 3 steadily fall it is upper section steel structure column 3 the strong point at after, operation work
People's band safe to carry is from the bottom to top from the cat ladder for having tied up up to main platform body(A people is only allowed on steel cat ladder during people
Climbing), but main platform body can allow two workmans weld job simultaneously, forbid to stack overweight material on platform, at most only
25kg can be put, and forbids personnel to be run on platform, regression.Main platform body is installed every time must send special messenger to check, bottom triangle
Diagonal brace length is not less than 500mm.Have to etc. tower crane rope could be released after main platform body is steady in installation process.Carry every time
Upper mounting plate main body is it must be appreciated that various materials, tool set rubbish incidental on moss.Forbid throwing part, instrument, material etc. downwards
Article, must clear up in time if any debris.Main platform body must periodically be checked by special messenger, conserved, and be scented a hidden danger clear in time
Reason.The stage of inspecting for acceptance is:1st, before mounting platform.2nd, before construction loading.3rd, after stage+module.Inspection project includes:1st, framework
Whether deformation meets the requirements.2nd, whether platform weld seam has cracking phenomena.3rd, install whether safeguard procedures meet the requirements.4th, whether have
Overloading.
Because operating platform described in the utility model has a reusing, after the completion of the work such as welding of steel structure column 3,
Dismountable main platform body is simultaneously hung to basement roof using civil engineering tower crane, and the people that stands is forbidden in period hoisting process, is put down
Platform main body should be cleaned out, and any article material is not stayed, finally send special messenger to add caution notice or guardrail, forbid non-operating personnel
In entering, and with windbreaker cloth covering protection main platform body, prevent debris from invading.
In sum, by above-mentioned technical proposal of the present utility model, efficiently solve steel column and asking without operating surface is installed
Topic, cannot make simple in routine operation platform in the case of use, using the platform of live clout processing and fabricating, flexibility,
It is safe, easy to use, the security of the work high above the ground personnel for greatly improving;Can Reusability, utilization rate is high, installs displacement
It is convenient and swift, save materials'use and engineering time.
The utility model is not limited to above-mentioned preferred forms, and anyone can draw under enlightenment of the present utility model
Other various forms of products, however, make any change in its shape or structure, it is every with same as the present application or phase
Approximate technical scheme, all falls within protection domain of the present utility model.
Claims (8)
1. a kind of operating platform for steel structure column installation, including main platform body, it is characterised in that the main platform body
Including platform floor(1), the platform floor(1)Front side be provided with and steel structure column(3)Corresponding fluting(4), it is described flat
The leading flank of platform main body is provided with the second fence(8), and the trailing flank and left surface of the main platform body, right flank be respectively arranged with
First fence(2), the bottom of the main platform body is fixedly connected on steel structure column by support beam(3)On.
2. a kind of operating platform for steel structure column installation according to claim 1, it is characterised in that described
One fence(2)With the second fence(8)Top be fixedly connected with some suspension ring.
3. a kind of operating platform for steel structure column installation according to claim 2, it is characterised in that described
One fence(2)With the second fence(8)Include column(5), crossbeam(6)With facade diagonal brace(7), the column(5)With crossbeam(6)
It is arranged in a mutually vertical manner, the facade diagonal brace(7)Along the first fence(2)With the second fence(8)Diagonal set.
4. a kind of operating platform for steel structure column installation according to claim 3, it is characterised in that described
One fence(2)With the second fence(8)Between be fixedly connected with horizontal diagonal brace(9).
5. a kind of operating platform for steel structure column installation according to claim 4, it is characterised in that described flat
Platform base plate(1)Including framework and setting checkered steel plate on said frame(10).
6. a kind of operating platform for steel structure column installation according to claim 5, it is characterised in that the frame
Frame includes longitudinal keel(11)And lateral keel(12).
7. a kind of operating platform for steel structure column installation according to claim 6, it is characterised in that described vertical
Post(5), crossbeam(6), facade diagonal brace(7), horizontal diagonal brace(9), longitudinal keel(11)And lateral keel(12)It is square steel.
8. a kind of operating platform for steel structure column installation according to claim 7, it is characterised in that the branch
Support beam is I-steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621303061.6U CN206220547U (en) | 2016-11-30 | 2016-11-30 | A kind of operating platform for steel structure column installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621303061.6U CN206220547U (en) | 2016-11-30 | 2016-11-30 | A kind of operating platform for steel structure column installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206220547U true CN206220547U (en) | 2017-06-06 |
Family
ID=58786564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621303061.6U Expired - Fee Related CN206220547U (en) | 2016-11-30 | 2016-11-30 | A kind of operating platform for steel structure column installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206220547U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109779224A (en) * | 2019-03-24 | 2019-05-21 | 中国二十二冶集团有限公司 | Steel structure column overhead connection operating platform and construction method |
-
2016
- 2016-11-30 CN CN201621303061.6U patent/CN206220547U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109779224A (en) * | 2019-03-24 | 2019-05-21 | 中国二十二冶集团有限公司 | Steel structure column overhead connection operating platform and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102444203B (en) | High-altitude long-span overhanging corridor type reinforced concrete structure and construction method | |
CN202227476U (en) | High-altitude large-span overhung corridor-type reinforced concrete structure | |
CN101886468B (en) | Construction method of suspension type template support in high-position conjoined structure | |
CN101736893B (en) | Overhanging type scaffold supporting system | |
CN103291076A (en) | Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame | |
CN102535845A (en) | Construction method of bearing frame of corridor structure | |
CN206053285U (en) | A kind of modular assembly of high-altitude overlength is encorbelmented steel platform | |
CN104975719A (en) | Novel material distribution device and construction method for pouring floor concrete by using same | |
CN103410101B (en) | Tower crane conversion method for construction of parabola-shaped ultrahigh pier | |
CN107524284A (en) | A kind of regularization pylon protection system and installation method | |
CN105298107B (en) | A kind of high carriage of High Large Cantilever structure | |
CN107165281A (en) | A kind of high-altitude long-span overhung steel platform mould bases construction | |
CN204163364U (en) | A kind of elevator shaft formwork and operation steel platform | |
CN201420385Y (en) | Overhanging type unloading platform for building construction | |
CN203891441U (en) | Assembly type section steel overhung protective shed | |
CN202990427U (en) | Climbing discharging platform | |
CN206902913U (en) | A kind of high-altitude long-span overhung structure | |
CN202954552U (en) | Steel tube concrete column high-altitude construction safety protection system | |
CN102425123B (en) | Combined type protection shed frame and construction method thereof | |
CN206220547U (en) | A kind of operating platform for steel structure column installation | |
CN211473320U (en) | Tool type external hanging rack for corridor | |
CN209685125U (en) | A kind of overhead large-span steel structure vestibule Integral synchronous lifting device | |
CN111236603B (en) | Comprehensive construction method for steel plate mesh overhanging scaffold | |
CN203499259U (en) | Tool type cantilevered unloading platform | |
CN109911755A (en) | A kind of overhead large-span steel structure vestibule Integral synchronous hoisting frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170606 |
|
CF01 | Termination of patent right due to non-payment of annual fee |