CN206220547U - A kind of operating platform for steel structure column installation - Google Patents

A kind of operating platform for steel structure column installation Download PDF

Info

Publication number
CN206220547U
CN206220547U CN201621303061.6U CN201621303061U CN206220547U CN 206220547 U CN206220547 U CN 206220547U CN 201621303061 U CN201621303061 U CN 201621303061U CN 206220547 U CN206220547 U CN 206220547U
Authority
CN
China
Prior art keywords
fence
steel structure
platform
structure column
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621303061.6U
Other languages
Chinese (zh)
Inventor
梁怀刚
刘强
苏德志
孔思
熊志龙
宋淼
王林明
鲁小明
朱延明
郭月飞
樊建伟
蔡建桢
赵洋洋
路赞赞
侯宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 16th Bureau Group Co Ltd
City Construction Development Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
China Railway 16th Bureau Group Co Ltd
City Construction Development Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 16th Bureau Group Co Ltd, City Construction Development Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical China Railway 16th Bureau Group Co Ltd
Priority to CN201621303061.6U priority Critical patent/CN206220547U/en
Application granted granted Critical
Publication of CN206220547U publication Critical patent/CN206220547U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model is related to a kind of operating platform for steel structure column installation, including main platform body, the main platform body includes platform floor, the first fence and the second fence, fluting corresponding with steel structure column is provided with front side of the platform floor, the leading flank of the main platform body sets the second fence, and remaining side of the main platform body sets the first fence, the bottom of the main platform body is fixedly connected on steel structure column by support beam.The beneficial effects of the utility model are:Efficiently solve the problems, such as that steel column is installed without operating surface, using the platform of live clout processing and fabricating, cannot make simple, flexibility, safe, easy to use, the security of the work high above the ground personnel for greatly improving in the case of use in routine operation platform;Can Reusability, utilization rate is high, and it is convenient and swift to install displacement, saves materials'use and engineering time.

Description

A kind of operating platform for steel structure column installation
Technical field
The utility model is related to construction equipment technical field, it particularly relates to one kind is installed for steel structure column The operating platform of construction.
Background technology
Current most of skyscrapers are steel reinforced concrete structure, and Core Walls Structure shear wall is by girder steel and housing steel structure column 3 connections.When housing steel structure column 3 is installed, Normal practice is the firm space formed using steel column, girder steel, shear wall, in girder steel On add operating platform.
But when Core Walls Structure shear wall is connected with housing steel structure column 3 without girder steel in skyscraper, it is impossible in work progress When forming firm spatial relationship, the way of conventional utilization steel girder erection steel column installation operating platform cannot just be realized, nothing Method provides the execution conditions of safety to work high above the ground personnel, there is very big security risk.
Therefore, develop one kind and may be disposed at steel column top, make simple, easy to use, flexibility, safe behaviour Make platform, it is the problem of professional's urgent need to resolve to become.
Utility model content
The utility model proposes a kind of operating platform for steel structure column installation, overcome in existing product State the deficiency of aspect.
The purpose of this utility model is achieved through the following technical solutions:
A kind of operating platform for steel structure column installation, including main platform body, the main platform body include platform Base plate, is provided with fluting corresponding with steel structure column on front side of the platform floor, the leading flank of the main platform body is provided with Second fence, and the trailing flank and left surface of the main platform body, right flank are respectively provided with the first fence, the bottom of the main platform body Portion is fixedly connected on steel structure column by support beam.
Further, some suspension ring are fixedly connected with the top of first fence and the second fence.
Further, first fence and the second fence include column, crossbeam and facade diagonal brace, the column and horizontal stroke Beam is arranged in a mutually vertical manner, and the facade diagonal brace is set along the diagonal of the first fence and the second fence.
Further, it is fixedly connected with horizontal diagonal brace between first fence and the second fence.
Further, the platform floor includes framework and the checkered steel plate being arranged on framework.
Further, the framework includes longitudinal keel and lateral keel.
Further, the column, crossbeam, facade diagonal brace, horizontal diagonal brace, longitudinal keel and lateral keel are square steel.
Further, the support beam is I-steel.
The beneficial effects of the utility model are:Efficiently solve the problems, such as that steel column is installed without operating surface, it is flat in routine operation Platform cannot make simple, flexibility, safe, user in the case of use, using the platform of live clout processing and fabricating Just, the security of the work high above the ground personnel for greatly improving;Can Reusability, utilization rate is high, and it is convenient and swift to install displacement, saves Materials'use and engineering time.
Brief description of the drawings
In order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art, below will be to embodiment Needed for the accompanying drawing to be used be briefly described, it should be apparent that, drawings in the following description are only of the present utility model Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other accompanying drawings.
Fig. 1 is the structural representation of the platform floor for steel structure column installation described in the utility model embodiment Figure;
Fig. 2 is the top view of the operating platform for steel structure column installation according to Fig. 1;
Fig. 3 is the side view of the operating platform for steel structure column installation according to Fig. 1.
In figure:
1st, platform floor;2nd, the first fence;3rd, steel structure column;4th, slot;5th, column;6th, crossbeam;7th, facade diagonal brace;8th, Two fences;9th, horizontal diagonal brace;10th, checkered steel plate;11st, longitudinal keel;12nd, lateral keel.
Specific embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, the every other embodiment that those of ordinary skill in the art are obtained all belongs to In the scope of the utility model protection.
As Figure 1-3, a kind of operation for steel structure column installation according to the utility model embodiment Platform, including main platform body, the main platform body include platform floor 1, and the front side of the platform floor 1 is provided with and steel construction The corresponding fluting 4 of post 3, the leading flank of the main platform body is provided with the second fence 8, and the main platform body trailing flank and left side Face, right flank are respectively provided with the first fence 2, and the bottom of the main platform body is fixedly connected on steel structure column 3 by support beam.
In a specific embodiment of the present utility model, first fence 2 is fixedly connected with the top of the second fence 8 There are some suspension ring.
In a specific embodiment of the present utility model, the fence 8 of first fence 2 and second includes column 5, horizontal stroke Beam 6 and facade diagonal brace 7, the column 5 are arranged in a mutually vertical manner with crossbeam 6, and the facade diagonal brace 7 encloses along the first fence 2 and second The diagonal on column 8 is set.
In a specific embodiment of the present utility model, it is fixedly connected between the fence 8 of first fence 2 and second Horizontal diagonal brace 9.
In a specific embodiment of the present utility model, the platform floor 1 includes framework and is arranged on framework Checkered steel plate 10.
In a specific embodiment of the present utility model, the framework includes longitudinal keel 11 and lateral keel 12.
It is the column 5, crossbeam 6, facade diagonal brace 7, horizontal diagonal brace 9, vertical in a specific embodiment of the present utility model Square steel is to keel 11 and lateral keel 12.
In a specific embodiment of the present utility model, the support beam is I-steel.
Above-mentioned technical proposal of the present utility model is understood for convenience, below by way of new to this practicality in specifically used mode The above-mentioned technical proposal of type is described in detail.
The mode that is fixedly connected described in the utility model can be replaced using conventional technical means such as welding, bolt connections.
After steel structure column 3 is marched into the arena, it is the 250 × 200 of 200mm that the surrounding in steel structure column 3 welds two spacing in advance × 8 × 12 I-steel(Support beam)As the main support primary structure member of main platform body, platform deadweight and construction loads are born, its Weld bead height has to comply with《Code for acceptance of construction quality of steel structures》It is required that.Main platform body surrounding is protected(That is the first fence 2)Height 1.8m, length and width are 2m(The maximum gauge 1m of steel structure column 3, respectively stays 0.5m construction operation spaces around steel structure column 3), 1.8 meters of the height of second fence 8, width 0.4m.Platform floor 1, the first fence 2, the second fence 8, horizontal diagonal brace 9 using 40 × 3mm thin-walled square steel tubes, the top of platform floor 1 laying 3mm thickness checkered steel plates 10, the first fence 2 and the second fence 8 are thick using 5mm Color steel is used as going along with sb. to guard him, and connected mode uses welding manner, local to be fixed using M20*80 plain bolts, embrace grid beam use 40 × 3mm thin-walleds square steel tube is fastened with connector.The crossbeam 6 at the top of the first fence 2 and the second fence 8 is provided with multiple suspension ring, uses In the installation and dismounting of main platform body.After the completion of the concreting in steel structure column 3, you can utilize tower crane by main platform body Lifting is added on the I-steel being welded in advance to the top of steel structure column 3, and stable connection.The length of horizontal diagonal brace 9 is not less than 500mm。
Main platform body from top to bottom pass through steel structure column 3 steadily fall it is upper section steel structure column 3 the strong point at after, operation work People's band safe to carry is from the bottom to top from the cat ladder for having tied up up to main platform body(A people is only allowed on steel cat ladder during people Climbing), but main platform body can allow two workmans weld job simultaneously, forbid to stack overweight material on platform, at most only 25kg can be put, and forbids personnel to be run on platform, regression.Main platform body is installed every time must send special messenger to check, bottom triangle Diagonal brace length is not less than 500mm.Have to etc. tower crane rope could be released after main platform body is steady in installation process.Carry every time Upper mounting plate main body is it must be appreciated that various materials, tool set rubbish incidental on moss.Forbid throwing part, instrument, material etc. downwards Article, must clear up in time if any debris.Main platform body must periodically be checked by special messenger, conserved, and be scented a hidden danger clear in time Reason.The stage of inspecting for acceptance is:1st, before mounting platform.2nd, before construction loading.3rd, after stage+module.Inspection project includes:1st, framework Whether deformation meets the requirements.2nd, whether platform weld seam has cracking phenomena.3rd, install whether safeguard procedures meet the requirements.4th, whether have Overloading.
Because operating platform described in the utility model has a reusing, after the completion of the work such as welding of steel structure column 3, Dismountable main platform body is simultaneously hung to basement roof using civil engineering tower crane, and the people that stands is forbidden in period hoisting process, is put down Platform main body should be cleaned out, and any article material is not stayed, finally send special messenger to add caution notice or guardrail, forbid non-operating personnel In entering, and with windbreaker cloth covering protection main platform body, prevent debris from invading.
In sum, by above-mentioned technical proposal of the present utility model, efficiently solve steel column and asking without operating surface is installed Topic, cannot make simple in routine operation platform in the case of use, using the platform of live clout processing and fabricating, flexibility, It is safe, easy to use, the security of the work high above the ground personnel for greatly improving;Can Reusability, utilization rate is high, installs displacement It is convenient and swift, save materials'use and engineering time.
The utility model is not limited to above-mentioned preferred forms, and anyone can draw under enlightenment of the present utility model Other various forms of products, however, make any change in its shape or structure, it is every with same as the present application or phase Approximate technical scheme, all falls within protection domain of the present utility model.

Claims (8)

1. a kind of operating platform for steel structure column installation, including main platform body, it is characterised in that the main platform body Including platform floor(1), the platform floor(1)Front side be provided with and steel structure column(3)Corresponding fluting(4), it is described flat The leading flank of platform main body is provided with the second fence(8), and the trailing flank and left surface of the main platform body, right flank be respectively arranged with First fence(2), the bottom of the main platform body is fixedly connected on steel structure column by support beam(3)On.
2. a kind of operating platform for steel structure column installation according to claim 1, it is characterised in that described One fence(2)With the second fence(8)Top be fixedly connected with some suspension ring.
3. a kind of operating platform for steel structure column installation according to claim 2, it is characterised in that described One fence(2)With the second fence(8)Include column(5), crossbeam(6)With facade diagonal brace(7), the column(5)With crossbeam(6) It is arranged in a mutually vertical manner, the facade diagonal brace(7)Along the first fence(2)With the second fence(8)Diagonal set.
4. a kind of operating platform for steel structure column installation according to claim 3, it is characterised in that described One fence(2)With the second fence(8)Between be fixedly connected with horizontal diagonal brace(9).
5. a kind of operating platform for steel structure column installation according to claim 4, it is characterised in that described flat Platform base plate(1)Including framework and setting checkered steel plate on said frame(10).
6. a kind of operating platform for steel structure column installation according to claim 5, it is characterised in that the frame Frame includes longitudinal keel(11)And lateral keel(12).
7. a kind of operating platform for steel structure column installation according to claim 6, it is characterised in that described vertical Post(5), crossbeam(6), facade diagonal brace(7), horizontal diagonal brace(9), longitudinal keel(11)And lateral keel(12)It is square steel.
8. a kind of operating platform for steel structure column installation according to claim 7, it is characterised in that the branch Support beam is I-steel.
CN201621303061.6U 2016-11-30 2016-11-30 A kind of operating platform for steel structure column installation Expired - Fee Related CN206220547U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621303061.6U CN206220547U (en) 2016-11-30 2016-11-30 A kind of operating platform for steel structure column installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621303061.6U CN206220547U (en) 2016-11-30 2016-11-30 A kind of operating platform for steel structure column installation

Publications (1)

Publication Number Publication Date
CN206220547U true CN206220547U (en) 2017-06-06

Family

ID=58786564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621303061.6U Expired - Fee Related CN206220547U (en) 2016-11-30 2016-11-30 A kind of operating platform for steel structure column installation

Country Status (1)

Country Link
CN (1) CN206220547U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779224A (en) * 2019-03-24 2019-05-21 中国二十二冶集团有限公司 Steel structure column overhead connection operating platform and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779224A (en) * 2019-03-24 2019-05-21 中国二十二冶集团有限公司 Steel structure column overhead connection operating platform and construction method

Similar Documents

Publication Publication Date Title
CN102444203B (en) High-altitude long-span overhanging corridor type reinforced concrete structure and construction method
CN101886468B (en) Construction method of suspension type template support in high-position conjoined structure
CN101736893B (en) Overhanging type scaffold supporting system
CN103291076A (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN102535845A (en) Construction method of bearing frame of corridor structure
CN206053285U (en) A kind of modular assembly of high-altitude overlength is encorbelmented steel platform
CN104060542B (en) Compound beam cable stayed bridge direction across bridge prestress application device and applying method thereof
CN107524284A (en) A kind of regularization pylon protection system and installation method
CN204163364U (en) A kind of elevator shaft formwork and operation steel platform
CN201420385Y (en) Overhanging type unloading platform for building construction
CN205775852U (en) A kind of active force conversion support for steel structure support moulding bed top
CN107165281A (en) A kind of high-altitude long-span overhung steel platform mould bases construction
CN105298107B (en) A kind of high carriage of High Large Cantilever structure
CN203891441U (en) Assembly type section steel overhung protective shed
CN202954552U (en) Steel tube concrete column high-altitude construction safety protection system
CN102425123B (en) Combined type protection shed frame and construction method thereof
CN206902913U (en) A kind of high-altitude long-span overhung structure
CN206220547U (en) A kind of operating platform for steel structure column installation
CN202990427U (en) Climbing discharging platform
CN209685125U (en) A kind of overhead large-span steel structure vestibule Integral synchronous lifting device
CN111236603B (en) Comprehensive construction method for steel plate mesh overhanging scaffold
CN203499259U (en) Tool type cantilevered unloading platform
CN109911755A (en) A kind of overhead large-span steel structure vestibule Integral synchronous hoisting frame
CN203222981U (en) Suspended platform for steel reinforced concrete cantilever structure construction
CN211473320U (en) Tool type external hanging rack for corridor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170606

CF01 Termination of patent right due to non-payment of annual fee