CN216583854U CN202122638997.1U CN202122638997U CN216583854U CN 216583854 U CN216583854 U CN 216583854U CN 202122638997 U CN202122638997 U CN 202122638997U CN 216583854 U CN216583854 U CN 216583854U
Authority
CN
China
Prior art keywords
length
hangers
fixed pulley
fixed
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122638997.1U
Other languages
Chinese (zh)
Inventor
邓恩兵
程广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN202122638997.1U priority Critical patent/CN216583854U/en
Application granted granted Critical
Publication of CN216583854U publication Critical patent/CN216583854U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Gates (AREA)

Abstract

A span beam hoisting combined frame belongs to the field of frame steel structure installation and construction. Comprises a door post (1), a door beam (2), a fixed pulley (3), a hanging lug (4), a movable pulley (5), an inclined strut (6), a lifting rope (7) and a pull rope (8); door beam (2) welded fastening is on the top of two gateposts (1), two bracing (6) of both sides welding below every gatepost (1), fixed pulley (3) and hangers (4) all welded fastening is in doorbeam (2) bottom surface, fixed pulley (3) and hangers (4) interval 300mm, stay cord (8) one end is fixed with hangers (4), the other end passes movable pulley (5) of a diameter 300mm, it is fixed temporarily to pass fixed pulley (3) again, lifting rope (7) one end and movable pulley (5) bottom mounting, the other end freely hangs down. The advantage lies in that the equipment is simple, and convenient operation has avoided the use of a large amount of cranes, convenient and fast, labour saving and time saving, greatly reduced construction cost.

Description

Span beam hoisting combined frame
Technical Field
The utility model belongs to the field of installation and construction of frame steel structures, and particularly provides a cross beam hoisting combined frame.
Background
During the installation and construction of the frame steel structure, a crane hoisting mode is generally adopted for small structural members such as a stay bar and a pull rod on a frame, and because the number of the small structural members is large, a large number of crane shifts are required, and the construction cost is high.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a cross beam hoisting combined frame, which solves the problems of large consumption of crane shifts, high construction cost and the like. According to the utility model, two doorposts of the hoisting combined frame are respectively welded and fixed on two adjacent steel beams of the frame, then the stay cord is released, the lifting cord is lowered to the position of a component on the ground, the lifting cord is bound with small components such as a stay bar and a pull rod, then the stay cord is pulled, the small component is lifted by the lifting cord until the installation height is reached, and a constructor can install the small component. Due to the use of the movable pulley, the pulling force of an operator is more than half of the weight of the small component, so that the operation is very convenient and labor-saving.
The utility model comprises a door post 1, a door beam 2, a fixed pulley 3, a hanging lug 4, a movable pulley 5, an inclined strut 6, a lifting rope 7 and a pull rope 8; are used in combination. With door beam 2 welded fastening on the top of two gateposts 1, two bracing 6 of both sides welding below every gatepost 1, with fixed pulley 3 and hangers 4 all welded fastening in door beam 2 bottom surfaces, fixed pulley 3 and hangers 4 interval 300mm, with 8 one end of stay cord and hangers 4 fixed, the other end passes a diameter 300 mm's movable pulley 5, then passes fixed pulley 3 temporary fixation again, 7 one end of lifting rope and 5 bottom mounting of movable pulley, the other end freely hangs down. (see FIG. 1 and FIG. 2)
Wherein, the length and width of the section of the gate post 1 are 200mm and 200mm, and the length is 1000 mm; the length and width of the section of the door beam 2 are 200mm and 200mm, and the length is 1000mm and 3000 mm; the diameter of the fixed pulley 3 is 200 mm; the hanging lug 4 is processed by a thick steel plate with the thickness of 14mm, the length and the width of the hanging lug are 100 x 100mm, a hoisting hole with the diameter of 20mm is arranged in the middle, and the diameter of the movable pulley 5 is 300 mm; the length and width of the cross section of the inclined strut 6 are 200mm and 200mm, the length is 500mm, and an included angle between the inclined strut 6 and the horizontal plane is 45 degrees; the lifting rope 7 is formed by processing a steel wire rope with the diameter of 10mm and has the length of 30000 mm; the pull rope 8 is formed by processing a steel wire rope with the diameter of 10mm and has the length of 10000 mm.
During the use, with two gateposts 1 of hoist and mount combined bay welded fastening respectively on two girder steels 9 that the frame is adjacent, then release stay cord 8, make lifting rope 7 transfer to subaerial small-size component 10 position, small-size components 10 such as vaulting pole, pull rod are bound to the lifting rope, later stimulate stay cord 8, and small-size component 10 is mentioned to lifting rope 7, and up to the mounting height, constructor can install small-size component 10. Due to the use of the movable pulley 5, the pulling force of an operator is larger than half of the weight of the small component 10, and the operation is very convenient and labor-saving (fig. 3 and 4).
The hoisting combined frame is simple to assemble and convenient to operate, avoids the use of a large number of cranes, is convenient and quick, saves time and labor, and greatly reduces the construction cost.
Drawings
FIG. 1 is a front view of a lifting assembly.
Figure 2 is a side view of a lifting assembly.
FIG. 3 is a front view of the lifting assembly.
Figure 4 is a side view of the lifting assembly.
In the figure, a door post 1, a door beam 2, a fixed pulley 3, a hanging lug 4, a movable pulley 5, an inclined strut 6, a lifting rope 7, a pull rope 8, a steel beam 9 and a small component 10.
Detailed Description
Fig. 1-4 illustrate an embodiment of the present invention. The utility model is further described below with reference to the accompanying drawings.
The hoisting combined frame comprises a door post 1, a door beam 2, a fixed pulley 3, a suspension loop 4, a movable pulley 5, an inclined strut 6, a lifting rope 7 and a pull rope 8; are used in combination. With door beam 2 welded fastening on the top of two gateposts 1, two bracing 6 of both sides welding below every gatepost 1, with fixed pulley 3 and hangers 4 all welded fastening in door beam 2 bottom surfaces, fixed pulley 3 and hangers 4 interval 300mm, with 8 one end of stay cord and hangers 4 fixed, the other end passes a diameter 300 mm's movable pulley 5, then passes fixed pulley 3 temporary fixation again, 7 one end of lifting rope and 5 bottom mounting of movable pulley, the other end freely hangs down.
During the use, with two gateposts 1 of hoist and mount combined bay welded fastening respectively on two girder steels 9 that the frame is adjacent, then release stay cord 8, make lifting rope 7 transfer to subaerial small-size component 10 position, small-size components 10 such as vaulting pole, pull rod are bound to the lifting rope, later stimulate stay cord 8, and small-size component 10 is mentioned to lifting rope 7, and up to the mounting height, constructor can install small-size component 10. Due to the use of the movable pulley 5, the pulling force of an operator is larger than half of the weight of the small component 10, so that the operation is very convenient and labor-saving.
When the steel structure frame of the sintering main factory building is installed and constructed, the cross-beam hoisting combined frame is adopted for installing small components such as supporting rods, pull rods and the like, and a good effect is achieved. This hoist and mount combined bay includes the gatepost, the fixed pulley, the hangers, the movable pulley, the bracing, the lifting rope, stay cord 8 part, the combination is used, with gatepost welded fastening on the top of two gateposts, two bracings of both sides welding below every gatepost, all welded fastening with fixed pulley and hangers in the gatepost bottom surface, fixed pulley and hangers interval 300mm, it is fixed with hangers with stay cord one end, the movable pulley of a diameter 300mm is passed to the other end, then it is fixed temporarily to pass the fixed pulley again, lifting rope one end and movable pulley bottom mounting, the other end freely hangs down. During the use, with two gateposts welded fastening respectively of hoist and mount combined bay on two adjacent girder steels of frame, then release the stay cord, make the lifting rope transfer to subaerial component position, small-size components such as vaulting pole, pull rod are bound to the lifting rope, later spur the stay cord, small-size component is mentioned to the lifting rope, and up to the mounting height, constructor can install small-size component. Due to the use of the movable pulley, the pulling force of an operator is more than half of the weight of the small component, so that the operation is very convenient and labor-saving.

Claims (2)

1. A span beam hoisting combined frame is characterized by comprising a door post (1), a door beam (2), a fixed pulley (3), a hanging lug (4), a movable pulley (5), an inclined strut (6), a lifting rope (7) and a pull rope (8); door beam (2) welded fastening is on the top of two gateposts (1), two bracing (6) of both sides welding below every gatepost (1), fixed pulley (3) and hangers (4) all welded fastening is in doorbeam (2) bottom surface, fixed pulley (3) and hangers (4) interval 300mm, stay cord (8) one end is fixed with hangers (4), the other end passes movable pulley (5) of a diameter 300mm, it is fixed temporarily to pass fixed pulley (3) again, lifting rope (7) one end and movable pulley (5) bottom mounting, the other end freely hangs down.
2. The cross-beam hoisting combination according to claim 1, wherein the dimension of the cross section of the door pillar (1) is 200 x 200mm long and 1000mm long; the length and width of the section of the door beam (2) are 200 x 200mm, and the length is 1000-; the diameter of the fixed pulley (3) is 200 mm; the hanging lug (4) is formed by processing a 14mm thick steel plate, the length and the width of the hanging lug are 100mm and 100mm, a hoisting hole with the diameter of 20mm is formed in the middle, and the diameter of the movable pulley (5) is 300 mm; the length and width of the cross section of the inclined strut (6) are 200mm by 200mm, the length is 500mm, and an included angle between the inclined strut (6) and the horizontal plane is 45 degrees; the lifting rope (7) is formed by processing a steel wire rope with the diameter of 10mm and the length of 30000 mm; the pull rope (8) is formed by processing a steel wire rope with the diameter of 10mm and the length of 10000 mm.
CN202122638997.1U 2021-10-30 2021-10-30 Span beam hoisting combined frame Active CN216583854U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122638997.1U CN216583854U (en) 2021-10-30 2021-10-30 Span beam hoisting combined frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122638997.1U CN216583854U (en) 2021-10-30 2021-10-30 Span beam hoisting combined frame

Publications (1)

Publication Number Publication Date
CN216583854U true CN216583854U (en) 2022-05-24

Family

ID=81644003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122638997.1U Active CN216583854U (en) 2021-10-30 2021-10-30 Span beam hoisting combined frame

Country Status (1)

Country Link
CN (1) CN216583854U (en)

Similar Documents

Publication Publication Date Title
CN205675990U (en) A kind of building prefabricated components hanging apparatus
CN106241618A (en) A kind of curtain wall profiles boom hoisting
CN216583854U (en) Span beam hoisting combined frame
CN110748139B (en) Hanging basket support system
CN210635627U (en) Large-scale lifting machine for outer wall decoration
CN211341686U (en) Hanging basket support system
CN211173007U (en) Novel tripod of encorbelmenting
CN209585654U (en) Adhesion type goes up and down discharging platform
CN209957241U (en) Steel hanger
CN206051364U (en) A kind of curtain wall profiles boom hoisting
CN109516390B (en) Flat-head tower crane convenient for manual carrying and installation and field installation method
CN214329960U (en) Unitized curtain wall loading platform
CN213329975U (en) Steel pull rod hanging and pulling overhanging bearing steel beam structure
CN210029781U (en) Anti-shaking device for hoisting
CN220550838U (en) Building construction external platform
CN204848024U (en) Girder steel hoist device for construction
CN215168193U (en) Prefabricated staircase single beam formula hoist
CN215925683U (en) Cable tower main reinforcement hoisting bracket
CN217173048U (en) Lifting device for unit type building materials
CN211421123U (en) Joist steel mounting bracket based on TRD construction method
CN218264865U (en) Triangular hanging basket supporting structure
CN109879165A (en) A kind of steel hanger and the construction method using steel hanger manpower hoisting steel beam
CN114278071B (en) Climbing frame for building construction
CN217871735U (en) Hanging basket for building facade with complex shape
CN219971621U (en) Autoclaved aerated concrete slab lifting device for forklift

Legal Events