CN218264865U - Triangular hanging basket supporting structure - Google Patents

Triangular hanging basket supporting structure Download PDF

Info

Publication number
CN218264865U
CN218264865U CN202222327826.1U CN202222327826U CN218264865U CN 218264865 U CN218264865 U CN 218264865U CN 202222327826 U CN202222327826 U CN 202222327826U CN 218264865 U CN218264865 U CN 218264865U
Authority
CN
China
Prior art keywords
triangular
frame
building wall
hoisting
basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222327826.1U
Other languages
Chinese (zh)
Inventor
陶阁
陈晶
刘秋媛
王露倩
邰振平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN202222327826.1U priority Critical patent/CN218264865U/en
Application granted granted Critical
Publication of CN218264865U publication Critical patent/CN218264865U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a three angie type hanging flower basket bearing structure aims at solving traditional construction hanging flower basket and waits that roofing construction completion just can hang on the roofing and establish, and latency is long, and work efficiency is low, and also higher to building roof's bearing capacity requirement, has the problem of very big limitation, including: the triangular hoisting frame is fixed on the vertical surface outside the building wall; the steel wire lifting rope is movably arranged on the lower side of the free end of the triangular lifting frame; a hanging basket fixed at the lower end of the steel wire lifting rope; one end of the hanging basket is arranged on the upper side of the free end of the triangular hoisting frame, and the other end of the hanging basket is fixed on the vertical surface of the outer side of the building wall body to pull the triangular hoisting frame to the other side. The utility model discloses be particularly useful for safe convenient installation and the use of construction hanging flower basket, have higher social use value and application prospect.

Description

Triangular hanging basket supporting structure
Technical Field
The utility model relates to a building engineering equipment technical field, concretely relates to three angie type hanging flower basket bearing structure.
Background
Along with the construction development rhythm accelerates, it is more and more general to adopt external hanging flower basket to carry out outer wall decoration operation, mainly used outer wall decoration, curtain installation etc. compare in traditional scaffold frame, can alleviate intensity of labour, improve work efficiency and can used repeatedly.
Traditional construction hanging flower basket will wait that the roofing construction is accomplished just can hang on the roofing and establish, and latency is long, and work efficiency is low, and also higher to the bearing capacity requirement of building roofing, has very big limitation. To this end, we propose a triangular basket support structure.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve or at least alleviate the problem that exists among the prior art.
The utility model provides a three angie type hanging flower basket bearing structure, including:
the triangular hoisting frame is fixed on the vertical surface outside the building wall;
the steel wire lifting rope is movably arranged on the lower side of the free end of the triangular lifting frame;
a hanging basket fixed at the lower end of the steel wire lifting rope;
one end of the hanging basket is arranged on the upper side of the free end of the triangular hoisting frame, and the other end of the hanging basket is fixed on the vertical surface of the outer side of the building wall body to obliquely pull and reinforce the triangular hoisting frame.
Optionally, the triangular hoisting frame comprises:
a right-angle triangular frame body which is formed by fixing a cross beam and an oblique beam;
the outer steel plate cushion blocks are vertically welded to the cross beam and the inclined beam and close to the outer side of the building wall;
a plurality of high-strength counter-pulling bolts penetrate through the building wall and the outer steel plate cushion blocks;
the inner steel plate cushion blocks are arranged at the positions corresponding to the high-strength split bolts on the inner side of the building wall body and matched with the outer steel plate cushion blocks to fix the right-angle triangular frame body;
the hoisting conversion component is arranged at the tail end of the right-angle triangular frame body, which is far away from the outer side of the building wall body;
and the plurality of hoisting point bolts penetrate through the lower side of the hoisting conversion member to provide hoisting points of the steel wire hoisting ropes.
Optionally, an embedded steel sleeve for high-strength split bolt penetration is embedded in the building wall body.
Optionally, the cross beam and the oblique beam are both i-beams, and the standard of the i-beams is 14 h-beams.
Optionally, the basket cable-stayed mechanism comprises:
the inclined pull frame is movably arranged at the upper part of the hoisting conversion component through a fixing bolt;
the bolt connecting frames are symmetrically fixed at the upper ends of the inclined pull frames;
the inclined pull bolt penetrates through the bolt frame;
one end of the inclined pull bolt is connected with the inclined pull wire rope, and the other end of the inclined pull wire rope penetrates through the building wall and is locked on the inner side of the building wall.
Optionally, the tail end of the diagonal steel wire rope is folded back after passing around the diagonal draw bolt and is fixed by a plurality of annular rope lockers.
Optionally, the number of the loop rope lockers is more than or equal to 4, and the distance between the adjacent loop rope lockers is 50mm.
Optionally, the free end of the triangular hoisting frame has a load-bearing gradient which rises by 2 to 4 degrees before the hanging basket is installed.
The utility model discloses mainly possess following beneficial effect:
the triangular hanging basket supporting structure is not limited by an outer wall full-mixed structure, the areas where the suspension mechanisms cannot be arranged behind the long shear wall, the corners and the hanging basket can be quickly and effectively installed and used, the construction is alternated on the outer wall, the problem of outer wall alternation construction is solved, the roof construction is not required to be finished, the constraint by external conditions is small, the working efficiency is high, and the construction period can be effectively guaranteed; meanwhile, the hanging basket is matched with the cable-stayed mechanism, so that the mounting firmness of the hanging basket is effectively guaranteed, the potential safety hazard is reduced, and the operation safety factor is improved.
Drawings
The above features, technical characteristics, advantages and implementation modes of a triangular type basket supporting structure will be further described in a clear and easily understood manner by referring to the accompanying drawings which illustrate preferred embodiments.
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a schematic structural view of a middle triangular hoisting frame of the present invention;
FIG. 3 is a right side view of the partial structure of the middle triangular hoisting frame and the hanging basket diagonal pulling mechanism of the utility model;
fig. 4 is a right side view of the structure of the middle cross beam, the high-strength split bolt and the outer steel plate cushion block of the present invention.
In the figure: the building wall comprises a triangular hoisting frame 10, a cross beam 101, an oblique beam 102, an outer steel plate cushion block 103, a high-strength split bolt 104, an inner steel plate cushion block 105, a hoisting conversion member 106, a hoisting point bolt 107, a steel wire hoisting rope 20, a hanging basket 30, a hanging basket diagonal pulling mechanism 40, a diagonal pulling frame 401, a fixing bolt 402, a bolting frame 403, a diagonal pulling bolt 404, a diagonal pulling steel wire rope 405 and a building wall a.
Detailed Description
The invention will be further described with reference to the following figures 1-4 and examples:
example 1
A triangular gondola support structure comprising:
the triangular hoisting frame 10 is fixed on the vertical surface outside the building wall a; in the embodiment, the free end of the triangular hoisting frame 10 has a loaded gradient of 2-4 degrees, which is raised before the hanging basket 30 is installed, so that all parts are uniformly stressed when the triangular hoisting frame 10 is loaded;
a steel wire lifting rope 20 movably arranged at the lower side of the free end of the triangular lifting frame 10 and a hanging basket 30 fixed at the lower end of the steel wire lifting rope 20;
one end of the hanging basket is arranged on the upper side of the free end of the triangular hoisting frame 10, and the other end of the hanging basket is fixed on the vertical surface of the outer side of the building wall body a to obliquely pull and reinforce the triangular hoisting frame 10.
Optionally, said delta-frame 10 comprises:
a right-angle triangular frame body formed by fixing a cross beam 101 and an oblique beam 102; in this embodiment, the cross beam 101 and the oblique beam 102 are both 14 h-shaped steel;
the outer steel plate cushion blocks 103 are vertically welded to the cross beam 101 and the oblique beam 102 and close to the outer side of the building wall a, in the embodiment, the specification of the outer steel plate cushion blocks 103 is 150 multiplied by 200 multiplied by 8mm, and the outer steel plate cushion blocks 103, the cross beam 101 and the oblique beam 102 are welded and fixed by adopting four sides of steel rib plates, so that the effects of deformation prevention and reinforcement are achieved; the welding is full welding and three-level welding, and the height of the welding is 10mm;
the high-strength split bolts 104 penetrate through a building wall a and an outer steel plate cushion block 103, in the embodiment, the specification of the high-strength split bolts 104 is M16 high-strength bolts, embedded steel sleeves for penetrating the high-strength split bolts 104 can be embedded in the building wall a, the sleeves are steel sleeves with the diameter of M18, the distance is determined according to the center distance of the high-strength split bolts 104, the high-strength split bolts 104 are welded and fixed with a wall or a beam steel bar, and when the high-strength split bolts are installed, the high-strength split bolts 104 can be directly penetrated and installed, so that before the installation, whether the positions of the embedded steel sleeves are accurate or not needs to be determined, and if the deviation is overlarge, a water drill is adopted for punching the wall;
the inner steel plate cushion block 105 is arranged at the position, corresponding to the high-strength counter-pull bolt 104, on the inner side of the building wall a and matched with the outer steel plate cushion block 103 to fix the inner steel plate cushion block 105 of the right-angle triangular frame body, and in the embodiment, the specification of the inner steel plate cushion block 105 is a galvanized steel plate cushion block with the specification of 100 multiplied by 8 mm;
the hoisting conversion component 106 is arranged at the tail end of the right-angle triangular frame body, which is far away from the outer side of the building wall a;
a plurality of hoisting point bolts 107 are arranged on the lower side of the hoisting conversion member 106 for providing hoisting points of the steel wire hoisting rope 20, in this embodiment, the number of the hoisting point bolts 107 is two, and the specification of the hoisting point bolts 107 is M16 bolts.
Example 2
The difference between this embodiment and embodiment 1 is that, as shown in fig. 2-3, the basket cable-stayed mechanism 40 includes:
the inclined pull frame 401 is movably arranged at the upper part of the hoisting conversion member 106 through a fixing bolt 402; in this embodiment, the inclined pull frame 401 is a door-shaped structure and is movably clamped on the upper side of the hoisting conversion member 106;
bolt connecting frames 403 symmetrically fixed at the upper ends of the diagonal tension frames 401;
a diagonal bolt 404 penetrating the bolt connecting frame 403;
one end of the diagonal wire rope 405 is connected to the diagonal tie 404, and the other end of the diagonal wire rope passes through the building wall a and is locked to the inner side of the building wall a; in this embodiment, the cable-stayed steel wire rope 405 is a steel wire rope with a diameter of 8.3mm, as shown in fig. 1, the tail end of the cable-stayed steel wire rope 405 bypasses the inclined pulling bolt 404, is folded back and is fixed by a plurality of annular rope lockers, the number of the annular rope lockers is more than or equal to 4, and the distance between adjacent annular rope lockers is 50mm;
it can be understood that, in this embodiment, a steel wire rope hole is pre-opened on the building wall a, and the oblique-pulling steel wire rope 405 passes through the steel wire rope hole and needs to be protected from abrasion synchronously.
Other undescribed structures refer to example 1.
According to the triangular hanging basket supporting structure of the embodiment of the utility model, the pre-embedding or on-site hole forming of the pre-embedded steel sleeve is firstly made, when being installed, the triangular hoisting frame 10 is firstly formed, then the triangular hoisting frame 10 is fixed on the outer side of the building wall a through the high-strength split bolt 104, then one end of the diagonal steel wire rope 405 is connected to the diagonal draw bolt 404, and the other end of the diagonal steel wire rope passes through the steel wire rope hole pre-formed in the building wall a and then is locked and fixed, so that the triangular supporting structure is effectively reinforced; finally, the hanging point bolt 107 at the lower end of the hanging conversion component 106 is wound around the steel wire hanging rope 20, the hanging basket 30 is fixed at one end, the other end is connected with a winding motor, and the hanging basket 30 can be normally used.
Finally, it should be noted that: the above-mentioned embodiments are only specific embodiments of the present invention, and are not intended to limit the technical solution of the present invention, and the protection scope of the present invention is not limited thereto, although the present invention is described in detail with reference to the foregoing embodiments, those skilled in the art should understand that: those skilled in the art can still modify or easily conceive of changes in the technical solutions described in the foregoing embodiments or make equivalent substitutions for some technical features within the technical scope of the present disclosure; such modifications, changes or substitutions do not substantially depart from the spirit and scope of the embodiments of the present invention, and are intended to be included within the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (8)

1. The utility model provides a triangle-shaped hanging flower basket bearing structure which characterized in that, including:
the triangular hoisting frame (10) is fixed on the vertical surface outside the building wall;
a steel wire lifting rope (20) movably arranged on the lower side of the free end of the triangular lifting frame (10);
a hanging basket (30) fixed at the lower end of the steel wire lifting rope (20);
one end of the hanging basket is arranged on the upper side of the free end of the triangular hoisting frame (10), and the other end of the hanging basket is fixed on the vertical surface of the outer side of the building wall body to obliquely pull and reinforce the triangular hoisting frame (10).
2. The triangular basket support structure of claim 1, wherein: triangle-shaped hoist and mount frame (10) including:
a right-angle triangular frame body formed by fixing a cross beam (101) and an oblique beam (102);
the outer steel plate cushion blocks (103) are vertically welded to the cross beams (101) and the oblique beams (102) and close to the outer side of the building wall;
a plurality of high-strength split bolts (104) which penetrate through the building wall and the outer steel plate cushion block (103);
the inner steel plate cushion block (105) is arranged at the position, corresponding to the high-strength split bolt (104), on the inner side of the building wall body and is matched with the outer steel plate cushion block (103) to fix the right-angle triangular frame body;
the hoisting conversion component (106) is arranged at the tail end of the right-angle triangular frame body, which is far away from the outer side of the building wall;
a plurality of hoisting point bolts (107) which are arranged at the lower side of the hoisting conversion member (106) in a penetrating way to provide hoisting points of the steel wire hoisting ropes (20).
3. A triangular basket support structure according to claim 2, wherein: an embedded steel sleeve for the penetration of the high-strength split bolt (104) is embedded in the building wall body.
4. A triangular basket support structure according to claim 2, wherein: the cross beam (101) and the oblique beam (102) are both I-shaped steel, and the standard of the I-shaped steel is 14-number I-shaped steel.
5. A triangular basket support structure according to claim 2, wherein: the hanging basket diagonal pulling mechanism (40) comprises:
the inclined pull frame (401) is movably arranged at the upper part of the hoisting conversion component (106) through a fixing bolt (402);
the bolt connecting frames (403) are symmetrically fixed at the upper end of the inclined pulling frame (401);
a diagonal draw bolt (404) which is arranged on the bolt connecting frame (403) in a penetrating way;
one end of the diagonal wire rope (405) is connected to the diagonal tie bolt (404), and the other end of the diagonal wire rope penetrates through the building wall and is locked on the inner side of the building wall.
6. A triangular basket support structure according to claim 5, wherein: the tail end of the diagonal steel wire rope (405) winds around the diagonal draw bolt (404), then is folded back and is fixed through a plurality of annular rope locking devices.
7. A triangular basket support structure according to claim 6, wherein: the number of the annular rope locking devices is more than or equal to 4, and the distance between every two adjacent annular rope locking devices is 50mm.
8. The triangular basket support structure of claim 1, wherein: the free end of the triangular hoisting frame (10) is provided with a loaded gradient which is raised by 2-4 degrees before the hanging basket (30) is installed.
CN202222327826.1U 2022-08-30 2022-08-30 Triangular hanging basket supporting structure Active CN218264865U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222327826.1U CN218264865U (en) 2022-08-30 2022-08-30 Triangular hanging basket supporting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222327826.1U CN218264865U (en) 2022-08-30 2022-08-30 Triangular hanging basket supporting structure

Publications (1)

Publication Number Publication Date
CN218264865U true CN218264865U (en) 2023-01-10

Family

ID=84712291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222327826.1U Active CN218264865U (en) 2022-08-30 2022-08-30 Triangular hanging basket supporting structure

Country Status (1)

Country Link
CN (1) CN218264865U (en)

Similar Documents

Publication Publication Date Title
KR100634465B1 (en) Reinforcement Device for Tower Crane
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN211736298U (en) Double-rod diagonal cantilever scaffold
CN114229695B (en) Hoisting method of special-shaped reinforcement cage of underground diaphragm wall
CN204663003U (en) Anchor ear type vestibule truss Steel Structure hoisting hanger
CN218264865U (en) Triangular hanging basket supporting structure
CN212336672U (en) I-steel overhanging bearing frame of basket pull rod for constructional engineering
CN205777489U (en) A kind of support system of high and big die plate
KR100838317B1 (en) Tower crane support system and method
CN204645669U (en) Vestibule truss Steel Structure promotes ground tackle
CN213449427U (en) Vertical lifting structure used in open caisson well
CN214329960U (en) Unitized curtain wall loading platform
CN215167862U (en) Be used in no counter weight hanging flower basket of parapet
CN213867922U (en) Large-axillary-angle single-side-wall movable formwork for subway engineering
CN211920714U (en) Support system of pull-up and pull-down type external hanging self-climbing tower crane
CN211873772U (en) Externally-hung operating steel platform
CN113247736A (en) Cage device supported by structural columns
CN210122723U (en) Novel steel reinforcement cage gallows
CN216764077U (en) Connecting structure for crane beam
CN215801686U (en) Steel support mounting system
CN217102749U (en) Roof large-scale steel beam sliding system
CN217974338U (en) Steel reinforcement cage gallows device
CN219471532U (en) Multifunctional formwork climbing hanger
CN215760547U (en) Novel combination formula steel platform of encorbelmenting
CN215925683U (en) Cable tower main reinforcement hoisting bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant