KR100838317B1 - Tower crane support system and method - Google Patents

Tower crane support system and method Download PDF

Info

Publication number
KR100838317B1
KR100838317B1 KR1020060128681A KR20060128681A KR100838317B1 KR 100838317 B1 KR100838317 B1 KR 100838317B1 KR 1020060128681 A KR1020060128681 A KR 1020060128681A KR 20060128681 A KR20060128681 A KR 20060128681A KR 100838317 B1 KR100838317 B1 KR 100838317B1
Authority
KR
South Korea
Prior art keywords
tower crane
fixture
ground
reinforcement
tower
Prior art date
Application number
KR1020060128681A
Other languages
Korean (ko)
Inventor
김석주
Original Assignee
주식회사 티엔투
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 티엔투 filed Critical 주식회사 티엔투
Priority to KR1020060128681A priority Critical patent/KR100838317B1/en
Application granted granted Critical
Publication of KR100838317B1 publication Critical patent/KR100838317B1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • B66C23/202Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided from below, e.g. by floors of buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • B66C23/208Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided from the side, e.g. by walls of buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details

Abstract

A tower fixing apparatus for a tower crane and a construction method thereof are provided to prevent damage to the tower crane and separation of the tower from the tower crane and to prevent stress concentration on the tower crane due to eccentricity of the tower. A tower fixing apparatus for a tower crane includes a base(300), a ground fixing tool(10), a wall fixing part, a wire rope(34), and a mast. The base is installed at the ground. The ground fixing tool is fixed to the base. The wall fixing part is fixed to a building structure. The wall fixing part is connected to the mast of the tower crane using the wire rope. The ground fixing tool includes a plurality of vertical plates(11), and a plurality of horizontal plates(12) perpendicular to the vertical plates. The horizontal plate has four bolt holes to which height adjustment bolts(13) are fastened.

Description

타워크레인의 타워고정장치 및 그 시공방법{Tower crane support system and method}Tower crane of tower crane and construction method of it {Tower crane support system and method}
도 1a은 종래의 타워마스트 연결상태를 나타낸 평면도,Figure 1a is a plan view showing a conventional tower mast connection state,
도 1b는 종래의 타워크레인의 지지를 위한 지반러그의 사시도,1b is a perspective view of a ground lug for supporting a conventional tower crane,
도 1c는 종래의 벽체고정방식을 나타낸 평면도,Figure 1c is a plan view showing a conventional wall fixing method,
도 2 및 도 3은 본 발명에 따른 지반고정구 및 벽체고정구의 사시도,2 and 3 are a perspective view of the ground fixture and wall fixture according to the invention,
도 4 및 도 5는 지반고정구 및 벽체고정구와 연결부의 연결 사시도,4 and 5 is a perspective view of the connection between the ground fixture and wall fixtures,
도 6 및 도 7은 지반고정구 및 벽체고정구의 설치단면도,6 and 7 are installed cross-sectional view of the ground fixture and wall fixture,
도 8은 본 발명에 따른 마스트와 와이어로프의 연결상태 사시도,8 is a perspective view of the connection state of the mast and the wire rope according to the present invention,
도 9 및 도 10은 지반고정구 및 벽체고정구의 시공개념도,9 and 10 is a construction conceptual diagram of the ground fixture and wall fixture,
도 11 및 도 12는 지반고정구 및 벽체고정구의 시공순서도,11 and 12 are the construction sequence diagram of the ground fixture and wall fixture,
도 13은 지반고정구 및 벽체고정구를 이용한 타워크레인의 지지상태도,Figure 13 is a state diagram of the tower crane using the ground fixture and wall fixture,
< 도면의 주요 부분에 대한 부호의 설명 ><Description of Symbols for Main Parts of Drawings>
10 : 지반고정구 11: 수직판10: ground fixing sphere 11: vertical plate
11a,22a: 섀클홀 12,21 : 가로판11a, 22a: Shackle hole 12, 21: horizontal plate
11b,22c : 횡배근홀 12a,21a : 볼트홀 11b, 22c: Lateral muscle hole 12a, 21a: Bolt hole
13 : 높이조절볼트 14 : 리브 13: height adjustment bolt 14: rib
14a : 열배근홀 20 : 벽체고정구 14a: heat reinforcement hole 20: wall fixture
22 : 경사수직판 23 : 각도조절볼트22: inclined vertical plate 23: angle adjustment bolt
30 : 연결부 31,32 : 기초,보조섀클 30: connection part 31,32: foundation, secondary shackle
33 : 턴버클 34 : 와이어로프 33: turnbuckle 34: wire rope
200 : 타워크레인 201 : 마스트 200: Tower Crane 201: Mast
201a : 세로기둥 201b : 섀클 201a: Vertical column 201b: Shackle
201c : 러그 300 : 기초바닥 201c: lug 300: foundation bottom
301,401 : 횡방향 철근배근 302 : 열방향 철근배근301,401: transverse reinforcement 302: thermal reinforcement
304,404 : 마감콘크리트 400 : 완성된 구조물 304,404: Finished concrete 400: Completed structure
402 : 증축될 구조물 403 : 증축콘크리트 402: Structure to be extended 403: Concrete to be expanded
본 발명은 타워크레인의 타워고정장치 및 그 시공방법에 관한 것으로, 특히 타워크레인의 수직방향 및 수평방향으로 작용되는 불안전한 유동현상을 방지하며, 유동현상이 발생되더라도 지지능력이 상실되지 않고, 여러 지점을 동시에 지지하여 안전하고 견고하게 지지할 수 있는 타워크레인의 타워고정장치 및 그 시공방법에 관한 것이다.The present invention relates to a tower fixing device and a construction method of the tower crane, in particular to prevent the unsafe flow phenomenon acting in the vertical and horizontal direction of the tower crane, even if the flow phenomenon does not lose the supporting capacity, The present invention relates to a tower crane fixing device capable of supporting the point at the same time and securely and firmly and a construction method thereof.
일반적으로, 타워크레인은 항만 하역용이나 고층 건축용으로 발달하여 조선소의 선대와 안벽 등에 설치하고, 초고층 빌딩이나 아파트 건설현장에서 많이 사용 된다. 또한, 플랜트 공사에서는 벌크작업과 스풀홀딩(spool holding)작업 등에 많이 사용되고 있다.In general, tower cranes are developed for port unloading or high-rise construction and installed in shipyard fleets and quay walls, and are often used in skyscrapers or apartment construction sites. In addition, the plant construction is widely used for bulk work and spool holding work.
이러한, 타워크레인은 꼭대기 부분의 모양에 따라 지브형(jib type)과 해머 헤드형(hammer head type)으로 나눈다. The tower crane is divided into a jib type and a hammer head type according to the shape of the top portion.
여기서, 지브(팔 모양으로 돌출된 것)형은 탑 꼭대기에 회전 프레임을 설치하고 지브를 붙여 회전운동이나 트롤리(trolley)의 직선운동을 이용하여 화물을 끌어올리거나 내리는 작업을 한다. Here, the jib (the one protruding in the shape of an arm) is installed by rotating the frame on the top of the tower and attaches the jib to work to lift or lower the cargo using a rotary motion or a trolley (trolley) linear motion.
반면, 해머 헤드형은 탑 꼭대기에 선회 프레임을 설치하고 여기에 좌우 평형하도록 붐(boom)을 장치한 것으로서, 하중의 이동이 수평으로 이루어지도록 작동되는 것이다.On the other hand, the hammer head type is equipped with a swivel frame on the top of the tower and equips it with left and right booms, and is operated to move the load horizontally.
그리고, 타워크레인의 용량을 나타내는 기준은 달아 올림 하중으로 나타내고, 소형은 3톤 미만, 중형은 5톤 미만, 대형은 5톤 이상으로 나눌 수 있다. 아울러, 작업 범위는 30m이상이 대부분이다.In addition, the criterion which shows the capacity of the tower crane is represented by a lifting load, and small size can be divided into less than 3 tons, medium size less than 5 ton, and large size more than 5 ton. In addition, the working range is most than 30m.
이러한, 타워크레인은 데릭 크레인에 비하여 지주와 지지 케이블이 필요 없으며, 인접시설 등에 장해가 없는 상태로 360도 회전할 수 있다는 장점이 있다. 또한, 작업 범위가 넓고 작업 능력도 다른 크레인에 비하여 2배에 이르는 장점이 있어 가장 많이 사용되고 있다.Such a tower crane does not require a prop and a support cable, compared to a derrick crane, and has an advantage of being able to rotate 360 degrees without obstacles to adjacent facilities. In addition, the work range is wide, and the work capacity is also used most because it has the advantage of twice as compared to other cranes.
또한, 타워크레인을 설치할 때에는 해당 작업을 마친 뒤에 기계를 해체할 방법을 고려하여야 하며, 사용지침에 있어서는 '타워크레인의 방호조치에 관한 기술지침'에 따라 정격하중의 105% 이하에서 작동되는 과부하방지장치를 부착하여야 한 다. In addition, when installing the tower crane, the method of dismantling the machine should be considered after finishing the relevant work.In the instructions for use, overload protection which operates at 105% or less of the rated load according to the 'Technical Guidelines on the Protective Measures for Other Work Cranes'. The device must be attached.
더불어, 권과방지장치, 하강제한장치, 선회제한장치, 주행제한장치, 기복제한장치, 로프이완방지장치, 지브 텔레스코핑 제한장치 등의 운동제한장치와 상승/하강/기복의 속도를 제한하는 성능제한장치를 부착하여야 한다.In addition, movement limiting devices such as winding prevention device, lowering limit device, turning limiting device, traveling limiting device, relief limiting device, rope relaxation prevention device, jib telescoping limiting device, and the ability to limit the speed of rising / falling / lowering Limiting devices should be attached.
이러한, 타워크레인의 전복사고방지를 위한 고정방식에는 와이어로프 지지방식과 벽체 지지고정 방식이 있다.Such a fixing method for preventing the rollover of the tower crane includes a wire rope support method and a wall support fixing method.
대표적으로 와이어로프 지지방식은 도 1a 및 1b에 도시된 바와 같이, 대한민국 실용신안등록 제20-334047호로 '와이어로프를 이용한 타워크레인의 타워고정장치'가 제안되었다.Representatively, as shown in Figures 1a and 1b, the wire rope support method has been proposed in the Republic of Korea Utility Model Registration No. 20-334047 'tower fixing device of the tower crane using a wire rope'.
상기 와이어로프를 이용한 타워크레인의 타워고정장치는 타워섹션(100)을 구성하는 마스터(101)에 연결을 위한 러그(102)를 각각 형성시킨 후, 러그(102)에 섀클(102a)을 이용하여 와이어로프(103)의 일단과 연결시킨다.The tower fixing device of the tower crane using the wire rope forms a lug 102 for connection to the master 101 constituting the tower section 100, and then uses the shackle 102a to the lug 102. It is connected to one end of the wire rope 103.
그리고, 와이어로프(103)의 타단은 타워크레인이 설치된 지반의 기초에 다수개의 앵커볼트(104)를 이용하여 고정되는 지반러그(105)에 결합된 섀클(105a)과 연결되어 타워크레인을 지지하게 된다.The other end of the wire rope 103 is connected to the shackle 105a coupled to the ground lug 105 which is fixed using a plurality of anchor bolts 104 on the foundation of the ground on which the tower crane is installed to support the tower crane. do.
그러나, 종래의 타워고정장치는 타워크레인이 고층 작업을 위해 높게 설치될 경우에 바람이나 매달아 이동하는 중량물의 하중 및 타워크레인의 회전원심력에 의해 유동 될 수 있는데, 이때, 지반에 고정된 러그가 앵커볼트를 이용하여 지지되어 앵커볼트가 유동되거나, 유동현상으로 인하여 러그가 지반에서 이탈되는 문제점 및 앵커볼트가 쉽게 파손되는 문제점이 있었다.However, in the conventional tower fixing device, when the tower crane is installed high for high-rise work, it can be flowed by wind or suspended heavy loads and the centrifugal force of the tower crane, where the lugs fixed to the ground are anchored. The anchor bolt is supported by the bolt to flow, or the lug is separated from the ground due to the flow phenomenon and there was a problem that the anchor bolt is easily broken.
아울러, 벽체 지지고정 방식은 도 1c에 도시된 바와 같이, 대한민국 실용신안등록 제 20-388764호로 '타워크레인의 벽체고정용 연결대'가 제안되었다.In addition, the wall support fixing method, as shown in Figure 1c, the Republic of Korea Utility Model Registration No. 20-388764 has been proposed 'connecting wall for the tower crane'.
이러한, 종래의 벽체 지지고정방식은 건축공사 현장과 같은 지반에 타워크레인을 설치한 후, 아파트 및 철골 구조물 건축공사시 타워크레인이 스스로 지탱할 수 없을 때 주로 활용되고 있다.The conventional wall support fixing method is mainly used when the tower crane cannot support itself during the construction of apartments and steel structures after installing the tower crane on the same ground as the construction site.
그러나, 건물의 골조가 상승 축조됨에 따라 타워크레인의 수직부재인 마스트(1a)를 연장하여 사용하게 됨으로써 고층으로 갈수록 풍력 등의 외력에 견딜 수 있는 힘이 약해지게 된다.However, as the structure of the building rises and extends, the mast 1a, which is a vertical member of the tower crane, is used to extend, thereby weakening the force to withstand external forces such as wind power toward higher floors.
아울러, 타워크레인의 지지를 위해 마스트(1a)의 둘레에 고정프레임(2)을 체결한 후, 타워크레인과 건축물의 외벽(3) 사이를 연결하는 섀클(4a)이 일단에 형성된 연결대(4)를 이용하여 고정프레임(2)과 외벽(3)을 연결하게 된다.In addition, after fastening the fixed frame (2) around the mast (1a) for the support of the tower crane, the connecting table (4) having a shackle (4a) connected between the tower crane and the outer wall (3) of the building at one end The fixed frame 2 and the outer wall 3 are connected to each other.
이때, 외벽(3)에는 고정브래킷(3a)을 고정시킨 후, 연결대(4)의 타단을 연결한다.At this time, after fixing the fixing bracket (3a) to the outer wall (3), the other end of the connecting table (4) is connected.
그리고, 연결대(4)의 섀클(4a)은 고정프레임(2)에 연결하여 타워크레인과 외벽(3)을 연결하여 수평방향 및 대각선 방향으로 지지하게 되는 것이다.The shackle 4a of the connecting table 4 is connected to the fixed frame 2 to connect the tower crane and the outer wall 3 to be supported in the horizontal direction and the diagonal direction.
이렇게, 타워크레인을 외벽(3)에 고정하기 위해서는 외벽(3)과 타워크레인의 간격에 맞는 길이의 연결대(4)를 필요로 하게 된다.In this way, in order to fix the tower crane to the outer wall (3) it is necessary to connect the length of the outer wall (3) and the length of the tower crane according to the interval.
그러나, 종래의 벽체 지지고정 방식은 현장에는 다양한 길이의 각 연결대들을 구비하고 건축물과 타워크레인의 간격에 맞는 다양한 길이의 연결대들은 구비하여야 하는 비경제성과 사용하지 않는 연결대들까지 현장에 보관 혹은 운반하게 되 는 불편함이 따르고 있다.However, the conventional wall support fixing method has the economical and unused connections to be stored or transported on site, with each connection having various lengths in the field and having various lengths for the distance between the building and the tower crane. Is accompanied by discomfort.
그리고, 한번 설치된 연결대는 길이의 조절이 쉽지 않아, 타워크레인과 건축물 사이의 간격에 변화가 있을 때 대응할 수 없고 연결대를 바꾸어야 하는 문제점이 있다.And, once the connecting rod is not easy to adjust the length, when there is a change in the distance between the tower crane and the building there is a problem that can not be changed and change the connecting rod.
이로 인하여, 간단한 구조 및 시공방식으로 지지하며, 현장여건에 따라 쉽게 변화시켜 사용가능한 안정화된 타워크레인 지지를 위한 고정구 및 고정구의 시공방법이 절실히 요구되는 실정이다.For this reason, a simple structure and construction method is supported, and the construction method of the fixtures and fixtures for stabilizing tower crane support that can be easily changed according to the site conditions is urgently required.
이에 본 발명은 상기와 같은 종래 기술의 문제점을 감안하여 안출한 것으로 지반,벽체고정구의 견고한 고정과 유동을 방지하기 위하여 기초콘크리트 및 증축콘크리트의 골격역할을 하는 횡,열방향의 철근배근과 결합시겨 보다 안전하고 외력에의해 파손이나 이탈을 방지하며, 변형량을 최소화시키도록 개선된 타워크레인의 타워고정장치 및 그 시공방법을 제공하는데 목적이 있다.Therefore, the present invention has been made in view of the problems of the prior art as described above when combined with the reinforcement in the transverse, thermal direction to act as a skeleton of the foundation concrete and expansion concrete in order to prevent the firm fixing and flow of ground, wall fixtures The purpose of the present invention is to provide a tower fixing device for the tower crane and its construction method which are more safe, prevent damage or departure by external force, and minimize the amount of deformation.
그리고, 본 발명의 다른 목적은 지반고정구가 설치되는 지반에 위치되었을 때 수평상태 및 수직방향으로의 높이를 조절가능한 높이조절볼트를 형성하여 수평이나 높이가 편심되어 발생되는 응력집중현상을 방지하는 동시에 지반고정구의 파손이나 지지력이 감소되는 것을 방지하며, 벽체고정구는 경사수직판에 경사조절볼트를 형성하여 타워크레인과 연결될 부분을 향하도록 하여 지지력이 극대화 되도록 형성하고, 경사수직판이 수평판과 35~60°로 경사지게 기울어져 인장응력을 분산시킬 수 있도록 개선된 타워크레인의 타워고정장치 및 그 시공방법을 제공하는데 목 적이 있다.Another object of the present invention is to form a height adjustment bolt that can adjust the height in the horizontal state and the vertical direction when the ground fixture is installed on the ground to prevent stress concentration phenomenon caused by the horizontal or height is eccentric It prevents the ground fasteners from being damaged or decreases the support force. The wall fasteners are formed with inclined adjustment bolts on the inclined vertical plate to face the parts to be connected to the tower crane. The objective is to provide an improved tower crane and its construction method for dispersing tensile stress by tilting at an angle of 60 °.
상기한 목적을 달성하기 위하여 본 발명은 타워크레인의 수직방향 지지를 위해 지반에 타설된 기초바닥에 고정되는 지반고정구는 상부에 섀클홀이 다수개로 형성된 수직판과, 수직판에 직교되게 형성된 가로판으로 형성되며;
수평방향의 지지를 위해 구조물에 고정되는 벽체고정구는 가로판의 상부에는 외측 끝단에 섀클홀이 형성된 경사수직판이 상부방향으로 기울어져 형성되며;
지반고정구,벽체고정구의 섀클홀에는 기초섀클이 결합되며, 기초섀클)에는 하나 이상의 보조섀클이 체결되고, 보조섀클에는 턴버클의 일단이 결합되며, 턴버클의 타단에는 타워크레인의 마스트에 연결되는 와이어로프가 체결되어 형성된 연결부로 구성되는 것을 특징으로 하는 타워크레인의 타워고정장치에 있어서,
상기 지반고정구의 수직판에는 섀클홀의 하부에 길이방향을 따라 기초바닥의 횡방향 철근배근이 관통되는 횡배근홀이 상하 복선으로 형성되며, 가로판에는 모서리부분에 높이조절볼트가 체결되는 볼트홀이 더 포함되어 구성되는 것을 특징으로 한다.
In order to achieve the above object, the present invention is a ground fixture which is fixed to the foundation floor placed on the ground for vertical support of the tower crane is a vertical plate formed with a plurality of shackle holes on the top, and a horizontal plate formed perpendicular to the vertical plate Formed;
The wall fixture is fixed to the structure for the support in the horizontal direction is formed on the top of the horizontal plate inclined vertical plate with a shackle hole formed at the outer end is inclined in the upper direction;
Ground shackle, foundation shackle is coupled to the shackle hole of the wall fixture, one or more auxiliary shackles are fastened to the foundation shackles, one end of the turnbuckle is coupled to the auxiliary shackle, and the other end of the turnbuckle is connected to the mast of the tower crane. In the tower fixing device of the tower crane, characterized in that consisting of the connection portion formed by fastening,
The vertical plate of the ground fixture is formed in the vertical bar of the transverse reinforcement through which the reinforcement in the transverse reinforcement of the base bottom along the longitudinal direction at the bottom of the shackle hole is formed in the upper and lower double line, the horizontal plate has a bolt hole in which the height adjustment bolt is fastened to the corner It is characterized in that it is further included.
삭제delete
삭제delete
삭제delete
그리고, 상기 지반고정구의 수직판에는 섀클홀의 하부에 길이방향을 따라 기초바닥의 횡방향 철근배근이 관통되는 횡배근홀이 상하 복선으로 형성되며, 가로판에는 모서리부분에 높이조절볼트가 체결되는 볼트홀이 더 포함되어 구성되는 것을 특징으로 한다.In addition, the vertical plate of the ground fixture is formed in the vertical reinforcement of the transverse reinforcement in the bottom of the base along the longitudinal direction at the bottom of the shackle hole is formed in the vertical double line, the horizontal plate is bolted to the height adjustment bolt fastened to the corner Characterized in that the hole is further included.
아울러, 상기 지반고정구의 수직판과 가로판의 양측 직교면에는 삼각편형상 의 리브가 대응되게 다수개로 형성되며, 리브에는 기초바닥의 열방향 철근배근이 관통되는 열배근홀이 하나 이상으로 더 포함되어 구성되는 것을 특징으로 한다.In addition, a plurality of ribs of a triangular piece shape are formed on both perpendicular surfaces of the vertical plate and the horizontal plate of the ground fixture, and the rib further includes one or more thermal reinforcing holes through which the reinforcing bar in the column direction passes. It is characterized in that the configuration.
한편, 상기 벽체고정구의 경사수직판에는 양측면에 연장되어 돌출되는 걸림리브가 대응되게 한 쌍 이상으로 길이방향을 따라 형성되며, 걸림리브를 제외한 경사수직판에는 증축될 구조물의 횡방향 철근배근이 관통되는 횡배근홀이 상하 복선으로 형성되는 한편, 가로판과 경사수직판이 이루는 기울기는 35~60°로 더 포함되어 구성되는 것을 특징으로 한다.On the other hand, the inclined vertical plate of the wall fixture is formed along the longitudinal direction in a pair or more to correspond to the engaging ribs protruding on both sides, the inclined vertical plate other than the locking ribs are penetrated the transverse reinforcement of the structure to be expanded While the transverse muscle hole is formed by a double line up and down, the inclination between the horizontal plate and the inclined vertical plate is characterized in that the configuration further comprises 35 ~ 60 °.
더불어, 상기 벽체고정구의 경사수직판이 기울어진 반대편 가로판에는 각도조절볼트가 체결되는 볼트홀이 더 포함되어 구성되는 것을 특징으로 한다.In addition, the opposite horizontal plate in which the inclined vertical plate of the wall fixture is inclined, characterized in that it further comprises a bolt hole to which the angle adjustment bolt is fastened.
이러한, 지반고정구를 이용하여 타워크레인이 지지되도록 설치되는 시공방법으로는 지반을 굴착하는 기초굴착단계와,The construction method is installed so that the tower crane is supported using the ground fixture, and the basic excavation step of excavating the ground,
기초굴착단계를 거친 후, 타워크레인 및 지반고정구의 위치를 배정하는 배치단계와,After the basic excavation step, the placement step of assigning the location of the tower crane and ground fixture,
배치단계를 거친 후, 높이조절볼트를 이용하여 지반고정구의 수평 및 높이를 조절하는 조정단계와,After the placement step, the adjustment step of adjusting the horizontal and height of the ground fixture using the height adjustment bolt,
조정단계를 거친 후, 기초바닥의 골격을 형성하는 횡방향 철근배근을 수직판의 횡배근홀에 관통시켜 결합하는 동시에, 기초바닥의 골격을 형성하는 열방향 철근배근을 리브의 열배근홀에 관통시켜 고정하는 배근시공단계와,After the adjustment step, the transverse reinforcement forming the skeleton of the foundation floor is penetrated by the transverse reinforcement hole of the vertical plate, and the column reinforcement forming the skeleton of the foundation floor is penetrated through the heat reinforcement hole of the rib. Reinforcement stage to fix and
배근시공단계를 거친 후, 지반고정구의 섀클홀의 하부까지 기초콘크리트를 타설 후 양생시키는 콘크리트타설 및 양생단계와,After the reinforcement construction stage, the concrete placement and curing step to cure after placing the foundation concrete to the lower part of the shackle hole of the ground fixture;
콘크리트타설 및 양생단계를 거친 후, 기초콘크리트가 양생되면 지반고정구와 연결부를 이용하여 타워크레인을 지지하도록 연결하는 연결단계와,After the concrete casting and curing step, if the foundation concrete is cured, the connecting step of supporting the tower crane by using the ground fixture and the connection portion,
연결단계를 통해 지지된 타워크레인의 작업이 완료되면, 타워크레인을 해체하는 동시에, 연결부를 해체한 후 지반고정구의 노출부분을 절단하거나 마감콘크리트를 상부로 타설하여 매입시키는 마무리단계로 구성되는 것을 특징으로 한다.When the work of the tower crane supported through the connection step is completed, the tower crane is dismantled, and at the same time, after dismantling the connection part, it is composed of a finishing step of cutting the exposed part of the ground fixture or placing the finishing concrete to the upper part and buying it. It is done.
또한, 벽체고정구를 이용하여 타워크레인이 지지되도록 설치되는 시공방법으로는 양생이 완성된 구조물의 상부면에 벽체고정구의 위치를 선정하는 배치단계와,In addition, the construction method is installed so that the tower crane is supported using the wall fixture as an arrangement step of selecting the position of the wall fixture on the upper surface of the completed structure,
배치단계를 거친 후, 각도조절볼트를 이용하여 벽체고정구가 타워크레인을 연결될 부분을 향하도록 기울기 각도를 조절하는 경사각조절단계와,After the arrangement step, the inclination angle adjustment step of adjusting the inclination angle so that the wall fixture to the portion to be connected to the tower crane using the angle adjustment bolt,
경사각조절단계를 거친 후, 증축될 구조물의 증축을 위한 골격을 형성하는 횡방향 철근배근이 경사수직판의 횡배근홀에 관통시켜 고정하는 배근시공단계와,After the inclination angle adjustment step, the reinforcement construction step of the transverse reinforcement to form a skeleton for the extension of the structure to be extended through the transverse reinforcement hole of the inclined vertical plate and fixed;
배근시공단계를 거친 후, 완성된 구조물의 상부에 벽체고정구의 섀클홀 부분까지 증축을 위한 증축콘크리트의 타설 후 양생시키는 콘크리트타설 및 양생단계와,After the step of reinforcement construction, the concrete placing and curing step of curing after placing the extension concrete for extension to the shackle hole part of the wall fixture on the upper part of the completed structure,
콘크리트타설 및 양생단계를 거친 후, 층축콘크리트가 양생되면 벽체고정구와 연결부를 이용하여 타워크레인을 지지하도록 연결하는 연결단계와,After the concrete placing and curing step, if the layered concrete is cured, the connecting step of supporting the tower crane by using the wall fixture and the connection,
연결단계를 통해 지지된 타워크레인의 작업이 완료되면, 타워크레인을 해체하는 동시에, 연결부를 해체한 후 벽체고정구의 노출부분을 절단하거나 마감콘크리트를 상부로 타설하여 매입시키는 마무리단계로 구성되는 것을 특징으로 한다.When the work of the tower crane supported through the connecting step is completed, the tower crane is dismantled, and at the same time, after dismantling the connection part, the finishing step of cutting the exposed part of the wall fixture or placing the finishing concrete to the upper part to buy it. It is done.
이에 상기한 바와같은 본 발명의 바람직한 실시예를 첨부도면에 의거하여 상세히 설명하면 다음과 같다.The preferred embodiment of the present invention as described above will be described in detail based on the accompanying drawings.
첨부된 도 2 및 도 3은 본 발명에 따른 지반고정구 및 벽체고정구의 사시도이며, 도 4 및 도 5는 지반고정구 및 벽체고정구와 연결부의 연결 사시도이고, 도 6 및 도 7은 지반고정구 및 벽체고정구의 설치단면도이며, 도 8은 본 발명에 따른 마스트와 와이어로프의 연결상태 사시도이고, 도 9 및 도 10은 지반고정구 및 벽체고정구의 시공개념도이며, 도 11 및 도 12는 지반고정구 및 벽체고정구의 시공순서도이고, 도 13은 지반고정구 및 벽체고정구를 이용한 타워크레인의 지지상태도이다.2 and 3 are a perspective view of the ground fixture and the wall fixture according to the present invention, Figures 4 and 5 is a perspective view of the connection between the ground fixture and the wall fixture and Figure 6 and 7 is a ground fixture and wall fixture 8 is a perspective view of the connection state of the mast and the wire rope according to the present invention, Figures 9 and 10 are conceptual diagrams of ground fixtures and wall fixtures, Figures 11 and 12 of the ground fixtures and wall fixtures It is a construction flowchart and FIG. 13 is a state diagram of the tower crane using the ground fixture and the wall fixture.
이에 도시된 바와 같이, 본 발명의 타워크레인의 타워고정장치 및 그 시공방법은 타워크레인의 수직방향 지지를 위해 지반(G)에 타설된 기초바닥(300)에 고정되는 지반고정구(10) 및 수평방향의 지지를 위해 완성 및 증축될 구조물(400,402)에 고정되는 벽체고정구(20)는 와이어로프(34)를 이용하여 타워크레인(200)의 마스트(201)에 연결되도록 구성된다.As shown therein, the tower fixing device of the tower crane of the present invention and its construction method are ground fixtures 10 and horizontal fixed to the foundation floor 300 placed on the ground (G) for vertical support of the tower crane The wall fixture 20 fixed to the structures 400 and 402 to be completed and extended for supporting the direction is configured to be connected to the mast 201 of the tower crane 200 using the wire rope 34.
여기서, 기초바닥(300)은 굴착작업을 통해 이루어진 지반(G)에 횡과 열의 방향으로 엇갈리게 배근되는 횡,열방향 철근배근(301,302)을 시공한 후, 횡,열방향 철근배근(301,302)의 공간에 콘크리트조성물을 타설하여 완성하도록 구성된 것이다.Here, the foundation floor 300 after the construction of the transverse, column reinforcement (301,302) are alternately in the transverse and column direction on the ground (G) made through excavation work, and then of the transverse, column reinforcement (301,302) It is constructed to finish by pouring concrete composition in the space.
아울러, 구조물(400,402)은 완성된 구조물(400)과 증축될 구조물(402)로 나뉘어진다.In addition, the structures 400 and 402 are divided into the completed structure 400 and the structure 402 to be expanded.
이러한, 지반고정구(10)는 상부에 섀클홀(11a)이 다수개로 형성된 수직판(11)과, 수직판(11)의 하부에 직교되게 형성된 가로판(12)으로 구성된다.The ground fixture 10 includes a vertical plate 11 having a plurality of shackle holes 11a formed thereon, and a horizontal plate 12 formed to be orthogonal to the lower portion of the vertical plate 11.
더불어, 지반고정구(10)의 수직판(11)에는 섀클홀(11a)의 하부에 길이방향을 따라 기초바닥(300)의 횡방향 철근배근(301)이 관통되는 횡배근홀(11b)이 상하 복선으로 형성된다.In addition, in the vertical plate 11 of the ground fixture 10, the horizontal reinforcement hole (11b) through which the transverse reinforcement 301 of the base bottom 300 passes along the longitudinal direction at the bottom of the shackle hole (11a) up and down It is formed by double lines.
부연 설명하자면, 횡방향 철근배근(300)은 기초바닥(300)을 시공할 때 콘크리트를 타설하게 되는데, 이때, 콘크리트의 강도를 증대시키며 파손을 방지하는 철근을 횡방향으로 배근하여 골격을 형성시키도록 구성된 것이다.In detail, the transverse reinforcement 300 is to place the concrete when constructing the foundation floor 300, at this time, to increase the strength of the concrete and to reinforce the transverse reinforcement in the transverse direction to form a skeleton It is configured to.
반면, 가로판(12)에는 모서리부분에 높이조절볼트(13)가 체결되는 4개의 볼트홀(12a)가 구성된다.On the other hand, the horizontal plate 12 is composed of four bolt holes 12a to which the height adjustment bolt 13 is fastened to the corner portion.
여기서, 높이조절볼트(13)는 가로판(12)이 지반(G)에 안치되었을 때 수평 및 가로판(12)의 하부측으로 기초바닥(300)의 콘크리트 조성물이 삽입될 수 있는 공간의 형성을 위해 높이방향으로 간격 조절을 하며, 평탄하지 않은 지반(G)에서도 수평을 맞추며 사용할 수 있어 현장 적용성이 확대되도록 구성된 것이다.Here, the height adjustment bolt 13 is formed when the horizontal plate 12 is placed on the ground (G) to form a space into which the concrete composition of the base bottom 300 can be inserted into the horizontal side and the lower side of the horizontal plate 12. To adjust the height in the direction of the height, even in uneven ground (G) can be used to be horizontally configured to expand the field applicability.
아울러, 지반고정구(10)의 수직판(11)과 가로판(12)의 양측 직교면에는 삼각편형상의 리브(14)가 직립상태를 이루며 대응되게 다수개로 형성된다.In addition, both sides of the vertical plate 11 and the horizontal plate 12 of the ground fixture 10, the triangular rib-like ribs 14 are formed in a plurality upright to correspond to the upright state.
또한, 리브(14)에는 기초바닥(300)의 열방향 철근배근(302)이 관통되는 열배근홀(14a)이 하나 이상으로 구성된다.In addition, the rib 14 includes one or more column reinforcing holes 14a through which the column reinforcement 302 of the foundation floor 300 penetrates.
한편, 열방향 철근배근(302)은 횡방향 철근배근(301)과 동일한 역할을 수행하며, 횡방향 철근배근(301)과 높이차를 형성하며 격자형태로 엇갈리게 형성된 것 이다.On the other hand, the column reinforcement 302 performs the same role as the transverse reinforcement 301, forming a height difference with the transverse reinforcement 301 is formed staggered in the form of a grid.
그리고, 지반고정구(10)를 구성하는 수직판(11)과 가로판(12)은 인장강도가 큰 금속재질의 판형상이며, 두께는 20~30mm로 형성하여 제작단가를 최소화하는 동시에 타워크레인(200)을 지지하는데 최소로 필요한 두께로 구성된 것이다.In addition, the vertical plate 11 and the horizontal plate 12 constituting the ground fixture 10 is a plate shape of a metal material with a large tensile strength, the thickness is formed of 20 ~ 30mm to minimize the manufacturing cost and at the same time tower crane ( It is composed of the minimum thickness required to support 200).
한편, 지반고정구(10)는 수직판(11)이 가로판(12)의 길이방향을 따라 중앙에 직립되어 배치된 후, 용접방식을 이용하여 구성된 것이다.On the other hand, the ground fixture 10 is configured by using a welding method after the vertical plate 11 is placed upright in the center along the longitudinal direction of the horizontal plate 12.
아울러, 지반고정구(10)의 리브(14)는 전방에서 투영시 직각삼각형 형상이며, 수직판(11)과 가로판(12)에 용접방식을 이용하여 고정되고, 가로판(12)의 최외측단에 일치하도록 구성되어 수직판(11)과 가로판(12)이 외력을 받아 비틀림현상이 일어나거나 용접방식을 이용한 연결된 부분이 파손되는 것을 방지할 수 있도록 형성된 것이다.In addition, the rib 14 of the ground fixture 10 has a right triangle shape when projected from the front, is fixed to the vertical plate 11 and the horizontal plate 12 by a welding method, and the outermost side of the horizontal plate 12 The vertical plate 11 and the horizontal plate 12 is configured to match the stage is formed so as to prevent the twisting phenomenon or the connected portion using the welding method is damaged by the external force.
더불어, 지반고정구(10)의 섀클홀(11a) 및 횡배근홀(11b), 볼트홀(12a), 열배근홀(14a)은 드릴링머신을 이용하여 천공한 후 천공된 홀의 내주면을 리머작업을 통해 매끈하게 다듬질작업을 시행하여 구성된 것이다.In addition, the shackle hole (11a), transverse muscle hole (11b), bolt hole (12a), heat reinforcement hole (14a) of the ground fixture 10 is reamed on the inner peripheral surface of the drilled hole after drilling using a drilling machine It is composed by performing smoothing work through.
그리고, 벽체고정구(20)는 가로판(21)의 상부에는 외측 끝단에 섀클홀(22a)이 형성된 경사수직판(22)이 상부방향으로 기울어져 형성된다.In addition, the wall fixing tool 20 is formed in the upper portion of the horizontal plate 21 is inclined vertical plate 22, the shackle hole 22a is formed at the outer end inclined upward.
이러한, 벽체고정구(20)의 경사수직판(22)에는 양측면에 연장되어 돌출되는 걸림리브(22b)가 대응되게 한 쌍 이상으로 길이방향을 따라 구성된다.Such, the inclined vertical plate 22 of the wall fixture 20 is configured along the longitudinal direction of one or more pairs so that the engaging ribs 22b extending and protruding on both sides thereof correspond to each other.
아울러, 가로판(21)과 경사수직판(22)이 이루는 기울기는 35~60°의 각도로 기울어져 구성되는 것이다.In addition, the inclination of the horizontal plate 21 and the inclined vertical plate 22 is configured to be inclined at an angle of 35 ~ 60 °.
더불어, 상기와 같이 경사수직판(22)의 기울기 각도를 한정하는 이유는, 수차례의 구조역학적으로 관련하여 현장시험결과 인장력에 안정화 상태를 이루는 동시에 인장력이 집중되지 않고 분산되는 최적의 효과를 나타내는 각도이기 때문이다.In addition, the reason for limiting the inclination angle of the inclined vertical plate 22 as described above shows the optimum effect of stabilizing the tensile force and dispersing the tensile force at the same time as the structural test results in several structural dynamics. Because it is an angle.
한편, 경사수직판(22)은 걸림리브(22b)를 제외한 면에 증축될 구조물(402)의 횡방향 철근배근(401)이 관통되는 횡배근홀(22c)이 상하 복선으로 형성된다.On the other hand, the inclined vertical plate 22 has a horizontal reinforcement hole 22c through which the transverse reinforcement 401 of the structure 402 to be expanded on the surface except the locking ribs 22b is formed in a vertical double line.
이때, 횡방향 철근배근(401)은 완성된 구조물(400)의 상부면에 배치되며, 완성된 구조물(400)의 상부로 증축될 구조물(402)의 골격을 형성하는 철근 중 횡방향으로 배치되는 것이다.At this time, the transverse reinforcement 401 is disposed on the upper surface of the completed structure 400, is disposed in the transverse direction of the reinforcing bars forming the skeleton of the structure 402 to be expanded to the upper portion of the completed structure 400 will be.
아울러, 벽체고정구(20)의 경사수직판(22)이 기울어진 반대편 가로판(21)에는 각도조절볼트(23)가 체결되는 볼트홀(21a)이 구성된다.In addition, the opposite horizontal plate 21 in which the inclined vertical plate 22 of the wall fixture 20 is inclined, the bolt hole 21a to which the angle adjusting bolt 23 is fastened is configured.
이러한, 각도조절볼트(23)는 완성된 구조물(400)의 상부면에 벽체고정구(20)가 안치되었을 때, 완성된 구조물(400)의 높이를 따라 적층형성되는 타워크레인(200)의 마스트(201)에 연결될 부분을 향하게 조절할 수 있도록 구성된 것이다.This, the angle adjustment bolt 23 is the mast of the tower crane 200 is formed along the height of the completed structure 400, when the wall fixture 20 is placed on the upper surface of the completed structure 400 ( 201) is configured to be adjusted to face the portion to be connected.
그리고, 연결부(30)는 지반,벽체고정구(10,20)의 섀클홀(11a,22a)에 기초섀클(31)이 결합되며, 기초섀클(31)에는 하나 이상의 보조섀클(32)이 체결되고, 보조섀클(32)에는 턴버클(33)의 일단이 결합되며, 턴버클(33)의 타단에는 타워크레인(200)의 마스트(201)에 연결되는 와이어로프(34)로 구성된다.And, the connection portion 30 is the foundation shackle 31 is coupled to the shackle holes (11a, 22a) of the ground, wall fixtures (10, 20), one or more auxiliary shackles 32 are fastened to the foundation shackle 31 One end of the turnbuckle 33 is coupled to the auxiliary shackle 32, and the other end of the turnbuckle 33 includes a wire rope 34 connected to the mast 201 of the tower crane 200.
여기서, 기초/보조섀클(31,32)은 '∪'형상이되, 기초섀클(31)은 섀클홀(11a,22a)에 체결시킨 후, 양끝단을 볼트 및 너트를 이용하여 폐쇄하고, 기초섀 클(31)에 보조섀클(32)을 하나 이상(와이어로프(34)의 개수와 동일함)으로 체결하여 기초/보조섀클(31,32)이 서로 자유롭게 움직일 수 있어 유동현상이 발생 되더라도 회동가능한 가변성을 형성하도록 구성된 것이다.Here, the foundation / secondary shackles 31 and 32 have a '∪' shape, and the foundation shackle 31 is fastened to the shackle holes 11a and 22a, and then both ends thereof are closed using bolts and nuts, and the foundation One or more secondary shackles 32 (same as the number of wire ropes 34) are fastened to the shackle 31 so that the base / secondary shackles 31 and 32 can move freely with each other, so that even if a flow phenomenon occurs It is configured to form possible variability.
또한, 턴버클(33)은 과도하게 당겨지거나 느슨하게 되어 지지력을 상실하는 와이어로프(34)의 장력을 조절가능 하도록 구성된 것이다.In addition, the turnbuckle 33 is configured to adjust the tension of the wire rope 34 that is excessively pulled or loosened to lose the bearing force.
아울러, 와이어로프(34)와 타워크레인(200)의 마스트(201)를 연결하기 위하여 마스트(201)를 구성하는 4개의 세로기둥(201a)에는 섀클(201b)이 연결된 러그(201c)가 구성된다.In addition, in order to connect the wire rope 34 and the mast 201 of the tower crane 200, the lugs 201c to which the shackles 201b are connected are formed at the four vertical columns 201a constituting the mast 201. .
이러한, 지반고정구(10)를 이용하여 타워크레인(200)이 지지되도록 설치되는 시공방법을 살펴보면 다음과 같다.Looking at the construction method installed such that the tower crane 200 is supported by using the ground fixture (10) as follows.
먼저, 기초굴착단계(S11)는 타워크레인(200)이 설치될 공사현장 등과 같은 지역의 지반(G)을 굴착하여 평탄화한다. First, the basic excavation step (S11) is flattened by excavating the ground (G) of the area, such as the construction site where the tower crane 200 is to be installed.
이후, 배치단계(S12)는 기초굴착단계(S11)를 거친 후, 타워크레인(200) 및 지반고정구(10)의 위치를 배정한다.Then, the arrangement step (S12) after the basic excavation step (S11), and assigns the position of the tower crane 200 and the ground fixture (10).
즉, 타워크레인(200)의 위치를 먼저 선정하여 배치하고, 타워크레인(200)의 증축될 높이를 미리 산출한 후, 지반고정구(10)이 타워크레인(200)과 이격되는 거리를 계산하여 배치시킨다.That is, the position of the tower crane 200 is first selected and arranged, the height of the tower crane 200 is calculated in advance, and then the ground fixture 10 is calculated by arranging the distance from the tower crane 200. Let's do it.
다음으로, 조정단계(S13)는 배치단계(S12)를 거친 후, 높이조절볼트(13)를 이용하여 지반고정구(10)의 수평 및 높이를 조절한다.Next, the adjustment step (S13) after the arrangement step (S12), using the height adjustment bolt 13 to adjust the horizontal and height of the ground fixture (10).
이때, 지반고정구(10)는 4개의 높이조절볼트(13)를 회전시키면서 수평계를 이용하여 수평의 여부를 확인하며, 지반고정구(10)의 가로판(12)이 지반(G)으로부터 일정하게 부상될 수 있도록 조정한다.At this time, the ground fixture 10 checks whether the level using a horizontal while rotating the four height adjustment bolts 13, the horizontal plate 12 of the ground fixture 10 is constantly rising from the ground (G) Adjust to be.
그리고, 배근시공단계(S14)는 조정단계(S13)를 거친 후, 기초바닥(300)의 골격을 형성하는 횡방향 철근배근(301)을 수직판(11)의 횡배근홀(11b)에 관통시켜 결합하는 동시에, 기초바닥(300)의 골격을 형성하는 열방향 철근배근(302)을 리브(14)의 열배근홀(14a)에 관통시켜 고정한다.In addition, the reinforcement step (S14) after the adjustment step (S13), the transverse reinforcement 301 forming the skeleton of the base floor 300 penetrates the transverse reinforcement hole (11b) of the vertical plate 11 And the column reinforcement 302, which forms the skeleton of the foundation floor 300, is penetrated through the heat reinforcement hole 14a of the rib 14.
즉, 횡/열방향 철근배근(301,302)은 지반(G)에 시공되는 것이며, 평면 투영시 격자형태로 엇갈리게 시공되어 기초바닥(300)의 골격을 이루는 것이다.That is, the lateral / column reinforcement (301,302) is to be constructed on the ground (G), when the plane is projected to be staggered to form a skeleton of the base floor 300.
아울러, 횡/열방향 철근배근(301,302)은 지반고정구(10)의 횡/열배근홀(11b,14a)을 관통할 수 있도록 미리 정해진 규격에 의해 시공가능하며, 반면, 횡/열방향 철근배근(301,302)의 간격에 적합하도록 지반고정구(10)의 횡/열배근홀(11b,14a)을 형성할 수도 있다.In addition, the transverse / column reinforcement (301, 302) can be constructed by a predetermined standard so as to penetrate the transverse / heat reinforcement holes (11b, 14a) of the ground fixture 10, while the transverse reinforcement The lateral / row reinforcement holes 11b and 14a of the ground fixture 10 may be formed so as to be suitable for the intervals of 301 and 302.
이렇게, 지반고정구(10)는 횡/열방향 철근배근(301,302)이 횡/열배근홀(11b,14a)을 각각 통과하면서 결합되어 별도의 지지고정수단이 필요없이 고정되며 시공될 수 있는 것이다.Thus, the ground fixture 10 is coupled to the transverse / column reinforcement (301, 302) passing through the transverse / heat reinforcement holes (11b, 14a), respectively, can be fixed and constructed without the need for a separate support fixing means.
그리고, 콘크리트타설 및 양생단계(S15)는 배근시공단계(S14)를 거친 후, 지반고정구(10)의 섀클홀(11a)의 하부까지 기초콘크리트(303)를 타설 후 양생시키는 것이다.In addition, after the concrete placing and curing step (S15) through the reinforcement construction step (S14), the foundation concrete 303 to the bottom of the shackle hole (11a) of the ground fixture 10 to pour after curing.
이때는, 횡/열방향 철근배근(301,302)과 지반고정구(10)가 배치시공이 완료 되고, 기초바닥(300)을 형성시키는 단계로써, 타워크레인(200)의 최하단부 및 지반 고정구(10)와 횡/열방향 철근배근(301,302)이 매립될 수 있도록 기초콘크리트(303)의 조성물을 타설한 후 양생시키는 것이다.At this time, the horizontal / column reinforcement (301, 302) and the ground fixture (10) is completed, the construction is completed, the base floor 300 to form a step, the bottom end of the tower crane 200 and the ground fixture (10) and transverse It is to cure after pouring the composition of the foundation concrete 303 so that the thermal reinforcement (301,302) is embedded.
부연 설명하자면, 횡/열방향 철근배근(301,302)은 모두 매립되는 것이며, 타워크레인(200)의 최하단부는 일부만이 매립되고, 지반고정구(10)는 섀클홀(11a)이 매립되지 않는 높이로 기초콘크리트(303)를 타설하는 것이다.In detail, the transverse / column rebars 301 and 302 are all buried, and the bottom end of the tower crane 200 is partially buried, and the ground fixture 10 is based on a height at which the shackle hole 11a is not buried. The concrete 303 is to be poured.
이후, 연결단계(S16)는 콘크리트타설 및 양생단계(S15)를 거친 후, 기초콘크리트(303)가 양생되면 지반고정구(10)와 연결부(30)를 이용하여 타워크레인(200)을 지지하도록 연결한다.After that, the connecting step (S16) after the concrete casting and curing step (S15), when the foundation concrete 303 is cured by using the ground fixture (10) and the connecting portion 30 is connected to support the tower crane 200 do.
연결을 위하여, 지반고정구(10)의 섀클홀(11a)에 기초섀클(31)을 체결한다.For connection, the base shackle 31 is fastened to the shackle hole 11a of the ground fixture 10.
그리고, 기초섀클(31)에 하나 이상의 보조섀클(32)를 체결한 후, 턴버클(33)의 일단과 결합시킨다.Then, after the one or more auxiliary shackles 32 are fastened to the base shackle 31, they are coupled to one end of the turnbuckle 33.
아울러, 턴버클(33)의 타단에는 타워크레인(200)의 마스트(201)의 세로기둥(201a)에 형성된 러그(201c)에 결합되어진 섀클(201b)에 와이어로프(34)의 일단을 결합하고, 타단은 턴버클(33)에 연결한다.In addition, the other end of the turnbuckle 33 is coupled to one end of the wire rope 34 to the shackle 201b coupled to the lug 201c formed in the vertical column 201a of the mast 201 of the tower crane 200, The other end is connected to the turnbuckle 33.
한편, 와이어로프(34)의 개수는 타워크레인(200)을 연결될 부분과 동일한 개수로 준비하는 동시에 기초/보조섀클(31,32)과 턴버클(33)을 준비하여 결합한다.On the other hand, the number of wire rope 34 to prepare the tower crane 200 in the same number as the portion to be connected and at the same time to prepare and combine the foundation / secondary shackles (31, 32) and turnbuckles (33).
이때, 가장 안정적으로는 하나의 섀클홀(11a)에 결합되는 하나의 기초섀클(31)과 기초섀클(31)에 연결되는 두 개의 보조섀클(32)과 보조새클(32)에 연결되는 두 개의 턴버클(33)과 턴버클(33)에 연결되는 두 개의 와이어로프(34)가 한 조로 구성되는 것이 타워크레인(200)을 가장 안정적으로 지지하며 최소화된 구성요소 로 최대화된 지지력을 발생시킬 수 있게 되는 것이다.At this time, the most stable one base shackle 31 coupled to one shackle hole (11a) and two secondary shackles 32 connected to the base shackle 31 and two connected to the secondary sackle 32 The combination of the turnbuckle 33 and the two wire ropes 34 connected to the turnbuckle 33 supports the tower crane 200 most stably and can generate the maximum supporting force with the minimized components. will be.
만약, 타워크레인(200)의 높이가 높아 강한 풍력을 작용받아 휘청거리거나, 중량물을 매달아 선회할 때 발생되는 원심력에 의해 휘청거릴 때에는 기초섀클(31)은 상하부로 유동되며, 보조섀클(32)은 좌우방향으로 유동되어 타워크레인(200)이 거동하는 방향을 따라 자연스럽게 회동되어 안전성을 확보하게 되는 것이다.When the height of the tower crane 200 is high, the foundation shackle 31 flows to the upper and lower portions when being shaken by the centrifugal force generated when the wind is shaken by the strong wind or suspended by the heavy object. Is flowed in the left and right direction is to rotate naturally along the direction in which the tower crane 200 behaves to ensure safety.
마지막으로, 마무리단계(S17)는 연결단계(S16)를 통해 지지된 타워크레인(200)의 작업이 완료되면, 타워크레인(200)을 해체하는 동시에, 연결부(30)를 해체한 후 지반고정구(10)의 노출부분을 절단하거나 마감콘크리트(304)를 상부로 타설하여 매입시킨다.Finally, in the finishing step (S17) is completed when the work of the tower crane 200 supported through the connecting step (S16), while dismantling the tower crane 200, at the same time dismantling the connecting portion 30, the ground fixture ( Cut the exposed part of 10) or pour the finishing concrete 304 to the top.
즉, 연결단계(S16)를 통해 안정화되게 지지된 상태를 이룬 타워크레인(200)의 중량물 인양작업이 완료되면, 타워크레인(200)의 철거규칙에 의해 안전하게 철거하는 동시에, 마스터(201)의 세로기둥(201a)에 연결되었던 와이어로프(34)의 연결을 해체한다.That is, when the lifting of the heavy goods of the tower crane 200 is stabilized through the connection step (S16) is completed, safely removed by the demolition rule of the tower crane 200, at the same time the length of the master 201 The connection of the wire rope 34 that was connected to the pillar 201a is released.
그리고, 와이어로프(34)에 연결된 턴버클(33)과 보조섀클(32), 기초섀클(31)을 순차적으로 지반고정구(10)에서 해체시킨다.Then, the turnbuckle 33 and the auxiliary shackle 32 and the base shackle 31 connected to the wire rope 34 are sequentially dismantled from the ground fixture 10.
이후, 지반고정구(10)를 마감하는 방법에는 두 가지로 나뉠 수 있는데, 먼저, 기초바닥(300)의 상부로 노출된 부분을 절단하여 노출되지 않도록 하는 방법이다.Thereafter, the ground fixing tool 10 may be divided into two methods. First, a method of cutting the exposed part to the upper part of the base bottom 300 may not be exposed.
이때는, 기초바닥(300)을 그대로 유지시키며 다른 용도로 활용할 경우에 이용된다.In this case, it is used to maintain the foundation floor 300 as it is and use for other purposes.
반면, 기초바닥(300)의 상부로 노출된 부분의 상부로 마감콘크리트(304)를 추가로 타설하는 방법은 기초바닥(300)의 상부를 보강하거나 건축물의 증축이 요구될 때 이용되는 방법이다.On the other hand, the method of additionally placing the finishing concrete 304 to the upper portion of the exposed portion of the foundation floor 300 is a method used when reinforcing the upper portion of the foundation floor 300 or when the expansion of the building is required.
그리고, 상기 벽체고정구(20)를 이용하여 타워크레인이 지지되도록 설치되는 시공방법을 살펴보면 다음과 같다.Then, look at the construction method is installed so that the tower crane using the wall fixture 20 as follows.
먼저, 배치단계(S21)는 양생이 완성된 구조물(400)의 상부면에 벽체고정구(20)의 위치를 선정한다.First, the arrangement step (S21) selects the position of the wall fixture 20 on the upper surface of the structure 400 is completed curing.
이후, 경사각조절단계(S22)는 배치단계(S21)를 거친 후, 각도조절볼트(23)를 이용하여 벽체고정구(20)가 타워크레인(200)을 연결될 부분을 향하도록 기울기 각도를 조절한다.Then, the inclination angle adjustment step (S22) after the arrangement step (S21), using the angle adjustment bolt 23 adjusts the inclination angle so that the wall fixture 20 toward the portion to be connected to the tower crane 200.
즉, 벽체고정구(20)는 각도조절볼트(23)을 회전시키면 완성된 구조물(400)의 상부면에 지지되며 기울어지게 되는 것이다.That is, the wall fixture 20 is to be supported and inclined to the upper surface of the completed structure 400 by rotating the angle adjustment bolt 23.
다음으로, 배근시공단계(S23)는 경사각조절단계(S22)를 거친 후, 증축될 구조물(402)의 증축을 위한 골격을 형성하는 횡방향 철근배근(401)이 경사수직판(22)의 횡배근홀(22c)에 관통시켜 고정한다.Next, the reinforcement construction step (S23) after the inclination angle adjustment step (S22), the transverse reinforcement 401 to form a skeleton for the expansion of the structure 402 to be expanded laterally of the inclined vertical plate 22 It penetrates through the reinforcement hole 22c and fixes it.
부연 설명하자면, 횡방향 철근배근(401)은 경사수직판(22)의 횡배근홀(22c)의 위치에 맞도록 미리 계산된 시공방법으로 시공된다.In other words, the transverse reinforcement 401 is constructed by a pre-calculated construction method to fit the position of the transverse reinforcement hole 22c of the inclined vertical plate 22.
더불어, 횡방향 철근배근(401)은 경사수직판(22)의 횡배근홀(22c)에 관통되어 체결되는 과정을 거쳐 벽체고정구(20)를 고정하게 되는 것이다.In addition, the transverse reinforcement 401 is to fix the wall fixture 20 through the process of being fastened through the transverse reinforcement hole (22c) of the inclined vertical plate 22.
그 다음으로, 콘크리트타설 및 양생단계(S24)는 배근시공단계(S23)를 거친 후, 완성된 구조물(400)의 상부에 벽체고정구(20)의 볼트홀(21a) 부분까지 증축을 위한 증축콘크리트(403)의 타설 후 양생시키는 단계이다.Next, the concrete placing and curing step (S24) after the reinforcement construction step (S23), the expansion concrete for the expansion to the bolt hole (21a) portion of the wall fixture 20 on the top of the completed structure 400 It is a step of curing after pouring (403).
즉, 벽체고정구(20)는 일차적으로 횡방향 철근배근(401)과 결합되어 고정된 후, 증축콘크리트(403)를 타설하여 양생함으로써 이차적으로 고정되어 타워크레인(200)을 지지할 수 있도록 시공되는 것이다.That is, the wall fixture 20 is first fixed and coupled with the transverse reinforcement 401, and then fixed by secondary expansion by pouring the expansion concrete 403 is constructed so as to support the tower crane 200 will be.
그리고, 연결단계(S25)는 콘크리트타설 및 양생단계(S24)를 거친 후, 층축콘크리트(403)가 양생되면 벽체고정구(20)와 연결부(30)를 이용하여 타워크레인(200)을 지지하도록 연결한다.In addition, the connection step (S25) after the concrete casting and curing step (S24), when the layered concrete 403 is cured by using the wall fixing fixture 20 and the connecting portion 30 is connected to support the tower crane 200 do.
이때, 가장 안정적으로는 하나의 섀클홀(22a)에 결합되는 하나의 기초섀클(31)과 기초섀클(31)에 연결되는 두 개의 보조섀클(32)과 보조새클(32)에 연결되는 두 개의 턴버클(33)과 턴버클(33)에 연결되는 두 개의 와이어로프(34)가 한 조로 구성되는 것이 타워크레인(200)을 가장 안정적으로 지지하며 최소화된 구성요소로 최대화된 지지력을 발생시킬 수 있게 되는 것이다.At this time, the most stable one base shackle 31 coupled to one shackle hole (22a) and two secondary shackle 32 connected to the base shackle 31 and two connected to the secondary sackle 32 The combination of the turnbuckle 33 and the two wire ropes 34 connected to the turnbuckle 33 supports the tower crane 200 most stably and generates the maximum supporting force with the minimized components. will be.
마지막으로, 마무리단계(S26)는 연결단계(S25)를 통해 지지된 타워크레인(200)의 작업이 완료되면, 타워크레인(200)을 해체하는 동시에, 연결부(30)를 해체한 후 벽체고정구(20)의 노출부분을 절단하거나 마감콘크리트(404)를 상부로 타설하여 매입시킨다.Finally, in the finishing step (S26) is completed when the work of the tower crane 200 supported through the connecting step (S25), while dismantling the tower crane 200, at the same time dismantling the connecting portion 30, the wall fixture ( 20) cut the exposed part or pour the finishing concrete 404 to the top.
이러한, 마무리단계(S26)는 지반고정구(10)를 시공하는 마무리단계(S17)와 동일하게 진행된다.This, finishing step (S26) is the same as the finishing step (S17) for constructing the ground fixture 10.
이로 인하여, 타워크레인(200)을 수직방향 및 수평방향으로 간단한 구조와 시공방법을 이용하여 지지가능하며, 타워크레인(200)에 중량물을 매달아 인양할 때 회전모멘트 및 선회원심력을 지지하고, 외력에 의해 휘청거리는 현상을 간단하게 방지 할 수 있는 것이다.Due to this, the tower crane 200 can be supported by a simple structure and construction method in the vertical and horizontal directions, and supports the rotation moment and the linear member core force when lifting the heavy object suspended on the tower crane 200, This can be easily prevented by the wobbly phenomenon.
이상에서는 본 발명을 특정의 바람직한 실시예를 예를들어 도시하고 설명하였으나, 본 발명은 상기한 실시예에 한정되지 아니하며 본 발명의 정신을 벗어나지 않는 범위내에서 당해 발명이 속하는 기술분야에서 통상의 지식을 가진자에 의해 다양한 변경과 수정이 가능할 것이다.In the above, the present invention has been illustrated and described with reference to specific preferred embodiments, but the present invention is not limited to the above-described embodiments and is not limited to the spirit of the present invention. Various changes and modifications can be made by those who have
이상에서와 같이 본 발명은 지반,벽체고정구의 견고한 고정과 유동을 방지하기 위하여 기초콘크리트 및 증축콘크리트의 골격역할을 하는 횡,열방향의 철근배근과 결합시겨 보다 안전하고 외력에 의해 파손이나 이탈을 방지하며, 변형량을 최소화시키도록 개선되는 효과가 있다.As described above, the present invention is more secure and combined with the reinforcement in the transverse and thermal directions to serve as the skeleton of the foundation concrete and the expanded concrete to prevent the firm fixing and flow of the ground and wall fixtures. It is effective to prevent and to minimize the amount of deformation.
그리고, 지반고정구가 설치되는 지반에 위치되었을 때 수평상태 및 수직방향으로의 높이를 조절가능한 높이조절볼트를 형성하여 수평이나 높이가 편심되어 발생되는 응력집중현상을 방지하는 동시에 지반고정구의 파손이나 지지력이 감소되는 것을 방지하며, 벽체고정구는 경사수직판에 경사조절볼트를 형성하여 타워크레인과 연결될 부분을 향하도록 하여 지지력이 극대화 되도록 형성하고, 경사수직판이 수평판과 35~60°로 경사지게 기울어져 인장응력을 분산시킬 수 있도록 개선되는 효과가 있다.When the ground fixture is located on the ground where the ground fixture is installed, the height adjustment bolt can be formed to adjust the height in the horizontal state and the vertical direction to prevent stress concentration caused by the eccentricity of the ground or the height, and at the same time to break or support the ground fixture. The wall fixture is formed to be inclined to the portion to be connected to the tower crane by forming an inclination adjustment bolt on the inclined vertical plate to maximize the supporting force, and the inclined vertical plate is inclined at an angle of 35 to 60 degrees with the horizontal plate There is an effect to be improved to disperse the tensile stress.
아울러, 간단한 구조의 지반,벽체고정구를 이용하여 타워크레인을 수직 및 수평방향으로 지지할 수 있어, 제작비의 절감과 설치 및 시공의 용이성이 우수하며, 해체 및 철거를 위한 마무리작업이 간단한 효과가 있다.In addition, it is possible to support the tower crane in the vertical and horizontal directions by using the ground and wall fixture of the simple structure, and it is easy to reduce the manufacturing cost, ease of installation and construction, and the finishing work for dismantling and dismantling has a simple effect. .

Claims (7)

  1. 삭제delete
  2. 타워크레인의 수직방향 지지를 위해 지반에 타설된 기초바닥에 고정되는 지반고정구(10)는 상부에 섀클홀(11a)이 다수개로 형성된 수직판(11)과, 수직판(11)에 직교되게 형성된 가로판(12)으로 형성되며;The ground fixture 10 fixed to the foundation floor placed on the ground for vertical support of the tower crane is formed perpendicular to the vertical plate 11 and the vertical plate 11 formed with a plurality of shackle holes 11a thereon. Formed of a horizontal plate 12;
    수평방향의 지지를 위해 구조물에 고정되는 벽체고정구(20)는 가로판(21)의 상부에는 외측 끝단에 섀클홀(22a)이 형성된 경사수직판(22)이 상부방향으로 기울어져 형성되며;The wall fixture 20 fixed to the structure for supporting in the horizontal direction is formed on the top of the horizontal plate 21 inclined vertical plate 22 formed with a shackle hole 22a at the outer end is inclined in the upper direction;
    지반고정구,벽체고정구(10,20)의 섀클홀(11a,22a)에는 기초섀클(31)이 결합되며, 기초섀클(31)에는 하나 이상의 보조섀클(32)이 체결되고, 보조섀클(32)에는 턴버클(33)의 일단이 결합되며, 턴버클(33)의 타단에는 타워크레인(200)의 마스트(201)에 연결되는 와이어로프(34)가 체결되어 형성된 연결부(30)로 구성되는 것을 특징으로 하는 타워크레인의 타워고정장치에 있어서,Ground shackles, foundation shackles 31 are coupled to the shackle holes 11a and 22a of the wall fixtures 10 and 20, and one or more auxiliary shackles 32 are fastened to the foundation shackles 31 and the auxiliary shackles 32 One end of the turnbuckle 33 is coupled to, the other end of the turnbuckle 33 is characterized in that the wire rope 34 is connected to the mast 201 of the tower crane 200 is formed by the connection portion 30 is formed In the tower crane of the tower crane
    상기 지반고정구(10)의 수직판(11)에는 섀클홀(11a)의 하부에 길이방향을 따라 기초바닥(300)의 횡방향 철근배근(301)이 관통되는 횡배근홀(11b)이 상하 복선으로 형성되며, 가로판(12)에는 모서리부분에 높이조절볼트(13)가 체결되는 볼트홀(12a)이 더 포함되어 구성되는 것을 특징으로 하는 타워크레인의 타워고정장치.In the vertical plate 11 of the ground fixture 10, the horizontal reinforcement hole 11b through which the transverse reinforcement 301 of the foundation floor 300 passes along the length of the lower part of the shackle hole 11a is vertically doubled. Is formed as, the horizontal plate 12, the tower fixing device of the tower crane, characterized in that the configuration further comprises a bolt hole (12a) is fastened to the height adjustment bolt 13 in the corner portion.
  3. 제 2항에 있어서, 상기 지반고정구(10)의 수직판(11)과 가로판(12)의 양측 직교면에는 삼각편형상의 리브(14)가 대응되게 다수개로 형성되며, 리브(14)에는 기초바닥(300)의 열방향 철근배근(302)이 관통되는 열배근홀(14a)이 하나 이상으로 더 포함되어 구성되는 것을 특징으로 하는 타워크레인의 타워고정장치.The vertical plate 11 and the horizontal plate 12 of the ground fixture 10, the triangular rib-like ribs 14 are formed in plural numbers, and the ribs 14 Tower anchoring device of the tower crane, characterized in that it is configured to further comprise at least one heat reinforcement hole (14a) through which the column reinforcement (302) of the base bottom 300.
  4. 제 2항에 있어서, 상기 벽체고정구(20)의 경사수직판(22)에는 양측면에 연장되어 돌출되는 걸림리브(22b)가 대응되게 한 쌍 이상으로 길이방향을 따라 형성되며, 걸림리브(22b)를 제외한 경사수직판(22)에는 증축될 구조물(402)의 횡방향 철근배근(401)이 관통되는 횡배근홀(22c)이 상하 복선으로 형성되는 한편, 가로판(21)과 경사수직판(22)이 이루는 기울기는 35~60°로 형성되어 구성되는 것을 특징으로 하는 타워크레인의 타워고정장치.According to claim 2, wherein the inclined vertical plate 22 of the wall fixture 20 is formed along the longitudinal direction in one or more pairs corresponding to the engaging ribs 22b extending and protruding on both sides, the locking ribs 22b Except for the inclined vertical plate 22, the transverse reinforcing hole 22c through which the transverse reinforcement 401 of the structure 402 to be expanded is formed in a vertical double line, while the horizontal plate 21 and the inclined vertical plate ( 22) The tower fixing device of the tower crane, characterized in that the inclination is formed by 35 ~ 60 °.
  5. 삭제delete
  6. 지반고정구(10)를 이용하여 타워크레인이 지지되도록 설치되는 시공방법으로는 지반(G)을 굴착하는 기초굴착단계(S11)와,As a construction method installed so that the tower crane is supported by using the ground fixture 10, the basic excavation step (S11) for excavating the ground (G),
    기초굴착단계(S11)를 거친 후, 타워크레인(200) 및 지반고정구(10)의 위치를 배정하는 배치단계(S12)와,After the basic excavation step (S11), the arrangement step (S12) for assigning the position of the tower crane 200 and the ground fixture 10,
    배치단계(S12)를 거친 후, 높이조절볼트(13)를 이용하여 지반고정구(10)의 수평 및 높이를 조절하는 조정단계(S13)와,After the arrangement step (S12), the adjustment step (S13) for adjusting the horizontal and height of the ground fixture 10 using the height adjustment bolt (13),
    조정단계(S13)를 거친 후, 기초바닥(300)의 골격을 형성하는 횡방향 철근배근(301)을 수직판(11)의 횡배근홀(11b)에 관통시켜 결합하는 동시에, 기초바닥(300)의 골격을 형성하는 열방향 철근배근(302)을 리브(14)의 열배근홀(14a)에 관통시켜 고정하는 배근시공단계(S14)와,After the adjusting step S13, the transverse reinforcement 301 forming the skeleton of the foundation floor 300 is passed through the transverse reinforcement hole 11b of the vertical plate 11 to be coupled to the foundation floor 300. Reinforcement construction step (S14) for penetrating the column reinforcement 302 forming the skeleton of the penetrating through the heat reinforcement hole (14a) of the rib 14, and
    배근시공단계(S14)를 거친 후, 지반고정구(10)의 섀클홀(11a)의 하부까지 기초콘크리트(303)를 타설 후 양생시키는 콘크리트타설 및 양생단계(S15)와,After going through the reinforcement construction step (S14), the concrete placing and curing step (S15) to cure after pouring the foundation concrete 303 to the lower part of the shackle hole (11a) of the ground fixture 10,
    콘크리트타설 및 양생단계(S15)를 거친 후, 기초콘크리트(303)가 양생되면 지반고정구(10)와 연결부(30)를 이용하여 타워크레인(200)을 지지하도록 연결하는 연결단계(S16)와,After the concrete casting and curing step (S15), when the foundation concrete 303 is cured, the connection step (S16) for supporting the tower crane 200 by using the ground fixture 10 and the connection portion 30,
    연결단계(S16)를 통해 지지된 타워크레인(200)의 작업이 완료되면, 타워크레인(200)을 해체하는 동시에, 연결부(30)를 해체한 후 지반고정구(10)의 노출부분을 절단하거나 마감콘크리트(304)를 상부로 타설하여 매입시키는 마무리단계(S17)로 구성되는 것을 특징으로 하는 타워크레인의 타워고정장치 시공방법.When the work of the tower crane 200 supported through the connecting step (S16) is completed, while dismantling the tower crane 200, at the same time dismantling the connection portion 30 after cutting or finishing the exposed portion of the ground fixture 10 The tower fixing device construction method of the tower crane, characterized in that consisting of the finishing step (S17) to pour the concrete (304) to the top.
  7. 벽체고정구(20)를 이용하여 타워크레인이 지지되도록 설치되는 시공방법으로는 양생이 완성된 구조물(400)의 상부면에 벽체고정구(20)의 위치를 선정하는 배치단계(S21)와,As a construction method installed so that the tower crane is supported using the wall fixture 20, an arrangement step (S21) for selecting the position of the wall fixture 20 on the upper surface of the structure 400 is completed, and
    배치단계(S21)를 거친 후, 각도조절볼트(23)를 이용하여 벽체고정구(20)가 타워크레인(200)을 연결될 부분을 향하도록 기울기 각도를 조절하는 경사각조절단계(S22)와,After the arrangement step (S21), using the angle adjustment bolt 23, the inclination angle adjustment step (S22) for adjusting the inclination angle so that the wall fixture 20 toward the portion to be connected to the tower crane 200,
    경사각조절단계(S22)를 거친 후, 증축될 구조물(402)의 증축을 위한 골격을 형성하는 횡방향 철근배근(401)이 경사수직판(22)의 횡배근홀(22c)에 관통시켜 고정하는 배근시공단계(S23)와,After passing through the inclination angle adjustment step (S22), the transverse reinforcement 401 to form a skeleton for the expansion of the structure 402 to be expanded to penetrate through the transverse reinforcement hole (22c) of the inclined vertical plate 22 Reinforcement construction step (S23),
    배근시공단계(S23)를 거친 후, 완성된 구조물(400)의 상부에 벽체고정구(20)의 볼트홀(21a) 부분까지 증축을 위한 증축콘크리트(403)의 타설 후 양생시키는 콘크리트타설 및 양생단계(S24)와,After the reinforcement construction step (S23), the concrete placing and curing step after curing of the expansion concrete 403 for expansion to the bolt hole 21a portion of the wall fixing fixture 20 in the upper portion of the completed structure 400 (S24) and,
    콘크리트타설 및 양생단계(S24)를 거친 후, 증축콘크리트(403)가 양생되면 벽체고정구(20)와 연결부(30)를 이용하여 타워크레인(200)을 지지하도록 연결하는 연결단계(S25)와,After the concrete placing and curing step (S24), when the expansion concrete 403 is cured, the connection step (S25) for supporting the tower crane 200 by using the wall fixture 20 and the connection portion 30, and
    연결단계(S25)를 통해 지지된 타워크레인(200)의 작업이 완료되면, 타워크레인(200)을 해체하는 동시에, 연결부(30)를 해체한 후 벽체고정구(20)의 노출부분을 절단하거나 마감콘크리트(404)를 상부로 타설하여 매입시키는 마무리단계(S26)로 구성되는 것을 특징으로 하는 타워크레인의 타워고정장치 시공방법.When the work of the tower crane 200 supported through the connecting step (S25) is completed, while dismantling the tower crane 200, at the same time dismantling the connection portion 30 after cutting or closing the exposed portion of the wall fixture (20) The tower fixing device construction method of the tower crane, characterized in that consisting of the finishing step (S26) to pour the concrete (404) to the top.
KR1020060128681A 2006-12-15 2006-12-15 Tower crane support system and method KR100838317B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020060128681A KR100838317B1 (en) 2006-12-15 2006-12-15 Tower crane support system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020060128681A KR100838317B1 (en) 2006-12-15 2006-12-15 Tower crane support system and method

Publications (1)

Publication Number Publication Date
KR100838317B1 true KR100838317B1 (en) 2008-06-13

Family

ID=39771313

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020060128681A KR100838317B1 (en) 2006-12-15 2006-12-15 Tower crane support system and method

Country Status (1)

Country Link
KR (1) KR100838317B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101043756B1 (en) 2008-09-17 2011-06-22 김영균 Apparatus for fixing a tower crane
CN102424332A (en) * 2011-11-30 2012-04-25 郑州市长城机器制造有限公司 Tower crane, working platform thereof, and splicing structure for working platform
CN103741709A (en) * 2014-01-09 2014-04-23 武汉竹安工程设备管理有限公司 Embedded bolt mold for tower crane
KR102150874B1 (en) * 2020-05-08 2020-09-02 박영수 Ground-mounted tower crane and how to install it

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000255972A (en) * 1999-03-15 2000-09-19 Musashino Kiko Kk Suspension jig for concrete product
JP2001199680A (en) 2000-01-13 2001-07-24 Kajima Corp Mast horizontal-supporting device for tower crane
KR200334047Y1 (en) * 2003-08-18 2003-11-21 한국타워크레인주식회사 use a wire rope to tower fixing device of tower crane
US20030223825A1 (en) 2002-05-31 2003-12-04 The Reinforced Earth Company Two stage wall connector
KR200387816Y1 (en) * 2005-03-24 2005-06-22 한국타워크레인주식회사 apparatus of fixing tower crane
JP2005272116A (en) 2004-03-26 2005-10-06 Kajima Corp Tower crane support device and its construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000255972A (en) * 1999-03-15 2000-09-19 Musashino Kiko Kk Suspension jig for concrete product
JP2001199680A (en) 2000-01-13 2001-07-24 Kajima Corp Mast horizontal-supporting device for tower crane
US20030223825A1 (en) 2002-05-31 2003-12-04 The Reinforced Earth Company Two stage wall connector
KR200334047Y1 (en) * 2003-08-18 2003-11-21 한국타워크레인주식회사 use a wire rope to tower fixing device of tower crane
JP2005272116A (en) 2004-03-26 2005-10-06 Kajima Corp Tower crane support device and its construction method
KR200387816Y1 (en) * 2005-03-24 2005-06-22 한국타워크레인주식회사 apparatus of fixing tower crane

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101043756B1 (en) 2008-09-17 2011-06-22 김영균 Apparatus for fixing a tower crane
CN102424332A (en) * 2011-11-30 2012-04-25 郑州市长城机器制造有限公司 Tower crane, working platform thereof, and splicing structure for working platform
CN102424332B (en) * 2011-11-30 2014-09-17 郑州市长城机器制造有限公司 Tower crane, working platform thereof, and splicing structure for working platform
CN103741709A (en) * 2014-01-09 2014-04-23 武汉竹安工程设备管理有限公司 Embedded bolt mold for tower crane
CN103741709B (en) * 2014-01-09 2016-06-29 武汉竹安工程设备管理有限公司 A kind of tower crane pre-embedded bolt mould
KR102150874B1 (en) * 2020-05-08 2020-09-02 박영수 Ground-mounted tower crane and how to install it

Similar Documents

Publication Publication Date Title
KR100634465B1 (en) Reinforcement Device for Tower Crane
KR100665718B1 (en) Reinforcement device for tower crane
US3974618A (en) Method of and means for multi-story building construction
JP3177157U (en) A simple tower instrument in a high-rise bridge.
CN101839070B (en) Construction method for temporarily supporting and strengthening reinforced concrete structured beam by using steel column
CN207988538U (en) A kind of overhanging overhanging oblique pull platform of vertical alien invasion
KR100838317B1 (en) Tower crane support system and method
JP2010065378A (en) Hanging scaffold and method for erecting the same
CN105908761A (en) Construction technology of hanging basket moving platform for high slope
CN102337782A (en) Lift system for constructing truss platform on top of tall and large space and construction method for lift system
CN209780193U (en) Suspension type scaffold
CN108019040B (en) A kind of high-rise building transfer floor Bailey bracket platform construction method
KR100808291B1 (en) A safety device for pierces
CN108862081A (en) A kind of chain block crane boom and the application in the adjusting of beam steel protective layer thickness
CN108708267A (en) Long span assembled Bailey beam bridge and its erection method
KR20100038880A (en) Square steel strut for temporary soil sheathing work
CN213477596U (en) Large-span high suspended structure formwork supporting platform connecting structure
CN214302864U (en) Well operation combination steel platform
KR101257823B1 (en) Turn over prevention apparatus for beam
CN213449427U (en) Vertical lifting structure used in open caisson well
CN212405472U (en) Cross node connection structure of assembled frame structure
CN211522880U (en) Wet seam hanging mould for prefabricated bridge deck
CN213571554U (en) Suspension type anchorage portal
CN210795584U (en) Internal climbing tower crane
JP6579674B1 (en) Upper scattering prevention curing system and upper scattering prevention curing method at the time of multi-story building dismantling

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
LAPS Lapse due to unpaid annual fee