CN204645669U - Vestibule truss Steel Structure promotes ground tackle - Google Patents

Vestibule truss Steel Structure promotes ground tackle Download PDF

Info

Publication number
CN204645669U
CN204645669U CN201520102127.4U CN201520102127U CN204645669U CN 204645669 U CN204645669 U CN 204645669U CN 201520102127 U CN201520102127 U CN 201520102127U CN 204645669 U CN204645669 U CN 204645669U
Authority
CN
China
Prior art keywords
steel structure
truss steel
vestibule truss
ground tackle
vestibule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520102127.4U
Other languages
Chinese (zh)
Inventor
卜利民
虞功平
金军波
吴子祥
俞锡钢
王晓东
俞俊民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongtian Construction Group Co Ltd
Original Assignee
Zhongtian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongtian Construction Group Co Ltd filed Critical Zhongtian Construction Group Co Ltd
Priority to CN201520102127.4U priority Critical patent/CN204645669U/en
Application granted granted Critical
Publication of CN204645669U publication Critical patent/CN204645669U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of vestibule truss Steel Structure and promote ground tackle, be installed on corner, vestibule truss Steel Structure top, comprise the gripper shoe that left and right is arranged side by side, bottom and the vestibule truss Steel Structure of described gripper shoe are welded and fixed, the fixed head of one piece of level is welded and fixed between two gripper shoes, described fixed head center is provided with anchor hole, is provided with lifting earth anchor below fixed head, the wire rope bundle promoting vestibule truss Steel Structure from anchor hole pass and with lifting earth anchorage.The utility model ensure that ground tackle has enough intensity and reliability, provides support for adopting hydraulic synchronous lifting technique to be put in place by vestibule truss Steel Structure erection & lift.

Description

Vestibule truss Steel Structure promotes ground tackle
Technical field
The utility model relates to vestibule truss Steel Structure lifting appliance.
Background technology
H profile steel trussed construction, single truss structure cross section is excessive, cannot meet whole truss structure movement requirement, therefore all rod members good by factory process after transport to scene, carry out on-site consolidation, and the setting height(from bottom) of vestibule truss Steel Structure is higher, dead load is huge, and composition component is many, according to bulk-breaking high altitude bulk, assembly, to weld not only workload huge, and there is larger quality, security risk, difficulty of construction is comparatively large, is unfavorable for the General Implementing of engineering.
In engineering, steel work adopts tower crane lifting in the past, but, in view of the setting height(from bottom) of vestibule truss Steel Structure is higher, dead load is huge, scene once cannot lift with tower crane and put in place, therefore intends adopting hydraulic synchronous lifting technique, but adopts which kind of ground tackle and vestibule truss Steel Structure to fix, guarantee reliability and intensity, become the primary technical problem solved.
Utility model content
Technical problem to be solved in the utility model just there is provided a kind of vestibule truss Steel Structure and promotes ground tackle, ensures enough intensity and reliability.
For solving the problems of the technologies described above, the utility model adopts following technical scheme: vestibule truss Steel Structure promotes ground tackle, be installed on corner, vestibule truss Steel Structure top, comprise the gripper shoe that left and right is arranged side by side, bottom and the vestibule truss Steel Structure of described gripper shoe are welded and fixed, the fixed head of one piece of level is welded and fixed between two gripper shoes, described fixed head center is provided with anchor hole, below fixed head, be provided with lifting earth anchor, the wire rope bundle promoting vestibule truss Steel Structure from anchor hole pass and with lifting earth anchorage.
Preferably, described fixed head is fixedly welded in the middle part of two gripper shoes, and the upside of described fixed head is welded with coaming plate between supported on both sides plate.
Preferably, deep floor is welded with outside described gripper shoe.
Preferably, described deep floor is right-angled triangle or ladder structure of right angle.
Lifting ground tackle of the present utility model, ensure that enough intensity and reliability, provides support, can reduce installation difficulty, ensure the quality of products, safety and duration for adopting hydraulic synchronous lifting technique to be put in place by vestibule truss Steel Structure erection & lift.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the utility model is further described:
Schematic diagram when Fig. 1 is anchor ear type vestibule truss Steel Structure hoisting hanger lifting vestibule truss Steel Structure;
Fig. 2 is that anchor ear type vestibule truss Steel Structure hoisting hanger coordinates schematic diagram when promoting vestibule truss Steel Structure with inclined-pulling type vestibule truss Steel Structure hoisting hanger;
Fig. 3 is the front view promoting ground tackle;
Fig. 4 is the top view promoting ground tackle;
Fig. 5 is the structural representation of inclined-pulling type vestibule truss Steel Structure lifting bracket;
Fig. 6 is the structural representation of anchor ear type vestibule truss Steel Structure lifting bracket;
Fig. 7 is the concrete vertical beam clasping structure schematic diagram of anchor ear type vestibule truss Steel Structure lifting bracket and major structure of construction;
Fig. 8 is the structural representation of leading truck;
Fig. 9 is the lateral view of leading truck.
Detailed description of the invention
As shown in Figure 3 and Figure 4, vestibule truss Steel Structure promotes ground tackle 1, be installed on corner, vestibule truss Steel Structure 6 top, comprise the gripper shoe 11 that left and right is arranged side by side, bottom and the vestibule truss Steel Structure of described gripper shoe are welded and fixed, and are welded and fixed the fixed head 12 of one piece of level between two gripper shoes, and described fixed head center is provided with anchor hole 121, below fixed head, be provided with lifting earth anchor, the wire rope bundle promoting vestibule truss Steel Structure from anchor hole pass and with lifting earth anchorage.Described fixed head is fixedly welded in the middle part of two gripper shoes, and the upside of described fixed head is welded with coaming plate 13 between supported on both sides plate.Deep floor 14 is welded with outside described gripper shoe.Described deep floor is right-angled triangle or ladder structure of right angle.
As shown in Figure 5, inclined-pulling type vestibule truss Steel Structure lifting bracket 2, be installed on major structure of construction 7 roof outside left, comprise the first bottom support post 21, described first bottom support post is horizontally disposed with and crossbeam 72 that is inner and major structure of construction roof is fixed, be arranged in parallel the first top braces post 22 above the first bottom support post, described first top braces post is horizontally disposed with, support post 23 is vertically provided with between the crossbeam and first top braces post the inner of major structure of construction roof, the first bearing diagonal post 24 is provided with between on the downside of described first top braces post outer end and on the upside of first bottom support post the inner, an oblique pull fixed leg 25 is provided with between described support post top and major structure of construction roof, the first hydraulic rockshaft is provided with above described first top braces post.
Described first bottom support post, the first top braces post, support post, the first bearing diagonal post and oblique pull fixed leg are i-beam structure.The corresponding oblique pull fixed leg bottom of major structure of construction roof is provided with fixed feet, and described fixed feet comprises U-shaped steel plate, and described U-shaped steel plate is fixed by pressing plate, and described oblique pull fixed leg bottom is weldingly fixed on U-shaped steel plate.Described first top braces post is provided with the first leading truck inside the first hydraulic rockshaft.
As shown in Figure 6 and Figure 7, anchor ear type vestibule truss Steel Structure lifting bracket 3, be installed on outside left in the middle part of major structure of construction 7, comprise the second bottom support post 31, described second bottom support post is horizontally disposed with and concrete vertical beam 71 that is inner and major structure of construction is fixed, the second top braces post 32 is arranged with in parallel above the second bottom support post, described second top braces post is horizontally disposed with, described second top braces post the inner is provided with anchor ear 34 and holds tightly fixing with the concrete vertical beam 71 of major structure of construction, the second bearing diagonal post 33 is provided with between on the downside of described second top braces post outer end and on the upside of second bottom support post the inner, the second hydraulic rockshaft is provided with above described second top braces post.
Described second bottom support post, the second top braces post and the second bearing diagonal post are i-beam structure.Described anchor ear comprises four blocks of i iron, and described four blocks of i iron piece together rectangles encompass on major structure of construction concrete vertical beam and are welded and fixed, and described second top braces post is inner to be welded and fixed with anchor ear.Described second top braces post is provided with the second leading truck inside the second hydraulic rockshaft.
As shown in Figure 8 and Figure 9, leading truck 5 comprises guide upright post 51, is located at the U-shaped targeting port 53 on guide upright post top, and to the diagonal brace 52 that guide upright post supports, arranges hydraulic rockshaft 4 in guide upright post side.Hydraulic rockshaft connecting steel wire ropes bundle 41, is connected by wire rope bundle 41 and promotes ground tackle.To promote or in decline process, the wire rope grown must be reserved in its top at hydraulic rockshaft 4, if reserved wire rope is too much, for promote or in decline process the operation of wire rope and hydraulic rockshaft sky anchor, upper anchor locking and opened considerable influence.So every platform hydraulic rockshaft must the good leading truck of configured in advance, facilitate its top to reserve the derivation of too much wire rope smooth and easy, unnecessary wire rope freely can be dredged backward, downwards along the targeting port on lifting bracket.Leading truck is installed on above hydraulic rockshaft, and the derivation direction of leading truck is installed oil pipe, sensor to facilitate and do not affect wire rope free fall for principle.
As shown in Figure 1, mode owing to taking echelon to promote in vestibule truss Steel Structure lifting process, so in each improvement stage, all anchor ear type vestibule truss Steel Structure lifting bracket 3 need be set on both sides major structure of construction 7, the lifting ground tackle of corresponding vestibule truss Steel Structure 6 top Corner Strapped, every side major structure of construction is arranged a pair anchor ear type vestibule truss Steel Structure lifting bracket 3.
Certainly, if both sides building is contour, and when needing vestibule truss Steel Structure to be promoted to roof, then, in whole lifting process, mode shown in Fig. 1 all can be adopted vestibule truss Steel Structure to be promoted.
As shown in Figure 2, if both sides major structure of construction 7 is highly different, when vestibule truss Steel Structure 6 is promoted to the roof height built close to shorter side by mode shown in employing Fig. 1, at the major structure of construction roof of shorter building, inclined-pulling type vestibule truss Steel Structure lifting bracket 2 need be installed, and in opposite side building equal height position, anchor ear type vestibule truss Steel Structure lifting bracket 3 is installed, coordinates eventually through inclined-pulling type vestibule truss Steel Structure lifting bracket 2 and anchor ear type vestibule truss Steel Structure lifting bracket 3 and vestibule truss Steel Structure is promoted to predetermined altitude.
The technical solution adopted in the utility model, utilize and promote ground tackle by vestibule truss Steel Structure top Corner Strapped, then corresponding each lifting ground tackle, one anchor ear type vestibule truss Steel Structure hoisting hanger is respectively set, the concrete vertical beam of this anchor ear type vestibule truss Steel Structure hoisting hanger and major structure of construction is held tightly fixing, the arbitrary height of major structure of construction can be arranged at, anchor ear type vestibule truss Steel Structure hoisting hanger is provided with hydraulic rockshaft, hydraulic rockshaft is connected with lifting ground tackle by wire rope bundle, hydraulic rockshaft synchronous working on such four anchor ear type vestibule truss Steel Structure hoisting hangers, by vestibule truss Steel Structure Synchronous lifting gradually, through repeatedly promoting, vestibule truss Steel Structure is promoted to predetermined altitude the most at last, last and major structure of construction is fixed again, therefore, installation difficulty can be reduced, ensure the quality of products, safety and duration.

Claims (4)

1. vestibule truss Steel Structure promotes ground tackle, be installed on corner, vestibule truss Steel Structure top, it is characterized in that: comprise the gripper shoe that left and right is arranged side by side, bottom and the vestibule truss Steel Structure of described gripper shoe are welded and fixed, the fixed head of one piece of level is welded and fixed between two gripper shoes, described fixed head center is provided with anchor hole, is provided with lifting earth anchor below fixed head, the wire rope bundle promoting vestibule truss Steel Structure from anchor hole pass and with lifting earth anchorage.
2. vestibule truss Steel Structure according to claim 1 promotes ground tackle, and it is characterized in that: described fixed head is fixedly welded in the middle part of two gripper shoes, the upside of described fixed head is welded with coaming plate between supported on both sides plate.
3. vestibule truss Steel Structure according to claim 1 promotes ground tackle, it is characterized in that: be welded with deep floor outside described gripper shoe.
4. vestibule truss Steel Structure according to claim 3 promotes ground tackle, it is characterized in that: described deep floor is right-angled triangle or ladder structure of right angle.
CN201520102127.4U 2015-02-12 2015-02-12 Vestibule truss Steel Structure promotes ground tackle Expired - Fee Related CN204645669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520102127.4U CN204645669U (en) 2015-02-12 2015-02-12 Vestibule truss Steel Structure promotes ground tackle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520102127.4U CN204645669U (en) 2015-02-12 2015-02-12 Vestibule truss Steel Structure promotes ground tackle

Publications (1)

Publication Number Publication Date
CN204645669U true CN204645669U (en) 2015-09-16

Family

ID=54098427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520102127.4U Expired - Fee Related CN204645669U (en) 2015-02-12 2015-02-12 Vestibule truss Steel Structure promotes ground tackle

Country Status (1)

Country Link
CN (1) CN204645669U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507600A (en) * 2016-01-27 2016-04-20 中国中铁航空港建设集团有限公司 Hoisting system and hoisting construction method for large steel corridor trusses
CN109653517A (en) * 2019-01-31 2019-04-19 济南四建(集团)有限责任公司 A kind of multidirectional Load Relief System and the construction method with the system assembly steel vestibule
CN110683452A (en) * 2018-07-07 2020-01-14 中国二十冶集团有限公司 Lower lifting point for integral lifting of steel structure corridor and use method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105507600A (en) * 2016-01-27 2016-04-20 中国中铁航空港建设集团有限公司 Hoisting system and hoisting construction method for large steel corridor trusses
CN110683452A (en) * 2018-07-07 2020-01-14 中国二十冶集团有限公司 Lower lifting point for integral lifting of steel structure corridor and use method thereof
CN109653517A (en) * 2019-01-31 2019-04-19 济南四建(集团)有限责任公司 A kind of multidirectional Load Relief System and the construction method with the system assembly steel vestibule
CN109653517B (en) * 2019-01-31 2024-02-20 济南四建(集团)有限责任公司 Multidirectional unloading system and construction method for assembling steel corridor by using same

Similar Documents

Publication Publication Date Title
CN104088449B (en) Safe and fast double-track construction platform of super high-rise curtain wall
CN204663003U (en) Anchor ear type vestibule truss Steel Structure hoisting hanger
CN108265628A (en) One kind rides cable-styled erection crane lifting cable-stayed bridge girder steel and bridge floor board construction method
CN204702474U (en) Inclined-pulling type vestibule truss Steel Structure hoisting hanger
CN207294093U (en) A kind of large span steel truss integral lifting apparatus
CN204643757U (en) Anchor ear type vestibule truss Steel Structure lifting bracket
CN109973112B (en) Super-large-dip-angle narrow-space tunnel anchor cable saddle gantry system and installation method thereof
CN204645669U (en) Vestibule truss Steel Structure promotes ground tackle
CN104989111B (en) Steel construction high level construction method for hanging
CN203113793U (en) Large formwork installation system of oblique structure
CN205100531U (en) Lift scaffold support body assembly
CN204645670U (en) Inclined-pulling type vestibule truss Steel Structure lifting bracket
CN206667458U (en) The constructing device of vestibule system steel structure girder
CN102677907A (en) Method for manually installing steel beam at top of silo
CN108086168A (en) Ride cable-styled erection crane
CN204510815U (en) A kind of pull-up strut-framed is encorbelmented flange beam formwork frame
CN209585654U (en) Adhesion type goes up and down discharging platform
CN104790300B (en) Set a roof beam in place by a kind of flexible pier platform and its construction method
CN103774841A (en) Track type sliding formwork device
CN110040632A (en) A kind of segmental hoisting construction method of large span section steel beam
CN205575534U (en) Lattice formula groined type support body lifting means
CN105060124B (en) Intra-frame portal crane system and hoisting use method thereof
CN205259573U (en) A hanging flower basket hangs mechanism for high -rise roofing transformation
CN208251142U (en) A kind of overhanging type Prefabricated steel construction basis of construction elevator
CN209957241U (en) Steel hanger

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150916

Termination date: 20160212

CF01 Termination of patent right due to non-payment of annual fee