CN213806482U - Combined scaffold for construction site - Google Patents

Combined scaffold for construction site Download PDF

Info

Publication number
CN213806482U
CN213806482U CN202021718174.9U CN202021718174U CN213806482U CN 213806482 U CN213806482 U CN 213806482U CN 202021718174 U CN202021718174 U CN 202021718174U CN 213806482 U CN213806482 U CN 213806482U
Authority
CN
China
Prior art keywords
base
erection column
spout
construction site
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021718174.9U
Other languages
Chinese (zh)
Inventor
彭彦彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Huansheng Building Engineering Co ltd
Original Assignee
Shenzhen Huansheng Building Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Huansheng Building Engineering Co ltd filed Critical Shenzhen Huansheng Building Engineering Co ltd
Priority to CN202021718174.9U priority Critical patent/CN213806482U/en
Application granted granted Critical
Publication of CN213806482U publication Critical patent/CN213806482U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a modular scaffold frame for building site, the on-line screen storage device comprises a base, the front and back end of base upper surface all is provided with the erection column, the mount pad with bolted connection between the base, be provided with the stiffener between the erection column, the top of erection column is provided with a fly leaf, the lower surface of base is provided with the universal wheel, the lower surface of base is provided with the telescopic link, the utility model relates to a scaffold frame technical field. This combination formula scaffold frame for building site carries out convenient removal installation through the structure of whole assembled, comes to support the fly leaf through the erection column of movable mounting on the base, and the stiffener has improved the security between the erection column, avoids the workman unstable condition to appear at the during operation, and the base still can install the mounting bracket, and the footboard is installed to the upper end of mounting bracket, can adapt to different behavior, and the top of mounting bracket is provided with the recess, can install the height that increases workman's work rather than the mounting bracket of adaptation.

Description

Combined scaffold for construction site
Technical Field
The utility model relates to a scaffold technical field specifically is a combined scaffold frame for building site.
Background
Scaffolding refers to various supports erected on a construction site for workers to handle and solve vertical and horizontal transportation. The general term of the building industry refers to the places which cannot be directly constructed on the building site and are used for exterior wall, interior decoration or high floor height. The scaffold is mainly used for the purposes of up-and-down dry life of constructors or enclosure of a peripheral safety net, high-altitude installation of components and the like, and is called a scaffold, the scaffold manufacturing materials are usually bamboo, wood, steel pipes or synthetic materials and the like, the scaffold is also used as a template in some projects, and the scaffold is also widely used in the advertising industry, the municipal administration, traffic roads, bridges, mines and other departments.
The existing scaffold has single function and low safety, a large number of fasteners are required to be used, the fasteners are easy to lose, rod pieces at nodes are eccentrically connected, and load and internal force are transmitted by virtue of anti-sliding force, so that the bearing capacity of the scaffold is reduced.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a modular scaffold frame for building site has solved the function singleness, and the security is lower, needs to use a large amount of fasteners, erects instrument itself and construction technique and safe in utilization management work are in comparatively laggard problem.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a combination formula scaffold frame for building site, includes the base, the front and back end of base upper surface all is provided with the erection column, the erection column with bolted connection between the base, detachably is provided with the stiffener between the erection column, the top of erection column is provided with a fly leaf, the upper surface of fly leaf is provided with a slide, the inside of slide is provided with the second spout, the inside front and back end of slide all is provided with the backup pad with the pull, the outside of erection column top is provided with the spout piece, the backup pad with be provided with the support column between the spout piece.
Further, the lower surface of base is provided with the universal wheel, the lower surface of base is provided with the telescopic link.
Further, two the inside of spout piece is vertical has seted up the spout, the inside wall of spout is provided with a plurality of draw-in grooves along vertical direction interval, the top of support column with the backup pad rotates to be connected, the bottom of support column rotates and is connected with rotates the seat, rotate the seat slidable set up in the inside of spout, the horizontal fixedly connected with spring holder in bottom of rotating the seat, the one end of spring holder be provided with one with the dop of draw-in groove looks adaptation.
Further, the movable plate is connected with the sliding plate through a bolt.
Furthermore, the sliding groove block is clamped with the mounting column through a buckle.
Furthermore, guardrails are arranged on the periphery of the supporting plate and the periphery of the movable plate.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) this combination formula scaffold frame for building site, overall structure through whole assembled carries out convenient removal installation, application range is comparatively extensive, mount column through movable mounting on the base supports the fly leaf, the stiffener has improved stability and security between the mount column, avoid the workman unstable condition to appear at the during operation, the mounting bracket can still be installed to the base, the footboard is installed to the upper end of mounting bracket, can adapt to different behavior, the top of mounting bracket is provided with the recess, can install the height that increases workman's work rather than the mounting bracket of adaptation.
(2) This combination formula scaffold for building site through the first backup pad and the second backup pad that can outside pull set up in roof inside, can take first backup pad or second backup pad out when needs increase workman's removal area, increase the area at work ladder top to enlarge workman's removal scope, make the workman can move and carry out the assembly work to different positions, need not frequently adjust the position of placing of work ladder, thereby improve workman's assembly efficiency.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural diagram of an embodiment of the present invention;
FIG. 3 is a schematic view of the structure of the chute block of the present invention;
FIG. 4 is a top view of the pedal structure of the present invention;
FIG. 5 is a schematic view of the buckle structure of the present invention;
fig. 6 is a schematic view of the reinforcing rod structure of the present invention.
In the figure: the device comprises a support plate 1, a rotating seat 2, a support column 3, a first sliding chute 4, a buckle 5, a bolt 6, a mounting column 7, a base 8, a universal wheel 9, a telescopic rod 10, a reinforcing rod 11, a movable plate 12, a sliding plate 13, a second sliding chute 14, a guardrail 15, a staircase 16, a mounting frame 17, a pedal 18, a supporting rod 19, a clamping groove 20, a spring block 21, a clamping head 22 and a sliding chute block 23.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: the utility model provides a combination formula scaffold frame for building site, includes base 8, and the front and back end of base 8 upper surface all is provided with erection column 7, bolted connection between erection column 7 and the base 8 is provided with stiffener 11 between the erection column 7, and the top of erection column 7 is provided with a fly leaf 23.
Be connected through bolt 6 between erection column 7 and the base 8, connected mode is not only firm but also convenient dismantlement, all alternately is provided with stiffener 11 between the erection column 7, and the stability and the security between the erection column 7 have been strengthened to stiffener 11, have ensured the safety of workman during operation.
The lower surface of base 8 is provided with universal wheel 9, and the lower surface of base 8 is provided with telescopic link 10.
The top joint of erection column 7 has a fly leaf 12, easy to assemble and dismantlement, the universal wheel 9 of base 8 lower surface is convenient removal when needs move the shelf, need not dismantle the equipment to it again, the time of having saved the workman, work efficiency is improved, telescopic link 10 can stretch out at the during operation, increase the stability of scaffold frame, the bottom of telescopic link 10 is provided with anti-skidding material, avoid the workman to appear rocking or the condition that the scaffold frame removed when the during operation on fly leaf 12, further improvement workman's security.
The upper surface of the movable plate 12 is provided with a sliding plate 13, the inside of the sliding plate 13 is provided with a second sliding chute 14, the front end and the rear end of the inside of the sliding plate 13 are provided with supporting plates 1 in a drawable manner, the outer side above the mounting column 7 is provided with a sliding chute block 23, and a supporting column 3 is arranged between the supporting plates 1 and the sliding chute block 23.
The movable plate 12 is connected with the sliding plate 13 through bolts, the bolts penetrate through the sliding plate 12 and are screwed into bolt holes of the movable plate 13, the connection mode is firm, when the moving area of a worker needs to be increased, the supporting plates 1 at the front end and the rear end inside the movable plate 13 are drawn out, the area of the top of the working ladder is increased, the moving range of the worker is expanded, and the worker can move to different positions to perform assembly work.
Spout 4 has been seted up to spout piece 23's inside, and the inside wall of spout 4 is provided with a plurality of draw-in grooves 20 along vertical direction interval, and the both ends of support column 3 are all rotated and are connected with and rotate seat 2, are provided with a spring block 21 in the spout 4, and the rotation seat 2 and the spring block 21 of bottom are connected, and the one end of spring seat 21 is provided with one dop 22 with draw-in groove 20 looks adaptation.
The both ends of support column 3 have all been set up and have been rotated seat 2, and the rotation seat 2 of support column 3 upper end is rotated with the lower surface of preceding side backup pad 1 and is connected, and the rotation seat 2 of support column 3 lower extreme rotates with the spring block 21 in the spout 4 to be connected.
When the moving area of the worker needs to be increased, the support plate 1 inside the movable plate 12 can be drawn out to increase the moving area of the worker, thereby enlarging the moving range of the worker and allowing the worker to move to different positions for work.
When the backup pad 1 of front and back end is being pulled, the support column 2 of backup pad 1 lower surface drives spring block 21 and slides in spout 4, and when spring block 21 slided the draw-in groove 20 of 4 inside wall tops of spout, 1 accessible draw-in groove 20 of backup pad at both ends played certain fixed effect to guarantee to step on at the backup pad 1 when surperficial plays the supporting role at the workman, guarantee workman's security.
When the support column 3 drives the spring block 21 to slide, the clamping head 22 arranged on the front side of the spring block 21 extrudes the spring block 21, so that the spring block 21 can move in the sliding groove 4, and the spring block 21 resets when sliding to the clamping groove 20, so that the spring block is fixed in the clamping groove 20.
The movable plate 12 is connected with the sliding plate 13 through the bolt 6, the bolt hole matched with the bolt 6 is formed in the movable plate 12, the bolt 6 penetrates through the movable plate 12 and is screwed into the sliding plate 13 to be firmly fixed, and the bolt 6 and the second sliding groove in the movable plate 12 are not on the same horizontal plane and do not affect the drawing of the support plate 1.
The sliding groove block 23 is clamped with the mounting column 7 through the buckle 5, and when the sliding plate 13 is not needed to be used, the sliding groove block 23 can be taken down by disassembling the buckle 5 through the sliding groove block 23.
All be provided with guardrail 15 around backup pad 1 and fly leaf 24, guardrail 15 on the backup pad 1 at both ends is little than the guardrail on slide 13, and when the backup pad 1 at slip both ends, in guardrail 15 of backup pad 1 can slide the guardrail on slide 13, has protected the workman when the eminence is assembled safety, avoids the workman to take place to fall.
As shown in fig. 2, another embodiment is provided, which includes a base 8, the base 8 can be further provided with a mounting frame 17, the inner side of the mounting frame 17 is provided with an escalator 16, the upper end of the mounting frame 17 is provided with a support rod 19, two pedals 18 are arranged between the support rods 19 for workers to use, the top end of the mounting frame 17 is provided with a groove, and the mounting frame matched with the groove can be installed to increase the working height of the workers.
When the device is used, the base 8 is moved to a designated position, the telescopic rod 10 is extended, the mounting column 7 is mounted on the base 8 through the bolt 6, the reinforcing rod 11 is mounted between the mounting columns 7, the movable plate 12 is mounted at the top end of the mounting column 7, the sliding plate 13 is mounted on the upper surface of the movable plate 12 through the bolt 6, the chute block 23 is mounted on the outer side above the mounting column 7 through a buckle, a supporting plate in the sliding plate 13 can be extracted to increase the moving area of a worker during the work of the worker, as shown in fig. 2, another embodiment is provided, the base 8 can be further provided with a mounting frame 17, the inner side of the mounting frame 17 is provided with a staircase 16, the upper end of the mounting frame 17 is provided with a supporting rod 19, two pedals 18 are arranged between the supporting rods 19 and used by the worker, the top end of the mounting frame 17 is provided with a groove, and the mounting frame matched with the supporting rod can be mounted to increase the working height of the worker, and after the work is finished, disassembling according to the installation sequence.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. A combined scaffold for construction site, includes base (8), its characterized in that: the utility model discloses a support plate, including base (8), erection column (7), detachable, the top of erection column (7), bottom plate (23), bottom plate (7), bottom plate (12), bottom plate (13), bottom plate (23), backup pad (1) and be provided with between chute piece (23) support column (3) are provided with between base (8) front and back end all to be provided with erection column (7), erection column (7) with bolted connection between base (8), detachably is provided with stiffener (11) between erection column (7), the top of erection column (7) is provided with a slide (13), the inside of slide (13) is provided with second spout (14), the inside front and back end equal drawability ground of slide (13) is provided with backup pad (1), the outside of erection column (7) top is provided with spout piece (3).
2. The combined scaffold for construction site according to claim 1, wherein: the lower surface of base (8) is provided with universal wheel (9), the lower surface of base (8) is provided with telescopic link (10).
3. The combined scaffold for construction site according to claim 1, wherein: two spout (4) have vertically been seted up in the inside of spout piece (23), the inside wall of spout (4) is provided with a plurality of draw-in grooves (20) along vertical direction interval, the top of support column (3) with backup pad (1) rotates and connects, the bottom of support column (3) is rotated and is connected with and rotates seat (2), rotate seat (2) slidable set up in the inside of spout (4), rotate the horizontal fixedly connected with spring holder (21) in bottom of seat (2), the one end of spring holder (21) be provided with one with dop (22) of draw-in groove (20) looks adaptation.
4. The combined scaffold for construction site according to claim 1, wherein: the movable plate (12) is connected with the sliding plate (13) through a bolt (6).
5. The combined scaffold for construction site according to claim 1, wherein: the sliding groove block (23) is clamped with the mounting column (7) through a buckle (5).
6. The combined scaffold for construction site according to claim 1, wherein: guard rails (15) are arranged on the periphery of the supporting plate (1) and the movable plate (12).
CN202021718174.9U 2020-08-18 2020-08-18 Combined scaffold for construction site Expired - Fee Related CN213806482U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021718174.9U CN213806482U (en) 2020-08-18 2020-08-18 Combined scaffold for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021718174.9U CN213806482U (en) 2020-08-18 2020-08-18 Combined scaffold for construction site

Publications (1)

Publication Number Publication Date
CN213806482U true CN213806482U (en) 2021-07-27

Family

ID=76951006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021718174.9U Expired - Fee Related CN213806482U (en) 2020-08-18 2020-08-18 Combined scaffold for construction site

Country Status (1)

Country Link
CN (1) CN213806482U (en)

Similar Documents

Publication Publication Date Title
CN107514128A (en) A kind of architectural engineering scaffold
CN213806482U (en) Combined scaffold for construction site
CN212957538U (en) Roof flower frame beam and outer wall decoration construction movable operation platform
CN209703967U (en) A kind of Multifunctional decoration construction bracket
CN210263832U (en) Movable cantilever platform
CN209799310U (en) Building scaffold convenient to dismantle transportation
CN216616780U (en) Anti-falling device for building scaffold
CN213710269U (en) Prefabricated T roof beam construction operation platform
CN211775585U (en) Building scaffold with protective structure
CN111794483A (en) Scaffold for building engineering based on height-adjustable festival formula
CN215212223U (en) Lifting scaffold
CN218061328U (en) Scaffold for building construction
CN215717042U (en) Construction equipment supporting platform for building construction
CN213742193U (en) Support for house building engineering
CN219773544U (en) Scaffold for building engineering
CN219672034U (en) Scaffold with automatic discharging function for building construction
CN220565647U (en) Bearing frame for building construction
CN213062847U (en) Scaffold frame of highway construction usefulness
CN214739730U (en) Frame type upright column scaffold device
CN212715838U (en) Multifunctional assembling scaffold for building decoration
CN220336396U (en) Mobile operation platform for decoration of bottom of indoor corridor
CN210195193U (en) But height-adjusting's scaffold frame for house construction
CN218842867U (en) Movable bridge arch rib support frame
CN219175812U (en) Beam side rear embedded part construction operation platform
CN216641356U (en) Adjustable bracket is used in building engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210727