CN219672034U - Scaffold with automatic discharging function for building construction - Google Patents

Scaffold with automatic discharging function for building construction Download PDF

Info

Publication number
CN219672034U
CN219672034U CN202320540210.4U CN202320540210U CN219672034U CN 219672034 U CN219672034 U CN 219672034U CN 202320540210 U CN202320540210 U CN 202320540210U CN 219672034 U CN219672034 U CN 219672034U
Authority
CN
China
Prior art keywords
plate
scaffold
climbing
climbing frame
fixedly installed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202320540210.4U
Other languages
Chinese (zh)
Inventor
杨浩铭
熊锋
鲍禹轩
任庆贺
安超明
王瑞祥
张骁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202320540210.4U priority Critical patent/CN219672034U/en
Application granted granted Critical
Publication of CN219672034U publication Critical patent/CN219672034U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a scaffold with an automatic discharging function for building construction, which comprises four upright posts and a mounting plate, wherein a supporting plate is fixedly arranged at the top of each upright post, reinforcing rods are fixedly arranged among the four upright posts, an air cylinder is rotatably arranged on a top plate of each reinforcing rod, the output end of each air cylinder is fixedly connected with a telescopic rod, a mounting seat is fixedly arranged at one end of a bottom plate of each supporting plate, a climbing frame is rotatably arranged at the bottom of each mounting seat, the telescopic rods of the air cylinders are rotatably connected to one side plate of each climbing frame, movable grooves are formed in the bottom plate of each climbing frame, the climbing frames can be pushed to rotate to be in an inclined state through the functions of the mounting plate, the air cylinders, the mounting seats and the climbing frames, and the air cylinders can be operated to form a triangular structure among the climbing frames, so that workers can climb the scaffold more conveniently and safely, the time spent by the workers in climbing the scaffold is saved, and the working efficiency is improved.

Description

Scaffold with automatic discharging function for building construction
Technical Field
The utility model relates to the technical field of scaffolds, in particular to a scaffold with an automatic discharging function for building construction.
Background
The building construction refers to the production activity of engineering construction implementation stage, which is the construction process of various buildings, and can be said to be the process of changing various lines on a design drawing into real objects at a designated place. The method comprises foundation engineering construction, main body structure construction, roof engineering construction, decoration engineering construction and the like. The site of construction is referred to as a "building site" or "job site," also known as a worksite. In the building construction process, a scaffold for building construction is needed, and the scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out.
The existing scaffold is usually used for climbing the scaffold of workman to lie in the both sides of scaffold, through welding it on the scaffold and because be in parallel state with the climbing scaffold, the workman is comparatively laborious and has certain climbing danger when climbing the scaffold, therefore has certain not enoughly.
Disclosure of Invention
The utility model aims to solve the defects in the prior art, and provides a scaffold with an automatic blanking function for building construction.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
the utility model provides a scaffold frame with automatic unloading function for construction, includes four stands and mounting panel, four the top fixed mounting of stand has the backup pad, four fixed mounting has the stiffening rod between the stand, rotate on the roof of stiffening rod and install the cylinder, the output fixedly connected with telescopic link of cylinder, the one end fixed mounting of backup pad bottom plate has the mount pad, the climbing rack is installed in the bottom rotation of mount pad, the telescopic link of cylinder rotates to be connected on a curb plate of climbing rack, the movable groove has been seted up on the bottom plate of climbing rack, the spout has been seted up respectively to the both sides face that the movable groove inner wall corresponds, two respectively slidable mounting has the slider in the spout, two the one side board fixedly connected with extension board that the slider corresponds, symmetrical fixed mounting has the removal wheel on the bottom plate of extension board.
Preferably, the top fixed mounting of backup pad has the protection subassembly, the protection subassembly includes base and rail guard, be the rectangle on the roof of backup pad and install the base, the top of base is "" shape and installs the rail guard.
Preferably, a fixing frame is fixedly arranged on the left side face of the supporting plate, a discharging pipe is fixedly arranged on the fixing frame in a penetrating mode, a collecting box is fixedly arranged on one side plate corresponding to each two adjacent upright posts, and one end corresponding to the discharging pipe penetrates through the top plate of the collecting box and extends into the collecting box.
Preferably, the top plate of mounting panel and a curb plate of climbing frame are equipped with the rotation subassembly respectively, the rotation subassembly includes minor axis and two rotation boards, two the rotation is installed the minor axis between the rotation board, cylinder fixed mounting is on one of them minor axis, just telescopic link fixed connection of cylinder is on a corresponding minor axis.
Preferably, the overlook projection of mount pad is "" shape, just rotate on the both sides board that the mount pad corresponds and install the major axis, climbing frame and major axis interference fit.
Preferably, the climbing frame comprises a fixed plate and a plurality of climbing rods, wherein a plurality of climbing rods are fixedly sleeved with rubber pads, and the rubber pads are provided with anti-skidding patterns.
The utility model has the following beneficial effects:
1. through setting up the effect of mounting panel, cylinder, mount pad and climbing rack, can promote the climbing rack through the work of cylinder and rotate and be the inclination for constitute triangle-shaped structure between climbing rack, stand and the ground, thereby make more convenient and the safety when the workman climbs the scaffold again, save the time that the workman spends at climbing scaffold, accelerate work efficiency;
2. through setting up movable groove, spout, slider, extension board and the effect of removing the wheel, make the climbing rack rotate the back at opening the cylinder, the extension board can be along with the rotation of climbing rack at the inside downwardly sliding of movable groove for through removing the wheel contact that remains all the time with ground, through the effect of extension board and removal wheel, play the effect of strengthening support to the climbing rack, the security when guaranteeing workman climbing rack.
Drawings
FIG. 1 is a schematic diagram of a front view structure according to the present utility model;
FIG. 2 is a schematic left-view diagram of the present utility model;
fig. 3 is a schematic diagram of an assembling structure of the climbing frame according to the present utility model;
fig. 4 is a schematic view of a partial enlarged structure at a in fig. 3 according to the present utility model.
In the figure: 1. a column; 101. a support plate; 2. a protective assembly; 3. a reinforcing rod; 4. a mounting plate; 5. a cylinder; 6. a mounting base; 7. a climbing rack; 8. a movable groove; 9. a chute; 10. a slide block; 11. an extension plate; 12. a moving wheel; 13. a fixing frame; 14. discharging pipes; 15. and (5) collecting a box.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
Referring to fig. 1-4, a scaffold with automatic unloading function for construction is provided, which comprises four upright posts 1 and a mounting plate 4, the top fixed mounting of four upright posts 1 has backup pad 101, fixed mounting has stiffening rod 3 between four upright posts 1, rotate on the roof of stiffening rod 3 and install cylinder 5, the output fixedly connected with telescopic link of cylinder 5, the one end fixed mounting of backup pad 101 bottom plate has mount pad 6, the climbing rack 7 is installed in the bottom rotation of mount pad 6, the telescopic link of cylinder 5 is rotated and is connected on a curb plate of climbing rack 7, movable groove 8 has been seted up on the bottom plate of climbing rack 7, spout 9 has been seted up respectively to the both sides face that the movable groove 8 inner wall corresponds, slidable mounting has slider 10 in two spouts 9 respectively, the one side board fixedly connected with extension board 11 that two sliders 10 correspond, symmetrical fixed mounting has movable wheel 12 on the bottom plate of extension board 11.
In this embodiment, as shown in fig. 1 and 2, the top of the supporting plate 101 is fixedly provided with a protection component 2, the protection component 2 includes a base and a guard rail, the top plate of the supporting plate 101 is rectangular and provided with the base, and the top of the base is -shaped and provided with the guard rail.
In this embodiment, as shown in fig. 1 and fig. 2, a fixing frame 13 is fixedly installed on the left side surface of the supporting plate 101, a blanking pipe 14 is fixedly installed on the fixing frame 13 in a penetrating manner, a collecting box 15 is fixedly installed on one side plate corresponding to two adjacent upright posts 1, one end corresponding to the blanking pipe 14 penetrates through the top plate of the collecting box 15 and extends into the collecting box 15, specifically, a buffer pad is arranged on the inner wall of the collecting box 15, after the construction operation of the building, relevant accessories for construction on the scaffold can be quickly conveyed into the collecting box 15 through the blanking pipe 14, so that relevant accessories for construction on the ground are convenient for workers to arrange, and potential safety hazards existing in the process of collecting the arrangement accessories on the scaffold and climbing the scaffold carrying the accessories are reduced.
In this embodiment, as shown in fig. 1, 2, 3 and 4, a rotating assembly is respectively disposed on a top plate of the mounting plate 4 and one side plate of the climbing frame 7, the rotating assembly includes a short shaft and two rotating plates, the short shaft is rotatably mounted between the two rotating plates, the air cylinder 5 is fixedly mounted on one of the short shafts, and the telescopic rod of the air cylinder 5 is fixedly connected on the corresponding short shaft.
In this embodiment, as shown in fig. 1 and 3, the top projection of the mounting seat 6 is in a shape of ", long shafts are rotatably mounted on two corresponding side plates of the mounting seat 6, and the climbing frame 7 is in interference fit with the long shafts.
In this embodiment, as shown in fig. 1, 2 and 3, the climbing frame 7 includes a fixed plate and a plurality of climbing rods, rubber pads are fixedly sleeved on the climbing rods, and anti-skidding patterns are formed on the rubber pads.
The application method and the advantages of the utility model are as follows: when the scaffold with the automatic discharging function for the building construction is used, the working process is as follows:
as shown in fig. 1, fig. 2, fig. 3 and fig. 4, when the device is used, firstly, external power supply and controller are carried out on electric equipment in the device, when a worker needs to climb to the top of a scaffold, the switch of the air cylinder 5 is opened to enable the electric equipment to work, the air cylinder 5 works to enable the telescopic rod to move so as to push the climbing frame 7 to rotate on the mounting seat 6, so that the angle of the climbing frame 7 is changed, namely, the climbing frame 7 can be pushed to rotate in an inclined state through the action of the mounting plate 4, the air cylinder 5, the mounting seat 6 and the climbing frame 7, and a triangular structure is formed among the climbing frame 7, the upright post 1 and the ground through the work of the air cylinder 5, so that the worker can climb the scaffold more conveniently and safely, the time spent by the worker in climbing the scaffold is saved, and the work efficiency is accelerated.
And after opening cylinder 5 and making climbing frame 7 rotate, because climbing frame 7 rotates the back and the interval on ground changes, and extension board 11 passes through slider 10 slidable mounting in movable groove 8, so extension board 11 can be along with the rotation of climbing frame 7 at the inside downwardly sliding of movable groove 8 to make through moving wheel 12 remain all the time with the contact on ground, play the effect of strengthening support to climbing frame 7 through extension board 11 and the effect of moving wheel 12, guarantee the security when workman climbs frame 7.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.

Claims (6)

1.一种建筑施工用具有自动下料功能的脚手架,包括四根立柱(1)和安装板(4),其特征在于,四根所述立柱(1)的顶部固定安装有支撑板(101),四根所述立柱(1)之间固定安装有加固杆(3),所述加固杆(3)的顶板上转动安装有气缸(5),所述气缸(5)的输出端固定连接有伸缩杆,所述支撑板(101)底板的一端固定安装有安装座(6),所述安装座(6)的底部转动安装有攀爬架(7),所述气缸(5)的伸缩杆转动连接在攀爬架(7)的一侧板上,所述攀爬架(7)的底板上开设有活动槽(8),所述活动槽(8)内壁对应的两侧面分别开设有滑槽(9),两处所述滑槽(9)内分别滑动安装有滑块(10),两块所述滑块(10)对应的一侧板固定连接有延伸板(11),所述延伸板(11)的底板上对称固定安装有移动轮(12)。1. A scaffold with an automatic unloading function for construction, including four upright columns (1) and a mounting plate (4). It is characterized in that a support plate (101) is fixedly installed on the top of the four upright columns (1). ), a reinforcing rod (3) is fixedly installed between the four columns (1), a cylinder (5) is rotatably installed on the top plate of the reinforcing rod (3), and the output end of the cylinder (5) is fixedly connected There is a telescopic rod, a mounting base (6) is fixedly installed at one end of the bottom plate of the support plate (101), a climbing frame (7) is rotatably installed at the bottom of the mounting base (6), and the telescopic cylinder (5) The rod is rotatably connected to one side plate of the climbing frame (7). A movable groove (8) is provided on the bottom plate of the climbing frame (7). Two corresponding sides of the inner wall of the movable groove (8) are respectively provided with The chute (9) has slide blocks (10) slidably installed in the two chute (9) respectively. The side plates corresponding to the two slide blocks (10) are fixedly connected with an extension plate (11), so A moving wheel (12) is symmetrically fixed on the bottom plate of the extension plate (11). 2.根据权利要求1所述的一种建筑施工用具有自动下料功能的脚手架,其特征在于,所述支撑板(101)的顶部固定安装有防护组件(2),所述防护组件(2)包括底座和防护栏,所述支撑板(101)的顶板上呈矩形安装有底座,所述底座的顶部呈“匚”形安装有防护栏。2. A scaffold with automatic unloading function for building construction according to claim 1, characterized in that a protective component (2) is fixedly installed on the top of the support plate (101), and the protective component (2) ) includes a base and a guardrail. A base is installed on the top of the support plate (101) in a rectangular shape, and a guardrail is installed on the top of the base in a "匚" shape. 3.根据权利要求1所述的一种建筑施工用具有自动下料功能的脚手架,其特征在于,所述支撑板(101)的左侧面固定安装有固定架(13),所述固定架(13)上固定贯穿安装有下料管(14),相邻两根所述立柱(1)对应的一侧板上固定安装有收集箱(15),所述下料管(14)对应的一端贯穿收集箱(15)的顶板并延伸至收集箱(15)内。3. A scaffold with automatic unloading function for construction according to claim 1, characterized in that a fixing frame (13) is fixedly installed on the left side of the support plate (101), and the fixing frame (13) A discharge pipe (14) is fixedly installed on the upper side, and a collection box (15) is fixedly installed on the side plate corresponding to the two adjacent columns (1). The discharge pipe (14) corresponds to One end penetrates the top plate of the collection box (15) and extends into the collection box (15). 4.根据权利要求1所述的一种建筑施工用具有自动下料功能的脚手架,其特征在于,所述安装板(4)的顶板和攀爬架(7)的一侧板上分别设有转动组件,所述转动组件包括短轴和两块转动板,两块所述转动板之间转动安装有短轴,所述气缸(5)固定安装其中一根短轴上,且所述气缸(5)的伸缩杆固定连接在对应的一根短轴上。4. A scaffold with automatic unloading function for building construction according to claim 1, characterized in that the top plate of the installation plate (4) and the side plate of the climbing frame (7) are respectively provided with The rotating assembly includes a short shaft and two rotating plates. A short shaft is installed for rotation between the two rotating plates. The cylinder (5) is fixedly installed on one of the short shafts, and the cylinder (5) The telescopic rod of 5) is fixedly connected to a corresponding short shaft. 5.根据权利要求1所述的一种建筑施工用具有自动下料功能的脚手架,其特征在于,所述安装座(6)的俯视投影呈“匚”形,且所述安装座(6)对应的两侧板上转动安装有长轴,所述攀爬架(7)与长轴过盈配合。5. A scaffold with an automatic unloading function for construction according to claim 1, characterized in that the top view projection of the mounting base (6) is in the shape of a "匚" shape, and the mounting base (6) A long axis is rotatably mounted on the corresponding two side plates, and the climbing frame (7) is an interference fit with the long axis. 6.根据权利要求1所述的一种建筑施工用具有自动下料功能的脚手架,其特征在于,所述攀爬架(7)包括固定板和若干根攀爬杆,若干块所述攀爬杆上均固定套接有橡胶垫,且所述橡胶垫上均开设有防滑纹。6. A scaffold with an automatic unloading function for construction according to claim 1, characterized in that the climbing frame (7) includes a fixed plate and a plurality of climbing poles, and a plurality of climbing poles. Rubber pads are fixedly connected to the rods, and anti-slip patterns are provided on the rubber pads.
CN202320540210.4U 2023-03-15 2023-03-15 Scaffold with automatic discharging function for building construction Expired - Fee Related CN219672034U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320540210.4U CN219672034U (en) 2023-03-15 2023-03-15 Scaffold with automatic discharging function for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320540210.4U CN219672034U (en) 2023-03-15 2023-03-15 Scaffold with automatic discharging function for building construction

Publications (1)

Publication Number Publication Date
CN219672034U true CN219672034U (en) 2023-09-12

Family

ID=87923280

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320540210.4U Expired - Fee Related CN219672034U (en) 2023-03-15 2023-03-15 Scaffold with automatic discharging function for building construction

Country Status (1)

Country Link
CN (1) CN219672034U (en)

Similar Documents

Publication Publication Date Title
CN212773348U (en) A construction frame for building construction
CN212957538U (en) Roof flower frame beam and outer wall decoration construction movable operation platform
CN115749364B (en) A building height increase renovation and expansion construction equipment and renovation and expansion construction method
CN219672034U (en) Scaffold with automatic discharging function for building construction
CN222249889U (en) Auxiliary equipment for installation and construction of air conditioning duct
CN210263832U (en) Movable cantilever platform
CN213806482U (en) Combined scaffold for construction site
CN217536662U (en) Guardrail flange plate construction moving trolley in bridge floor
CN201212250Y (en) Mobile wheel track installation platform for large-sized network frame engineering
CN212866952U (en) Low-rise floor is protector for concrete placement
CN212359055U (en) Scaffold for civil engineering construction
CN221664196U (en) A mobile construction frame
CN220599079U (en) High scaffold of protectiveness
CN223386941U (en) Foot rest for decoration
CN212507263U (en) Multifunctional construction platform
CN221989845U (en) Building construction frame
CN214739730U (en) Frame type upright column scaffold device
CN219213647U (en) Automatic erect and prop installation device that punches
CN214658643U (en) Mobile platform for multi-use architecture construction
CN218348049U (en) Semi-automatic vertical pole mounting device
CN221095780U (en) Spliced scaffold for building construction
CN222140636U (en) A scaffolding for construction engineering
CN219411733U (en) Building construction platform convenient to move
CN212954222U (en) Building construction is with lift that has safety structure
CN222558079U (en) Construction safety frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230912