CN212427025U - Transportation ship for harvesting and processing water hyacinth - Google Patents

Transportation ship for harvesting and processing water hyacinth Download PDF

Info

Publication number
CN212427025U
CN212427025U CN201820831944.7U CN201820831944U CN212427025U CN 212427025 U CN212427025 U CN 212427025U CN 201820831944 U CN201820831944 U CN 201820831944U CN 212427025 U CN212427025 U CN 212427025U
Authority
CN
China
Prior art keywords
main arm
water hyacinth
collecting box
cockpit
ship body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820831944.7U
Other languages
Chinese (zh)
Inventor
丁满
秦兆宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei University of Technology
Original Assignee
Hebei University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei University of Technology filed Critical Hebei University of Technology
Priority to CN201820831944.7U priority Critical patent/CN212427025U/en
Application granted granted Critical
Publication of CN212427025U publication Critical patent/CN212427025U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cleaning Or Clearing Of The Surface Of Open Water (AREA)

Abstract

The utility model relates to a water hyacinth harvesting and processing transport ship, which comprises a ship body, a main arm, a recovery roller, a fork shovel and a collecting box, wherein the upper part of the front end of the ship body is hinged with the rear end of the main arm, the middle part of the upper end of the ship body corresponding to the rear end of the main arm is provided with the collecting box, the main arm extends towards the lower part of the front end, and the front end of the main arm is provided with the recovery roller; a fork shovel is fixedly arranged at the front end of the main arm at the lower end of the recovery roller. The utility model discloses the recovery gyro wheel below of bow main arm is provided with fork shovel structure, installs bulky collecting box on the hull, can once only accomodate more water hyacinth that reap, improves and reaps efficiency. The hull wholly adopts the lightweight design, and the main arm adopts skeleton texture, guarantees intensity to reduce the dead weight, the operation is more nimble. The cockpit adopts multiaspect large tracts of land glass window, and the field of vision is broad, is convenient for observe the surface of water condition, the operation of being convenient for, and it is effectual to clear up to be equipped with the intelligent control platform at the cockpit, reduce the operation degree of difficulty, the automatic control residue.

Description

Transportation ship for harvesting and processing water hyacinth
Technical Field
The utility model belongs to the salvage ship field, especially a water hyacinth reaps handles transport ship.
Background
The water hyacinth has multiple functions, but because the propagation speed is too fast, a large amount of water hyacinth covers the river surface, the water quality is easy to deteriorate, and the growth of underwater organisms is influenced. Moreover, water hyacinth consumes a large amount of dissolved oxygen during growth, and almost becomes a substitute term of pollution. The flood of the hyacinths and the calabash in the famous waters such as Dian Chi, Tai lake, Huangpu river, Wuhan east lake and the like in China is a disaster. At present, traditional water hyacinth salvage ship structure is comparatively simple, and it is relatively poor to water hyacinth serious pollution's water harvesting ability, needs frequent round trip, and the activity duration is short, reaps inefficiency, and the operation panel sight is obstructed moreover, operates inconveniently, has certain potential safety hazard.
SUMMERY OF THE UTILITY MODEL
The utility model aims to overcome the shortcomings of the prior art and provide a water hyacinth harvesting and processing transport ship which is reasonable in layout, high in harvesting efficiency and convenient to operate.
The utility model provides a its technical problem take following technical scheme to realize:
the utility model provides a water hyacinth reaps handles transport ship which characterized in that: the recovery device comprises a ship body, a main arm, a recovery roller, a fork shovel and a collection box, wherein the upper part of the front end of the ship body is hinged with the rear end of the main arm, the collection box is arranged in the middle of the upper end of the ship body corresponding to the rear end of the main arm, the main arm extends towards the lower part of the front end, and the recovery roller is arranged at the front end of the main arm; a fork shovel is fixedly arranged at the front end of the main arm at the lower end of the recovery roller.
And, the structure of retrieving the gyro wheel includes pedestal, main shaft and shift fork, installs the pedestal at the horizontal bilateral symmetry of main arm front end, installs the main shaft that transversely sets up between the pedestal of this both sides, and a plurality of shift forks are installed to horizontal interval equipartition on this main shaft, and the shift fork comprises a plurality of radial equipartition radial fork arms.
And, the collecting box is the open cube box structure in an upper end, and the lateral wall of collecting box front end entry is the open mode, is convenient for send the water hyacinth into the collecting box, and the collecting box link up hull upper end space.
And, install the cockpit in hull middle part, the cockpit is upper and lower bilayer structure, and the cockpit upper strata is operating space, installs intelligent control platform in the cockpit, is provided with the glass window around the cockpit upper strata, installs the cat ladder of connecting the hull at the cockpit rear end.
And the upper end of the main arm is provided with a conveyor belt, the middle rear part of the upper end of the main arm is provided with a guide deflector rod, the guide deflector rod is convenient for guiding the water hyacinth into the front end inlet of the collecting box, and the bottom end of the front part of the collecting box is provided with the conveyor belt.
And two groups of hanging brackets are fixedly arranged at the upper end of the main arm.
Moreover, the front end of the fork shovel is provided with a plurality of flat shovel structures arranged in parallel.
The utility model has the advantages that:
1. the utility model discloses the recovery gyro wheel below of bow main arm is provided with fork shovel structure, the collection of being more convenient for, and the bulky collecting box of installation on the hull can once only accomodate more water hyacinth that reap, reduces and comes and goes the number of times, improves and reaps efficiency.
2. The utility model discloses the hull wholly adopts the lightweight design, and the main arm adopts skeleton texture, guarantees intensity to reduce the dead weight, move more in a flexible way.
3. The utility model discloses a cockpit adopts multiaspect large tracts of land glass window, and the field of vision is wide, is convenient for observe the surface of water condition, and the operation of being convenient for clears up effectually to be equipped with intelligent control platform at the cockpit, reduce the operation degree of difficulty, the automatic monitoring residue.
Drawings
FIG. 1 is a front view of the overall structure of the present invention;
FIG. 2 is a left side view of FIG. 1;
FIG. 3 is a right side view of FIG. 1;
fig. 4 is a top view of the overall structure of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the following embodiments, which are illustrative, not restrictive, and the scope of the invention should not be limited thereto.
A water hyacinth reaping and processing transport ship comprises a ship body 5, a main arm 3, a fork shovel 2, a recovery roller 1 and a collection box 6, wherein the left side is the front end of the ship body according to the direction shown in figure 1, the upper part of the front end of the ship body is hinged with the rear end of the main arm, the middle part of the upper end of the ship body corresponding to the rear end of the main arm is provided with the collection box, the main arm extends towards the lower part of the front end, the front end of the main arm is obliquely inserted into the surface of a water body during operation, and the front end of the;
the structure of retrieving the gyro wheel includes pedestal, main shaft and shift fork, installs the pedestal in the horizontal bilateral symmetry of main arm front end, installs the main shaft of horizontal setting between the pedestal of this both sides, and a plurality of shift forks are installed to horizontal interval equipartition on this main shaft, and the shift fork comprises a plurality of radial equipartition's radial fork arm, and the shift fork that this embodiment attached drawing shows has six fork arms.
The recycling roller is driven by a motor to rotate, sundries on the surface of the water body are continuously pushed to the main arm, sundries such as water hyacinth and the like are pushed to the ship body direction along the main arm, and water automatically flows back; the drive motor is mounted within the hull of the vessel in a conventional configuration and is not shown in the drawings.
The front end of a main arm at the lower end of the recovery roller is fixedly provided with a fork shovel 2, the front end of the fork shovel is provided with a plurality of flat shovel structures arranged in parallel, and sundries such as water hyacinth on the surface of a water body can be shoveled when the ship body moves forwards.
The collecting box is a cubic box structure with an open upper end, the side wall of the inlet at the front end of the collecting box is in an open state during working, water hyacinth is conveniently fed into the collecting box, the length of the water hyacinth is the same as that of the upper end of the ship body, and the containing capacity is large.
In order to guide the water hyacinth to enter the collecting box, the upper end of the main arm is provided with a conveyor belt, the middle rear part of the upper end of the main arm is provided with a guide deflector rod 8, the guide deflector rod is convenient for guiding the water hyacinth to the inlet at the front end of the collecting box, and the bottom end of the front part of the collecting box is provided with the conveyor belt.
There is cockpit 7 at hull mid-mounting, and the cockpit is upper and lower bilayer structure, and the cockpit upper strata is operating space, installs the intelligence in the cockpit and controls the platform, and the cockpit upper strata all is provided with the glass window all around and is convenient for observe, and lower floor's middle part link up and is used for placing the collecting box, and the cat ladder of connecting the hull is installed at the cockpit rear end and is used for operating personnel from top to bottom.
In order to save space when the ship body stops, two groups of hanging brackets 3 are fixedly arranged at the upper end of the main arm and are used for fixing the main arm by using a rope when the main arm is turned upwards.
Although the embodiments of the present invention and the accompanying drawings are disclosed for illustrative purposes, those skilled in the art will appreciate that: various substitutions, changes and modifications are possible without departing from the spirit and scope of the present invention and the appended claims, and therefore, the scope of the present invention is not limited to the disclosure of the embodiments and the accompanying drawings.

Claims (5)

1. The utility model provides a water hyacinth reaps handles transport ship which characterized in that: the recovery device comprises a ship body, a main arm, a recovery roller, a fork shovel and a collection box, wherein the upper part of the front end of the ship body is hinged with the rear end of the main arm, the collection box is arranged in the middle of the upper end of the ship body corresponding to the rear end of the main arm, the main arm extends towards the lower part of the front end, and the recovery roller is arranged at the front end of the main arm; the front end of a main arm at the lower end of a recovery roller is fixedly provided with a fork shovel, the structure of the recovery roller comprises shaft brackets, a main shaft and shifting forks, the shaft brackets are symmetrically arranged at two transverse sides of the front end of the main arm, the main shaft arranged transversely is arranged between the shaft brackets at the two sides, the main shaft is uniformly provided with a plurality of shifting forks transversely at intervals, and the shifting forks are composed of a plurality of radial uniform-distributed radial fork rods;
the collecting box is the open cube box structure in an upper end, and the lateral wall of collecting box front end entry is the open mode, is convenient for send the water hyacinth into the collecting box, and the collecting box link up hull upper end space.
2. The water hyacinth harvesting and processing transport ship of claim 1, wherein: the intelligent control cabin is characterized in that a cockpit is arranged in the middle of the ship body, the cockpit is of an upper double-layer structure and a lower double-layer structure, the upper layer of the cockpit is an operation space, an intelligent control platform is arranged in the cockpit, glass windows are arranged around the upper layer of the cockpit, and a crawling ladder connected with the ship body is arranged at the rear end of the cockpit.
3. The water hyacinth harvesting and processing transport ship of claim 1, wherein: the water hyacinth collecting device is characterized in that a conveyor belt is installed at the upper end of the main arm, a guide deflector rod is installed at the middle rear part of the upper end of the main arm, the guide deflector rod is convenient for guiding the water hyacinth into an inlet at the front end of the collecting box, and the conveyor belt is installed at the bottom end of the front part of the collecting box.
4. The water hyacinth harvesting and processing transport ship of claim 1, wherein: two groups of hanging brackets are fixedly arranged at the upper end of the main arm.
5. The water hyacinth harvesting and processing transport ship of claim 1, wherein: the front end of the fork shovel is provided with a plurality of flat shovel structures arranged in parallel.
CN201820831944.7U 2018-05-31 2018-05-31 Transportation ship for harvesting and processing water hyacinth Expired - Fee Related CN212427025U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820831944.7U CN212427025U (en) 2018-05-31 2018-05-31 Transportation ship for harvesting and processing water hyacinth

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820831944.7U CN212427025U (en) 2018-05-31 2018-05-31 Transportation ship for harvesting and processing water hyacinth

Publications (1)

Publication Number Publication Date
CN212427025U true CN212427025U (en) 2021-01-29

Family

ID=74275431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820831944.7U Expired - Fee Related CN212427025U (en) 2018-05-31 2018-05-31 Transportation ship for harvesting and processing water hyacinth

Country Status (1)

Country Link
CN (1) CN212427025U (en)

Similar Documents

Publication Publication Date Title
CN102963505B (en) Automatic clearing ship for rubbish on water
CN202923846U (en) Water surface garbage automatic cleaning boat
CN102020004B (en) Water surface garbage cleaning ship
CN109024453B (en) Novel beach garbage cleaning vehicle and use method thereof
CN107580865A (en) One main laminaria harvests method for sorting and robot
CN106592553B (en) A kind of river way cleaning ship
EP4353080A1 (en) Catamaran for deep and far sea culture
CN216709596U (en) Underwater dredging system
CN206554048U (en) A kind of river way cleaning ship
CN210681100U (en) A full-automatic underwater ROV device for collecting benthos
CN211281396U (en) Water surface garbage cleaning ship
CN202828028U (en) Watercourse garbage clearing boat
CN1236849A (en) Ship for colleting garbage floated on water
CN212427025U (en) Transportation ship for harvesting and processing water hyacinth
CN112411499B (en) Near-water-surface garbage cleaning and collecting device and collecting method
CN214267907U (en) Primary and secondary ship for salvaging garbage on water surface
CN211898272U (en) Amphibious algae rubbish cleaning robot of coastal waters bank
CN111846121A (en) Automatic pull and block dirty diversion system
CN207917094U (en) A kind of device for cleaning water surface rubbish
CN111605672A (en) Small-size surface of water cleaning boat with guiding device
CN110409393A (en) A kind of automatic river floating pollutant cleaning plant of perfusion type
CN106172275A (en) Shellfish harvester
CN2908344Y (en) Multifunctional amusement ship
CN212685863U (en) A robot of decontaminating for collecting tiny rubbish of water surface
CN208007237U (en) A kind of device for cleaning water surface rubbish

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210129