CN212263369U - Reduce construction cost's construction waste recovery device - Google Patents

Reduce construction cost's construction waste recovery device Download PDF

Info

Publication number
CN212263369U
CN212263369U CN202020662993.XU CN202020662993U CN212263369U CN 212263369 U CN212263369 U CN 212263369U CN 202020662993 U CN202020662993 U CN 202020662993U CN 212263369 U CN212263369 U CN 212263369U
Authority
CN
China
Prior art keywords
transmission shaft
driven gear
motor
driven
construction waste
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020662993.XU
Other languages
Chinese (zh)
Inventor
祝言国
李勤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202020662993.XU priority Critical patent/CN212263369U/en
Application granted granted Critical
Publication of CN212263369U publication Critical patent/CN212263369U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Crushing And Grinding (AREA)
  • Crushing And Pulverization Processes (AREA)

Abstract

The utility model discloses a reduce construction cost's construction waste recovery device, including smashing the room, it is equipped with the feed inlet to smash the roof portion, from the top down is equipped with slide group, first rubbing crusher, second rubbing crusher in proper order and the funnel that gathers materials in smashing the room, install the electromagnetism suction disc on the slide group, the electromagnetism suction disc with be equipped with the deflector between the first rubbing crusher, install the discharging pipe on the funnel that gathers materials, it is equipped with the support to smash the room bottom, the utility model discloses simple structure has the function of autosegregation reinforcing bar and fragment of brick, improves recovery efficiency to can fully process the fragment of brick after the separation, promote reutilization value.

Description

Reduce construction cost's construction waste recovery device
Technical Field
The utility model relates to a construction technical field specifically is a reduce construction cost's construction waste recovery device.
Background
The common materials for building construction comprise bricks, tiles, reinforcing steel bars and the like, and the materials used in the construction process are complete each time, so that one complete material has a part of the rest, the rest can not be used continuously, the rest can be discarded as garbage, the space is occupied, the construction cost is wasted, and the wastes need to be recycled.
Common waste recovery device simple structure still need pick out reinforcing bar and fragment of brick, ceramic tile with the manual work when processing the waste material, consuming time power, moreover to the processing of waste material not thorough, make the reutilization value of waste material reduce.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a reduce construction cost's construction waste recovery device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a reduce building construction cost's construction waste recovery device, is including smashing the room, it is equipped with the feed inlet to smash the roof portion, from the top down is equipped with slide block group, first rubbing crusher constructs, second rubbing crusher and the funnel that gathers materials in proper order in smashing the room, slide block group is last to install the electromagnetism suction disc, the electromagnetism suction disc with be equipped with the deflector between the first rubbing crusher constructs, install the discharging pipe on the funnel that gathers materials, it is equipped with the support to smash the roof portion.
As a further aspect of the present invention: and the right side surface of the crushing chamber is provided with a mounting hole corresponding to the electromagnetic suction plate.
As a further aspect of the present invention: and a first supporting plate and a second supporting plate are sequentially arranged on the front side wall of the crushing chamber from top to bottom.
As a further aspect of the present invention: first rubbing crusher constructs includes first motor, first transmission shaft, first driven shaft, first driving gear, first driven gear and first roller, first motor is fixed in first backup pad, first transmission shaft one end with first motor is connected, the other end of first transmission shaft is installed in crushing room rear side wall, from left to right install in proper order on the first transmission shaft first driving gear with first roller, first driven shaft one end is installed in crushing room rear side wall, the first transmission shaft other end passes crushing room front side wall is installed first driven gear, install on the first driven shaft first driven gear, first driving gear with first driven gear is connected in driven fit.
As a further aspect of the present invention: and a tooth block is arranged on the first rolling roller.
As a further aspect of the present invention: second rubbing crusher constructs includes second motor, second transmission shaft, second driven shaft, second driving gear, second driven gear and second and rolls the roller, the second motor is fixed in the second backup pad, second transmission shaft one end with the second motor is connected, the other end of second transmission shaft is installed in crushing room rear side wall, from left to right install in proper order on the second transmission shaft the second driving gear with the second rolls the roller, second driven shaft one end is installed in crushing room rear side wall, the second transmission shaft other end passes crushing room front side wall is installed second driven gear, install on the second driven shaft second driven gear, the second driving gear with second driven gear is connected in coordination.
As a further aspect of the present invention: and a flow valve is arranged on the discharge pipe.
Compared with the prior art, the beneficial effects of the utility model are that: through the sliding table group and the electromagnetic suction plate which are arranged, the steel bars can be separated from the bricks and the tiles without manual separation, the recycling efficiency is improved, the waste can be processed in a grading manner through the first crushing mechanism and the second crushing mechanism which are arranged, the loss of the equipment can be reduced, the waste can be fully processed, and the reutilization value of the waste is improved.
Drawings
Fig. 1 is a schematic structural view of a construction waste recycling apparatus for reducing construction costs.
Fig. 2 is a schematic structural view of a crushing chamber part of a construction waste recycling device for reducing construction cost.
Fig. 3 is a schematic structural view of a first crushing mechanism of the construction waste recycling device for reducing construction cost.
Fig. 4 is a schematic structural view of a second crushing mechanism of the construction waste recycling device for reducing construction costs.
In the figure: 1-crushing chamber, 2-feeding port, 3-sliding table group, 4-first crushing mechanism, 5-second crushing mechanism, 6-collecting hopper, 7-electromagnetic suction plate, 8-guide plate, 9-discharging pipe, 10-bracket, 11-first support plate, 12-second support plate, 13-flow valve, 41-first motor, 42-first transmission shaft, 43-second driven shaft, 44-first driving gear, 45-first driven gear, 46-first rolling roller, 51-first motor, 52-first transmission shaft, 53-second driven shaft, 54-first driving gear, 55-first driven gear, 56-second rolling roller, 101-mounting hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example 1
Please refer to fig. 1-4, in the embodiment of the utility model, a reduce construction cost's construction waste recovery device, including smashing room 1, it is equipped with feed inlet 2 to smash 1 top in the room, from the top down is equipped with smooth platform group 3, first rubbing crusher constructs 4, second rubbing crusher constructs 5 and collecting hopper 6 in proper order in smashing room 1, install electromagnetism suction disc 7 on smooth platform group 3, electromagnetism suction disc 7 with be equipped with deflector 8 between the first rubbing crusher constructs 4, install discharging pipe 9 on the collecting hopper 6, it is equipped with support 10 to smash room 1 bottom.
Example 2
In this embodiment, as shown in fig. 2, the right side surface of the pulverization chamber 1 is provided with a mounting hole 101 corresponding to the electromagnetic absorption plate 7.
In this embodiment, as shown in fig. 2, a first supporting plate 11 and a second supporting plate 12 are sequentially disposed on the front side wall of the pulverizing chamber 1 from top to bottom.
In this embodiment, as shown in fig. 3, the first crushing mechanism 4 comprises a first motor 41, a first transmission shaft 42, a first driven shaft 43, a first driving gear 44, a first driven gear 45 and a first crushing roller 46, the first motor 41 is fixed on the first support plate, one end of the first transmission shaft 42 is connected with the first motor 41, the other end of the first transmission shaft 42 is installed in the rear side wall of the crushing chamber 1, the first driving gear 44 and the first rolling roller 46 are sequentially installed on the first transmission shaft 42 from left to right, one end of the first driven shaft 43 is arranged in the rear side wall of the crushing chamber 1, the other end of the first driven shaft 42 passes through the front side wall of the crushing chamber 1 and is provided with the first driven gear 45, the first driven shaft 43 is provided with the first driven gear 45, and the first driving gear 44 is connected with the first driven gear 45 in a matching manner.
In this embodiment, as shown in fig. 3, a toothed block 461 is disposed on the first rolling roller 46.
In this embodiment, as shown in fig. 4, the second crushing mechanism 5 includes a second motor 51, a second transmission shaft 52, a second driven shaft 53, a second driving gear 54, a second main driven gear 55 and a second crushing roller 56, the second motor 51 is fixed on the second support plate, one end of the second transmission shaft 52 is connected with the second motor 51, the other end of the second transmission shaft 52 is installed in the rear side wall of the crushing chamber 1, the second transmission shaft 52 is sequentially provided with the second driving gear 54 and the second rolling roller 56 from left to right, one end of the second driven shaft 53 is arranged in the rear side wall of the crushing chamber 1, the other end of the second transmission shaft 52 passes through the front side wall of the crushing chamber 1 and is provided with the second main driven gear 55, the second driven shaft 53 is provided with the second main driven gear 55, and the second driving gear 54 is connected with the second main driven gear 55 in a matching manner.
In this embodiment, as shown in fig. 1, a flow valve 13 is disposed on the discharge pipe 9.
The utility model discloses a theory of operation is: put into the waste material from feed inlet 2 during the use, start electromagnetism suction disc 7, first motor 41 and second motor 51, electromagnetism suction disc 7 can hold the reinforcing bar in the waste material, then pull out electromagnetism suction disc 7 from mounting hole 101 along slipway group 3, because slipway group 3 has certain inclination, the fragment of brick can the landing, and the reinforcing bar is taken out crushing room 1, then close electromagnetism suction disc 7, take off the reinforcing bar, deflector 8 can prevent that the fragment of brick from dropping from first rubbing crusher mechanism 4 both sides, first motor 41 rotates, drive first transmission shaft 42 and rotate, under the cooperation of first driving gear 44 and first driven gear 45, the tooth piece on two first rolling roller 46 rolls the fragment of brick into the large granule, the large granule falls into second rubbing crusher mechanism 5 after, become tiny particle under the effect of two second rolling roller 56 and get into the funnel that gathers materials, then wait to be collected.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (7)

1. The utility model provides a reduce construction cost's construction waste recovery device, is including smashing room (1), its characterized in that, it is equipped with feed inlet (2) to smash room (1) top, from the top down is equipped with sliding table group (3), first rubbing crusher constructs (4), second rubbing crusher constructs (5) and gathers materials funnel (6) in proper order in smashing room (1), install electromagnetism suction disc (7) on sliding table group (3), electromagnetism suction disc (7) with be equipped with deflector (8) between first rubbing crusher constructs (4), install discharging pipe (9) on the funnel that gathers materials (6), it is equipped with support (10) to smash room (1) bottom.
2. The construction waste recycling device for reducing construction costs according to claim 1, wherein the right side surface of the crushing chamber (1) is provided with a mounting hole (101) corresponding to the electromagnetic absorption plate (7).
3. The construction waste recycling device for reducing construction costs according to claim 2, wherein the crushing chamber (1) has a first support plate (11) and a second support plate (12) on the front side wall thereof in sequence from top to bottom.
4. The construction waste recycling device for reducing construction costs of claim 1, wherein the first pulverizing mechanism (4) comprises a first motor (41), a first transmission shaft (42), a first driven shaft (43), a first driving gear (44), a first driven gear (45) and a first rolling roller (46), the first motor (41) is fixed on a first supporting plate, one end of the first transmission shaft (42) is connected with the first motor (41), the other end of the first transmission shaft (42) is installed in the rear side wall of the pulverizing chamber (1), the first driving gear (44) and the first rolling roller (46) are sequentially installed on the first transmission shaft (42) from left to right, one end of the first driven shaft (43) is installed in the rear side wall of the pulverizing chamber (1), and the other end of the first transmission shaft (42) passes through the front side wall of the pulverizing chamber (1) and is installed with the first driven gear (45) The first driven shaft (43) is provided with the first driven gear (45), and the first driving gear (44) is connected with the first driven gear (45) in a matching mode.
5. The construction waste recycling device for reducing construction costs according to claim 4, wherein the first rolling roller (46) is provided with a tooth block (461).
6. The construction waste recycling device for reducing construction costs of claim 1, wherein the second crushing mechanism (5) comprises a second motor (51), a second transmission shaft (52), a second driven shaft (53), a second driving gear (54), a second driving driven gear (55) and a second rolling roller (56), the second motor (51) is fixed on a second support plate, one end of the second transmission shaft (52) is connected with the second motor (51), the other end of the second transmission shaft (52) is installed in the rear sidewall of the crushing chamber (1), the second driving gear (54) and the second rolling roller (56) are sequentially installed on the second transmission shaft (52) from left to right, one end of the second driven shaft (53) is installed in the rear sidewall of the crushing chamber (1), and the other end of the second transmission shaft (52) passes through the front sidewall of the crushing chamber (1) to install the second driving driven gear (56) ((s) ("b")) and (b) ("b) 55) The second driven shaft (53) is provided with the second main driven gear (55), and the second driving gear (54) is connected with the second main driven gear (55) in a matching manner.
7. The construction waste recycling device for reducing construction costs according to claim 1, wherein the discharge pipe (9) is provided with a flow valve (13).
CN202020662993.XU 2020-04-27 2020-04-27 Reduce construction cost's construction waste recovery device Expired - Fee Related CN212263369U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020662993.XU CN212263369U (en) 2020-04-27 2020-04-27 Reduce construction cost's construction waste recovery device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020662993.XU CN212263369U (en) 2020-04-27 2020-04-27 Reduce construction cost's construction waste recovery device

Publications (1)

Publication Number Publication Date
CN212263369U true CN212263369U (en) 2021-01-01

Family

ID=73885214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020662993.XU Expired - Fee Related CN212263369U (en) 2020-04-27 2020-04-27 Reduce construction cost's construction waste recovery device

Country Status (1)

Country Link
CN (1) CN212263369U (en)

Similar Documents

Publication Publication Date Title
CN111266146A (en) Automatic cleaning and smashing device for recycling building tiles
CN108262135B (en) Multifunctional solid waste comprehensive utilization equipment
CN211706891U (en) Reducing mechanism for building rubbish
CN210752901U (en) Decorative board defective material retrieves reducing mechanism
CN113522404A (en) Municipal house building garbage crushing equipment and garbage treatment method using same
CN110756269A (en) Waste brick processing apparatus
CN212263369U (en) Reduce construction cost's construction waste recovery device
CN218890662U (en) Sand and stone material processing discharge mechanism
CN214916797U (en) High-efficiency material crusher
CN214288376U (en) High-efficient breaker of mine building stones
CN114160240A (en) Waste concrete waste residue recovery unit for building engineering
CN210449344U (en) Smash effectual lime crushing apparatus
CN213050789U (en) High-efficient type caking cement breaker for building
CN215964070U (en) Building construction is with abandonment fragment of brick crushing apparatus
CN220328790U (en) Urea breaker is used in production of water-soluble fertilizer
CN220716172U (en) Raw material crushing device easy to discharge
CN216704515U (en) A abandonment shell environmental protection processing apparatus for nut production
CN216826413U (en) Building waste recycling collection box
CN216260947U (en) Raw material crushing device for ceramic tile processing
CN217450352U (en) Machine-made sand production system
CN217910609U (en) Reduce green construction discarded object cleaning device that discarded object discharged
CN211755684U (en) Composite environment-friendly material crushing device
CN219702219U (en) Road bridge construction crushed aggregates processing apparatus
CN217798017U (en) Building engineering waste treatment device
CN216322159U (en) Underground coal block crusher for coal mining

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210101

CF01 Termination of patent right due to non-payment of annual fee