CN211973656U - Urban rainwater runoff groundwater recharge system based on compound LID facility - Google Patents

Urban rainwater runoff groundwater recharge system based on compound LID facility Download PDF

Info

Publication number
CN211973656U
CN211973656U CN202020223299.8U CN202020223299U CN211973656U CN 211973656 U CN211973656 U CN 211973656U CN 202020223299 U CN202020223299 U CN 202020223299U CN 211973656 U CN211973656 U CN 211973656U
Authority
CN
China
Prior art keywords
well
rainwater
pipe
recharge
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020223299.8U
Other languages
Chinese (zh)
Inventor
张茜
黄津辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nankai University
Original Assignee
Nankai University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nankai University filed Critical Nankai University
Priority to CN202020223299.8U priority Critical patent/CN211973656U/en
Application granted granted Critical
Publication of CN211973656U publication Critical patent/CN211973656U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/152Water filtration
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/40Protecting water resources
    • Y02A20/406Aquifer recharge

Landscapes

  • Sewage (AREA)

Abstract

The utility model provides an urban rainwater runoff groundwater recharge system based on compound LID facility belongs to rainwater resource high-efficient utilization and groundwater recharge field, and roofing and impervious ground are respectively through pipe in the water and rainwater pipe intercommunication rainwater trash device, and the rainwater trash device passes through the collector pipe and is connected with sewage treatment plant, and the ground that permeates water passes through the LID facility, the collector pipe is connected with sewage treatment plant, and sewage treatment plant passes through raceway I and raceway II and connects the first layer and the second floor of layering cistern respectively, and wherein, the second floor passes through wet return intercommunication recharge well, recharge well is respectively through the third layer intercommunication of overflow pipe and recharge pipe and layering cistern, and wherein, install at the recharge pipe of third layer and turn over the board. The rainwater purification and back-filling system is simple in structure, can automatically meet the requirement of realizing the function of purifying more rainwater and then back-filling the purified rainwater into the underground with less energy consumption under various rainfall conditions, is low in construction cost and strong in applicability, and can bring considerable environmental benefits and economic benefits.

Description

Urban rainwater runoff groundwater recharge system based on compound LID facility
Technical Field
The utility model belongs to rainwater resource high efficiency utilization and groundwater recharge field mainly relates to a city rainfall runoff groundwater recharge system based on compound LID facility.
Background
Under the global climate change large environment, in recent years, the extreme weather frequently occurs in China, the contradiction of water resources with uneven distribution in north and south is more prominent, the ground subsidence is caused by excessive exploitation of underground water in regions with surface water shortage, the underground water resource failure in local regions is caused and the pollution risk is increased, and the seawater invasion is caused in coastal regions, so that the soil salinization is increased. In addition, part of urban groundwater is because of unable in time supply and continuous water level decline appears, seriously influences the ecological water consumption of vegetation to still can bring the environmental geology problem of certain degree.
Urban rainfall flood management and the resulting regional ecological problems have become one of the bottlenecks that plague and restrict people's life, production and economic sustainability, and in the process of dealing with this problem, the concept of "sponge city" has come into force. The "sponge city" means a city which has good "elasticity" in terms of adaptation to environmental changes, coping with natural disasters, etc. like a sponge, and can absorb, retain, store, purify rainwater when the rainwater falls, and release and utilize the stored water when necessary. However, the planning and construction ideas of sponge city construction cannot be generalized, and a city is needed. Coastal areas have the characteristics of high underground water level, high soil salt content, high water impermeability, low aeration zone permeability, high salt content of shallow underground water, non-resource utilization and the like, and the characteristics determine that the traditional guideline 'seepage, stagnation, storage, purification, use and discharge' for sponge city construction fails. In the past, aiming at the concept of managing and utilizing urban rainfall flood resources, the sponge city advocates that the mode of using conventional LID (Low Impact Development) facilities to make rainwater infiltrate in situ is not suitable for coastal areas any more. Firstly, the groundwater level in coastal areas is high, and high salt runoff pollutants brought by initial rainwater are easy to pollute the groundwater, so that great care needs to be taken when natural sponges are selected; along with the raising of the underground water level, the capillary rise height of the soil water is increased, and the phenomenon that the root system is flooded, even wetlands and swamps can occur after the ecological water demand of the vegetation root system is exceeded; the salinity of underground water in the coastal areas is high, the evaporation effect is enhanced after the underground water level is lifted, and salt in the water is separated out and crystallized on the earth surface in the evaporation process, so that secondary land salinization is caused. In addition, coastal areas are often more developed in economy, the proportion of impervious surfaces is higher, pollutants such as automobile exhaust, factory exhaust, haze and the like are carried by rainwater and then seep down in the sponge more obviously, so that the sponge is blocked, and then microorganisms, organic matters and pollutants are continuously enriched in the water existence process to influence the water quality condition. Therefore, rainwater resources have certain technical problems in the process of recycling, particularly replenishing underground water.
Disclosure of Invention
The utility model aims at solving the problems existing in the prior art, and provides a city rainwater runoff groundwater recharge system based on a composite LID facility.
The purpose of the utility model is realized like this: the roof (22) and the impervious ground (16) are respectively communicated with a rainwater trash device (15) through a downpipe (13) and a rainwater pipe (14), the rainwater trash device (15) can intercept dry branches, fallen leaves, large-particle silt and the like, and the rainwater trash device (15) is connected with the sewage treatment device (1) through a water collecting pipe (19); permeate water ground (17) and be connected with sewage treatment plant (1) through LID facility (18), collector pipe (19), install water quality testing device in sewage treatment plant (1), sewage treatment plant (1) is through raceway I (2) and raceway II (3) first layer and the second floor of connecting layering cistern (4) respectively, return water pipe (7) intercommunication recharge well (9) are passed through on the second floor of layering cistern (4), recharge well (9) are respectively through overflow pipe (5) and recharge pipe (6) and the third layer intercommunication of layering cistern (4), install at the recharge pipe (6) of layering cistern (4) third layer and turn over board (12), turn board (12) can be connected with sewage treatment plant (1), turn over board (12)Rotate a certain angle around the fixed shaft in one direction. The water level monitoring device I (8) is installed on the recharging well (9), the observation well (10) is arranged at a position r away from the recharging well (9), and the water level monitoring device II (11) is installed in the observation well (10) and can measure the real-time water level H(r)The water level information is transmitted to an upper computer (21), and the water level information can be displayed on a display (20) connected with the upper computer (21) after being calculated by the following formula to serve as the recharging capacity Q of the recharging well (9)w
If the recharge well (9) is a diving well, then
Figure BSA0000202914900000031
If the recharging well (9) is a pressure bearing well, then
Figure BSA0000202914900000032
Wherein k is the permeability coefficient, B is the thickness of the bearing water-containing layer, H(r)Is the water level at the r position away from the recharging well (9) within the recharging influence range. H(R)Is the stable water level in the aquifer before recharging; r is the radius of influence, RwIs the radius of the recharging well (9) and r is the distance from the calculated point to the recharging well (9).
The utility model discloses can mend groundwater through the cooperation of layering cistern (4) and recharging well (9) with the rainwater on roofing (22), ground (16) that can not permeate water, ground (17) permeate water behind purification treatment, water yield in layering cistern (4) can allot self and recharging well (9), can satisfy automatically and realize under the multiple precipitation situation and mend the underground with less energy consumption after purifying more rainwater. The whole system is low in construction cost and high in applicability, and can bring considerable environmental benefits and economic benefits. Taking Tianjin city as an example, the rainwater is recharged into the confined aquifer through the recharging well (9), and the catchment area per square meter can be about 0.4m3The water is effectively infiltrated, and the underground water supply amount is increased by 819.4 multiplied by 10 about a year4m3The method can effectively relieve the continuous decline of the underground water landing funnel, improve the rainwater resource utilization efficiency, and if the replenished underground water resource is used as the water for residents, the direct financial income can be brought by about 3 million by calculating according to the price of 3.9 yuan per cubic meterYuan
Drawings
FIG. 1 is a schematic structural diagram of an urban rainwater runoff groundwater recharging system based on a composite LID facility;
FIG. 2 is a partial isometric view of the flap;
description of part numbers in the figures:
1. a sewage treatment device; 2. a water conveying pipe I; 3. a water delivery pipe II; 4. layering water reservoirs; 5. an overflow pipe; 6. a back-supplementing pipe; 7. a water return pipe; 8. a water level monitoring device I; 9. recharging the well; 10. an observation well; 11. a water level monitoring device II; 12. turning over a plate; 13. a downpipe; 14. a rain pipe; 15. a rainwater trash device; 16. a water impervious floor; 17. a permeable ground; 18. LID facilities; 19. a water collection pipe; 20. a display; 21. an upper computer; 22. and (4) a roof.
Detailed Description
The embodiments of the present invention will be described in detail below with reference to the accompanying drawings. A roof (22) and an impervious ground (16) are respectively communicated with a rainwater trash-blocking device (15) through a downpipe (13) and a rainwater pipe (14), the rainwater trash-blocking device (15) can block dead branches, fallen leaves, large-particle silt and the like, and the rainwater trash-blocking device (15) is connected with a sewage treatment device (1) through a water collecting pipe (19); permeate water ground (17) and pass through LID facility (18), collector pipe (19) and be connected with sewage treatment plant (1), install water quality testing device in sewage treatment plant (1), sewage treatment plant (1) is through raceway I (2) and raceway II (3) first layer and the second floor of connecting layering cistern (4) respectively, return pipe (7) intercommunication recharge well (9) are passed through on the second floor of layering cistern (4), recharge well (9) are respectively through overflow pipe (5) and recharge pipe (6) and the third layer intercommunication of layering cistern (4), and repayment pipe (6) at layering cistern (4) third layer installs and turns over board (12), turn board (12) can wind certain angle of fixed axle unidirectional rotation. The water level monitoring device I (8) is installed on the recharging well (9), the observation well (10) is arranged at a position r away from the recharging well (9), and the water level monitoring device II (11) is installed in the observation well (10) and can measure the real-time water level H(r)The water level information is transmitted to an upper computer (21) and is calculated by the following formulaThen can be displayed on a display (20) connected with an upper computer (21) as the recharging capacity Q of the recharging well (9)w
If the recharge well (9) is a diving well, then
Figure BSA0000202914900000051
If the recharging well (9) is a pressure bearing well, then
Figure BSA0000202914900000052
Wherein k is the permeability coefficient, B is the thickness of the bearing water-containing layer, H(r)Is the water level at the r position away from the recharging well (9) within the recharging influence range. H(R)Is the stable water level in the aquifer before recharging; r is the radius of influence, RwIs the radius of the recharging well (9) and r is the distance from the calculated point to the recharging well (9).
When the urban rainwater runoff and groundwater recharge system based on the composite LID facility is used in operation, a water level monitoring device I (8) and a water level monitoring device II (11) start to work to respectively measure the water levels of a recharge well (9) and an observation well (10), and the water levels are calculated by the following formula and then are displayed on a display (20) connected with an upper computer (21) to serve as the real-time recharge capability Q of the recharge well (9) at the momentw
If the recharge well (9) is a diving well, then
Figure BSA0000202914900000053
If the recharging well (9) is a pressure bearing well, then
Figure BSA0000202914900000054
Wherein k is the permeability coefficient, B is the thickness of the bearing water-containing layer, H(r)Is the water level at the r position away from the recharging well (9) within the recharging influence range. H(R)Is the stable water level in the aquifer before recharging; r is the radius of influence, RwIs the radius of the recharging well (9) and r is the distance from the calculated point to the recharging well (9).
When precipitation occurs, rainwater falling on a roof (22) and an impermeable ground (16) is collected into the rainwater trash device (15) through the downpipe (13) and the rainwater pipe (14), the rainwater trash device (15) filters dead branches and fallen leaves and large-particle silt, and the rainwater subjected to primary filtering enters the sewage treatment device (1) through the water collecting pipe (19). Rainwater falling on the permeable ground (17) passes through the LID facility (18) and the water collecting pipe (19) and finally enters the sewage treatment device (1). Rainwater is purified in a centralized manner in the sewage treatment device (1), and the rainwater qualified in water quality detection enters the second layer of the layered reservoir (4) through the water delivery pipe II (3) and then flows into the recharge well (9) through the water return pipe (7); rainwater unqualified in water quality detection continues to be purified, the rainwater which continues to flow into the sewage treatment device (1) enters a first layer of the layered reservoir (4) for temporary storage through the water delivery pipe I (2), when the sewage treatment device (1) can treat redundant rainwater, the rainwater temporarily stored in the first layer of the layered reservoir (4) is pumped back into the sewage treatment device (1), enters a second layer of the layered reservoir (4) through the water delivery pipe II (3) after being treated to be qualified, and then flows into the recharge well (9) through the water return pipe (7); when the flow rate of rainwater entering the recharge well (9) is larger than the flow rate of rainwater permeating into the underground, the water level of the recharge well (9) rises relatively, when the height of the recharge pipe (6) is exceeded, the turning plate (12) is supported by the layered reservoir (4) structure and cannot turn over towards the inner side of the layered reservoir (4), at the moment, rainwater in the recharge well (9) cannot enter the layered reservoir (4), when the water level exceeds the height of the overflow pipe (5), rainwater in the recharge well (9) enters the third layer of the layered reservoir (4) through the overflow pipe (5) for temporary storage, along with the continuous seepage of rainwater into the underground in the recharge well (9), the water level in the recharge well (9) drops, when the water level drops below the height of the overflow pipe (5), the water level difference between the third layer of the layered reservoir (4) and the recharge well (9) exists, and the hydrostatic pressure balance on the two sides of the turning plate (12) is broken at the moment, turning over board (12) can take place to rotate under one side hydrostatic pressure effect and open, at this moment, the rainwater in layering cistern (4) third layer can get into recharge well (9) through turning over board (12) and recharge pipe (6), until the water level in recharge well (9) is the same with the water phase of layering cistern (4) third layer, turn over board (12) both sides hydrostatic pressure balanced once more, turn over board (12) and receive the action of gravity rotation to close, rainwater continues to infiltrate and replenishes groundwater in recharge well (9), so relapse until in layering cistern (4) third layer rainwater all supply recharge well (9) in.

Claims (3)

1. The utility model provides a city rainfall runoff groundwater anaplerosis system based on compound LID facility which characterized in that: the roof (22) and the impervious ground (16) are respectively communicated with a rainwater trash holding device (15) through a downpipe (13) and a rainwater pipe (14), and the rainwater trash holding device (15) is connected with the sewage treatment device (1) through a water collecting pipe (19); permeate water ground (17) and be connected with sewage treatment plant (1) through LID facility (18), collector pipe (19), water quality testing device is installed in sewage treatment plant (1), and sewage treatment plant (1) is through raceway I (2) and raceway II (3) first layer and the second floor of connecting layering cistern (4) respectively, return water pipe (7) intercommunication recharge well (9) are passed through on the second floor of layering cistern (4), recharge well (9) are respectively through overflow pipe (5) and recharge pipe (6) and the third layer intercommunication of layering cistern (4), water level monitoring device I (8) are installed in recharge well (9).
2. The urban rainwater runoff and groundwater recharge system based on the compound LID facility as claimed in claim 1, wherein: an observation well (10) is arranged at a distance r from the recharging well (9), and a water level monitoring device II (11) capable of measuring the real-time water level H is arranged in the observation well (10)(r)The water level information is transmitted to an upper computer (21), and the water level information can be displayed on a display (20) connected with the upper computer (21) after being calculated by the following formula to serve as the recharging capacity Q of the recharging well (9)w
If the recharge well (9) is a diving well, then
Figure FSA0000202914890000011
If the recharging well (9) is a pressure bearing well, then
Figure FSA0000202914890000012
Wherein k is the permeability coefficient, B is the thickness of the bearing water-containing layer, H(r)For recharging the water level at a distance r from the recharging well (9) within the influence range, H(R)Is the stable water level in the aquifer before recharging; r is the radius of influence, RwFor rechargingRadius of the well (9), r is the distance from the calculated point to the recharge well (9).
3. The urban rainwater runoff and groundwater recharge system based on the compound LID facility as claimed in claim 1, wherein: a turning plate (12) is arranged on a back-supplementing pipe (6) on the third layer of the layered reservoir (4), and the turning plate (12) can rotate around a fixed shaft in a one-way mode for a certain angle.
CN202020223299.8U 2020-02-25 2020-02-25 Urban rainwater runoff groundwater recharge system based on compound LID facility Expired - Fee Related CN211973656U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020223299.8U CN211973656U (en) 2020-02-25 2020-02-25 Urban rainwater runoff groundwater recharge system based on compound LID facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020223299.8U CN211973656U (en) 2020-02-25 2020-02-25 Urban rainwater runoff groundwater recharge system based on compound LID facility

Publications (1)

Publication Number Publication Date
CN211973656U true CN211973656U (en) 2020-11-20

Family

ID=73376649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020223299.8U Expired - Fee Related CN211973656U (en) 2020-02-25 2020-02-25 Urban rainwater runoff groundwater recharge system based on compound LID facility

Country Status (1)

Country Link
CN (1) CN211973656U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111255010A (en) * 2020-02-25 2020-06-09 南开大学 Urban rainwater runoff groundwater recharge system based on compound LID facility
CN115362777A (en) * 2022-08-31 2022-11-22 宁夏农林科学院农业资源与环境研究所(宁夏土壤与植物营养重点实验室) System and method for removing saline and alkaline by soil irrigation infiltration method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111255010A (en) * 2020-02-25 2020-06-09 南开大学 Urban rainwater runoff groundwater recharge system based on compound LID facility
CN115362777A (en) * 2022-08-31 2022-11-22 宁夏农林科学院农业资源与环境研究所(宁夏土壤与植物营养重点实验室) System and method for removing saline and alkaline by soil irrigation infiltration method

Similar Documents

Publication Publication Date Title
CN103374972B (en) Integrate pavement runoff collection, purification, retaining also as the system and method that plant utilizes
CN201317952Y (en) Rainwater collecting and utilizing system for city and town residential districts
CN211973656U (en) Urban rainwater runoff groundwater recharge system based on compound LID facility
CN107816082A (en) A kind of sponge roof rainwater collection reutilization system
CN206408676U (en) A kind of cell environment landscape planting rain collector
CN205259345U (en) Greenery patches rain sewage's system of recycling
CN204530839U (en) A kind of Initial Runoff collection and purification reutilizing device
CN105442668A (en) Roof rainwater recycling system
CN208898678U (en) A kind of rain collector
CN111255010A (en) Urban rainwater runoff groundwater recharge system based on compound LID facility
CN113187160A (en) Double-substrate-layer green roof structure designed aiming at local climate differentiation
CN111353120B (en) Design method and design device for long-distance high-altitude water delivery line
CN105464190A (en) Green space rain sewage reuse system
CN109993440A (en) A kind of clean energy resource is the method for degraded wetland emergence compensating water
CN114208471B (en) Coastal region irrigation method
Kashiwar et al. An overview on the ground water recharge by rain water harvesting
CN209179131U (en) A kind of rain water collecting system based on sponge city
CN212278758U (en) Saline and alkaline land water resource collection and saline and alkaline soil improvement system
CN206941749U (en) Rainwater-collecting recycling system
CN206128177U (en) Structure is collected to rainwater with descend garage in large area
CN202391027U (en) Roof wetland system
CN214884908U (en) Double-substrate-layer green roof structure designed aiming at local climate differentiation
CN1217066C (en) Small drainage basin rainwater utilization micro regulation and control method
CN213682393U (en) Infiltration canal system with rainwater regulation function
CN211499030U (en) Underground water resource collecting and supplying system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201120