CN208023593U - A kind of foundation pit fertilizer slot backfill structure in sponge city - Google Patents

A kind of foundation pit fertilizer slot backfill structure in sponge city Download PDF

Info

Publication number
CN208023593U
CN208023593U CN201820437702.XU CN201820437702U CN208023593U CN 208023593 U CN208023593 U CN 208023593U CN 201820437702 U CN201820437702 U CN 201820437702U CN 208023593 U CN208023593 U CN 208023593U
Authority
CN
China
Prior art keywords
clay layer
layer
foundation pit
clay
retaining wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820437702.XU
Other languages
Chinese (zh)
Inventor
高晓峰
李耀家
彭涛
邓安
任东兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CREEC Chengdu Survey Design and Research Co Ltd
Original Assignee
CREEC Chengdu Survey Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CREEC Chengdu Survey Design and Research Co Ltd filed Critical CREEC Chengdu Survey Design and Research Co Ltd
Priority to CN201820437702.XU priority Critical patent/CN208023593U/en
Application granted granted Critical
Publication of CN208023593U publication Critical patent/CN208023593U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of foundation pit fertilizer slots in sponge city to backfill structure, belongs to foundation pit fertilizer slot backfill technical field, carrys out security risk to ground generation buoyant belt for solving the problems, such as that sponge urban rainwater is deposited to.The utility model includes, non- permeable stratum, main body bottom plate and retaining wall, the retaining wall is connected with each other with main body bottom plate, it is provided with braced wall on the outside of the retaining wall, space between the braced wall and retaining wall is disposed with the first clay layer and the second clay layer from bottom to up, second clay layer is provided with multiple rain water storages and oozes device, it is provided with above second clay layer and oozes the interconnected dmp filter collecting layer of device with rain water storage, permeable ground is provided with above the dmp filter collector.The utility model utilizes existing foundation pit, is backfilled to fertile slot, saves device, broad covered area without individually carrying out excavation pit setting rainwater, each corner of design city is suitable for promoting.

Description

A kind of foundation pit fertilizer slot backfill structure in sponge city
Technical field
The utility model is related to foundation pit fertilizer slots to backfill technical field, more particularly to a kind of foundation pit fertilizer in sponge city Slot backfills structure.
Background technology
Sponge city is new generation of city storm water man- agement concept, refers to that city is adapting to environmental change and reply rainwater band Natural calamity come etc. has good " elasticity ", also referred to as " water elasticity city ".Rain when water suction, water storage, ooze Water, water purification by the water stored " release " and are used when needing, and solve seriously affect civil plantation and city life very well The waterlogging of production.
But the general construction procedure in sponge city in the prior art typically individually establishes water-absorbing-retaining layer, it is existing Independent excavation pit setting savings facility, the lower layer in sponge city is needed to be set as non-pervious bed in technology, rain penetration is arrived Bottom, a large amount of rainwater are accumulated in the intersection of main body bottom plate and non-pervious bed, and water can will produce buoyancy to ground, make sponge city City builds ground shakiness, brings security risk, therefore also needs to setting anti-floating facility, but by adding anti-floating facility just significantly Increase construction cost.
Utility model content
The purpose of this utility model is that:It is deposited to the next safety of ground generation buoyant belt to solve sponge urban rainwater The problem of hidden danger, the utility model provide a kind of foundation pit fertilizer slot backfill structure in sponge city.
The utility model specifically uses following technical scheme to achieve the goals above:
A kind of foundation pit fertilizer slot backfill structure in sponge city, including non-permeable stratum, main body bottom plate and retaining wall, the gear Cob wall is connected with each other with main body bottom plate, which is characterized in that braced wall, the braced wall and gear are provided on the outside of the retaining wall Space between cob wall is disposed with the first clay layer and the second clay layer from bottom to up, and second clay layer is provided with more A rain water storage oozes device, is provided with above second clay layer and oozes the interconnected dmp filter collection of device with rain water storage Layer, the dmp filter collector top are provided with permeable ground.
Preferably, non-pervious bed is provided with weeper drain below first clay layer, it, will to exclude underground water The ponding of non-permeable layer surface excludes, and avoids underground water accumulation from generating buoyancy to ground, causes security risk.
Preferably, first clay layer uses 1.0-1.5m thick soil layers or plain concrete water barrier, and clay compactness >=94%, it ensure that rigidity, intensity, stability and the smoothness on road surface, ensure the backfill quality of foundation pit, extend ground road surface Service life.
Preferably, second clay layer is carried out using the method for clay compaction in layers backfill or soil cement, plain concrete backfill Backfill, and clay compactness >=94%, back-filling in layers are easily installed rain water storage and ooze device, at the same ensure that road surface rigidity, Intensity, stability and smoothness ensure the backfill quality of foundation pit, extend the service life on ground road surface.
Preferably, vertical direction is provided with multiple rain water storages and oozes device in the second clay layer, and two neighboring rain water storage oozes Device is interconnected so that and it can also meet the needs of savings in heavy rainfall, while be stored convenient for the centralized collection of rainwater, with And the concentration when needing to use is allocated.
Preferably, dmp filter collecting layer lower end is additionally provided with PE water-separating films, avoids rainwater straight by permeable stratum It connects and enters in the second clay layer or permeate retaining wall.
The operation principle and the course of work of the utility model be:
Foundation pit refers to the foundation excavation of large area, generally isolated footing or raft foundation, and fertile slot refers to foundation construction The general space all between side slope is called fertile slot after excavation of foundation pit, the backfill of fertile slot be after main body foundation pit construction, Space between agent structure column and the side slope of expense permeability formation backfills.In sponge urban construction, the main body of foundation pit It is non-pervious bed below bottom plate, between main body bottom plate and non-pervious bed, the rainwater of accumulation generates ground for part rain penetration Buoyancy brings security risk.The utility model by the way that in the outside of foundation pit, the side wall against non-pervious bed is provided with braced wall, The depth of braced wall is more than the depth of main body foundation pit, and the space between agent structure and braced wall is disposed with from top to bottom First clay layer and the second clay layer are additionally provided with dmp filter collecting layer above the second clay layer and main body foundation pit, Permeable ground is additionally provided with above dmp filter collecting layer, be then above permeable ground afforestation vegetation layer, pervious floor tile and Concrete etc..
Rainwater from sky landing after a moving line figure be:Rainwater drops to the afforestation vegetation layer of earth's surface, dankly On brick or concrete, then passes through the infiltration of permeable ground, enter in dmp filter collecting layer, subsequently enter rain water storage Device centralized collection is oozed, rain water storage oozes device and is connected with greening with water or city planting ductwork, is convenient for city unified allocation of resources, by collection Water rationally utilizes the place needed with water.Vertical direction in the second clay layer is provided with multiple rain water storages and oozes device, is dropping It can also meet receiving demand, the second clay layer and the first clay layer dg/*refg*/s long grounds road when the larger heavy showers of water The service life in face;Non- pervious bed is provided with weeper drain below the first clay layer, it, will be non-to exclude underground water The ponding on water layer surface excludes, and avoids underground water accumulation from generating buoyancy to ground, causes security risk.It is collected by dmp filter Layer, the second clay layer, the first clay layer, rain water storage ooze device, weeper drain and braced wall, and precipitation is guided collection, The contact surface that precipitation enters foundation pit and non-pervious bed is effectively prevented, foundation pit backfills quality assurance, can be arranged to avoid surface water Enter, while also avoiding side wall leak and anti-floating problem, measure of anti float expense can be saved.
The beneficial effects of the utility model are as follows:
1, the utility model utilizes existing foundation pit, is backfilled to fertile slot, and rainwater is arranged without individually carrying out excavation pit Device, broad covered area are saved, each corner of design city is suitable for promoting;By rainwater-collecting to the green planted city cities Shui Huo The connected rain water storage of political affairs webmaster oozes in device, is convenient for rainwater centralized collection and use;Avoiding surface water is drained into base simultaneously In hole, the leak of agent structure column and water is avoided to accumulate the anti-floating problem brought at main body bottom plate, saves measure of anti float expense.
2, the compactness of the first clay layer and the second clay layer ensure that the rigidity on road surface, intensity, stability and steady Degree ensures the backfill quality of foundation pit, extends the service life on ground road surface.
3, the second clay layer is by the way of compaction in layers backfill, and during backfill, phase is arranged in different height layer Intercommunicated rain water storage oozes device, and the installation of device is oozed convenient for rain water storage.
4, by the way that weeper drain is arranged, to exclude underground water, the ponding of non-permeable layer surface is excluded, underground water is avoided Accumulation generates buoyancy to ground, causes security risk.
6, by the way that PE water-separating films are arranged, rainwater is collected into rain water storage by dmp filter layer and oozes utilization rate in device more Height avoids rainwater from being entered directly into after pervious bed in the second clay layer.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Reference numeral:The non-permeable stratums of 1-, 2- weeper drains, the first clay layers of 3-, 4- braced walls, the second clay layers of 5-, 6- pervious floor tiles, 7- afforestation vegetation layers, 8- permeable grounds, 9- dmp filters collecting layer, 10-PE water-separating films, 11- rain water storages ooze dress It sets, 12- retaining walls, 13- main body bottom plates.
Specific implementation mode
In order to which those skilled in the art are better understood from the utility model, below in conjunction with the accompanying drawings with following embodiment to this Utility model is described in further detail.
The foundation pit fertilizer slot in the sponge city of the utility model backfills structure, including non-permeable stratum 1, main body bottom plate 13 and gear Cob wall 12, the retaining wall 12 are connected with each other with main body bottom plate 13, and the outside of the retaining wall 12 is provided with braced wall 4, described Space between braced wall 4 and retaining wall 12 is disposed with the first clay layer 3 and the second clay layer 5 from bottom to up, and described Two clay layers 5 are provided with multiple rain water storages and ooze device 11, and second clay layer, 5 top is provided with oozes 11 phase of device with rain water storage Intercommunicated dmp filter collecting layer 9,9 top of the dmp filter collecting layer are provided with permeable ground 8.
Preferably, first clay layer, 3 lower section is provided with weeper drain 2 positioned at non-permeable stratum 1.
Preferably, clay layer or plain concrete water barrier of first clay layer 3 using 1.0-1.5m thickness, and clay Compactness >=94% of layer.
Preferably, second clay layer 5 is using clay compaction in layers backfill or the method for soil cement, plain concrete backfill It is backfilled, and compactness >=94% of clay layer.
Preferably, vertical direction is provided with multiple rain water storages and oozes device 11, two neighboring rain in the second clay layer 5 Water storage oozes device 11 and is interconnected.
Preferably, 9 lower end of dmp filter collecting layer is additionally provided with PE water-separating films 10.
Embodiment 1
The foundation pit fertilizer slot in the sponge city of the utility model backfills structure, including non-permeable stratum 1, main body bottom plate 13 and gear Cob wall 12, the retaining wall 12 are connected with each other with main body bottom plate 13, and the outside of the retaining wall 12 is provided with braced wall 4, described Space between braced wall 4 and retaining wall 12 is disposed with the first clay layer 3 and the second clay layer 5 from bottom to up, and described Two clay layers 5 are provided with multiple rain water storages and ooze device 11, and second clay layer, 5 top is provided with oozes 11 phase of device with rain water storage Intercommunicated dmp filter collecting layer 9,9 top of the dmp filter collecting layer are provided with permeable ground 8.
Preferably, first clay layer, 3 lower section is provided with weeper drain 2 positioned at non-permeable stratum 1.
Preferably, clay layers or plain concrete water barrier of first clay layer 3 using 1.0 thickness, and clay layer Compactness is 94%.
Preferably, second clay layer 5 is using clay compaction in layers backfill or the method for soil cement, plain concrete backfill It is backfilled, and the compactness of clay layer is 94%.
Preferably, vertical direction is provided with multiple rain water storages and oozes device 11, two neighboring rain in the second clay layer 5 Water storage oozes device 11 and is interconnected.
Preferably, 9 lower end of dmp filter collecting layer is additionally provided with PE water-separating films 10.
Embodiment 2
The foundation pit fertilizer slot in the sponge city of the utility model backfills structure, including non-permeable stratum 1, main body bottom plate 13 and gear Cob wall 12, the retaining wall 12 are connected with each other with main body bottom plate 13, and the outside of the retaining wall 12 is provided with braced wall 4, described Space between braced wall 4 and retaining wall 12 is disposed with the first clay layer 3 and the second clay layer 5 from bottom to up, and described Two clay layers 5 are provided with multiple rain water storages and ooze device 11, and second clay layer, 5 top is provided with oozes 11 phase of device with rain water storage Intercommunicated dmp filter collecting layer 9,9 top of the dmp filter collecting layer are provided with permeable ground 8.
Preferably, first clay layer, 3 lower section is provided with weeper drain 2 positioned at non-permeable stratum 1.
Preferably, clay layer or plain concrete water barrier of first clay layer 3 using 1.3m thickness, and clay layer Compactness is 96%.
Preferably, second clay layer 5 is using clay compaction in layers backfill or the method for soil cement, plain concrete backfill It is backfilled, and the compactness of clay layer is 96%.
Preferably, vertical direction is provided with multiple rain water storages and oozes device 11, two neighboring rain in the second clay layer 5 Water storage oozes device 11 and is interconnected.
Preferably, 9 lower end of dmp filter collecting layer is additionally provided with PE water-separating films 10.
Embodiment 3
The foundation pit fertilizer slot in the sponge city of the utility model backfills structure, including non-permeable stratum 1, main body bottom plate 13 and gear Cob wall 12, the retaining wall 12 are connected with each other with main body bottom plate 13, and the outside of the retaining wall 12 is provided with braced wall 4, described Space between braced wall 4 and retaining wall 12 is disposed with the first clay layer 3 and the second clay layer 5 from bottom to up, and described Two clay layers 5 are provided with multiple rain water storages and ooze device 11, and second clay layer, 5 top is provided with oozes 11 phase of device with rain water storage Intercommunicated dmp filter collecting layer 9,9 top of the dmp filter collecting layer are provided with permeable ground 8.
Preferably, first clay layer, 3 lower section is provided with weeper drain 2 positioned at non-permeable stratum 1.
Preferably, clay layer or plain concrete water barrier of first clay layer 3 using 1.5m thickness, and clay layer Compactness is 100%.
Preferably, second clay layer 5 is using clay compaction in layers backfill or the method for soil cement, plain concrete backfill It is backfilled, and the compactness of clay layer is 100%.
Preferably, vertical direction is provided with multiple rain water storages and oozes device 11, two neighboring rain in the second clay layer 5 Water storage oozes device 11 and is interconnected.
Preferably, 9 lower end of dmp filter collecting layer is additionally provided with PE water-separating films 10.
The above, the only preferred embodiment of the utility model, are not intended to limit the utility model, the utility model Scope of patent protection be subject to claims, it is equivalent made by every specification and accompanying drawing content with the utility model Structure change similarly should be included in the scope of protection of the utility model.

Claims (6)

1. a kind of foundation pit fertilizer slot in sponge city backfills structure, including non-permeable stratum (1), main body bottom plate (13) and retaining wall (12), the retaining wall (12) is connected with each other with main body bottom plate (13), which is characterized in that the outside of the retaining wall (12) is arranged There are braced wall (4), the space between the braced wall (4) and retaining wall (12) to be disposed with the first clay layer from bottom to up (3) multiple rain water storages are provided with and ooze device (11), second clay layer with the second clay layer (5), second clay layer (5) (5) top is provided with oozes the interconnected dmp filter collecting layer (9) of device (11), the dmp filter collecting layer with rain water storage (9) top is provided with permeable ground (8).
2. the foundation pit fertilizer slot in sponge city according to claim 1 backfills structure, which is characterized in that first clay layer (3) lower section is provided with weeper drain (2) positioned at non-permeable stratum (1).
3. the foundation pit fertilizer slot in sponge city according to claim 1 or 2 backfills structure, which is characterized in that described first is glutinous Clay layer or plain concrete water barrier of the soil layer (3) using 1.0-1.5m thickness, and compactness >=94% of clay layer.
4. the foundation pit fertilizer slot in sponge city according to claim 1 backfills structure, which is characterized in that second clay layer (5) clay compaction in layers backfill or the method for soil cement, plain concrete backfill is used to be backfilled, and the compactness of clay layer >= 94%.
5. the foundation pit fertilizer slot in sponge city according to claim 1 backfills structure, which is characterized in that in the second clay layer (5) interior vertical direction is provided with multiple rain water storages and oozes device (11), and two neighboring rain water storage oozes device (11) and is interconnected.
6. the foundation pit fertilizer slot in sponge city according to claim 1 backfills structure, which is characterized in that the dmp filter is received Collection layer (9) lower end is additionally provided with PE water-separating films (10).
CN201820437702.XU 2018-03-29 2018-03-29 A kind of foundation pit fertilizer slot backfill structure in sponge city Active CN208023593U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820437702.XU CN208023593U (en) 2018-03-29 2018-03-29 A kind of foundation pit fertilizer slot backfill structure in sponge city

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820437702.XU CN208023593U (en) 2018-03-29 2018-03-29 A kind of foundation pit fertilizer slot backfill structure in sponge city

Publications (1)

Publication Number Publication Date
CN208023593U true CN208023593U (en) 2018-10-30

Family

ID=63908719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820437702.XU Active CN208023593U (en) 2018-03-29 2018-03-29 A kind of foundation pit fertilizer slot backfill structure in sponge city

Country Status (1)

Country Link
CN (1) CN208023593U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537664A (en) * 2018-12-06 2019-03-29 安徽省人防建筑设计研究院 A kind of civil air defense constructions and installations building backfilling apparatus
CN109826153A (en) * 2018-12-24 2019-05-31 中水淮河规划设计研究有限公司 A kind of high retaining wall effectively reducing cross dimensions and construction method
CN113175005A (en) * 2021-04-29 2021-07-27 山东金城建设有限公司 Anti-floating design and construction method for waterproof bottom plate of underground garage in rainstorm period
CN114482081A (en) * 2022-01-28 2022-05-13 中国建筑第八工程局有限公司 Deep foundation pit fertilizer groove backfilling system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537664A (en) * 2018-12-06 2019-03-29 安徽省人防建筑设计研究院 A kind of civil air defense constructions and installations building backfilling apparatus
CN109826153A (en) * 2018-12-24 2019-05-31 中水淮河规划设计研究有限公司 A kind of high retaining wall effectively reducing cross dimensions and construction method
CN113175005A (en) * 2021-04-29 2021-07-27 山东金城建设有限公司 Anti-floating design and construction method for waterproof bottom plate of underground garage in rainstorm period
CN113175005B (en) * 2021-04-29 2022-05-20 山东金城建设有限公司 Anti-floating design and construction method for waterproof bottom plate of underground garage in rainstorm period
CN114482081A (en) * 2022-01-28 2022-05-13 中国建筑第八工程局有限公司 Deep foundation pit fertilizer groove backfilling system
CN114482081B (en) * 2022-01-28 2024-01-23 中国建筑第八工程局有限公司 Deep foundation pit fertilizer groove backfill system

Similar Documents

Publication Publication Date Title
CN106638918B (en) Construction method of sponge urban rainwater collection system
CN208023593U (en) A kind of foundation pit fertilizer slot backfill structure in sponge city
CN206752614U (en) A kind of sponge-type road sinks formula afforests dividing strip Rainwater collection system
CN206667420U (en) Sponge city high-effective penetrating type greenery patches constructs
CN110226379A (en) The saline and alkaline region water resource of the automatic dripping irrigation of the structure containing terraced fields, which is regulated and stored, utilizes system
CN104652595B (en) Half support water storage type greenery patches structure of a kind of urban flood defence and utilization of flood resources
CN208009393U (en) A kind of non-dankly base manure slot backfill structure based on sponge city
CN207892652U (en) A kind of dewatering device of tunnel rich water section
CN214301528U (en) Sponge transformation system for urban river retaining wall
CN204491797U (en) A kind of sports ground dmp filter stacking device
CN212153625U (en) Urban construction rainwater garden
CN211037246U (en) Build sponge city regulation pond that has infiltration and recycle function between pile foundation
CN208152219U (en) A kind of dry depression for sponge city
CN209443563U (en) A kind of large-scale water storage system of molten mound depression people and animals' drinking water
CN209144964U (en) A kind of efficient rainwater isolation collection device
CN206477347U (en) The water storage structure of basement
CN210797787U (en) Saline-alkali region building and green land water resource regulation and storage utilization system
CN111133859A (en) Saline and alkaline land water resource collection and saline and alkaline soil improvement system
CN216739926U (en) Basement roof backfill layer drainage structures
CN218713681U (en) Integrated system adopting circulating osmosis water storage sponge
CN211816304U (en) Rainwater leaching caching and utilizing structure based on fertilizer tank
CN211621499U (en) Saline-alkali region water resource regulation and storage utilization system with storage seepage pipe
CN220748293U (en) Double-layer waterproof system for underground excavation tunnel of poor water-rich stratum
CN211240736U (en) Contain automatic saline and alkaline region water resource regulation and storage utilization system of driping irrigation of terraced fields structure
CN212053088U (en) Coastal saline-alkali area water resource regulation and storage utilization system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant