CN109826153A - A kind of high retaining wall effectively reducing cross dimensions and construction method - Google Patents

A kind of high retaining wall effectively reducing cross dimensions and construction method Download PDF

Info

Publication number
CN109826153A
CN109826153A CN201811581361.4A CN201811581361A CN109826153A CN 109826153 A CN109826153 A CN 109826153A CN 201811581361 A CN201811581361 A CN 201811581361A CN 109826153 A CN109826153 A CN 109826153A
Authority
CN
China
Prior art keywords
bank
aileron
slopes
ground
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811581361.4A
Other languages
Chinese (zh)
Inventor
孙勇
朱旋
王根喜
王东栋
钟恒昌
屈学平
于继禄
汪晴娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA WATER HUAIHE PLANNING DESIGN AND RESEARCH CO LTD
Original Assignee
CHINA WATER HUAIHE PLANNING DESIGN AND RESEARCH CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA WATER HUAIHE PLANNING DESIGN AND RESEARCH CO LTD filed Critical CHINA WATER HUAIHE PLANNING DESIGN AND RESEARCH CO LTD
Priority to CN201811581361.4A priority Critical patent/CN109826153A/en
Publication of CN109826153A publication Critical patent/CN109826153A/en
Pending legal-status Critical Current

Links

Abstract

The invention belongs to the high retaining wall technical fields of hydraulic and hydroelectric engineering, specially a kind of high retaining wall that can effectively reduce cross dimensions, including ground, side on the ground is equipped with slopes, and ground is equipped with bank aileron far from the side of slopes, bank aileron bottom is equipped with several bored concrete piles close to the side of slopes, and the inside on bored concrete pile insertion ground is equipped with soil cement between the bank aileron and slopes.The present invention passes through the optimization to the box bank aileron in traditional high-altitude, using backfilling soil cement after wall, and bored concrete pile is set under combining wall, soil pressure after wall is greatly reduced, to reduce bank aileron section structure size, preferably resolve the design challenges of soil matrix disembarkation aileron, the bored concrete pile being arranged under wall hallux, while effectively reducing backfill soil cement and the side of lock chamber is carried and influence, it can be achieved that lock chamber and bank aileron while constructing, duration and cost are saved, to obtain higher economic results in society.

Description

A kind of high retaining wall effectively reducing cross dimensions and construction method
Technical field
The present invention relates to the high retaining wall technical fields of hydraulic and hydroelectric engineering more particularly to one kind can effectively reduce cross dimensions High retaining wall and construction method.
Background technique
The design of bank aileron is a great and complicated scientific and technical problem in large-scale water conservancy and hydropower multi-purpose project design, The cost of bank aileron accounts for larger specific gravity in entire engineering project.Common traditional bank aileron design is often empty using big cross section Case structure or bored concrete pile combine empty case structure.Since wall is higher, water pressure and soil pressure are all quite big after wall, if by normal The design of empty van formula bank aileron is advised, wall need to have very big weight to resist horizontal force, and in order to avoid wall is to the pressure of foundation soil Power is not more than the permitted bearing capacity of foundation soil, and empty van structure size certainly will design very big.The section and engineering of the latter's bank aileron Though amount reduces but bored concrete pile need to expire hall arrangement, pile foundation engineering amount is again larger.Although the hydraulic structure on soil matrix has a large amount of uses The case history of soil cement, but the overwhelming majority contributes to foundation stabilization or as laying material, to increase the carrying of foundation soil Power, and the engineering as backfilling material for after bank aileron wall does not have.
The information disclosed in the background technology section is intended only to increase the understanding to general background of the invention, without answering When being considered as recognizing or imply that the information constitutes the prior art already known to those of ordinary skill in the art in any form.
Summary of the invention
1. technical problems to be solved
The purpose of the present invention is to solve the problems of the prior art, and the one kind proposed can effectively reduce the height of cross dimensions Retaining wall and construction method.
2. technical solution
To achieve the goals above, present invention employs following technical solutions:
A kind of high retaining wall effectively reducing cross dimensions, including ground, the side on the ground are equipped with slopes, and ground Side far from slopes is equipped with bank aileron, and bank aileron bottom is equipped with several bored concrete piles, the filling close to the side of slopes The inside for infusing stake insertion ground, is equipped with soil cement between the bank aileron and slopes.
Preferably, the bank aileron is determined using cross dimensions by the measuring pressure coefficient of soil cement.
Preferably, the stake diameter of the bored concrete pile is not less than 5.0m, and spacing is not less than 0.6m.
Preferably, the backfill range of the soil cement is to backfill from the wall bottom of bank aileron to wall top by excavation slope 1:1.
Preferably, cement mixing content is not less than 8% in the soil cement.
Preferably, the height of the bank aileron is not less than 20m.
The invention also provides one kind can effectively reduce the construction method of the high retaining wall of cross dimensions, including following step It is rapid:
Step 1 first excavates the slopes for forming slope of standard on the ground according to construction drawing;
Step 2 pours several bored concrete piles close to the side designated position of slopes on the ground according still further to construction drawing;
Step 3 builds bank aileron close to the position of bored concrete pile on the ground;
Step 4 finally backfills soil cement between bank aileron and slopes.
Preferably, in the step 3, the gap 3-5cm is reserved between the bottom of bank aileron and the stake top of bored concrete pile.
3. beneficial effect
Compared with the prior art, the present invention has the advantages that
(1) present invention optimizes the box bank aileron in traditional high-altitude, proposes the novel bank aileron that soil cement is backfilled after a kind of wall, Soil pressure after wall is greatly reduced, to reduce wall section structure size, preferably resolves setting for soil matrix disembarkation aileron Problem is counted, bank aileron cost is significantly reduced, economic benefit is obvious;
(2) bored concrete pile that the present invention is arranged under bank aileron hallux, while effectively reducing backfill soil cement and the side of lock chamber is carried It influences, and side lock chamber and bank aileron can construct simultaneously, save duration and cost, to obtain higher economic results in society.
Detailed description of the invention
Fig. 1 is the structural schematic diagram for the high retaining wall that one kind proposed by the present invention can effectively reduce cross dimensions.
In figure: 1- soil cement, 2- bank aileron, the ground 3-, 4- bored concrete pile, 5- slopes.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.
Referring to Fig.1, a kind of high retaining wall effectively reducing cross dimensions, including ground 3, the side on ground 3 are equipped with Slopes 5, and 3 inside of ground is equipped with bored concrete pile 4 far from the side of slopes 5, the side of close bored concrete pile 4 is equipped with the bank wing on ground 3 Wall 2, bank aileron 2 are equipped with soil cement 1 close to the side of slopes 5.
In the present invention, for bank aileron 2 using compared with light section, bank aileron 2 presses the measuring pressure coefficient of soil cement 1 using cross dimensions It determines, bored concrete pile 4 is located under the hallux of bank aileron 2, and the stake diameter of bored concrete pile 4 is not less than 0.6m, and spacing is not less than 5.0m, water after wall The backfill range of soil 1 is to backfill from the wall bottom of bank aileron 2 to wall top by practical excavation slope 1:1, cement mixing content in soil cement 1 No less than 8%, the height of bank aileron 2 is not less than 20m.
The invention also provides one kind can effectively reduce the construction method of the high retaining wall of cross dimensions, including following step It is rapid:
Step 1 first excavates the slopes 5 for forming slope of standard according to construction drawing on ground 3;
Step 2 pours several bored concrete piles 4 according still further to side designated position of the construction drawing on ground 3 close to slopes 5;
Step 3 builds bank aileron 2 close to the position of bored concrete pile 4 on ground 3;
Step 4 finally backfills soil cement 1 between bank aileron 2 and slopes 5.
In step 3, the gap 3-5cm is reserved between the bottom of bank aileron 2 and the stake top of bored concrete pile 4, to control bank aileron Differential settlement amount.
In the present invention, one kind can effectively reduce bank aileron section, and meeting bank aileron and abutment pier can construct simultaneously, reduce engineering The novel bank aileron of cost, its working principle is that: the cement mixed ratio that soil cement 1 is backfilled after wall is no less than 8%, according to soil cement 1 Laboratory test achievement, the soil cement 1 backfilled after wall is only 0.05~0.1 or so to the coefficient of earth pressure of front wall, is substantially reduced 1 pressure of soil cement after wall, thus reduce 2 section structure size of bank aileron, in the backfill construction of soil cement 1, strict control Cement mixing content is not less than 8%, selects fresh, agglomeration of not making moist cement, strict control earth material water content, 1 uniform mixing of soil cement Rear can be used for backfilling, and backfill uses layered rolling method from bottom to top, and every layer is not less than with a thickness of 0.3m or so, compactness 0.94, the soil cement after backfill need to be through detecting, and unconfined compressive strength is not less than 0.9MPa, and internal friction angle is not less than 30 °, cohesion When power is not less than 80kPa, carry out one layer of backfill, the soil cement 1 itself of backfill can generate certain sedimentation, and soil cement 1 with There is the presence of frictional force between bank aileron 2, wall certainly will be will drive and settled downwardly together, therefore will lead at 2 hallux of bank aileron Settling amount it is bigger than front toe place, to solve this uneven subsidence, at bank aileron hallux provided with row's spacing 5m Bored concrete pile 4, there is no the insertion ground 3 as common filling pile for the bored concrete pile 4, but according to settlement calculation, the stake of bored concrete pile 4 The gap that 3~5cm height is reserved between top and bank aileron bottom plate, controls the differential settlement amount of bank aileron 2, due to bank aileron 2 Using this scheme, it is effectively controlled the hypsokinesis of wall, the bored concrete pile 4 being arranged under 2 hallux of bank aileron effectively reduces simultaneously Backfill soil cement 1, which carries the side of lock chamber, to be influenced, and side lock chamber and bank aileron 2 can construct simultaneously.
Those skilled in the art can understand that unless otherwise defined, all terms used herein (including skill Art term and scientific term) there is meaning identical with the general understanding of those of ordinary skill in fields of the present invention.Also It should be understood that those terms such as defined in the general dictionary should be understood that have in the context of the prior art The consistent meaning of meaning will not be explained in an idealized or overly formal meaning and unless defined as here.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (8)

1. one kind can effectively reduce the high retaining wall of cross dimensions, including ground (3), which is characterized in that on the ground (3) Side is equipped with slopes (5), and ground (3) are equipped with bank aileron (2) far from the side of slopes (5), and bank aileron (2) bottom is close The side of slopes (5) is equipped with several bored concrete piles (4), the inside of bored concrete pile (4) insertion ground (3), the bank aileron (2) Soil cement (1) is equipped between slopes (5).
2. the high retaining wall that one kind according to claim 1 can effectively reduce cross dimensions, which is characterized in that the bank wing Wall (2) is determined using cross dimensions by the measuring pressure coefficient of soil cement (1).
3. the high retaining wall that one kind according to claim 1 can effectively reduce cross dimensions, which is characterized in that the perfusion The stake diameter of stake (4) is not less than 0.6m, and spacing is not less than 5.0m.
4. the high retaining wall that one kind according to claim 1 can effectively reduce cross dimensions, which is characterized in that the cement The backfill range of soil is to backfill from the wall bottom of bank aileron (2) to wall top by excavation slope 1:1.
5. the high retaining wall that one kind according to claim 4 can effectively reduce cross dimensions, which is characterized in that the cement Cement mixing content is no less than 8% in native (1).
6. the high retaining wall that one kind according to claim 1 can effectively reduce cross dimensions, which is characterized in that the bank wing The height of wall (2) is not less than 20m.
7. a kind of construction method that can effectively reduce cross dimensions bank aileron as described in any in claim 1-6, feature exist In: the following steps are included:
Step 1 first excavates the slopes (5) for forming slope of standard according to construction drawing on ground (3);
Step 2 pours several bored concrete piles according still further to side designated position of the construction drawing on ground (3) close to slopes (5) (4);
Step 3, the position on ground (3) close to bored concrete pile (4) build bank aileron (2);
Step 4 finally backfills soil cement (1) between bank aileron (2) and slopes (5).
8. construction method according to claim 7, it is characterised in that: in the step 3, the bottom of bank aileron (2) and filling It infuses and reserves the gap 3-5cm between the stake top of stake (4).
CN201811581361.4A 2018-12-24 2018-12-24 A kind of high retaining wall effectively reducing cross dimensions and construction method Pending CN109826153A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811581361.4A CN109826153A (en) 2018-12-24 2018-12-24 A kind of high retaining wall effectively reducing cross dimensions and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811581361.4A CN109826153A (en) 2018-12-24 2018-12-24 A kind of high retaining wall effectively reducing cross dimensions and construction method

Publications (1)

Publication Number Publication Date
CN109826153A true CN109826153A (en) 2019-05-31

Family

ID=66860639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811581361.4A Pending CN109826153A (en) 2018-12-24 2018-12-24 A kind of high retaining wall effectively reducing cross dimensions and construction method

Country Status (1)

Country Link
CN (1) CN109826153A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205134359U (en) * 2015-11-19 2016-04-06 山东科技大学 Bored concrete pile formula retaining wall
CN105585130A (en) * 2016-01-22 2016-05-18 河海大学 Drainage control-purification compound system for paddy-upland rotation farmland and implementation method
CN106930319A (en) * 2017-05-03 2017-07-07 中冶沈勘工程技术有限公司 A kind of high slope framed revetment and its construction method
CN108643225A (en) * 2018-07-25 2018-10-12 中铁七局集团第工程有限公司 A kind of peg board retaining wall with steel reinforced concrete rib
CN208023593U (en) * 2018-03-29 2018-10-30 中冶成都勘察研究总院有限公司 A kind of foundation pit fertilizer slot backfill structure in sponge city

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205134359U (en) * 2015-11-19 2016-04-06 山东科技大学 Bored concrete pile formula retaining wall
CN105585130A (en) * 2016-01-22 2016-05-18 河海大学 Drainage control-purification compound system for paddy-upland rotation farmland and implementation method
CN106930319A (en) * 2017-05-03 2017-07-07 中冶沈勘工程技术有限公司 A kind of high slope framed revetment and its construction method
CN208023593U (en) * 2018-03-29 2018-10-30 中冶成都勘察研究总院有限公司 A kind of foundation pit fertilizer slot backfill structure in sponge city
CN108643225A (en) * 2018-07-25 2018-10-12 中铁七局集团第工程有限公司 A kind of peg board retaining wall with steel reinforced concrete rib

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
扬中等: "海淤土地基挡潮闸基础设计", 《水利水电技术》 *
朱 旋等: "沙颍河耿楼枢纽高挡土墙墙后回填水泥土技术", 《南水北调与水利科技》 *
马文英等编著: "《水工建筑物 上》", 31 August 2003 *

Similar Documents

Publication Publication Date Title
CN204662499U (en) Concrete of basement exterior wall, waterproof, fertile groove integrated construction structure
CN103821060B (en) A kind of construction method of existing highway soft foundation Treating technology
CN204401385U (en) A kind of road structure processing Deep Thick Soft Ground karst foundation
CN210562157U (en) Post-grouting composite pile
CN108330958A (en) A kind of constructing device filled for composite pile foundation stake top cavity envelope
CN100513708C (en) Method for transversal reinforcement and grouting underpinning of ready construction foundation
CN109537588A (en) A kind of novel practical anchor pile
CN107524154B (en) The artificial dam apparatus for building and construction process of coal seam goaf
CN201771514U (en) Concealed tunneling structure with pile foundation
CN109826153A (en) A kind of high retaining wall effectively reducing cross dimensions and construction method
CN204825925U (en) Centrifugation side's stake envelope with chase mortise
CN209025072U (en) Reinforced concrete sleeve stake
CN201212151Y (en) Retaining wall foundation structure
CN106087976A (en) A kind of prefabricated friction pile of new concrete and pile sinking process
CN103015430A (en) Long auger pressure filling steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN215441846U (en) Foundation anti-settling structure
CN108978705A (en) Precast concrete retaining wall system
CN209603127U (en) Eliminate the bored concrete pile of breathing soil layer frictional force
CN209368813U (en) Novel practical anchor pile
CN205259188U (en) Miniature pressure -bearing stake of bag pocket type of controllable slip casting scope
CN107100179A (en) Light-duty combination retaining structure and the method for administering a wide range of tall earth fill engineering
CN205857160U (en) A kind of prefabricated friction pile of new concrete
CN209040147U (en) It can bear the power transmission tower pressure anchor wire cushion cap foundation of uplift load and horizontal loading
CN208363065U (en) Separate wall lock chamber structure
CN203174586U (en) Concrete pipe pile for reinforcing railway soft soil foundation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190531