CN211776158U - Interim building of built-in corridor - Google Patents
Interim building of built-in corridor Download PDFInfo
- Publication number
- CN211776158U CN211776158U CN202020492200.4U CN202020492200U CN211776158U CN 211776158 U CN211776158 U CN 211776158U CN 202020492200 U CN202020492200 U CN 202020492200U CN 211776158 U CN211776158 U CN 211776158U
- Authority
- CN
- China
- Prior art keywords
- built
- corridor
- temporary building
- temporary
- fixing piece
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
The utility model discloses an interim building in built-in corridor, including double interim building and install the built-in corridor between double interim building, built-in corridor includes that a plurality of structures are the same walk the gangway board concatenation and form, walks the gangway board and passes through connection structure to be fixed on interim building's outer wall, can be applied to the narrow and small job site in place, improves space utilization, avoids the dust to influence indoor environment.
Description
Technical Field
The utility model relates to an equipment technical field is faced at building engineering job site, concretely relates to temporary building in built-in corridor.
Background
In the field of constructional engineering, construction of temporary buildings on site is indispensable because of long engineering time consumption. At present, common temporary buildings are mostly in an external corridor type, and on one hand, the space utilization rate cannot be improved to the maximum extent by the design; on the other hand, the dust is more in the construction site of the building engineering, the external corridor type movable board house cannot better block the external dust, and the indoor sanitation cannot be guaranteed.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims at providing a temporary building in built-in corridor can be applied to the narrow and small job site in place, improves space utilization, avoids the dust to influence the indoor environment.
The purpose of the utility model is achieved through the following technical scheme:
the utility model provides a built-in corridor's interim building, includes double interim building and installs the built-in corridor between double interim building, and built-in corridor includes that a plurality of structures are the same walks the guidance tape concatenation and forms, walks the guidance tape and passes through connection structure to be fixed on interim building's outer wall.
Furthermore, the connecting structure comprises an inserting plate fixedly arranged on the lower end face of the walkway plate, and the inserting plate is arranged on two side edges of the lower side of the walkway plate, which are close to the double-row temporary building.
Further, connection structure still include the bracing piece, the bracing piece include the slope section and with slope section fixed connection's flat section, the flat section extends the setting along upper and lower direction, the middle part at guidance tape width direction is fixed to the one end of keeping away from the flat section of bracing piece slope section.
Furthermore, an upper fixing piece and a lower fixing piece which are arranged at an upper interval and a lower interval are prefabricated or fixed on the outer wall surface of the temporary building, the upper fixing piece comprises a horizontal bearing part and a vertical clamping part, the horizontal bearing part, the vertical clamping part and the outer wall surface of the temporary building form an accommodating cavity with an upward opening for accommodating the plugboard, the upper fixing piece and the lower fixing piece are identical in structure, after the walkway board is connected with the temporary building, the plugboard is inserted into the upper fixing piece, and the flat section in the supporting rod is inserted into the lower fixing piece.
Furthermore, a steel plate and a wooden floor are laid above the walkway plate.
Furthermore, the built-in corridor is provided with a stair, the upper end of the stair is fixedly connected with the built-in corridor, and the lower end of the stair is connected with the ground.
Compared with the prior art, the beneficial effects of the utility model are that: by arranging the built-in corridor, the sealing performance of the temporary building is enhanced, the indoor cleanness and sanitation are improved, the method can be applied to construction sites with narrow sites, and the space utilization rate is improved; the corridor can be quickly disassembled and assembled through the plurality of walkway plates, and meanwhile, the corridor is convenient to use and transport at the later stage; the walkway plates can be more stably connected with the temporary building through the connecting structure and the fixing structure, and dislocation of the walkway plates is prevented; by laying the steel plate and the wooden floor, the flatness and the comfort of the upper end surface of the walkway plate can be improved.
Drawings
FIG. 1 is a schematic structural view of the temporary construction of the present invention;
fig. 2 is the connection schematic diagram of the middle walkway plate and the outer wall face of the temporary construction.
In the figure: 1. temporary construction; 2. a walkway plate; 3. a plugboard; 4. a support bar; 401. a flattened section; 5. an upper fixing member; 501. a horizontal bearing part; 502. a vertical clamping portion; 6. a lower fixing member; 7. a steel plate; 8. a floor board.
Detailed Description
In order to make the technical solutions of the present invention clearer and clearer for those skilled in the art, the present invention will be described in further detail with reference to the following embodiments and drawings, but the embodiments of the present invention are not limited thereto.
As shown in fig. 1, the embodiment provides a temporary building of built-in corridor, including double temporary building 1 and install the built-in corridor between double temporary building 1, built-in corridor includes that a plurality of structures are the same and walk the flitch 2 concatenation to form, walk the flitch 2 and fix on temporary building 1's outer wall through connection structure, temporary building 1 is the common color steel plate 7 rooms in current job site, the material of board 2 of walking adopts the steel board, the size in temporary building 1 and built-in corridor is according to the place size and is done the suitability adjustment.
In order to ensure that the walkway plate 2 is more stably connected with the temporary building 1, the connecting structure comprises an inserting plate 3 and a supporting rod 4 which are fixedly arranged on the lower end surface of the walkway plate 2, the connecting part of the walkway plate 2 and the temporary building 1 is provided with the inserting plate 3 and the supporting rod 4, namely as shown in figure 2, the inserting plate 3 and the supporting rod 4 are respectively arranged on the left side and the right side of the walkway plate 2, namely close to the two side edges of the double-row temporary building 1, the inserting plate 3 and the supporting rod 4 are fixed on the outer wall of the temporary building 1 through direct welding or expansion bolts, the inserting plate 3 and the supporting rod 4 are made of steel materials, the sizes of the inserting plate 3 and the supporting rod 4 are adjusted according to the field construction condition, the inserting plate 3 and the supporting rod 4 are integrally formed or welded with the walkway plate 2, the lower end of the supporting rod 4 is provided with a flat section 401 which extends along the up, after the walkway plate 2 is connected with the temporary building 1, the inserting plate 3 is inserted into the accommodating cavity in the upper fixing piece 5, the flat section 401 is inserted into the accommodating cavity in the lower fixing piece 6, the width of the accommodating cavity is the same as the thickness of the inserting plate 3 and the thickness of the flat section 401, and the depth of the accommodating cavity is the same as the length of the inserting plate 3 and the length of the flat section 401.
In order to further improve the more firm and temporary building 1 connection of guidance tape 2, prefabricated on the outer wall of temporary building 1 or fix and have last mounting 5 and lower mounting 6 that the interval set up from top to bottom, it can be prefabricated on the outer wall of temporary building 1 to go up mounting 5 and lower mounting 6, can also fix on the outer wall of temporary building 1 through fixed modes such as later stage welding or adopting bolted connection, it includes horizontal supporting part 501 and vertical clamping part 502 to go up mounting 5, horizontal supporting part 501, the ascending holding chamber that is used for holding plugboard 3 is constituteed to vertical clamping part 502 and temporary building 1 outer wall, it is the same with lower mounting 6 structure to go up mounting 5, after guidance tape 2 is connected with temporary building 1, plugboard 3 inserts in the mounting 5, bracing piece 4 inserts in lower mounting 6. And the lower fixing member 6 is connected with the support rod 4.
In order to improve the flatness and comfort of the upper end surface of the walkway plate 2, a steel plate 7 and a wooden floor 8 are laid above the walkway plate 2. The built-in corridor is also provided with a stair, the upper end of the stair is fixedly connected with the built-in corridor, and the lower end of the stair is connected with the ground.
The utility model discloses when implementing, constructor will build completion with temporary building 1 at first, install built-in corridor after that, will walk the plugboard 3 of 2 lower extremes of guidance tape and insert the holding intracavity in mounting 5 and lower mounting 6 with the flat section 401 of 4 lower extremes of bracing piece, treat that every walks and to splice into complete corridor after board 2 all installs, fix stair on the corridor that splices well at last.
The above description is only a further embodiment of the present invention, but the scope of protection of the present invention is not limited thereto, and any person skilled in the art can replace or change the technical solution and the concept of the present invention within the scope of the present invention.
Claims (6)
1. A temporary building with built-in corridor is characterized in that: the built-in corridor comprises double rows of temporary buildings and a built-in corridor arranged between the double rows of temporary buildings, the built-in corridor comprises a plurality of walkway plates with the same structure which are spliced, and the walkway plates are fixed on the outer wall of the temporary buildings through connecting structures.
2. A temporary building with built-in corridor according to claim 1, characterized in that: the connecting structure comprises a plugboard fixedly arranged on the lower end face of the walkway plate, and the plugboard is arranged on two side edges of the lower side of the walkway plate, which are close to the double-row temporary building.
3. A temporary building with built-in corridor according to claim 2, characterized in that: the connecting structure further comprises a supporting rod, the supporting rod comprises an inclined section and a flat section fixedly connected with the inclined section, the flat section extends along the upper direction and the lower direction, and one end, far away from the flat section, of the inclined section of the supporting rod is fixed in the middle of the width direction of the walkway plate.
4. A temporary building with built-in corridor according to claim 3, characterized in that: the temporary building outer wall surface is prefabricated or fixed with an upper fixing piece and a lower fixing piece which are arranged at an upper-lower interval, the upper fixing piece comprises a horizontal bearing portion and a vertical clamping portion, the horizontal bearing portion, the vertical clamping portion and the temporary building outer wall surface form an accommodating cavity with an upward opening and used for accommodating the insertion board, the upper fixing piece and the lower fixing piece are identical in structure, after the walkway board is connected with the temporary building, the insertion board is inserted into the upper fixing piece, and the flat section in the supporting rod is inserted into the lower fixing piece.
5. A temporary building with built-in corridor according to any of claims 1-4, characterized in that: and a steel plate and a wooden floor are laid above the walkway plate.
6. A temporary building with built-in corridor according to claim 5, characterized in that: the built-in corridor is also provided with a stair, the upper end of the stair is fixedly connected with the built-in corridor, and the lower end of the stair is connected with the ground.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020492200.4U CN211776158U (en) | 2020-04-07 | 2020-04-07 | Interim building of built-in corridor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020492200.4U CN211776158U (en) | 2020-04-07 | 2020-04-07 | Interim building of built-in corridor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211776158U true CN211776158U (en) | 2020-10-27 |
Family
ID=72958532
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020492200.4U Active CN211776158U (en) | 2020-04-07 | 2020-04-07 | Interim building of built-in corridor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211776158U (en) |
-
2020
- 2020-04-07 CN CN202020492200.4U patent/CN211776158U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2009225124B2 (en) | Prefabricated self-supporting construction element | |
CN211499206U (en) | Assembled house | |
CN114411978A (en) | Dovetail-tenon concrete assembled enclosure wall building | |
CN210396246U (en) | Spliced integral toilet | |
CN211776158U (en) | Interim building of built-in corridor | |
CN215889107U (en) | Bidirectional keel and keel adapter structure | |
CN210216748U (en) | Prefabricated part connecting node and supporting structure | |
CN212898115U (en) | Windowsill veneer mounting structure of prefabricated assembled window that wafts | |
CN112878483A (en) | Assembled building balcony | |
CN211114596U (en) | Floor connecting buckle and floor system | |
CN110006085B (en) | Prefabricated geothermal heating structure and installation method thereof | |
KR20060122539A (en) | Wood-carving structure for construction and the erection method using that | |
CN109914743B (en) | Frame type decoration structure and installation method thereof | |
CN113293899A (en) | Mounting structure and mounting method of artificial brick curtain wall | |
WO2020120530A1 (en) | Constructional system for providing structural arrangements to buildings | |
WO1983001800A1 (en) | Building construction method and device | |
CN213653858U (en) | Assembled wallboard | |
CN216840575U (en) | Combined type supporting template for constructional engineering | |
CN214364146U (en) | Civil engineering assembled plug connector | |
CN211523712U (en) | Steel structure roof | |
CN211080278U (en) | Combined dual-purpose building pile | |
CN218091308U (en) | Mounting structure of core section of thick bamboo and steel construction | |
CN214424016U (en) | Template support device of beam column type frame structure | |
CN211369528U (en) | Folded form structural slab post-cast strip seam template construction structures | |
CN215978408U (en) | Wall-attached foot stool for civil construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |