CN211080278U - Combined dual-purpose building pile - Google Patents

Combined dual-purpose building pile Download PDF

Info

Publication number
CN211080278U
CN211080278U CN201921726221.1U CN201921726221U CN211080278U CN 211080278 U CN211080278 U CN 211080278U CN 201921726221 U CN201921726221 U CN 201921726221U CN 211080278 U CN211080278 U CN 211080278U
Authority
CN
China
Prior art keywords
pile body
pile
strengthen
post
inner cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921726221.1U
Other languages
Chinese (zh)
Inventor
沈蓓蓓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921726221.1U priority Critical patent/CN211080278U/en
Application granted granted Critical
Publication of CN211080278U publication Critical patent/CN211080278U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a modular dual-purpose building pile, including the pile body, it has the enhancement post to peg graft at the pile body top, strengthen the inner chamber top of the post and seted up the mounting groove, and peg graft in the mounting groove inner chamber on the pile body top, strengthen four sides of inner chamber bottom of the post and install the enhancement nail, the utility model relates to a building pile technical field. This dual-purpose building pile of combination formula has solved current building pile and has met and to change building pile more troublesome when needs strengthen when using, and some make the complicated inconvenient problem of using of its whole structure in order to strengthen the pile body, strengthen the post reinforcing pile body with ground area of contact, strengthen stability, and install the reinforcement nail of a plurality of groups in four sides of the inner chamber bottom of strengthening the post, strengthen the nail like this and insert in the ground, strengthen the stability of pile body and increased the support dynamics, can not use the enhancement post under the sufficient circumstances of strength when pile body itself supports, and thus the cost is reduced, pile body outside combination formula installation is strengthened the post and is made its convenient dual-purpose.

Description

Combined dual-purpose building pile
Technical Field
The utility model relates to a building pile technical field specifically is a modular dual-purpose building pile.
Background
The building pile is a building device commonly used in construction sites, a pile foundation is composed of a foundation pile and a bearing platform connected to a pile top, if a pile body is completely buried in soil, the bottom surface of the bearing platform is in contact with the soil body, the pile foundation is called a low bearing platform pile foundation, and if the upper part of the pile body is exposed out of the ground and the bottom of the bearing platform is positioned above the ground, the pile foundation is called a high bearing platform pile foundation. The building pile foundation is generally a low-bearing platform pile foundation, and the pile foundation is widely applied in high-rise buildings.
But current building pile meets when using and can only change building pile troublesome when needing to strengthen, and some make its whole structure complicated inconvenient use and increase cost in order to strengthen the pile body moreover.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a modular dual-purpose building pile has solved current building pile and has met can only change building pile when needs strengthen when using more troublesome, some make the complicated inconvenient problem of using of its overall structure in order to strengthen the pile body moreover.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: a combined dual-purpose building pile comprises a pile body, wherein a reinforcing column is inserted into the top of the pile body in an inserted mode, a mounting groove is formed in the top of an inner cavity of the reinforcing column, the top end of the pile body is inserted into the inner cavity of the mounting groove, reinforcing nails are installed on four sides of the bottom of the inner cavity of the reinforcing column and are located on four sides of the pile body, a thin edge is fixedly installed on the edge of the bottom of the reinforcing column, and a conical head is installed at the bottom end of the pile body.
Preferably, the top of the pile body is provided with a positioning hole.
Preferably, the positioning column is installed at the top of the inner cavity of the installation groove and is located in the inner cavity of the positioning hole.
Preferably, T-shaped grooves are formed in the top ends of the two side walls of the pile body, and the T-shaped grooves are located on the two sides of the positioning hole.
Preferably, T-shaped clamping blocks are installed on two sides of the wall of the inner cavity of the installation groove, and the T-shaped clamping blocks are located in the inner cavity of the T-shaped groove.
Advantageous effects
The utility model provides a modular dual-purpose building pile. The method has the following beneficial effects:
1. the combined dual-purpose building pile has the advantages that when the building pile needs to bear too much force after being installed and needs to be reinforced, the pile body can be installed underground firstly, then the reinforcing column is inserted at the top, the positioning column of the reinforcing column is aligned to the positioning hole at the top of the pile body, the T-shaped clamping block of the inner cavity of the mounting groove is aligned to the inner cavity of the T-shaped groove, then the reinforcing column is nailed into the ground, so that the contact area between the pile body and the ground is reinforced, the stability is enhanced, a plurality of groups of reinforcing nails are installed on four sides of the bottom of the inner cavity of the reinforcing column, so that the reinforcing nails are inserted into the ground, the stability is further enhanced, the stability of the pile body is enhanced, the supporting force is increased, the reinforcing column is not used under the condition that the supporting force of the pile body is enough, the cost is reduced, the reinforcing column is installed outside the pile, the installation and use are convenient, and the bottom edge of the reinforcing column is provided with a thin edge which is convenient to insert into the ground.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the pile structure of the present invention;
fig. 3 is a schematic view of the reinforcing column of the present invention.
In the figure: 1. a pile body; 2. a conical head; 3. a reinforcement column; 4. reinforcing nails; 5. a T-shaped groove; 6. a T-shaped fixture block; 7. a thin edge; 8. mounting grooves; 9. positioning holes; 10. and a positioning column.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a combined dual-purpose building pile technical solution: a combined dual-purpose building pile comprises a pile body 1, a reinforcing column 3 is inserted at the top of the pile body 1, a mounting groove 8 is arranged at the top of the inner cavity of the reinforcing column 3, the top end of the pile body 1 is inserted in the inner cavity of the mounting groove 8, reinforcing nails 4 are arranged at four sides of the bottom of the inner cavity of the reinforcing column 3, the reinforcing nails 4 are arranged at four sides of the pile body 1, thin edges 7 are fixedly arranged at the bottom edge of the reinforcing column 3, a conical head 2 is arranged at the bottom end of the pile body 1, a positioning hole 9 is arranged at the top of the pile body 1, a positioning column 10 is arranged at the top of the inner cavity of the mounting groove 8 and is positioned in the inner cavity of the positioning hole 9, T-shaped grooves 5 are arranged at the top ends of two side walls of the pile body 1, the T-shaped grooves 5 are positioned at two sides of the positioning hole 9, T-shaped clamping blocks, the pile body 1 can be installed underground firstly, then the reinforcing column 3 is inserted at the top, the positioning column 10 of the reinforcing column 3 is aligned with the positioning hole 9 at the top of the pile body 1, the T-shaped clamping block 6 in the inner cavity of the installation groove 8 is aligned with the inner cavity of the T-shaped groove 5, then the reinforcing column 3 is nailed into the ground, so that the reinforcing column 3 enhances the contact area of the pile body 1 and the ground, enhances the stability, moreover, a plurality of groups of reinforcing nails 4 are arranged on the four sides of the bottom of the inner cavity of the reinforcing column 3, so that the reinforcing nails 4 are inserted into the ground, the stability is further enhanced, the stability of the pile body 1 is enhanced, the supporting force is increased, when the supporting force of the pile body 1 is enough, the reinforcing column 3 is not used, so that the cost is reduced, the reinforcing column 3 is assembled and installed outside the pile body 1, the pile is convenient and has two purposes, and overall structure is simple and convenient, and the installation and use of being convenient for, and the bottom border of strengthening the post 3 is provided with featheredge 7 and conveniently inserts in the ground.
When the combined type building pile is in work, when the building pile needs to bear too large force after being installed and needs to be reinforced, the pile body 1 can be installed underground firstly, then the reinforcing column 3 is inserted at the top, the positioning column 10 of the reinforcing column 3 is aligned to the positioning hole 9 at the top of the pile body 1, the T-shaped clamping block 6 of the inner cavity of the installation groove 8 is aligned to the inner cavity of the T-shaped groove 5, then the reinforcing column 3 is nailed into the ground, so that the contact area between the pile body 1 and the ground is enhanced by the reinforcing column 3, the stability is enhanced, and a plurality of groups of reinforcing nails 4 are installed on four sides of the bottom of the inner cavity of the reinforcing column 3, so that the reinforcing nails 4 are inserted into the ground, the stability is further enhanced, the stability of the pile body 1 is enhanced, the supporting force is increased, the reinforcing column 3 can not be used under the condition that the force supported by the pile body 1 per se is, and overall structure is simple and convenient, and the installation and use of being convenient for, and the bottom border of strengthening the post 3 is provided with featheredge 7 and conveniently inserts in the ground.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation. The use of the phrase "comprising one of the elements does not exclude the presence of other like elements in the process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a modular dual-purpose building pile, includes pile body (1), its characterized in that: the top of the pile body (1) is spliced with a reinforcing column (3), the top of an inner cavity of the reinforcing column (3) is provided with a mounting groove (8), the top end of the pile body (1) is spliced in the inner cavity of the mounting groove (8), reinforcing nails (4) are mounted on four sides of the bottom of the inner cavity of the reinforcing column (3), the reinforcing nails (4) are located on four sides of the pile body (1), a thin edge (7) is fixedly mounted on the edge of the bottom of the reinforcing column (3), and a conical head (2) is mounted at the bottom end of the pile body (1).
2. The modular dual-purpose building pile of claim 1, further comprising: the top of the pile body (1) is provided with a positioning hole (9).
3. The modular dual-purpose building pile of claim 1, further comprising: and a positioning column (10) is installed at the top of the inner cavity of the installation groove (8), and the positioning column (10) is located in the inner cavity of the positioning hole (9).
4. The modular dual-purpose building pile of claim 1, further comprising: t-shaped grooves (5) are formed in the top ends of two side walls of the pile body (1), and the T-shaped grooves (5) are located on two sides of the positioning hole (9).
5. The modular dual-purpose building pile of claim 1, further comprising: t-shaped clamping blocks (6) are installed on two sides of the wall of the inner cavity of the installation groove (8), and the T-shaped clamping blocks (6) are located in the inner cavity of the T-shaped groove (5).
CN201921726221.1U 2019-10-15 2019-10-15 Combined dual-purpose building pile Expired - Fee Related CN211080278U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921726221.1U CN211080278U (en) 2019-10-15 2019-10-15 Combined dual-purpose building pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921726221.1U CN211080278U (en) 2019-10-15 2019-10-15 Combined dual-purpose building pile

Publications (1)

Publication Number Publication Date
CN211080278U true CN211080278U (en) 2020-07-24

Family

ID=71625521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921726221.1U Expired - Fee Related CN211080278U (en) 2019-10-15 2019-10-15 Combined dual-purpose building pile

Country Status (1)

Country Link
CN (1) CN211080278U (en)

Similar Documents

Publication Publication Date Title
US6694699B2 (en) Post-frame building
CN113585293A (en) Ecological environmental protection pin-connected panel municipal administration side slope reinforced structure
CN214614154U (en) Assembled open caisson for building underground sewage tank
CN216075619U (en) Waterproof bottom box structure for fixing wall board
CN211080278U (en) Combined dual-purpose building pile
CN217399993U (en) Energy-saving assembled building structure
CN217353856U (en) A prefabricated concrete enclosure
KR200258921Y1 (en) construction of panel
CN212835956U (en) Prefabricated balcony board of assembled and balcony support connection structure
CN205502069U (en) Basement outer wall fabricated construction based on excavation supporting stake
AU2010257353B2 (en) Building foundation structure, foundation construction method, and anchor bolt installation jig
CN223329952U (en) Base for assembled building toilet groove
CA2615154A1 (en) Method of building construction
CN212129497U (en) Steel construction wall body convenient to installation
JP2002356853A (en) Anchor bolt location setting jig
CN222252159U (en) Side slope reinforcing device for building municipal engineering
CN215630654U (en) Lateral movement prevention device for column base of wood structure
CN216810546U (en) Concrete precast slab convenient to drainage
CN220666653U (en) Market board post structure
CN215759143U (en) Prefabricated rim of a cup subassembly convenient to assembly
CN220468821U (en) Seepage-proof plastic steel sheet pile for soft soil foundation
CN215253495U (en) Light steel house building structure coupling assembling
CN214460444U (en) Foundation pit slope support and reinforcement device
CN112252221A (en) Assembled information column and installation method thereof
CN215212730U (en) Pit foundation protection fence for construction engineering construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200724

CF01 Termination of patent right due to non-payment of annual fee